Campbell Exhaust Insulation SOW 2126406Y61J5596015.docx

DOCX document 19 KB Posted

Attached to
USCGC 270' Campbell Exhaust Insulation Install
Solicitation number
70Z04026Q60326
Issued by

About this file

This is a Statement of Work (SOW) for exhaust insulation installation services on the USCGC 270' Campbell, a U.S. Coast Guard vessel. The SOW outlines the scope of work required to install thermal insulation on the vessel's exhaust system to reduce surface temperatures and meet safety and operational requirements. The work involves insulating exhaust piping, components, and associated systems according to specified technical standards and drawings prepared by a professional engineer. All quotes must include engineer-approved drawings to be considered for award.

The contract is being procured as a commercial items purchase order under FAR 12 with a Firm Fixed Price basis. The U.S. Coast Guard Surface Forces Logistics Center (SFLC) will evaluate quotes based on technical compliance with SOW requirements, ability to meet delivery deadlines, and price under a Best Value evaluation approach. Vendors must be able to self-fund the work until completion and delivery to the Coast Guard, with payment issued via Government Purchase Order on Net 30 terms upon Contracting Officer approval. Past performance will be reviewed only for contractor responsibility determination per FAR 9.1. Professional engineer-approved drawings are mandatory inclusions in all quotations for the submission to be considered responsive.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

STATEMENT of WORK For Exhaust Insulation Blankets

Procurement Request: 2126406Y61J5596015

USCGC 270’ Campbell Yard POC: James Johnston Tentative Start Date for Ship Check: 7/20/26 Through 7/24/26 Tentative Start Date for Install: 3/1/27 through 4/1/27 Period of Performance: 4 Weeks

Provide all materials & labor for insulating a portion of 2 (ea.) Main Diesel Engine Exhaust, complete 2 (ea.) Ship Service Diesel Generator Exhaust in engine room and 1 (ea.) Emergency Diesel Generator

The exhaust insulation blankets and pads are required upon completing the installation of:

1. Port and Stbd MDE Exhaust Piping and Silencers

1. Port and Stbd SSDG Exhaust Piping and Silencers

1. Emergency Diesel Generator Piping and Silencer

Please use the drawing(s) 901-WMEC-259-002, 905-WMEC-342-003 and Miratech Silencer attachment drawings provided as guidance for the manufacturing of piping insulation pads. Materials do not have to be 100% exact, they can be equal too.

General Information:

All exhaust piping, including mufflers and flexible joints, shall be insulated in accordance with MIL-STD-769J or Equal to Industry standard. For all piping, the insulation should have proper thickness for all temperature ratings for system to be insulated.

1. External surface temperature for exhaust piping shall not exceed 130 F. Operating exhaust gas temperatures range from 32 F to 800 F.

1. All insulation blankets shall be fabricated and installed with proper lagging anchors and attachments. The insulation blankets shall be attached with steel lacing.

***It is recommended to take measurements to pre-manufacture the pads after installation of all exhaust piping, brackets, and expansion joints are completely installed. Installations may not be 100% according to the drawings detailing both SSDG’s and the EDG. The MDE Exhaust piping is existing and will be temporarily removed to accommodate the US Coast Guard Yards scope of work. A site survey is mandatory prior to the start of work.

All work shall be completed within a timely and efficient manner. Contractor shall communicate all work via contracting officer and ship’s superintendent (Yard POC).