Calloway WLS Jan 2025.xlsx
XLSX spreadsheet 16 KB Posted
- Attached to
- RoW Mow and Trim Murray Section
- Solicitation number
- RFB-605-2500000442-1
- Issued by
- Caldwell County, Kentucky
About this file
This is a mowing work location sheet for road maintenance in Calloway County, detailing specific mowing requirements across multiple state routes. The document outlines mowing requirements for 254.471 total miles of roadway, comprising 1,026 acres across various routes including US highways, Kentucky state routes (KY), and rural secondary (RS) roads. Each location requires three mowing cycles, with a maximum completion time of 20 working days per cycle. The work is divided between 59.582 miles of MP (Main Priority) routes covering 354 acres and 194.889 miles of RS routes covering 672 acres.
The document provides detailed specifications for each route, including precise beginning and ending points measured in mile points (MP), the number of acres to be mowed, and the project identification numbers. Major routes include US 641, KY 94, KY 121, and various secondary roads, with individual sections ranging from 0.307 miles to 29.778 miles in length. The project appears to be planned for January 2025, as indicated in the filename.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Final_RFB_605_2500000442_1_SO_FORM.PDF | ||
| 2025 Drawing - Trimming of Bridge Embankments.pdf | ||
| Marshall WLS Jan 2025.xlsx | XLSX spreadsheet | |
| 2025 Drawings Mowing with Trimming.pdf | ||
| 2025 Drawings - Delineator Posts.pdf | ||
| How to Submit an Online Response - March 2023.pdf | ||
| Trigg WLS Jan 2025.xlsx | XLSX spreadsheet |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Sheet1
| Mowing Work Location Sheet | Sheet 1 of 4 | |||||||
| Limits of Project | Project | Type 3 | Number | |||||
| Route | Project | Length | Mowing | of | ||||
| Number | System | County | Number | Begin | End | (Miles) | Acres | Cycles |
| US 641 | MP | Calloway | FE01 018 0641 | Tennessee State Line | KY 1550 | 7.444 | 156 | 3 |
| 000-008 | (MP 0.000) | (MP 7.444) | ||||||
| US 641X | MP | Calloway | FE01 018 641X | KY 1550 | KY 1327 | 2.873 | 3 | 3 |
| 000-003 | (MP 0.000) | (MP 2.873) | ||||||
| KY 94 | MP | Calloway | FE01 018 0094 | Graves Co. Line | Marshall Co. Line | 24.209 | 89 | 3 |
| 000-025 | (MP 0.000) | (MP 24.209) | ||||||
| KY 94C | MP | Calloway | FE01 018 094C | KY 94 | KY 80 | 0.385 | 5 | 3 |
| 000-001 | (MP 0.000) | (MP 0.385) | ||||||
| KY 121 | MP | Calloway | FE01 018 0121 | Tennessee State Line | KY 893 | 24.671 | 101 | 3 |
| 000-0025 | (MP 0.000) | (MP 24.671) | ||||||
| Subtotal MP | 59.582 | 354 | ||||||
| KY 280 | RS | Calloway | FE01 018 0280 | KY 94 | KY 121 | 12.552 | 36 | 3 |
| 000-013 | (MP 0.000) | (MP 12.552) | ||||||
| KY 299 | RS | Calloway | FE01 018 0299 | KY 94 | Marshall Co. Line | 10.665 | 36 | 3 |
| 000-011 | (MP 0.000) | (MP 10.665) | ||||||
| KY 444 | RS | Calloway | FE01 018 0444 | KY 121 | Tea Rose Drive | 6.437 | 17 | 3 |
| 000-007 | (MP 0.000) | (MP 6.437) | ||||||
| KY 464 | RS | Calloway | FE01 018 0464 | Graves Co. Line | KY 94 | 18.655 | 80 | 3 |
| 000-019 | (MP 0.000) | (MP 18.655) | ||||||
| Mowing Work Location Sheet | Sheet 2 of 4 | |||||||
| Limits of Project | Project | Type 3 | Number | |||||
| Route | Project | Length | Mowing | of | ||||
| Number | System | County | Number | Begin | End | (Miles) | Acres | Cycles |
| KY 497 | RS | Calloway | FE01 018 0497 | KY 94 | Barge Terminal Ent. | 2.635 | 7 | 3 |
| 000-003 | (MP 0.000) | (MP 2.635) | ||||||
| KY 732 | RS | Calloway | FE01 018 0732 | KY 94 | Watrview Lane | 9.571 | 28 | 3 |
| 000-010 | (MP 0.000) | (MP 9.571) | ||||||
| KY 748 | RS | Calloway | FE01 018 0748 | KY 1327 | Valentine Avenue | 0.307 | 2 | 3 |
| 000-001 | (MP 0.000) | (MP 0.307) | ||||||
| KY 774 | RS | Calloway | FE01 018 0774 | KY 121 | KY 1327 | 0.483 | 2 | 3 |
| 000-001 | (MP 0.000) | (MP 0.483) | ||||||
| KY 783 | RS | Calloway | FE01 018 0783 | KY 893 | Magness Road | 16.257 | 56 | 3 |
| 000-017 | (MP 0.000) | (MP 16.257) | ||||||
| KY 821 | RS | Calloway | FE01 018 0821 | KY 822 | US 641 | 0.506 | 2 | 3 |
| 000-001 | (MP 0.000) | (MP 0.506) | ||||||
| KY 822 | RS | Calloway | FE01 018 0822 | KY 1550 | KY 94 | 1.170 | 3 | 3 |
| 000-002 | (MP 0.000) | (MP 1.170) | ||||||
| KY 893 | RS | Calloway | FE01 018 0893 | Graves Co. Line | KY 121 | 29.778 | 91 | 3 |
| 000-030 | (MP 0.000) | (MP 29.778) | ||||||
| KY 972 | RS | Calloway | FE01 018 0972 | KY 732 | Moser Drive | 2.100 | 6 | 3 |
| 000-003 | (MP 0.000) | (MP 2.100) | ||||||
| KY 1270 | RS | Calloway | FE01 018 1270 | Graves Co. Line | KY 893 | 4.338 | 16 | 3 |
| 000-005 | (MP 0.000) | (MP 4.338) | ||||||
| Mowing Work Location Sheet | Sheet 3 of 4 | |||||||
| Limits of Project | Project | Type 3 | Number | |||||
| Route | Project | Length | Mowing | of | ||||
| Number | System | County | Number | Begin | End | (Miles) | Acres | Cycles |
| KY 1327 | RS | Calloway | FE01 018 1327 | KY 1660 | US 641 | 2.035 | 2 | 3 |
| 000-003 | (MP 0.000) | (MP 2.035) | ||||||
| KY 1346 | RS | Calloway | FE01 018 1346 | US 641 | Resort Road | 13.103 | 75 | 3 |
| 000-014 | (MP 0.000) | (MP 13.103) | ||||||
| KY 1429 | RS | Calloway | FE01 018 1429 | KY 783 | US 641 | 3.556 | 9 | 3 |
| 000-004 | (MP 0.000) | (MP 3.556) | ||||||
| KY 1483 | RS | Calloway | FE01 018 1483 | KY 94 | Elm Grove Road | 4.118 | 10 | 3 |
| 000-005 | (MP 0.000) | (MP 4.118) | ||||||
| KY 1497 | RS | Calloway | FE01 018 1497 | Tennessee State Line | KY 121 | 6.085 | 15 | 3 |
| 000-007 | (MP 0.000) | (MP 6.085) | ||||||
| KY 1509 | RS | Calloway | FE01 018 1509 | Kyle Field End | KY 783 | 0.538 | 1 | 3 |
| 000-001 | (MP 0.000) | (MP 0.538) | ||||||
| KY 1536 | RS | Calloway | FE01 018 1536 | KY 280 | KY 280 | 7.419 | 18 | 3 |
| 000-008 | (MP 0.000) | (MP 7.419) | ||||||
| KY 1550 | RS | Calloway | FE01 018 1550 | KY 893 | US 641 | 6.968 | 18 | 3 |
| 000-007 | (MP 0.000) | (MP 6.968) | ||||||
| KY 1551 | RS | Calloway | FE01 018 1551 | KY 464 | KY 94 | 1.774 | 6 | 3 |
| 000-002 | (MP 0.000) | (MP 1.774) | ||||||
| KY 1660 | RS | Calloway | FE01 018 1660 | KY 94 | KY 121 | 1.530 | 6 | 3 |
| 000-002 | (MP 0.000) | (MP 1.530) | ||||||
| Mowing Work Location Sheet | Sheet 4 of 4 | |||||||
| Limits of Project | Project | Type 3 | Number | |||||
| Route | Project | Length | Mowing | of | ||||
| Number | System | County | Number | Begin | End | (Miles) | Acres | Cycles |
| KY 1824 | RS | Calloway | FE01 018 1824 | US 641 | Marshall Co. Line | 5.208 | 28 | 3 |
| 000-006 | (MP 0.000) | (MP 5.208) | ||||||
| KY 1828 | RS | Calloway | FE01 018 1828 | KY 893 | US 641 | 6.048 | 26 | 3 |
| 000-007 | (MP 0.000) | (MP 6.048) | ||||||
| KY 1836 | RS | Calloway | FE01 018 1836 | KY 893 | Marshall Co. Line | 10.651 | 32 | 3 |
| 000-011 | (MP 0.000) | (MP 10.651) | ||||||
| KY 1918 | RS | Calloway | FE01 018 1918 | KY 444 | End State Maint. | 3.017 | 8 | 3 |
| 000-004 | (MP 0.000) | (MP 3.017) | ||||||
| KY 2075 | RS | Calloway | FE01 018 2075 | KY 2594 | US 641 | 1.678 | 9 | 3 |
| 000-002 | (MP 0.000) | (MP 1.678) |
| KY 2547 | RS | Calloway | FE01 018 2547 | US 641 | US 641 | 4.909 | 25 | 3 |
| 000-005 | (MP 0.000) | (MP 4.909) | ||||||
| KY 2594 | RS | Calloway | FE01 018 2594 | KY 94 | KY 2075 | 0.798 | 2 | 3 |
| 000-001 | (MP 0.000) | (MP 0.798) | ||||||
| Subtotal RS | 194.889 | 672 |
| Grand Total | 254.471 | 1,026 | |
| Maximum number of days to complete a mowing cycle: 20 Working Days |
File details come from the government source that posted it. Updated .