Calloway WLS Jan 2025.xlsx

XLSX spreadsheet 16 KB Posted

Attached to
RoW Mow and Trim Murray Section
Solicitation number
RFB-605-2500000442-1
Issued by
Caldwell County, Kentucky

About this file

This is a mowing work location sheet for road maintenance in Calloway County, detailing specific mowing requirements across multiple state routes. The document outlines mowing requirements for 254.471 total miles of roadway, comprising 1,026 acres across various routes including US highways, Kentucky state routes (KY), and rural secondary (RS) roads. Each location requires three mowing cycles, with a maximum completion time of 20 working days per cycle. The work is divided between 59.582 miles of MP (Main Priority) routes covering 354 acres and 194.889 miles of RS routes covering 672 acres.

The document provides detailed specifications for each route, including precise beginning and ending points measured in mile points (MP), the number of acres to be mowed, and the project identification numbers. Major routes include US 641, KY 94, KY 121, and various secondary roads, with individual sections ranging from 0.307 miles to 29.778 miles in length. The project appears to be planned for January 2025, as indicated in the filename.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Sheet1

Mowing Work Location SheetSheet 1 of 4
Limits of ProjectProjectType 3Number
RouteProjectLengthMowingof
NumberSystemCountyNumberBeginEnd(Miles)AcresCycles
US 641MPCallowayFE01 018 0641Tennessee State LineKY 15507.4441563
000-008(MP 0.000)(MP 7.444)
US 641XMPCallowayFE01 018 641XKY 1550KY 13272.87333
000-003(MP 0.000)(MP 2.873)
KY 94MPCallowayFE01 018 0094Graves Co. LineMarshall Co. Line24.209893
000-025(MP 0.000)(MP 24.209)
KY 94CMPCallowayFE01 018 094CKY 94KY 800.38553
000-001(MP 0.000)(MP 0.385)
KY 121MPCallowayFE01 018 0121Tennessee State LineKY 89324.6711013
000-0025(MP 0.000)(MP 24.671)
Subtotal MP59.582354
KY 280RSCallowayFE01 018 0280KY 94KY 12112.552363
000-013(MP 0.000)(MP 12.552)
KY 299RSCallowayFE01 018 0299KY 94Marshall Co. Line10.665363
000-011(MP 0.000)(MP 10.665)
KY 444RSCallowayFE01 018 0444KY 121Tea Rose Drive6.437173
000-007(MP 0.000)(MP 6.437)
KY 464RSCallowayFE01 018 0464Graves Co. LineKY 9418.655803
000-019(MP 0.000)(MP 18.655)
Mowing Work Location SheetSheet 2 of 4
Limits of ProjectProjectType 3Number
RouteProjectLengthMowingof
NumberSystemCountyNumberBeginEnd(Miles)AcresCycles
KY 497RSCallowayFE01 018 0497KY 94Barge Terminal Ent.2.63573
000-003(MP 0.000)(MP 2.635)
KY 732RSCallowayFE01 018 0732KY 94Watrview Lane9.571283
000-010(MP 0.000)(MP 9.571)
KY 748RSCallowayFE01 018 0748KY 1327Valentine Avenue0.30723
000-001(MP 0.000)(MP 0.307)
KY 774RSCallowayFE01 018 0774KY 121KY 13270.48323
000-001(MP 0.000)(MP 0.483)
KY 783RSCallowayFE01 018 0783KY 893Magness Road16.257563
000-017(MP 0.000)(MP 16.257)
KY 821RSCallowayFE01 018 0821KY 822US 6410.50623
000-001(MP 0.000)(MP 0.506)
KY 822RSCallowayFE01 018 0822KY 1550KY 941.17033
000-002(MP 0.000)(MP 1.170)
KY 893RSCallowayFE01 018 0893Graves Co. LineKY 12129.778913
000-030(MP 0.000)(MP 29.778)
KY 972RSCallowayFE01 018 0972KY 732Moser Drive2.10063
000-003(MP 0.000)(MP 2.100)
KY 1270RSCallowayFE01 018 1270Graves Co. LineKY 8934.338163
000-005(MP 0.000)(MP 4.338)
Mowing Work Location SheetSheet 3 of 4
Limits of ProjectProjectType 3Number
RouteProjectLengthMowingof
NumberSystemCountyNumberBeginEnd(Miles)AcresCycles
KY 1327RSCallowayFE01 018 1327KY 1660US 6412.03523
000-003(MP 0.000)(MP 2.035)
KY 1346RSCallowayFE01 018 1346US 641Resort Road13.103753
000-014(MP 0.000)(MP 13.103)
KY 1429RSCallowayFE01 018 1429KY 783US 6413.55693
000-004(MP 0.000)(MP 3.556)
KY 1483RSCallowayFE01 018 1483KY 94Elm Grove Road4.118103
000-005(MP 0.000)(MP 4.118)
KY 1497RSCallowayFE01 018 1497Tennessee State LineKY 1216.085153
000-007(MP 0.000)(MP 6.085)
KY 1509RSCallowayFE01 018 1509Kyle Field EndKY 7830.53813
000-001(MP 0.000)(MP 0.538)
KY 1536RSCallowayFE01 018 1536KY 280KY 2807.419183
000-008(MP 0.000)(MP 7.419)
KY 1550RSCallowayFE01 018 1550KY 893US 6416.968183
000-007(MP 0.000)(MP 6.968)
KY 1551RSCallowayFE01 018 1551KY 464KY 941.77463
000-002(MP 0.000)(MP 1.774)
KY 1660RSCallowayFE01 018 1660KY 94KY 1211.53063
000-002(MP 0.000)(MP 1.530)
Mowing Work Location SheetSheet 4 of 4
Limits of ProjectProjectType 3Number
RouteProjectLengthMowingof
NumberSystemCountyNumberBeginEnd(Miles)AcresCycles
KY 1824RSCallowayFE01 018 1824US 641Marshall Co. Line5.208283
000-006(MP 0.000)(MP 5.208)
KY 1828RSCallowayFE01 018 1828KY 893US 6416.048263
000-007(MP 0.000)(MP 6.048)
KY 1836RSCallowayFE01 018 1836KY 893Marshall Co. Line10.651323
000-011(MP 0.000)(MP 10.651)
KY 1918RSCallowayFE01 018 1918KY 444End State Maint.3.01783
000-004(MP 0.000)(MP 3.017)
KY 2075RSCallowayFE01 018 2075KY 2594US 6411.67893
000-002(MP 0.000)(MP 1.678)
KY 2547RSCallowayFE01 018 2547US 641US 6414.909253
000-005(MP 0.000)(MP 4.909)
KY 2594RSCallowayFE01 018 2594KY 94KY 20750.79823
000-001(MP 0.000)(MP 0.798)
Subtotal RS194.889672
Grand Total254.4711,026
Maximum number of days to complete a mowing cycle: 20 Working Days

File details come from the government source that posted it. Updated .