This document outlines requirements for a bridge painting project. The project consists of painting the West Fork Sulphur Creek Bridge located in Lassen Volcanic National Park, approximately 30 miles northwest of Chester, California. The project length is 0.03 miles and has a tentative completion date of Fall 2020. Estimated pricing is between $1,000,000 and $2,000,000. The scope of work includes mobilization, construction surveying and staking, contractor quality control and sampling/testing, and construction scheduling. Specific work items consist of painting the steel structure of the bridge along with containment systems, worker protection plans, and temporary traffic control including signage, flaggers, and a traffic control supervisor. The pre-solicitation for this project is listed under solicitation number 69056720B000013 and is being conducted by the Department of Transportation Federal Highway Administration.

View the file

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

CA NPS BP LAVO 2019(1), West Fork Sulphur Creek Bridge Preservation

This work consists of: Bridge Painting

Project length: .03 Miles

Tentative Fixed Completion Date: Fall 2020 (Once solicitation is issued, see FAR Clause 52.211-10 for exact date.)

Estimated Price Range: Between 1,000,000.00 and 2,000,000.00

This project is located in Lassen Volcanic National Park, approximately 30 Miles NW of Chester CA.

DESCRIPTION OF WORK in US CUSTOMARY UNITS

FP-14

Sc h

Na m e Ba se

DIVISION 150 – Project Requirements 151 Mobilization (yes/no) Yes 152 Construction Survey & Staking (yes/no) No 153 Contractor Quality Control and Assurance (yes/no) Yes

154 Contractor Sampling & Testing (yes/no) Yes

155 Schedules for Construction Contracts (construction schedules) (yes/no) Yes

157 Soil Erosion Control LPSM

CA NPS BP LAVO 2019(1), West Fork Sulphur Creek Bridge Preservation

Sc h

Na m e Ba se

DIVISION 550 – BRIDGE CONSTRUCTION

563 Painting, Steel Structure LPSM

563 Containment System and Worker Protection Plan LPSM

DIVISION 600 – Incidental Construction

635 Temporary Traffic Control – Drum 20 EACH

635 Temporary Traffic Control – Construction Sign 120 SQFT

635 Temporary Traffic Control – Flagger 400 HOUR

635 Temporary Traffic Control – Traffic Control Supervisor 44 DAY