CA NP LAVO 10(6) Sulphur Works Repairs FINAL PLANS.pdf
PDF 7 MB Posted
- Attached to
- CA NP LAVO 10(6) Sulphur Works Repair
- Solicitation number
- 6982AF23B000024
About this file
This document package includes plans and specifications for a federal highway construction project. The solicitation is for repairs to the Sulphur Works area along California State Route 191 in Lassen Volcanic National Park. Work includes reconstruction of approximately 400 feet of roadway embankment and structural section, installation of colored concrete sidewalk, curb and gutter, application of pavement markings, and replacement of fencing. The bid schedule provides estimated quantities and unit pricing for various work items such as select topping, embankment construction, roadway aggregate, concrete curb and gutter, colored sidewalk, general labor, and fencing materials. Construction is to be completed by July 5, 2023. The total estimated cost is $500,000. The soliciting agency is the United States Department of Transportation Federal Highway Administration for the National Park Service.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Bid Opening Summary.pdf | ||
| A001.pdf | ||
| Interested Vendors- 8.15.23.pdf | ||
| Interested Vendors- 8.3.23.pdf | ||
| IFB 6982AF23B000024 CA NP LAVO 10(6) Sulphur.pdf | ||
| FP-14_Eng.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
jointjt.J westWWinteriorint.
vertical point of intersectionVPIincrementincr.
vehicles per hourvphinclusive, includingincl.
verticalvert.inside diameterIDI design speedVVhighwayhwy.
typicaltyp.high waterHW Material Source point of tangent to spiralTShorizontalhoriz.
transversetransv.hexagonhex.
Boring Location (Existing, Proposed) temporary construction easementTCEhomestead entry surveyHES temporary bench markTBMheadwallhdwl.H GEOLOGIC SYMBOLS tangenttan.girdergdr.
townshipT.galvanizedgalv.
tangent lengthTTgage (gauge)ga.G Cattleguard (Existing, Proposed) symmetricalsym.footingftg.
structuralstruc.finishfin.
Fence w/ Gate (Existing, Proposed) straightstr.flared end sectionFES stiffenerstiff.federalFed.
Fence (Existing, Proposed) standardstd.fill facef.f.F stationsta.exteriorext. FENCE & CATTLEGUARD SYMBOLS point of spiral to tangentSTexpansion jointexp. jt.
streetst.excavationexc.
specificationspec.edge of waterEW Fiber Roll (Slope Protection) spacing, Spaces or Spacedspa.and wifeet ux shouldershldr.and otherset al Temporary Inlet Protection sectionsec.edge of roadER point of spiral to curveSCequationEQ or eq.
Silt Fence seasonal average daily trafficSADTedge of pavementEOP southSSEngineer(s)engr(s).
Fiber Roll (Ditch and/or Cut Slope) routerte.embankmentemb.
rightRt. or RTelevationelev.
Riprap reference hubRHelevation with numberEl. 94.066 retaining wallret. wallsuperelevation ratee Rolled Erosion Control Product
ReservationRes.eastEE reservoirres.drawing(s)dwg(s).
Diversion Berm requiredreqd.donation land claimDLC reinforcementreinf.districtDist.
Check Dam reconstructionreconst.distancedist.
roadwayrdwy.diaphragmdiaph.
Bonded Fiber Matrix Mulching roadrd.diagonaldiag.
right-of-wayR/Wdiameterdia. or D EROSION & SEDIMENT CONTROL SYMBOLS rangeR.drop inletDI radiusRRdesign hour volumeDHV quantitiesquant., QtyQdecrementdecr.D Riprap Apron (Proposed) pavementpvmt.culvertculv.
point of tangentPTcontingent sumCTSM Underdrain (Existing, Proposed) pounds per square inchpsicentersctrs.
projectproj.point of curve to spiralCS With Drop Inlet (Existing, Proposed) point on tangentPOTcreekcr.
point on spiralPOScorrugatedcorr.
With Headwalls (Existing, Proposed) point on curvePOCcontinuouscont.
platepl.construction jointconstr. jt.
With End Sections (Existing, Proposed) point of intersectionPIconstructionconstr.
perforateperf.concreteconc.
Pipe Culvert (Existing, Proposed) point of compound curvePCCcolumncol.
point of curvePCPcountyCo.
Box Culvert (Existing, Proposed) outside diameterODcorrugated metal pipeCMP other faceo.f.clearclr.
Bridge (Existing, Proposed) on centerso.c.Ocenter to centerc-c numberno. or #concrete box culvertCBCC negativeneg.bearingbrg.
normal crownNCbridgebr.
Spring northNNbalance pointBP mountain(s)mtn(s).bench markBM River monumentmon.backBK minimummin.beginning, beginbeg.
Wetland maximummax.both facesb.f.B materialmatl.asphaltasph.
Large Creek maintenancemaint.approachappr.
magneticmag.Malternatealt.
Lake, Pond or Reservoir low waterLWaheadAH leftLt. or LTaggregateaggr.
Drainage or Small Creek lump sumLPSMaverage daily trafficADT longitudinallong.abutmentabut.A Flow Arrow latitudelat.diameter� laminationlam.curve delta� Ditch (Existing, Proposed) length of curveLLcenterline
DRAINAGE SYMBOLSABBREVIATIONS
SPRING
DI
:3
P
M
J u n e
S h e e t
N
C A
\l a v o (6
R o a d w a y \C
A D
D S h e e ts
\A -G e n s h t\ s y m d g n
OFFICE OF FEDERAL LANDS HIGHWAY
FEDERAL HIGHWAY ADMINISTRATION
U.S. DEPARTMENT OF TRANSPORTATION
Sheet 1 of 2
SYMBOLS AND ABBREVIATIONS
CONVENTIONAL PLAN
STATE PROJECT
NUMBER
SHEET
CA
CA NP LAVO 10(6)
A2
NPS PMIS No. 334779
SULPHUR WORKS REPAIRS
Telephone
Power
Fiber Optic
CATV
Overhead Utility Line (Existing, Proposed)
Water
Telephone Section Corner (Found)16
Sanitary Sewer Section Corner (Found, Projected)4
Power Section Corner (Found, Projected)
Oil Right-of-Way Line (Proposed)
Gas Right-of-Way Line (Existing)
Fiber Optic Property Line
CATV
Parcel Number
Underground Utility (Existing, Proposed) Monument (As described)
Telephone Pedestal (Existing, Proposed) Temporary (Proposed)
Telephone Booth (Existing, Proposed) Permanent (Proposed)
Street Light (Existing, Proposed) Permanent (Existing)
Support Pole Anchor (Existing, Proposed) Easements
Support Pole (Existing, Proposed) National Wildlife Refuge
Surface (Existing, Proposed) National Park
Underground (Existing, Proposed) National Forest
Irrigation Ditch Bureau of Land Management
Bureau of Indian Affairs UTILITY SYMBOLS
1/16 Section
Post Mounted (Existing, Proposed) 1/4 Section
Portable (Proposed) Section
Delineator (Existing, Proposed) Township or Range Line
Commercial (Existing, Proposed) City
Signs County
State SIGN SYMBOLS
National
Roadway Obliteration Boundaries
Roadway Centerline (With Station ticks)
Proposed
RIGHT-OF-WAY SYMBOLS
ExistingSurvey Control Point
Edge of Roadway Trail
Toe of FillSpot Elevation
Transition Double Track
Top of Cut Single Track
Slope Stake Limits Railroad
Clearing/Construction LimitsNorth Arrow
Coordinate Grid Tick
ROADWAY SYMBOLS
Building (Existing, Proposed)
Retaining Wall (Existing, Proposed)
Median & Side Barrier (Existing, Proposed)
MAPPING SYMBOLS
Guardwall (Existing, Proposed)Treeline
Guardrail (Existing, Proposed) Tree
PROJECT SPECIFIC SYMBOLSGUARDRAIL, BARRIER & WALL SYMBOLSLANDSCAPING & VEGETATION SYMBOLS
N
CP
36 31
36 31
0.00EL.
Telephone
Power
Fiber Optic
CATV
Overhead Utility Line (Existing, Proposed)
Water
Telephone Section Corner (Found)16
Sanitary Sewer Section Corner (Found, Projected)4
Power Section Corner (Found, Projected)
Oil Right-of-Way Line (Proposed)
Gas Right-of-Way Line (Existing)
Fiber Optic Property Line
CATV
Parcel Number
Underground Utility (Existing, Proposed) Monument (As described)
Telephone Pedestal (Existing, Proposed) Temporary (Proposed)
Telephone Booth (Existing, Proposed) Permanent (Proposed)
Street Light (Existing, Proposed) Permanent (Existing)
Support Pole Anchor (Existing, Proposed) Easements
Support Pole (Existing, Proposed) National Wildlife Refuge
Surface (Existing, Proposed) National Park
Underground (Existing, Proposed) National Forest
Irrigation Ditch Bureau of Land Management
Bureau of Indian Affairs UTILITY SYMBOLS 1/16 Section
Post Mounted (Existing, Proposed) 1/4 Section
Portable (Proposed) Section
Delineator (Existing, Proposed) Township or Range Line
Commercial (Existing, Proposed) City
Signs County
State SIGN SYMBOLS National
Roadway Obliteration Boundaries
Roadway Centerline (With Station ticks)
Proposed
RIGHT-OF-WAY SYMBOLS
ExistingSurvey Control Point
Edge of Roadway Trail
NPS = National Park Service Toe of FillSpot Elevation
FIO = For Information Only Transition Double Track
PROJECT SPECIFIC ABBREVIATIONS Top of Cut Single Track
Slope Stake Limits Railroad
Clearing/Construction LimitsNorth Arrow
Coordinate Grid Tick ROADWAY SYMBOLS
Building (Existing, Proposed)
Retaining Wall (Existing, Proposed)
Median & Side Barrier (Existing, Proposed)
MAPPING SYMBOLS
Guardwall (Existing, Proposed)Treeline
Guardrail (Existing, Proposed) Tree
PROJECT SPECIFIC SYMBOLSGUARDRAIL, BARRIER & WALL SYMBOLSLANDSCAPING & VEGETATION SYMBOLS
Sheet 2 of 2
SYMBOLS AND ABBREVIATIONS
CONVENTIONAL PLAN
:4
A
J u n e
S h e e t
N
C
A \l a v o (6
R o a d w a y \C
A D
D S h e e ts
\A -G e n s h t\ s y m d g n
OFFICE OF FEDERAL LANDS HIGHWAY
FEDERAL HIGHWAY ADMINISTRATION
U.S. DEPARTMENT OF TRANSPORTATION
STATE PROJECT
NUMBER
SHEET
CA
CA NP LAVO 10(6)
A3
EV
A D
A
A R I Z
O N
A
MEXICO
OREGON
Eureka
FRANCISCO
SAN
Sacramento
ANGELES
LOS
Diego
San
Redding
CALIFORNIA KEY MAP
LEGEND
Interstate
County Road
U.S. Route
Sheet 1 of 1
SITE MAP
Sta. 430+00.00 - 434+00.00
SULPHUR WORKS REPAIRS
CA NP LAVO 10(6)
SCHEDULE A
No Scale
Images taken from GOOGLE and from NPS Park Maps.1.
NOTE:
CA NP LAVO 10(6)
CA NP LAVO 10(6)
CA NP LAVO 10(6)
10 Miles
To Mineral, CA
66 Miles
To Redding, CA
No Scale
No Scale
No Scale
Parking Lot
Sulphur Works
Staging Area
:5
J u n e
U n ti tl e d
S h e e
C A
\l a v o \R o a d w a y \C
A D
D S h e e ts
\A G e n s h t\
S it e M a p .d g n
OFFICE OF FEDERAL LANDS HIGHWAY
FEDERAL HIGHWAY ADMINISTRATION
U.S. DEPARTMENT OF TRANSPORTATION
STATE PROJECT
NUMBER
SHEET
CA
CA NP LAVO 10(6)
A4
Type II-A geotextile fabric
6" Select Topping
4" Roadway Aggregate, Method 2
Existing Structural Section
Detail A approx. 1.5' depth
Keyed Class 1 Riprap, Existing ground
No Scale
SULPHUR WORKS REPAIRS
TYPICAL SECTION
Structural Section
Existing
Detail A
1:20 typ.
Fencing Materials)
Fixture (Split Rail, 3 Rail, Item 64605-0000, Replace fencing components
(proposed)
Concrete Curb & Gutter
(proposed)
Colored Concrete Sidewalk
(existing)
Concrete Sidewalk
Perimeter Boulder
(Approximate)
Existing Ground
(two layer)
Base Boulder
(Non-woven)
Geotextile, Class 1, Type E
Limit
Equipment
4" Roadway Aggregate, Method 2
No Scale
6" Select Topping
Special Rock Embankment non-woven geotextile
Class 1, Type E
Lean Concrete Backfill (as needed)
Proposed Structural Section
Detail B
CL
1%
Varies Varies 1%
Existing fence
(Do not disturb) to the sidewalk curb
Active fumarole adjacent
Structural Section
Proposed
Detail B
(left open for clarity on existing ground)
Place Special Rock Embankment
Special Rock Embankment
Rock
Volcanic Topping
Method 2 (proposed)
Roadway Aggregate, Embankment Material
(existing)
Roadway Aggregate, Method 2
5. See Sheet C1 for installation notes and operating equipment near the edge of undermined edge of concrete.
See Specials 609-A for concrete curb and gutter, concrete sidewalk details. See Special 619-A for Fence details.4.
Construct Special Rock Embankment according to Section 252 of the SCR's. See C-sheets for more information.3.
Protect existing roadway. do not disturb the roadway or slopes outside the limits of construction shown.2.
is shown for information only.
Typical section shown reflects previously constructed work with proposed repairs. Existing structural section information1.
NOTE:
V :1
H M a x . Fa ce S lo p e
V :1
H M a x . B a ck slo p e approx.
25 ft.
7' 2'
Embankment
Special Rock
Rock
Topping
Volcanic
Rigid Pavement (charcoal gray) 12" Type V Cement, Colored Reinforced
Construction and Repair Limits
5'
5'
12" 501 Rigid Pavement (existing)
11'11'
1' - 10"
4'-6'
Sheet 1 of 1
SULPHUR WORKS
TYPICAL SECTIONS
:5
J u n e
T
Y P
IC
A
L S
E C
T
IO
S
U
L P
H U
R W
O R
K
C A
\l a v o \R o a d w a y \C
A D
D S h e e ts
\A G e n s h t\
R ty p ic a l.
d g n
OFFICE OF FEDERAL LANDS HIGHWAY
FEDERAL HIGHWAY ADMINISTRATION
U.S. DEPARTMENT OF TRANSPORTATION
STATE PROJECT
NUMBER
SHEET
CA
CA NP LAVO 10(6)
A5
PMIS#: 334779
Sheet and Description
B2
Tabulation of Quantities
Allowance Bid
Schedule
A0020 15101-0000 MOBILIZATION LPSM ALL
A0040 15201-0000 CONSTRUCTION SURVEY AND STAKING LPSM ALL
A0060 15301-0000 CONTRACTOR QUALITY CONTROL LPSM ALL
A0080 15401-0000 CONTRACTOR TESTING LPSM ALL
A0100 15501-0000 CONSTRUCTION SCHEDULE LPSM ALL
A0120 15701-0000 SOIL EROSION CONTROL LPSM ALL
A0140 20304-1000 REMOVAL OF STRUCTURES AND OBSTRUCTIONS LPSM ALL
A0160 20415-0000 SELECT TOPPING (VOLCANIC ROCK) CUYD 150 150
A0180 20416-0000 SELECT TOPPING TON 20 5 25
A0200 20420-0000 EMBANKMENT CONSTRUCTION CUYD 20 20
A0220 25201-1000 SPECIAL ROCK EMBANKMENT, MECHANICALLY-PLACED CUYD 1,000 1,000
A0240 30202-2000 ROADWAY AGGREGATE, METHOD 2 TON 40 10 50
A0260 60902-1000 CURB AND GUTTER, CONCRETE, 12-INCH DEPTH LNFT 70 20 90
A0280 61401-0000 LEAN CONCRETE BACKFILL CUYD 5 1 6
A0300 61501-0200 SIDEWALK, COLORED CONCRETE SQYD 40 10 50
A0320 62201-0200 DUMP TRUCK, 8 CUBIC YARD MINIMUM CAPACITY HOUR 40 As directed by the CO.
A0340 62201-3350 HYDRAULIC EXCAVATOR, 1 CUBIC YARD MINIMUM CAPACITY HOUR 40 As directed by the CO.
A0360 62301-0000 GENERAL LABOR HOUR 40 As directed by the CO.
A0380 63401-0300 PAVEMENT MARKINGS, TYPE B, SOLID LNFT 3,632 168 3,800
A0400 63501-0000 TEMPORARY TRAFFIC CONTROL LPSM ALL
A0420 64605-0000 FIXTURE (SPLIT RAIL, 3 RAIL, FENCING MATERIALS) LPSM ALL
MileStone: CA NP LAVO10(6) SULPHUR WORKS REPAIRS Date Completed: 07/05/23 Report Date: 07/05/23
A M E N D
Line Item No.
Pay Item Number
SUMMARY OF QUANTITIES - Schedule A -J u l-
:3 P
M
Remarks and/or Determination of Estimated Quantity
Pay Item Description Unit
Estimated Quantities
N
C A \l a vo
(6
R o a d w a y\
C A D
D S h ee ts \B
-S u m m
C A N
P L
A V O
(6
S u lp h u r
W o rk s S O
Q .x ls m
]S h ee t
PROJECT
B1
CA NP LAVO 10(6)
SULPHUR WORKS REPAIRS
SHEET
NUMBER
:3
J u ly
M is c e ll a n e o u s S u m m a r ie s
C A
\l a v o
\R o a d w a y
\C A
D D
S h e e ts
\B S u m m \B
S h e e ts
.d g n
OFFICE OF FEDERAL LANDS HIGHWAY
FEDERAL HIGHWAY ADMINISTRATION
U.S. DEPARTMENT OF TRANSPORTATION
Sheet 1 of 1
TABULATION OF QUANTITIES
STATE PROJECT
NUMBER
SHEET
CA
CA NP LAVO 10(6)
B2
STATE PROJECT
P
M N C
A la v o R o a d w a y C
A D
D S h e e ts C
M L P
P C
R e p a ir P la n .d g n
CENTRAL FEDERAL LANDS HIGHWAY DIVISION
FEDERAL HIGHWAY ADMINISTRATION
U.S. DEPARTMENT OF TRANSPORTATION
U s e r J e ff r e y .F e ll in g
NUMBER
SHEET
NOTE:
Sheet 1 of 2
CA C1
NO SCALE
100'50'0
Scale in Feet
SULPHUR WORKS SLOPE REPAIR PLAN VIEW
REPAIR LOCATION
Boulder Base
Special Rock Embankment
Sulphur Works Sidewalk Reconstruct Pre-existing
Perimeter Boulder
Boulder Base
Concrete Sidewalk, Curb and Gutter
Special Rock Embankment
Special Rock Embankment
SULPHUR WORKS REPAIRS
CA NP LAVO 10(6)
SULPHUR WORKS REPAIRS
Limits of Construction
Boulder Base 6.
5.
4.
3.
2.
1.
void under concrete slab
Approximate Limits of
NPS PMIS NO.: 334779
Embankment
Special Rock
Boulder Base
REPAIR LOCATION - TOP VIEWREPAIR LOCATION - PROFILE VIEW
Perimeter Boulder
Station 430+00.00
CA NP LAVO 10(6)
Begin Project
Station 434+00.00
CA NP LAVO 10(6)
End Project
To Sulphur Works Parking Lot
(Staging Area) 300 ft.
face of Special Rock Embankment.
Embankment to contain the structural section and embankment material buffer. Place volcanic topping material over the
Hand Place smaller rock within the top 1' of repair zone. Place a boulder perimeter at the top of the Special Rock sidewalk, fence and buffer space. Refer to Section 252 of the SCR's for more information on Special Rock Embankment.
Construct Special Rock Embankment at a offset distance far enough to reconstruct the proposed curb and gutter, bottom, back and top of Rock Embankment. Place the Rock Embankment to match the existing slope angle, as feasible.
Place Special Rock Embankment to fill the repair area. Place rock mechanically to interlock. Place Geotextile at the are included inside the Special Rock Embankment Pay Limits.
Boulders with a minimum dimension of 3'. Fit Boulders to a 2 deep base pattern, for full width of repair zone. Boulders against. Place Geotextile below and behind of base boulders. Key the base boulders into existing native material. Place along the proposed back slope of the Special Rock Embankment to fill remaining void and create a smooth slope to place
Excavate to and prepare foundation on competent ground. Use suitable on -site material to level foundation pad and fill been reestablished under the roadway structural section.
Equipment may operate closer to the existing edge of concrete after the slope has been reconstructed and support has
Do not operate equipment, load or unload material within 6' of the edge of concrete pavement inside the repair limits.
submit a repair plan for review. The Contractor is responsible for the required repairs.
damage during construction. If the wearing surface or other features designated to remain in place are damaged, Do not disturb the existing concrete pavement. Protect the existing surface, sidewalk, curb and gutter from construction limits. Do not remove native material beyond the limits of repair.
Remove existing debris including concrete, rock, fabric, and other unsuitable material within the
STATE PROJECT
P
M N C
A la v o R o a d w a y C
A D
D S h e e ts C
M L P
P C
R e p a ir P la n .d g n
CENTRAL FEDERAL LANDS HIGHWAY DIVISION
FEDERAL HIGHWAY ADMINISTRATION
U.S. DEPARTMENT OF TRANSPORTATION
U s e r J e ff r e y .F e ll in g
NUMBER
SHEET
A
A
SULPHUR WORKS REPAIRS
Sheet 2 of 2
CA
SULPHUR WORKS REPAIRS
CA NP LAVO 10(6)
C2
FINISHING - ORIGINAL
SIDEWALK, FENCE, SLOPE
FINISHING - ORIGINAL
SIDEWALK, FENCE, SLOPE
100'50'0
Scale in Feet
Begin Fence, Split Rail, 3 Rail Begin Concrete Sidewalk (colored) Begin Concrete Curb and Gutter Sta. 432+25
End Fence, Split Rail, 3 Rail End Concrete Sidewalk (colored) End Concrete Curb and Gutter Sta. 432+92
Lean Concrete Backfill
Sta. 434+00
End Permanent Striping
Sta. 430+00
Begin Permanent Striping
Material
Embankment
NOTE (continued):
CL
Varies
1% Roadway Aggregate, Method 2
Width varies
Colored Concrete Sidewalk
Install 12" Concrete Curb and Gutter
SULPHUR WORKS SLOPE REPAIR PLAN VIEW - CONCRETE & FENCING
Existing Concrete Pavement
Special Rock Embankment
Fence, Split Rail, 3 Rail
NPS PMIS NO.: 334779
Perimeter Boulder
12.
11.
10.
9.
8.
7.
(Typical Sections Sheet)
Structural Section
Detail B
Embankment Material
Boulder Perimeter (proposed)
Top of Special Rock Embankment/
Class 1 Riprap (pre-existing)
Stripe the roadway according to Section 634.
Install Fence according to Section 619 and 646. See the SCR's and Special 619-A for more information.
the concrete has had 7 days to cure, and the fence has been installed.
Place Roadway Embankment material between the perimeter boulders and the exposed face of sidewalk/fence line after
See Special 609-A for more information.
Construct Concrete Curb and Gutter, Sidewalk according to Sections 609 and 615. See the SCR's for more information.
remaining void between repair work and existing concrete, without filling further under existing concrete than necessary.
existing concrete pavement or concrete sidewalk or curb and gutter. Place lean concrete in a manner to fill the pavement to the extent practical. Place Lean Concrete Backfill between roadway aggregate and the bottom of the
Place Roadway Aggregate, Method 2 according to Section 302. Place Roadway Aggregate under the existing concrete
Place geotextile over the top of Select Topping material.
Place Select Topping material to level out Special Rock Embankment prior to placing Roadway Aggregate.
Rock
Topping
Volcanic
SECTION A - A'
side of fiber roll material on uphill
Place excavated Wood stakes
Fiber roll
Slope
Fill slope uphill side of fiber roll
Place excavated material on uphill side of fiber roll
Place excavated material on
Fill or cut slope
Stagger joints (typ.)
along contours
Install fiber rolls roll 2" min.
Trench fiber
Fiber roll table for length requirements
See Fiber Rolls at Culverts around culvert inlet
Install fiber rolls flared end section
Culvert inlet with end section with flared
Culvert outlet length requirements
Culverts table for
See Fiber Rolls at around culvert outlet
Install fiber rolls
Fiber Roll
See note 6 control runoff culvert as needed to
Install fiber rolls below
151V:2H and steeper
30Between 1V:3H and 1V:2H
45Between 1V:4H and 1V:3H
601V:4H or flatter spacing (ft)
Fiber Roll Maximum �9" Slope Gradient
FIBER ROLL SPACING TABLE*
NOTE:
1. Repair all rills or gullies and properly compact prior to installation.
2. Install fiber rolls along slope contours. For any 20' section of fiber roll, do not allow the fiber roll to vary more than 5% from level.
3.Stake fiber rolls in place with 1 "x 1" or 1" � wood stakes. Space stakes 4' o.c. max. on slopes and 2' o.c. max. culverts. Stake fiber rolls 6-inches from each end.
4. Drive stakes into undisturbed soil at least 12" deep. Expose stakes 2" above top of fiber roll.
5. For fiber rolls on bare soil, construct trenches parallel to the contour.
Place fiber rolls in continuous contact with trench bottom and sides.
Tamp soil backfill against upstream side of fiber roll to ensure storm water is forced to flow through fiber roll rather than under it.
6. Place fiber rolls all the way around the inlet when the disturbance is on both the road and around the culvert and all water entering the culvert is crossing the disturbance.
NO SCALE
FIBER ROLL JOINT DETAIL
D irection of ru n off
*Approximate spacing shown. Adjust spacing as needed dut to project-specific conditions.
FIBER ROLL LAPPING DETAIL
S lo p e
S ta k e
C le a ri n g
L im it
Flow
Trench 2" min.
FIBER ROLL AS PERIMETER CONTROL
INSTALLATION DETAIL
Flow
Trench 2" min.
STAKE DETAIL
FIBER ROLL SLOPE LAYOUT
Flow
Flow
Flow
SECTION A-A
FIBER ROLL
AT CULVERT INLET
FIBER ROLL
AT CULVERT OUTLET
A A
Flow
*Approximate length shown for rolls across the top of the culvert inlet only.
Adjust length as needed due to project-specific conditions.
3054" or larger
2030" to 48"
1024" or smaller
Fiber Roll length (ft)�9" Culvert Size
FIBER ROLL AT CULVERTS*
Pay lim its
Pay lim its ove rlap12" mi n.
m in m in spacing table See Fiber roll
Se e n ote
Se e n ote
FIBER ROLL
C157-55
:3
J u n e
C
-5
S h e t]
C
A \l a v o
(6
R o a d w a y \C
A D
D
S h e e ts \E
-1
\C
-5
.d g n
DETAIL
CENTRAL FEDERAL LANDS HIGHWAY DIVISION
FEDERAL HIGHWAY ADMINISTRATION
U.S. DEPARTMENT OF TRANSPORTATION
CFLHD DETAIL
01/2011DETAIL APPROVED FOR USE
09/2020 12/2017REVISED:
STATE PROJECT
NUMBER
SHEET
CA
CA NP LAVO 10(6)
E1
CURB & GUTTER, CONCRETE, 12-INCH DEPTH
12"
1%
SULPHUR WORKS SIDEWALK DETAIL
section thickness for existing structural
See typical sections
Curb and gutter4" Concrete Sidewalk fence details
619-A for
See special
Dimension Varies (4' minimum)
R=2"
R=4"
12" Reinforce Concrete Pavement (existing)
12" Reinforce Concrete Pavement (existing) section thickness for existing structural
See typical sections separately or monolithically the curb and sidewalk are poured
A tooled joint is required whether
1' - 4"
12"
4" min.
6" min. Roadway Aggregate, Method 2
Roadway Aggregate, Method 2
NOTE:
Match roadway cross slope but no flatter than 1:12.4.
to match existing according to section 601 of the SCRs
Curb and Gutter will be type V cement, Class F Fly Ash with coloring 3.
Measure roadway aggregate, other materials as shown in the quantities.2.
Match coloring of existing concrete curb and gutter, sidewalk.1.
SIDEWALK FORMING - FOR INFORMATION ONLY
SIDEWALK FORMING - FOR INFORMATION ONLY
NO SCALE
''2
6''
10"
12"
"2
:0
J u n e
D D e s ig n S u r v
F
C A
\l a v o \R o a d w a y \C
A D
D S h e e ts
\T \s p A
.d g n
SPECIAL
CENTRAL FEDERAL LANDS HIGHWAY DIVISION
FEDERAL HIGHWAY ADMINISTRATION
U.S. DEPARTMENT OF TRANSPORTATION
CFLHD SPECIAL
DETAILS
CURB AND GUTTER, SIDEWALK
609-A
STATE PROJECT
NUMBER
SHEET
CA
CA NP LAVO 10(6)
T1
WOOD THREE RAIL FENCE
Sheet 1 of 2
619-A
Steel brace plates
Steel post sleeve post base cut to fit post sleeve
" x 2" Hex head lag screws
Cut flat faces in log end to fit bracket
Steel brace plate
Cut flat faces in log side to fit bracket
Railing bracket
Cont. Weld
EA. Side
10" DIA. Wood log post
4" DIA. Wood log railing
Chamfer edge, 3
6"X6" Post end
Post above
Carriage bolt
Post
Railing
2"
4"
2"
SECTION A
Concrete sidewalk
3/4" X 8" Carriage bolt with washer and nut
A
45°
Steel post sleeve with slotted holes5.
4.
DETAIL B
Steel railing bracket, see
DETAIL B
Finished ground the post of anchorage assembly)
(Use to attach the section to
SLOTTED HOLE DIMENSIONS
Slotted Hole Dimensions steel brace plate. See
Provide slotted holes in
" O.D.2
12"
" screws2 1" x 28 end
Steel Rod with threaded
1" dia. Galvanized A36
Plate washer, lock washer and hex nut
12" approval. Provide slotted holes on steel brace plates.
5. Submit connection detail sleeve, bolts, to CO for
4. Cut post bases in field to ensure a tight fit.
fit brackets as shown.
12%. Use architectural grade lumber. Cut ends of logs to
Fir, with tight growth rings and moisture content less than
3. Posts and railings to be cut from standing dead Douglas for acceptance prior to fabrication.
Color shall be NPS Dark Brown. Submit color samples
2. Powder coat brackets and sleeves after fabrication.
" thick. 16
1. All metal hardware will be A36 steel. Brackets will be
NOTES:
NO SCALE
(Photos For Info Only)
WOOD THREE RAIL FENCE
RAILING BRACKET
POST SLEEVE
"16
" O .D
:0
J u n e
F e n c e o f
C A
\l a v o
\R o a d w a y
\C A
D D
S h e e ts
\T
\s p
A
.d g n
SPECIAL
OFFICE OF FEDERAL LANDS HIGHWAY
FEDERAL HIGHWAY ADMINISTRATION
U.S. DEPARTMENT OF TRANSPORTATION
CFLHD SPECIAL
STATE PROJECT
NUMBER
SHEET
CA
CA NP LAVO 10(6)
T2
WOOD THREE RAIL FENCE
Sheet 2 of 2
619-A NO SCALE
CONC. SIDEWALK
LOG RAILING
STEEL RAILING BRACKET
10" LOG POST
ELEVATION
4' or 8'
NOTE:
3.
2.
1.
approval prior to ordering materals.
Submit fence layout drawings to the CO for locations.
4' sections are required at all sidewalk overlook numbering plan for review prior to branding.
hides them from view when installed. Submit posts, and on the ends of the rails in a manner that winter closure. Brand numbers into the tang of the
Number posts and rails to facilitate removal during
1 2 3 4
1a
1b
1c 2c
2b
2a 3a
3b
3c
2A
2B
2C 3C
3B
3A 4A
4B
4C
NUMBERING (TYPICAL)
Up Station
PIECE MARKING STYLE
(PIECE NUMBERS TBD/VERIFIED)
:4
J u n e
F e n c e o f
C A
\l a v o
\R o a d w a y
\C A
D D
S h e e ts
\T
\s p
A
.d g n
SPECIAL
OFFICE OF FEDERAL LANDS HIGHWAY
FEDERAL HIGHWAY ADMINISTRATION
U.S. DEPARTMENT OF TRANSPORTATION
CFLHD SPECIAL
STATE PROJECT
NUMBER
SHEET
CA
CA NP LAVO 10(6)
T3
C634-50
4 4
White edge line center line
Broken yellow
White edge line yellow center line
Broken and solid
White edge line yellow center line
Solid double
White edge line
White edge line yellow center line
Solid double yellow center line
Solid double
PAVEMENT JOINT
AND TOP LIFT
CENTERLINE STRIPING
4" or as required by the state.
NO SCALE
L w
L w
DETAIL C
Two-way traffic
No passing zone both directions
L w
L w and top lift pavement joint
Striped centerline
Shoulder is applied. See note 2
To be used on curves where curve widening centerline
Staked design
Shoulder is applied. See note 2
To be used on curves where curve widening centerline
Staked design
Shoulder
DETAIL A
Shoulder
DETAIL B
Shoulder w /2
Staked Centerline and top lift pavement joint
Striped centerline
Staked centerline
CURVE WIDENING ON SIMPLE CURVES (INSIDE)
CURVE WIDENING ON SPIRAL CURVES
CURVE STRIPING DETAIL ON SIMPLE CURVES
(normal edge of shoulder)
Edgeline striping
(normal edge of shoulder)
Edgeline striping
(normal edge of shoulder)
Edgeline striping
(normal edge of shoulder)
Edgeline striping
Two-way traffic
Passing zone both directions
Two-way traffic
No passing zone single lane direction
(Staked)
(Staked)
ON SPIRAL CURVES
STRIPING DETAIL
NOTE:
to curve widening on simple curves.
Centerline offset striping is only applicable curve widening.
widths remain constant throughout the widths within the traveled way. Shoulder curve widening to achieve equal lane
Paint centerline striping on curves with ranges and quantities for pavement markings.
See Summary for tables showing station normal edge of shoulder.
way and curve widening, 2" (max.) from the
5. Paint the edgeline striping outside the travel
4.
3.
2.
1.
40'
30'10'
10'
40'
30'
No Passing Zone
No Passing Zone
Travel way (L)Travel way (L) curve widening (w) guardrail offset shoulder (s) shoulder (s) w/2 shoulder (s)
Travel way (L) curve widening (w/2)
Travel way (L) guardrail offset curve widening (w/2) shoulder (s) s s L
L
Length of curve widening
L L s s s s
L w /2
L w /2
2L w
2L w s s s s
2L w
Length of curve widening
L L
L L
2L w s s w /2
L w /2
L w /2 s s s s
Paved ditchPaved ditch
:1
J u n e
C
C A
\l a v o \R o a d w a y \C
A D
D S h e e ts
\T \C
.d g n
DETAIL
CENTRAL FEDERAL LANDS HIGHWAY DIVISION
FEDERAL HIGHWAY ADMINISTRATION
U.S. DEPARTMENT OF TRANSPORTATION
CFLHD DETAIL
07/2004DETAIL APPROVED FOR USE
08/2021 01/2018 08/2014 08/2006REVISED:
STATE PROJECT
NUMBER
SHEET
CA
CA NP LAVO 10(6)
T4
NO SCALE
ROAD NAME
WORK
ROAD
xxxxx
WORK
ROAD
xxxxxxx
ROAD WORK
NEXT xx MILES xx
MPH
ROAD NAME
WORK
ROAD
xxxxxxx xx
MPH
WORK
ROAD
xxxxxxx
ROAD WORK
NEXT xx MILES
13.
12.
11.
10.
9.
8.
7.
6.
5.
4.
3.
2.
1.
ROAD TYPE
DISTANCE BETWEEN
A B C
NOTE:
M in o r R o a d
M a jo r R o a d
ROAD WORK
END
WORK
ROAD
AHEAD
WORK
ROAD
AHEAD
ROAD WORK
END
WORK
ROAD
AHEAD
ROAD WORK
END
ROAD WORK
END
See Note 8 W16-8P W20-1 over
W20-1
G20-2
See Note 9 W20-1
See Note 9 W20-1
(optional) W13-1P
See Note 10 G20-1
G20-2
See Note 8 W16-8P W20-1 over
G20-2
G20-2
See Note 9 W20-1
See Note 9 W20-1
(optional) W13-1P
See Note 10 G20-1 the distance to the work area in feet or in miles. Install an additional W20-1 The message on the W20-1 signs may be ROAD WORK AHEAD or may specify of the road on which the construction does occur (applies to major roads only).
construction work occurs, include a supplementary plaque indicating the name If W20-1 is placed on a roadway other than that on which the actual
Cover post-mounted signs when not applicable.
Do not store traffic control devices along the roadway when not in use.
the CO.
Maintain two-way traffic during all non-work hours except as approved by
NCHRP-350 or MASH for crashworthiness.
Ensure all sign supports exposed to impact by traffic meet the requirements of indicate a maximum recommended speed through the construction area.
Install advisory speed plates under the W20 series warning signs as needed to
Vary messages as required.
signs, locate the warning signs to fit field conditions as approved by the CO.
Where advance warning signs, placed as shown, interfere with permanent this traffic control plan as necessary to accommodate actual operations.
to this project. The Contractor may add or delete information and details in Not all details shown on the temporary traffic control sheets may be applicable
Erect all project advance warning signs before starting construction work.
retroreflective sheeting types.
Refer to Section 635 of the Special Contract Requirements for allowable
State standards may be used as an alternative if approved by the CO.
verify that an encroachment permit has been obtained.
If signing on a roadway under a jurisdiction other than the client agency, whole mile.
each end of the project. Show the distance on the G20-1 sign to the nearest
Ro ad N ame
SIGN SPACING TABLE
For work zones that are 2 miles or more in length, install G20-1 signs at signs "B" feet apart according to the Sign Spacing Table.
sign when approach speeds exceed 50 MPH. When used, place the two W20-1
C
B as de ter mi ne d b y t he C
O
Wor k z on e A re a o f I nfl ue nc
(S ee S ign S pa cin g T ab le)
ADVANCE W
ARNI
NG
AREA
(S ee S ign S pa cin g T ab le)
ADVANCE W
ARNI
NG
AREA
A
B
C
A
A
A
A
Pr oje ct Lim its
Expressway / Freeway
SIGNS IN FEET
Rural greater than 50 MPH
Urban and Rural 35 MPH to 50 MPH
Urban and Rural 30 MPH and less
6/2005 STANDARD APPROVED FOR USE
7/2022 REVISED: 635-1
ADVANCE SIGNING
TEMPORARY TRAFFIC CONTROL
:4
J u n e
S td
-1
C
A \l a v o (6
R o a d w a y \C
A D
D S h e e ts
\W -6
\S td -1
.d g n
FLH STANDARD
STANDARD
OFFICE OF FEDERAL LANDS HIGHWAY
FEDERAL HIGHWAY ADMINISTRATION
U.S. DEPARTMENT OF TRANSPORTATION
STATE PROJECT
NUMBER
SHEET
CA
CA NP LAVO 10(6)
W1 posted speed, not the advisory speed.
Approach speed based on the regulatory *
6.
5.
4.
3.
2.
1.
the buffer space.
Do not allow equipment, materials, or vehicles to be parked or stored in
For night time flagging operation, provide floodlighting at flagger stations.
WORK AHEAD (W20-1) and END ROAD WORK (G20-2) signs.
If closure is completely within the project limits, eliminate the ROAD name of the Contractor on the pilot car.
a conspicuous location on the rear of vehicle. Prominently display the
For pilot car operation, mount the PILOT CAR FOLLOW ME (G20-4) sign at as approved by the CO.
Final location and spacing of devices may be changed to fit field conditions those depicted for the opposite direction of travel.
Signs are shown for one direction of travel only. Place signs similar to
Flagger location
WORK
ROAD
AHEAD
See Note 4
W20-1
BE
PREPARED
TO STOP
W20-7
(optional)
W16-2Pxxx
FEET
Flagger location
ROAD WORK
END
See Note 4
G20-2
W3-4
Traffic flow
Traffic flow
NOTE:LENGTH AND SPACING TABLE SIGN SPACING TABLE
LENGTH
BUFFER SPACE
SPEED*
APPROACH
BUFFER SPACE
(optional)
Spacing Table)
(See Length and
ADVANCE WARNING AREA (See Sign Spacing Table)
TERMINATION AREAVARIABLEBUFFER SPACEABC
Spacing Table)
(See Length and WORK SPACE
A
ROAD TYPE
DISTANCE BETWEEN
A B C
Expressway / Freeway
SIGNS IN FEET
Rural greater than 50 MPH
Urban and Rural 35 MPH to 50 MPH
Urban and Rural 30 MPH and less
FEETMPH
7/2022 REVISED:
635-5
(WITH FLAGGERS)
ROAD CLOSURE LAYOUT
TEMPORARY TRAFFIC CONTROL
:0
J u n e
S td
C A
\l a v o
\R o a d w a y
\C A
D D
S h e e ts
\W
\S td
.d g n
FLH STANDARD
STANDARD
OFFICE OF FEDERAL LANDS HIGHWAY
FEDERAL HIGHWAY ADMINISTRATION
U.S. DEPARTMENT OF TRANSPORTATION
STATE PROJECT
NUMBER
SHEET
CA
CA NP LAVO 10(6)
W2
Traffic flow
Traffic flow not the advisory speed.
Approach speed based on the regulatory posted speed, *
Spacing Table)
(See Length and Channelizing devices
(optional)
Flagger location
WORK
ROAD
AHEAD
See Note 4
W20-1
ONE LANE
ROAD
AHEAD
xx
MPH
W20-4
(optional)
W13-1P xxx
FEET
W20-7
(optional)
W16-2P
Flagger location
WORK SPACE
ROAD WORK
END
See Note 4
G20-2 the buffer space.
Do not allow equipment, materials, or vehicles to be parked or stored in
Requirements, Section 156.
For project specific minimum width, refer to the Special Contract
For night time flagging operation, provide floodlighting at flagger stations.
WORK AHEAD (W20-1) and END ROAD WORK (G20-2) signs.
If closure is completely within the project limits, eliminate the ROAD name of the Contractor on the pilot car.
a conspicuous location on the rear of vehicle. Prominently display the
For pilot car operation, mount the PILOT CAR FOLLOW ME (G20-4) sign at as approved by the CO.
Final location and spacing of devices may be changed to fit field conditions those depicted for the opposite direction of travel.
Signs are shown for one direction of travel only. Place signs similar to
7.
6.
5.
4.
3.
2.
1.
(optional)(optional)
NOTE:SIGN SPACING TABLELENGTH AND SPACING TABLE
50' - 100' 50' - 100'
ROAD TYPE
DISTANCE BETWEEN
A B C
Expressway / Freeway
SPEED*
APPROACH
AREA
TAPER
SPACE
BUFFER
SPACE
WORK
CHANNELIZING DEVICE
LENGTH
SPACE
BUFFER
Device spacing
BUFFER SPACE
(See Length and Spacing Table)ADVANCE WARNING AREA (See Sign Spacing Table)
ATAPER AREABUFFER SPACEVARIABLEBUFFER SPACETAPER AREAABC
TERMINATION AREA
Rural greater than 50 MPH
Urban and Rural 35 MPH to 50 MPH
Urban and Rural 30 MPH and less
SIGNS IN FEET
100MPH FEET SPACING IN FEET
See Note 6
10' min.
635-6
(WITH FLAGGERS)
SINGLE LANE CLOSURE LAYOUT
TEMPORARY TRAFFIC CONTROL
:5
J u n e
S td
C A
\l a v o
\R o a d w a y
\C A
D D
S h e e ts
\W
\S td
.d g n
FLH STANDARD
STANDARD
OFFICE OF FEDERAL LANDS HIGHWAY
FEDERAL HIGHWAY ADMINISTRATION
U.S. DEPARTMENT OF TRANSPORTATION
STATE PROJECT
NUMBER
SHEET
CA
CA NP LAVO 10(6)
W3 not the advisory speed.
Approach speed based on the regulatory posted speed, *
Traffic flow
Traffic flow xx
MPH
ONE LANE
ROAD
AHEAD
WORK
ROAD
AHEAD
(optional) light warning
Type B
See Note 5
STOP LINE
See Note 5
STOP LINE
See Note 2
Temporary traffic signal
See Note 2
Temporary traffic signal
Channelizing devices to provide access to work space downstream taper if necessary
Reduce or eliminate drums in it has two signal faces that are at least 8 feet apart and meets the other
50' - 100'50' - 100'
NOTE:
LENGTH AND SPACING TABLE SIGN SPACING TABLE
8.
7.
6.
5.
4.
3.
2.
1.
A single signal installation is acceptable, on the right-hand side of the road, if depicted for the opposite direction of travel.
Signs are shown for one direction of travel only. Place signs similar to those the buffer space.
Do not allow equipment, materials, or vehicles to be parked or stored in
Section 156.
For project specific minimum width, refer to Special Contract Requirements, AHEAD (W20-1) and END ROAD WORK (G20-2) signs.
If closure is completely within the project limits, eliminate the ROAD WORK pavement markings.
Removeable pavement markings may be used for stop lines and no-passing advance of the stop line that comply with MUTCD Section 3B.02.
markers between the work space and the stop line. Add no-passing lines in
Section 3B.16. Remove existing conflicting pavement markings and raised
For paved roadway surfaces, install stop lines complying with MUTCD using a qualified engineer.
approved by the CO. If signals are moved, determine revised signal timing
Final location and spacing of devices may be changed to fit field conditions as automatically, ensure red signal indications are flashed to both approaches.
engineer. When the signal is changed to the flashing mode either manually or requirements of Part 4 of the MUTCD. Establish signal timing using a qualified
Install and operate temporary traffic control signals in accordance with the requirements of Part 4 of the MUTCD.
See Note 6
G20-2
ROAD WORK
END
W3-3
R10-6
See Note 6
W20-1 W20-4
(optional)
W13-1P
STOP
HERE ON
RED
(optional)
W1-4
R10-6
STOP
HERE ON
RED
See Note 6
G20-2
ROAD WORK
END
(optional)
WORK SPACE
(optional)
Spacing Table)
(See Length and
DISTANCE BETWEEN
A B C
Expressway / Freeway
SPEED*
APPROACH
AREA
TAPER
SPACE
BUFFER
SPACE
WORK
CHANNELIZING DEVICE
LENGTH
SPACE
BUFFER
ROAD TYPE
(See Length and Spacing Table) VARIABLE TERMINATION AREA
ABUFFER SPACE TAPER AREABUFFER SPACETAPER AREAABC
ADVANCE WARNING AREA (See Sign Spacing Table)
See Note 5 Device spacing
MPH FEET SPACING IN FEET
Rural greater than 50 MPH
Urban and Rural 35 MPH to 50 MPH
Urban and Rural 30 MPH and less
SIGNS IN FEET
40' - 180'
See Note 7
10' min.
40' - 180'
635-9
(WITH SIGNALS)
SINGLE LANE CLOSURE LAYOUT
TEMPORARY TRAFFIC CONTROL
:0
J u n e
S td
C A
\l a v o
\R o a d w a y
\C A
D D
S h e e ts
\W
\S td
.d g n
FLH STANDARD
STANDARD
OFFICE OF FEDERAL LANDS HIGHWAY
FEDERAL HIGHWAY ADMINISTRATION
U.S. DEPARTMENT OF TRANSPORTATION
STATE PROJECT
NUMBER
SHEET
CA
CA NP LAVO 10(6)
W4
Traffic flow
Traffic flow
LENGTH AND SPACING TABLE
* Approach speed based on the regulatory posted speed, not the advisory speed.
pavement markings
Remove conflicting
See Note 2
Temporary concrete barrier.
Channelizing devices
NOTE:
6.
5.
4.
3.
2.
1.
necessary to provide access to work space.
Reduce or eliminate drums and barrier in downstream taper if stored in the buffer space.
Do not allow equipment, materials, or vehicles to be parked or hours or when access is not needed.
Place channelizing devices at downstream taper during non-work
Requirements, Section 156.
For project specific minimum width, refer to Special Contract the barrier ends with a crash cushion. Include reflectors on barrier
Terminate barrier ends outside the work zone clear zone or protect
Place barrier according to the AASHTO Roadside Design Guide.
may be changed to fit field conditions as approved by the CO.
Install signs and other devices for single lane closure according to
Standard 635-6, 7, 8, or 9. Final location and spacing of devices at 25' intervals.
(50' - 100')
50' - 100')
SPEED*
APPROACH
AREA
TAPER
SPACE
BUFFER
SPACE
WORK
CHANNELIZING DEVICE
LENGTH
SPACE
BUFFER
WIDTH
CLEAR ZONE
WORK ZONE
RATE
FLARE
BARRIER
CONCRETE
1:16
1:16
1:16
1:16
1:14
1:12
1:10
1:9
1:8
1:8
1:8 spacing
Device
(optional)
BUFFER SPACE
TAPER AREA
See Note 4
TAPER AREA (
(optional)
BUFFER SPACE
VARIABLE WORK SPACE
(See Length and Spacing Table)
MPH
FEET
SPACING IN FEET
FEET
See Note 3
10' min.
See Note 2
See Note 2
635-13
WITH TEMPORARY BARRIER
SINGLE LANE CLOSURE LAYOUT
TEMPORARY TRAFFIC CONTROL
:5
J u n e
S td
C A
\l a v o \R o a d w a y \C
A D
D S h e e ts
\W \S td
.d g n
FLH STANDARD
STANDARD
OFFICE OF FEDERAL LANDS HIGHWAY
FEDERAL HIGHWAY ADMINISTRATION
U.S. DEPARTMENT OF TRANSPORTATION
STATE PROJECT
NUMBER
SHEET
CA
CA NP LAVO 10(6)
W5
See post detail (typ.)
Break-away holes.
See table for hole size parallel to sign face.
Field drill holes through post
Bottom of sign panel
Post�
Local tangent
< 10
" dia. bolts 4 1Attach sign panels with a minimum of 2 -a minimum lateral distance of 1' behind the face of lateral offset of 2' may be used. In areas with curbs, 6" x 6" or larger.
Use 7' minimum spacing between posts for sign posts and 6' minimum mounting height for secondary sign.
use 7' minimum mounting height for main sign
NOTE:
WOOD POST SELECTION TABLE
7.
6.
5.
4.
3.
2.
1.
In areas where lateral distance is limited, a minimum
D = Post embedment depth for average soil conditions.
Select post lengths to fit field conditions.
H1 and H2 = Overall post length.
per post.
In pedestrian locations, or in areas with obstructed views, the curb may be used.
by the CO.
State standards may be used as an alternative if approved
SINGLE POST SIGN TWO POST SIGN
SIGN INSTALLATION ANGLE
POST DETAIL
E d g e o f p a v e d s h o u ld e r
E d g e o f tr a v e le d w a y
90°
93° "X"
WIDTH AREA
OF POSTS
NUMBER POST SIZE D HOLE SIZE
X X
0.75X
H
H
X
0.2X0.6X 0.2X
Y
H
D
H
D
H
D
Long side of post
D
(SQFT)
Other Shapes ≤ 48" Diamond ≤ 36"
Other Shapes ≤ 12' Diamond ≤ 48"
(INCH) (INCH) (INCH)
Diamond ≤ 48"
65 - 95
65 - 95
50 - 65
50 - 65
20 - 50
10 - 20
10 - 20
> 30'
> 17'
12' - 16'
> 13'
6 x 6
4 x 6
4 x 6
6 x 6
4 x 6
4 x 4
6 x 6
4 x 6
4 x 4
1.5
1.5
1.5
1.5
S e e N o te m in
S e e N o te m in
See Note 4
6' - 12'
On tangent alignment
200'
7/2022 REVISED: 635-14
WOOD POSTS
SIGN INSTALLATION
TEMPORARY TRAFFIC CONTROL
:0
A p ri l
S td
-1
C
A \l a v o
(6
R o a d w a y \C
A D
D
S h e e ts \W
-6
\S td -1 d g n
FLH STANDARD
STANDARD
OFFICE OF FEDERAL LANDS HIGHWAY
FEDERAL HIGHWAY ADMINISTRATION
U.S. DEPARTMENT OF TRANSPORTATION
STATE PROJECT
NUMBER
SHEET
CA
CA NP LAVO 10(6)
W6
See USDOT Pictograph spaced 0.5-inch apart
Three 0.5-inch stripes
See NPS Pictograph and Note 3 5 .2
.5
.2
.5
0.4510.2
0.675
2.25
0.675
0.4510.23.6
0.510.153.6
0.52 sqftArea:
Background - Blue (retroreflective)
Legend - White (retroreflective)Colors:
USDOT PICTOGRAPH
9.7652.489.76
22.52722.5
164016
3.7664.483.76
5.660.85.6
9.76 9.76
.3
.2
E
E
C
C
.3
BIL PROJECT FUNDING SOURCE SIGN
24 sqftArea:
Background - Green (retroreflective)
Legend, Border - White (retroreflective)Colors:
2.3" Radius, 1" BorderDimensions:
Ensure all pictographs are vector-based, vinyl-ready.
All incorporated pictographs are subject to approval. 3.
requirements.
Refer to Standard 635-14 for post and sign mounting 2.
Unless otherwise noted, dimensions are inches.1.
NOTES:
1.175
0.5C
0.7
0.5C
0.7
0.5C
1.175
14.25
Background - White (retroreflective)
Border - White (retroreflective)
Legend - PMS 1615, Brown (retroreflective)Colors:
NPS PICTOGRAPH
.2
635-A
LAW SIGN
BIPARTISAN INFRASTRUCTURE
:4
J u n e
N
C A
\l a v o
\R o a d w a y
\C A
D D
S h e e ts
\W
\s p
A
.d g n
SPECIAL
OFFICE OF FEDERAL LANDS HIGHWAY
FEDERAL HIGHWAY ADMINISTRATION
U.S. DEPARTMENT OF TRANSPORTATION
CFLHD SPECIAL
STATE PROJECT
NUMBER
SHEET
CA
CA NP LAVO 10(6)
W7
File details come from the government source that posted it. Updated .