CA FTBL DUMONT DUNES (1) Dumont Dunes Road Hydraulics Report.pdf
PDF 6 MB Posted
- Attached to
- CA FTBL Dumont Dunes (1) Dumont Dunes Road
- Solicitation number
- 6982AF22B000013
About this file
This is a final hydraulics report for the Dumont Dunes Road project located in the Dumont Dunes Off-Highway Vehicles Recreation Area in San Bernardino County, California. The report evaluates hydrologic and hydraulic conditions along Dumont Dunes Road and Little Dumont Dunes Road and provides final design recommendations. Key aspects include replacing the existing low-water crossing over the Armargosa River with a new 232-foot-long by 32-foot-wide concrete low-water crossing capable of conveying flows from a 5-year rainfall event. The report also recommends installing 12-inch diameter riprap downstream of the new low-water crossing to stabilize the channel. No drainage improvements are proposed for Little Dumont Dunes Road beyond constructing the roadway with a crown to direct runoff to both sides.
View the file
Other files
Show all 12
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Final Hydraulics Report Dumont Dunes Road
CA FTBL Dumont Dunes (1) San Bernardino County, California
Federal Highway Administration Central Federal Lands Highway Division
12300 West Dakota Avenue Lakewood, Colorado 80228
Project Location:
Western Extent: 35.6925° / 116.2519° Eastern Extent: 35.6956° / 116.2403°
Prepared by:
Douglas P. Stewart, PE
August 2021
ESF SIO OR NP A LD EE NR GE
T INSI E
G E
E R
R
S
T AIA NTE R OO FF I LCA
. RUR TS LA EDM
GO
EH
T
C LI IV
No. 62468 i
Contents
Acronyms and Abbreviations ......................................................................................................................................... iii
1. Introduction and Purpose
1.1 Project Location
1.2 Project Description
1.3 Previous Studies
1.4 Field Survey
1.5 Floodplain Investigation
1.6 Wetlands Investigation
2. Drainage Design Criteria and Methodology
2.1 General
2.2 Hydrologic Analysis
2.3 Hydraulic Analysis
2.4 Roadside Ditches
2.5 Erosion Control
2.6 Miscellaneous
3. Hydrologic and Hydraulic Analyses
3.1 Existing Low Water Crossing
3.2 Proposed Low-water Crossing
3.3 Culverts
3.4 Ditches
3.5 Riprap Analysis
3.6 Waters of the US Crossing Dumont Dunes Road
4. Final Design
4.1 Low-water Crossing
4.2 Dumont Dunes Road
4.3 Little Dumont Dunes Road
5. Erosion and Sediment Control
5.1 Construction Best Management Practices
5.2 Permanent Best Management Practices
6. References
Appendixes
A FEMA FIRMette B Riprap Sizing C FlowMaster Cross Sections ii
Table
1 USGS StreamStats Peak Flow Events on the Armargosa River at the Low Water Crossing
Figures
1 Vicinity Map 2 USGS StreamStats – Delineated Watershed 3 Existing Low Water Crossing 4 Existing LWC Capacity FlowMaster Analysis 5 Proposed LWC Capacity FlowMaster Analysis 6 Map of WOUS Crossings iii
Acronyms and Abbreviations
BMP best management practice
CFLHD Central Federal Lands Highway Division
FEMA Federal Emergency Management Agency
FIRM Flood Insurance Rate Map ft3/s cubic feet per second
HEC hydraulic engineering circular
LWC low-water crossing
OHV off-highway vehicles
PDDM Project Development and Design Manual
Project Dumont Dunes Road
WOUS waters of the U.S.
1. Introduction and Purpose
This preliminary hydraulics report describes the hydrologic and hydraulic design recommendations for improvements to the low-water crossing (LWC) on Dumont Dunes Road in the Dumont Dunes Off- Highway Vehicles (OHV) Recreation Area. Dumont Dunes Road and Little Dumont Dunes Road are proposed to be paved. There was evidence during the site visit that portions of the road had been previously paved with asphalt pavement, but it has broken down over the years, with mostly gravel visible.
As there are no culverts along either of the roadways, no hydraulic analysis is included in the scope.
Proposed drainage across Dumont Dunes Road will sheet flow generally to the south while drainage across Little Dumont Dunes Road will sheet flow to the north, similar to existing conditions.
The overall purpose of the Dumont Dunes Road project (Project) is to enhance public safety and access to the recreation area by creating a uniform width and paving Dumont Dunes Road.
1.1 Project Location
The OHV Recreation Area is located in the Mohave Desert approximately 33 miles north of Baker, California along State Highway 127. Refer to Figure 1 for a general location of the Project.
1.2 Project Description
The Project is located in a desert environment. Rainfall along the roadways typically percolates into the sandy soils. If there is any excess runoff, it sheet flows across the roadway. There are no formalized ditches along the roadways, but there are windrows created by grading and maintenance. Run-out cuts and berms have been placed periodically through the windrows on the south side of Dumont Dunes Road to direct any runoff collected along the windrows away from the roadway.
The Armargosa River crosses the roadway at an existing concrete LWC. The crossing appears to have been constructed in two adjacent segments: one segment being shorter in length than the other. There appears to be a scour hole about 2 feet deep at the downstream side of the LWC.
Figure 1. Vicinity Map
1.3 Previous Studies
No known previous studies have been identified for this area.
1.4 Field Survey
The field survey was completed by Jacobs staff in November 2020 in the vicinity of the LWC area.
1.5 Floodplain Investigation
There are no Federal Emergency Management Agency (FEMA) -regulated floodplain crossings within the project limits as shown in Effective FEMA Flood Insurance Rate Map (FIRM) Panel 06071C0750H dated August 28, 2008, for San Bernardino County Unincorporated Areas. A FIRMette map for this area can be found in Appendix A.
1.6 Wetlands Investigation
There are no wetlands within the project limits.
2. Drainage Design Criteria and Methodology
2.1 General
The drainage design for the Project will be in accordance with the Central Federal Lands Highway Division’s (CFLHD’s) Project Development and Design Manual (PDDM) Chapter 7 (2017). The scope of this Project includes increasing the flow-over capacity of the LWC to eliminate damage at each end of the crossing caused by more frequent storm events.
2.2 Hydrologic Analysis
StreamStats (USGS n.d.) and the Regional Regression Equations (USGS 2018) was used to calculate flows for 2-, 5-, 10-, 25-, 50-, and 100-year flood events in the Armargosa River. Per project scope, no other hydrologic analyses was performed for the Project.
2.3 Hydraulic Analysis
Recommended hydraulic design standards and criteria can be found in Exhibit 7.1-A of the PDDM (CFLHD 2017). Published information for LWCs recommends that they be designed for a 25-year flood event.
Because of the flat topography of the Armargosa River overbanks, the hydraulic capacity of the proposed LWC will be calculated for its maximum feasible length within the lower conveyance area of the river. No other hydraulic analyses will be performed for the Project.
Because of the difference in elevation between the downstream end of the LWC and the channel of over 2 feet, riprap will be designed using Hydraulic Engineering Circular (HEC) 23 Design Guideline 5 – Riprap Design for Embankment Overtopping (FHWA 1997) to best estimate rock size for the steeper longitudinal slope of the placed riprap along the channel.
2.4 Roadside Ditches
Roadside ditch flows and capacity will not be analyzed as part of this Project.
2.5 Erosion Control
Temporary construction best management practices (BMPs), as shown in the standard CFLHD details, will be used for control of erosion during construction in the vicinity of the LWC and staging areas.
2.6 Miscellaneous
The Project is not within a mapped FEMA Floodplain. Neither a Conditional Letter of Map Revision nor a Letter of Map Revision will be needed. Fish passage will not be accommodated since the Armargosa River is dry throughout most of the year.
As rainwater generally percolates into the area’s surrounding soils, runoff generated from the added pavement surface will mostly sheet flow to the south side of the road and percolate into the adjacent soils.
There is a large expanse of desert sands between most of the roadway and the Armargosa River downstream of the roadway. As there is only a small section of roadway near the Armargosa River thalweg, which is currently paved as a LWC, there would be insignificant adverse impacts of increased cumulative flows to the channel.
3. Hydrologic and Hydraulic Analyses
3.1 Existing Low Water Crossing
The Amargosa River crosses over Dumont Dunes Road at an existing LWC. Its watershed stretches across the Amargosa Desert, terminating in Death Valley into the ground aquifer. StreamStats (USGS n.d.) was used to delineate the basin, which resulted in a drainage area of 810,240 acres (Figure 2). This area can produce flows up to 50,100 cubic feet per second (ft3/s) for the 100-year storm event (Table 1). As the topography is generally flat, a bridge or culvert is not feasible for conveyance of the flow. There is an existing concrete LWC located on Dumont Dunes Road within the project area, which extends across the river bottom for approximately 149 feet along the roadway (Figure3). The original width of the LWC is approximately 24 feet with a newer section added 12 feet upstream.
Figure 2. StreamStats – Delineated Watershed Source: USGS n.d.
N
Figure 3. Existing Low-water Crossing
Table 1. StreamStats Peak-flow Events on the Armargosa River at the Low-water Crossing
Statistic Value Desert (Region 6) Eqn.
2-year peak flood 383 ft3/s 10.3(DRNAREA)0.506
5-year peak flood 2,230 ft3/s 60.0(DRNAREA)0.506
10-year peak flood 5,610 ft3/s 151(DRNAREA)0.506
25-year peak flood 15,000 ft3/s 403(DRNAREA)0.506
50-year peak flood 28,200 ft3/s 760(DRNAREA)0.506
100-year peak flood 50,100 ft3/s 1,350(DRNAREA)0.506
200-year peak flood 84,300 ft3/s 2,270(DRNAREA)0.506
500-year peak flood 15,9000 ft3/s 4,280(DRNAREA)0.506
Peak-flow Statistics Flow Report (100 percent [1,270 square miles] 2012 5113 Region 6 Desert)
Source: USGS n.d.
3.2 Proposed Low-water Crossing
During the initial field visit, the Bureau of Land Management stated that flows in the river frequently exceeded the capacity of the existing LWC during the spring runoff season. It was also observed that scour was occurring at each end and just downstream of the LWC. Based on this information, field observations, and existing concrete conditions, it is recommended to replace the existing LWC with a new LWC that expands farther across the Amargosa River and will convey flows from larger storm events.
Various geometries for the LWC could be created to allow increased flows across its surface, including increasing its depth and/or lengthening the crossing. The capacity of the river approaching the LWC is generally controlled by channel topography and established embankments. Therefore, increasing the low-flow area of the LWC to be wider than the channel conveyance width would not improve hydraulic conditions. Instead it would slow down velocities, allowing sediment to settle out onto the road. As the goal is to expand the crossing to convey more flows, thereby reducing maintenance, it was decided to extend the length of the LWC by following generally the existing roadway vertical alignment, terminating its end points at higher elevations along the roadway than the elevations of the existing LWC end points.
This would increase the capacity of the LWC, reducing maintenance generally required for events exceeding the capacity of the existing LWC.
CFLHD PDDM (2017) criteria do not give specific rainfall event criteria to adhere to for the design of LWCs, so the extents of the LWC were determined by existing roadway topography. Each end of the LWC terminated at an elevation matching that near a localized high point along the road at the west end of the crossing. This design produced a LWC with a 232-foot length, while extending the width of the proposed roadway section to 32 feet to match the roadway. A hydraulic analysis was performed using FlowMaster (Bentley Systems 2009) to model the LWC as an irregular trapezoidal channel based on using Manning’s formula and approximating the existing roadway/LWC geometry. These parameters yielded a proposed LWC that can convey over three times the capacity of the existing LWC, allowing the proposed LWC to accommodate the 5-year rainfall event (Figures 4 and 5).
Figure 4. Existing LWC Capacity FlowMaster Analysis
Figure 5. Proposed LWC Capacity FlowMaster Analysis
3.3 Culverts
No culverts were analyzed for this Project.
3.4 Ditches
No ditches were analyzed for this Project.
3.5 Riprap Analysis
Riprap will be used to fill the scour hole downstream of the proposed LWC and to stabilize the channel. A longitudinal riprap channel slope of 1:20 was used to connect the LWC to the downstream channel in approximately 52 feet. The extents of the riprap along the downstream face of the LWC will be to the locations where it was observed that scour was beginning. Although the proposed LWC only conveys approximately the 5-year flow, it is recommended that the riprap be sized to be stable for a 25-year event.
In HEC-23 Design Guideline 5 – Riprap Design for Embankment Overtopping (FHWA 1997), the following parameters and assumptions were made:
• FlowMaster was used to determine the 4.14-foot, 25-year depth of flow for an irregular section representing the channel cross section at the LWC.
• Unit discharge and overtopping depth in the HEC-23 Design Guideline 5 calculations were determined based on an average top width to obtain the 25-year flow depth of 4.14 feet obtained in FlowMaster.
• Calculated rock size was increased from 9 inches to 12 inches to meet the adequate thickness check in Step 8 of the calculations.
It was determined that riprap with a d50 of 12 inches and a depth of 24 inches would be stable for the 25-year storm event. See calculations in Appendix B.
3.6 Waters of the US Crossing Dumont Dunes Road
Maps prepared by CFLHD indicate that eight other Waters of the U.S. (WOUS) drainageways, in addition to the Armargosa River, cross Dumont Dunes Road. Although they are indicated on a map, they are not readily apparent in the field. There were no visible signs of channels approaching or crossing Dumont Dunes Road at these five locations. Very shallow sand dune undulations were observed, which could serve to create rivulets during high rainfall events, but no identifiable locations where concentrated flow would cross the road were observed.
The WOUS drainageway closest and parallel to Highway 127 was more identifiable as a potential waterway since the construction of the highway added berms on the east side of the road, which could divert and concentrate runoff from larger storm events. The existing Dumont Dunes Road crosses this potential flow path at the same elevation of the surrounding ground, creating a large flat area where water could accumulate and spread out.
The Jacobs and CFLHD environmental teams determined that the WOUS path crossing Dumont Dunes Road closest to Highway 127 was to be further evaluated for impacts to the WOUS. The Dumont Dunes roadway improvements will not significantly impact the other seven identified WOUS crossings, and they will drain similar to existing conditions. See Figure 6 for map of WOUS crossings.
Figure 6. Map of WOUS Crossings
4. Final Design
4.1 Low-water Crossing
The existing LWC will be replaced with a 232-foot-long by 32-foot-wide LWC with a depth of 1.64 feet to convey more flows than the existing LWC and reduce potential maintenance for the higher flows it conveys.
D50=12-inch riprap constructed at a depth of 24 inches will be placed at the downstream end of the crossing to fill the scour hole and stabilize the channel. The riprap will extend approximately 52 feet downstream of the LWC to tie into the existing channel.
4.2 Dumont Dunes Road
The Dumont Dunes Road improvements near its connection to Highway 127 will be designed to not negatively impact runoff in the WOUS crossing drainageway for higher flow events.
Dumont Dunes Road will have a cross slope that drains generally to the south in the same direction as the general overall topography. Runoff will sheet flow across the roadway with no ditches or culverts placed to concentrate flows.
4.3 Little Dumont Dunes Road
No drainage improvements will be made at Little Dumont Dunes Road. As the existing terrain is very flat along this road, the proposed road will be constructed with a crown to shed runoff to each side of the road.
5. Erosion and Sediment Control
5.1 Construction Best Management Practices
Riprap berms and/or gravel bag check dams will be used around the disturbed areas in the vicinity of the LWC to minimize the amount of sediment that could potentially leave the project site. Silt fencing or fiber rolls will be used at the base of disturbed slopes in the staging area to minimize sediment leaving the Project via sheet flow. It is not anticipated that stabilized construction exits or other BMPs along the remaining roadway will be required.
5.2 Permanent Best Management Practices
Riprap will be placed along the downstream end of the LWC to stabilize the channel and protect against scour.
6. References
Bentley Systems, Incorporated. 2009. OpenFlows FlowMaster Hydraulic Calculator Software. Haestad Methods Solution Center. https://www.bentley.com/en/products/product-line/hydraulics-and-hydrology-software/flowmaster.
Central Federal Lands Highway Division (CFLHD). 2017. Project Development and Design Manual.
Federal Highway Association (FHWA). 1997. Bridge Scour and Stream Instability Countermeasures.
HEC-23. Archived. July. https://www.fhwa.dot.gov/engineering/hydraulics/pubs/hec/hec23.pdf.
U.S. Geological Survey (USGS). n.d. StreamStats. Version 4.5. https://streamstats.usgs.gov/ss/.
U.S. Geological Survey (USGS). (2018). Regional Regression Equation Publications by State.
https://water.usgs.gov/osw/programs/nss/pubs.html.
U.S. Department of Transportation Federal Highway Administration (FHWA). 2009. Hydraulic Engineering Circular No. 23, Scour and Stream Instability Countermeasures: Experience, Selection, and Design Guidance. Third edition, Volume 2. Design Guideline 5. September.
https://www.bentley.com/en/products/product-line/hydraulics-and-hydrology-software/flowmaster https://www.bentley.com/en/products/product-line/hydraulics-and-hydrology-software/flowmaster https://www.fhwa.dot.gov/engineering/hydraulics/pubs/hec/hec23.pdf https://streamstats.usgs.gov/ss/ https://water.usgs.gov/osw/programs/nss/pubs.html
Appendix A FEMA FIRMette
Appendix B Riprap Sizing
Sheet No. 1
Calculcation No. 1
PROJECT: CA FTBL DUMONT DUNES Project No.
CFL Calc By DPS Date 5/13/2021 Rev
SUBJECT: Checked By Date
Hydraulic Engineering Circular No. 23
Federal Highway Adiministration
September 2009
Volume 2
1.0 Determine Unit Discharge
Use
Where:
q = Discharge per unit width of the channel, cfs/ft
Q = Design flow (25-year event), cfs 15,000 cfs from StreamStats Wave = Average channel width, ft
Wave Q25 qf
(ft) (cfs) (cfs/ft)
628.00 15000.00 23.89
2.0 Determine Overtopping Depth
Use
Where:
Q = Total discharge, cfs
L = Embankment Overtopping length, ft
C = Weir flow coefficient, 2.84 for Broad-crested weirs, ft0.5/S
H = Depth above weir, ft
Q25 C L H
(cfs) (ft0.5/S) (ft) (ft)
15,000 2.84 628.00 4.14 L=628' selected to reach H of 4.14 per FlowMaster
CFL CA FTBL DUMONT DUNES
Riprap Size Design For Downstream of Low Water Crossing
Reference:
Rock Size per Design Guideline 5 - Riprap Design for Embankment Overtopping
Broad-Crested Weir Equation
Used 628' average top width to obtain FlowMaster flow depth below in Section 2
Riprap__Dumont Dunes_LWC_DPS.xlsx <<DD_LWC_Riprap>> 1 of 3 5/13/2021 10:19 AM
3.0 Compute Rock Size
Use
Where: d50 = Particle size for which 50% is finer by weight, ft
Ku = Riprap sizing equation coefficient, S0.52/ft0.04 qf = Unit discharge, cfs/ft
Cu = Coefficient of uniformity of the riprap, d60/d10
S = Slope of the embankment, ft/ft
Sg = Specific gravity of the riprap α = Slope of the embankment, degrees ϕ = Angle of repose of the riprap, degrees
Ku qf Cu S Sg α ϕ d50 d50
(S0.52/ft0.04) (cfs/ft) (ft/ft) (degrees) (degrees) (ft) (in)
0.525 23.89 2.1 0.05 2.65 2.86 42 0.53 6.38
Choose next largest size class from Table 4.1: d50 (inches) = 12 Use 12" v.s. 9" to meet Step 8 check
4.0 Interstitial Velocity
Use
Where:
Vi = Interstitial velocity, ft/s g = Acceleration due to gravity, 32.2 ft/s2 d50 = Particle size for which 50% is finer by weight, ft
Cu = Coefficient of uniformity of the riprap, d60/d10
S = Slope of the embankment, ft/ft
Vave = Average velocity, ft/s η = Porosity of the rock g d50 Cu S Vi η Vave
(ft/s2) (ft) (ft/ft) (ft/s) (ft/s)
32.2 1.00 2.1 0.05 0.48 0.45 0.21
5.0 Compute Average Flow Depth
Use
Where:
y = Average flow depth, ft qf = Unit discharge at failure, cfs/ft
Vave = Average velocity, ft/s
Vave qf y
(ft/s) (cfs/ft) (ft)
0.21 23.89 111.29 i.e. Since y > 2d50, all the flow is not contained within the thickness of the riprap layer. Go to Step 6.
Equation 5.1
Equation 5.2
Riprap__Dumont Dunes_LWC_DPS.xlsx <<DD_LWC_Riprap>> 2 of 3 5/13/2021 10:19 AM
6.0 Find Allowable Flow Depth Above Riprap
Use
Where: h = Allowable flow depth over riprap, ft
Sg = Specific gravity of the riprap d50 = Particle size for which 50% is finer by weight, ft ϕ = Angle of repose of the riprap, degrees
S = Slope of the embankment, ft/ft
Sg d50 ϕ S h
(ft) (degrees) (ft/ft) (ft)
2.65 1.00 42 0.05 1.84
7.0 Calculate Mannings Roughness and Unit Discharge Over and Through Riprap
Use
Where: n = Manning roughness coefficient d50 = Particle size for which 50% is finer by weight, ft y = Average flow depth, ft (use h)
S = Slope of the embankment, ft/ft q1 = Unit discharge which can flow over riprap, cfs/ft q2 = Required interstitial flow through the riprap, cfs/ft qf = Unit discharge, cfs/ft
Vave = Average velocity, ft/s q2d50 = Unit flow divided by a 2d50 riprap thickness, cfs/ft q4d50 = Unit flow divided by a 4d50 riprap thickness, cfs/ft d50 n y S q1 qf q2 Vave q2d50 q4d50
(ft) (ft) (ft/ft) cfs/ft cfs/ft cfs/ft (ft/s) cfs/ft cfs/ft
1.00 0.034 1.84 0.05 26.95 23.89 -3.07 0.21 0.43 0.86
8.0 Check
2d50 adequate thickness? YES
4d50 adequate thickness? YES
Equation 5.3 since, q2 < q2d50 since, q2 < q4d50
Riprap__Dumont Dunes_LWC_DPS.xlsx <<DD_LWC_Riprap>> 3 of 3 5/13/2021 10:19 AM
632.50
4.14' Q25 = 15,000 cfs
Appendix C FlowMaster Cross Sections
| DumontDunes_PrelimHydraulics_05062021 |
| Contents |
| Acronyms and Abbreviations |
| 1. Introduction and Purpose |
| 1.1 Project Location |
| 1.2 Project Description |
| 1.3 Previous Studies |
| 1.4 Field Survey |
| 1.5 Floodplain Investigation |
| 1.6 Wetlands Investigation |
| 2. Drainage Design Criteria and Methodology |
| 2.1 General |
| 2.2 Hydrologic Analysis |
| 2.3 Hydraulic Analysis |
| 2.4 Roadside Ditches |
| 2.5 Erosion Control |
| 2.6 Miscellaneous |
| 3. Hydrologic and Hydraulic Analyses |
| 3.1 Existing Low Water Crossing |
| 3.2 Proposed Low-water Crossing |
| 3.3 Culverts |
| 3.4 Ditches |
| 3.5 Riprap Analysis |
| 3.6 Waters of the US Crossing Dumont Dunes Road |
| 4. Final Design |
| 4.1 Low-water Crossing |
| 4.2 Dumont Dunes Road |
| 4.3 Little Dumont Dunes Road |
| 5. Erosion and Sediment Control |
| 5.1 Construction Best Management Practices |
| 5.2 Permanent Best Management Practices |
| 6. References |
| Appendix A FEMA FIRMette |
| Appendix B Riprap Sizing |
| Appendix C FlowMaster Cross Sections |
| Dumont_Dunes_Prelim_Hyd_04282021_Combined |
| 1.Dumont_Dunes_Prelim_Hyd_04212021 |
| 1. Introduction and Purpose |
| 1.1 Project Location |
| 1.2 Project Description |
| 1.3 Previous Studies |
| 1.4 Field Survey |
| 1.5 Floodplain Investigation |
| 1.6 Wetlands Investigation |
| 2. Drainage Design Criteria and Methodology |
| 2.1 General |
| 2.2 Hydrologic Analysis |
| 2.3 Hydraulic Analysis |
| 2.4 Roadside Ditches |
| 2.5 Erosion Control |
| 2.6 Miscellaneous |
| 3. Hydrologic and Hydraulic Analyses |
| 3.1 Existing Low Water Crossing |
| 3.2 Proposed Low Water Crossing |
| 3.3 Culverts |
| 3.4 Ditches |
| 3.5 Riprap Analysis |
| 3.6 Waters of the US Crossing Dumont Dunes Road |
| 4. Final Design |
| 4.1 Low Water Crossing |
| 4.2 Dumont Dunes Road |
| 4.3 Little Dumont Dunes Road |
| 5. Erosion and Sediment Control |
| 5.1 Construction BMPs |
| 5.2 Permanent BMPs |
| 6. References |
| Appendix A. FEMA FIRMs |
| Appendix B. Riprap Sizing |
| Appendix C. FlowMaster Output |
| FIRMETTE_dbf438c8-836b-4dc1-a8f7-06962df08a1d |
| DD_Profile1 |
| DD_CH_HYD_Output |
| EX-X-SEC |
| Riprap__Dumont Dunes_LWC.pdf |
| DD_LWC_Riprap |
| Blank Page |
| Blank Page |
| Blank Page |
| Blank Page |
| Blank Page |
| Blank Page |
| DumontDunes_PrelimHydraulics_05132021.pdf |
| Contents |
| Acronyms and Abbreviations |
| 1. Introduction and Purpose |
| 1.1 Project Location |
| 1.2 Project Description |
| 1.3 Previous Studies |
| 1.4 Field Survey |
| 1.5 Floodplain Investigation |
| 1.6 Wetlands Investigation |
| 2. Drainage Design Criteria and Methodology |
| 2.1 General |
| 2.2 Hydrologic Analysis |
| 2.3 Hydraulic Analysis |
| 2.4 Roadside Ditches |
| 2.5 Erosion Control |
| 2.6 Miscellaneous |
| 3. Hydrologic and Hydraulic Analyses |
| 3.1 Existing Low Water Crossing |
| 3.2 Proposed Low-water Crossing |
| 3.3 Culverts |
| 3.4 Ditches |
| 3.5 Riprap Analysis |
| 3.6 Waters of the US Crossing Dumont Dunes Road |
| 4. Final Design |
| 4.1 Low-water Crossing |
| 4.2 Dumont Dunes Road |
| 4.3 Little Dumont Dunes Road |
| 5. Erosion and Sediment Control |
| 5.1 Construction Best Management Practices |
| 5.2 Permanent Best Management Practices |
| 6. References |
| Appendix A FEMA FIRMette |
| Appendix B Riprap Sizing |
| Appendix C FlowMaster Cross Sections |
| DumontDunes_FinalHydraulics_07202021.pdf |
| Contents |
| Acronyms and Abbreviations |
| 1. Introduction and Purpose |
| 1.1 Project Location |
| 1.2 Project Description |
| 1.3 Previous Studies |
| 1.4 Field Survey |
| 1.5 Floodplain Investigation |
| 1.6 Wetlands Investigation |
| 2. Drainage Design Criteria and Methodology |
| 2.1 General |
| 2.2 Hydrologic Analysis |
| 2.3 Hydraulic Analysis |
| 2.4 Roadside Ditches |
| 2.5 Erosion Control |
| 2.6 Miscellaneous |
| 3. Hydrologic and Hydraulic Analyses |
| 3.1 Existing Low Water Crossing |
| 3.2 Proposed Low-water Crossing |
| 3.3 Culverts |
| 3.4 Ditches |
| 3.5 Riprap Analysis |
| 3.6 Waters of the US Crossing Dumont Dunes Road |
| 4. Final Design |
| 4.1 Low-water Crossing |
| 4.2 Dumont Dunes Road |
| 4.3 Little Dumont Dunes Road |
| 5. Erosion and Sediment Control |
| 5.1 Construction Best Management Practices |
| 5.2 Permanent Best Management Practices |
| 6. References |
| Appendix A FEMA FIRMette |
| Appendix B Riprap Sizing |
| Appendix C FlowMaster Cross Sections |
| 2021-09-23T09:40:50-0600 | |
| Thomas R Rutledge | |
| I am approving this document |