This is an Inquiry of Availability document outlining the scope of work for a Low Voltage Controls Installation Project in support of the Naval Research Laboratory's Climate Control System procurement (Solicitation N00173-26-Q-1301365124). The project requires the contractor to provide labor, tools, and materials, including all Argus Controls system software and components as specified in an attached Argus proposal.

The scope of work encompasses three primary phases: (1) Demolition and Removal—removal and disposal of three existing low voltage control panels and three contactor panels, with disconnection and labeling of existing wiring for re-termination; (2) New Panel Installation—furnishing and installation of one 60" x 36" Relay Contactor control panel with panel mounting, conduit re-routing to the Argus panel, and field wiring termination; and (3) Controls and Devices Installation—installation and connection of one access point controller, one space temperature/RH sensor, one backup temperature sensor, and one weather station, including all low-voltage wiring, terminations, labeling, and testing. The final phase includes system commissioning with point-to-point verification, sensor verification and calibration, and confirmation of device communication to the control system. This is a Total Small Business Set-Aside procurement on a Firm-Fixed-Price basis with NAICS code 236220 (Commercial and Institutional Building Construction) and PSC code J059, with vendors required to be OEM authorized and provide manufacturer warranty coverage.

View the file

Other files

File Type Posted
Climate control functional specifications .docx DOCX document
Scope of Work.docx DOCX document

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Inquiry of Availability

Line Item
Description
1
Scope of work-Low Voltage Controls Installation

Project Scope:The contractor will provide labor, tools, and materials (including all Argus Controls system software and materials as detailed in the attached Argus proposal),necessary to complete the following scope of work:

Demolition / Removal Remove and dispose of (3) existing low voltage control panels and (3) contactor panels. Disconnect and label existing wiring as required for re-termination into new equipment.

New Panel Installation Furnish and install (1) new 60” x 36” Relay Contactor control panel, including:

Panel mounting and anchoring Re-routing conduit to Argus panel Termination of field wiring

Controls & Devices Installation Install and connect (1) access point controller Install and connect (1) space temperature / RH sensor Install and connect (1) backup temperature sensor Install and connect (1) weather station Provide all low-voltage wiring, terminations, labeling, and testing for the above devices

Commissioning Commission the control system, including:

Point-to-point verification Sensor verification and calibration (as applicable) Confirmation of device communication to the control system

2
Materials
3
Labor