C5612461-D_Trench_Shoring_B1_Rate_Sheets.xlsx

XLSX spreadsheet 65 KB Posted

Attached to
C5612461-D Trench Shoring Equipment Rental Services IFB
Solicitation number
0000032317
Issued by
Imperial County, California

About this file

This document is a Rate Sheet (Exhibit B-1) for a Trench Shoring Equipment Rental Services Invitation for Bid (IFB) issued by the California Department of Corrections and Rehabilitation (CDCR). The IFB covers multiple CDCR facilities, including Calipatria State Prison, Centinela State Prison, California Institution for Men, California Institution for Women, California Rehabilitation Center, Ironwood State Prison, California State Prison - Los Angeles County, and Richard J. Donovan Correctional Facility. The Contractor shall provide trench shoring equipment rentals on an as-needed basis and deliver requested equipment within 24 hours of notification. The CDCR estimates quantities for various shoring equipment, trench plates, and trench boxes but does not guarantee all listed items will be rented. The contract term is undefined, but the estimated contract values range from $50,000 to $200,000 across the facilities.

Pricing for the rental equipment is provided on the Rate Sheet, with daily, weekly, and monthly rates, as well as pick-up and delivery charges. The Contractor may also provide a price list with additional equipment options. If the Contractor's published rates are lower than the Rate Sheet, the lower rates will apply. The Contractor must bid each item, and failure to provide pricing for any item may result in the entire bid being rejected. The CDCR reserves the right to omit portions of the work as deemed necessary.

View the file

Other files

File Type Posted
C5612461-D_Trench_Shoring_IFB_Packet.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

1 CAL-CEN

TRENCH SHORING EQUIPMENT RENTAL SERVICES
CONSTRUCTION TRAINING REHABILITATION PROGRAM
CALIPATRIA STATE PRISON
CENTINELA STATE PRISON

Electronic bid packages include an Excel version of the Rate Sheet (Exhibit B-1) in addition to the PDF file in order to assist bidders in computing accurate totals. Bidders should download the Excel version and complete all highlighted cells.

Any quantities listed on Exhibit B-1 are CDCR's estimates only and are offered as a basis for the comparison of bids. The State does not expressly or by implication agree that the actual amount of work will correspond therewith and reserves the right to omit portions of the work as may be deemed necessary or advisable by the State.
Note: Bidder is required to bid each item. Failure to indicate a dollar amount in any item will be grounds to reject the entire bid. A zero dollar ($0.00) amount listed for any and all items will be interpreted and understood by the State to mean that the bidder shall perform any such service at no cost to the State.
HYDRAULIC & MECHANICAL SHORING JACKSRATESxESTIMATED QTY=TOTAL
12' rail X 22"-27" cylinder sizeDaily Rate$x16=$ - 0
Weekly Rate$x16=$ - 0
Monthly Rate$x16=$ - 0
Pick-up & Delivery$x8=$ - 0
23.5'2" rail X 28"-46" cylinder sizeDaily Rate$x24=$ - 0
Weekly Rate$x24=$ - 0
Monthly Rate$x24=$ - 0
Pick-up & Delivery$x8=$ - 0
37" rail X 34"-55" cylinder sizeDaily Rate$x24=$ - 0
Weekly Rate$x24=$ - 0
Monthly Rate$x24=$ - 0
Pick-up & Delivery$x8=$ - 0`
4Plywood shoring-All rail sizesDaily Rate$x48=$ - 0
Weekly Rate$x48=$ - 0
Monthly Rate$x48=$ - 0
Pick-up & Delivery$x48=$ - 0
5Mechanical Screw JackDaily Rate$x24=$ - 0
Weekly Rate$x24=$ - 0
Monthly Rate$x24=$ - 0
Pick-up & Delivery$x8=$ - 0
6Hydraulic Jack AccessoriesDaily Rate$x16=$ - 0
Weekly Rate$x16=$ - 0
Monthly Rate$x16=$ - 0
Pick-up & Delivery$x8=$ - 0
TRENCH PLATESRATESESTIMATED QTYTOTAL
78'X8'Daily Rate$x24=$ - 0
Weekly Rate$x24=$ - 0
Monthly Rate$x24=$ - 0
Pick-up & Delivery$x8=$ - 0
88' x10'Daily Rate$x24=$ - 0
Weekly Rate$x24=$ - 0
Monthly Rate$x24=$ - 0
Pick-up & Delivery$x8=$ - 0
98' x16'Daily Rate$x24=$ - 0
Weekly Rate$x24=$ - 0
Monthly Rate$x24=$ - 0
Pick-up & Delivery$x8=$ - 0
TRENCH BOXESRATESESTIMATED QTYTOTAL
104'x8'x3"Daily Rate$x10=$ - 0
Weekly Rate$x10=$ - 0
Monthly Rate$x10=$ - 0
Pick-up & Delivery$x6=$ - 0
116'x8'x3"Daily Rate$x12=$ - 0
Weekly Rate$x12=$ - 0
Monthly Rate$x12=$ - 0
Pick-up & Delivery$x8=$ - 0
128'x8'x3"Daily Rate$x12=$ - 0
Weekly Rate$x12=$ - 0
Monthly Rate$x12=$ - 0
Pick-up & Delivery$x8=$ - 0
13Subtotal of items 1 through 12 =$ - 0
TECHNICAL SUPPORTCost
14Technical Support on an as needed basisNot to exceed 20% of contract total$ - 0
EMERGENCY SERVICESRATExESTIMATED QUANTITIES
15Notification of 3 hours or lessx80=$ - 0
EQUIPMENT REPAIRHOURLY RATExESTIMATED NUMBER OF HOURS
16Laborx120=$ - 0
PartsESTIMATED COST FOR PARTS=$ 20,000.00
GRAND TOTAL (SUM OF TOTALS FOR ITEMS 1 THROUGH 16) BASIS OF AWARD:$ - 0

AGREEMENT SHALL BE WRITTEN FOR THE STATE'S ESTIMATE OF $200,000.00

*The grand total shall be used for determining the Basis of Award.

Contractor may offer a discount on invoices paid within thirty (30) days of receipt. Discount offered must be at least one percent and a minimum of $50.00.

Discount offered on invoices paid within 30 days of receipt = %**

** The percent of discount (highest discount prevails) may be used in the event of tie bids. Refer to the Notice to Prospective Bidders, Bid Submission Requirements.

The CDCR will be under no obligation to rent specific equipment listed herein. The list of equipment on Exhibit B-1, Rate Sheet, is an estimate only of the type of equipment needed. The CDCR does not expressly, or by implication, agree that all of the equipment listed will be used during the term of this contract, nor does it agree that the equipment will be needed for the entire period. Except where specifically requested by the IWL Site Supervisor, all equipment shall be rented exclusively of damage waiver provisions.

California Department of Corrections and Rehabilitation (CDCR) Rate Sheet Bid Number C5612461-D Exhibit B-1

2 CCI

TRENCH SHORING EQUIPMENT RENTAL SERVICES
CONSTRUCTION TRAINING REHABILITATION PROGRAM
CALIFORNIA CORRECTIONAL INSTITUTION

Electronic bid packages include an Excel version of the Rate Sheet (Exhibit B-1) in addition to the PDF file in order to assist bidders in computing accurate totals. Bidders should download the Excel version and complete all highlighted cells.

Any quantities listed on Exhibit B-1 are CDCR's estimates only and are offered as a basis for the comparison of bids. The State does not expressly or by implication agree that the actual amount of work will correspond therewith and reserves the right to omit portions of the work as may be deemed necessary or advisable by the State.
Note: Bidder is required to bid each item. Failure to indicate a dollar amount in any item will be grounds to reject the entire bid. A zero dollar ($0.00) amount listed for any and all items will be interpreted and understood by the State to mean that the bidder shall perform any such service at no cost to the State.
HYDRAULIC & MECHANICAL SHORING JACKSRATESxESTIMATED QTY=TOTAL
12' rail X 22"-27" cylinder sizeDaily Rate$x16=$ - 0
Weekly Rate$x16=$ - 0
Monthly Rate$x16=$ - 0
Pick-up & Delivery$x8=$ - 0
23.5'2" rail X 28"-46" cylinder sizeDaily Rate$x24=$ - 0
Weekly Rate$x24=$ - 0
Monthly Rate$x24=$ - 0
Pick-up & Delivery$x8=$ - 0
37" rail X 34"-55" cylinder sizeDaily Rate$x24=$ - 0
Weekly Rate$x24=$ - 0
Monthly Rate$x24=$ - 0
Pick-up & Delivery$x8=$ - 0`
4Plywood shoring-All rail sizesDaily Rate$x48=$ - 0
Weekly Rate$x48=$ - 0
Monthly Rate$x48=$ - 0
Pick-up & Delivery$x48=$ - 0
5Mechanical Screw JackDaily Rate$x24=$ - 0
Weekly Rate$x24=$ - 0
Monthly Rate$x24=$ - 0
Pick-up & Delivery$x8=$ - 0
6Hydraulic Jack AccessoriesDaily Rate$x16=$ - 0
Weekly Rate$x16=$ - 0
Monthly Rate$x16=$ - 0
Pick-up & Delivery$x8=$ - 0
TRENCH PLATESRATESESTIMATED QTYTOTAL
78'X8'Daily Rate$x24=$ - 0
Weekly Rate$x24=$ - 0
Monthly Rate$x24=$ - 0
Pick-up & Delivery$x8=$ - 0
88' x10'Daily Rate$x24=$ - 0
Weekly Rate$x24=$ - 0
Monthly Rate$x24=$ - 0
Pick-up & Delivery$x8=$ - 0
98' x16'Daily Rate$x24=$ - 0
Weekly Rate$x24=$ - 0
Monthly Rate$x24=$ - 0
Pick-up & Delivery$x8=$ - 0
TRENCH BOXESRATESESTIMATED QTYTOTAL
104'x8'x3"Daily Rate$x10=$ - 0
Weekly Rate$x10=$ - 0
Monthly Rate$x10=$ - 0
Pick-up & Delivery$x6=$ - 0
116'x8'x3"Daily Rate$x12=$ - 0
Weekly Rate$x12=$ - 0
Monthly Rate$x12=$ - 0
Pick-up & Delivery$x8=$ - 0
128'x8'x3"Daily Rate$x12=$ - 0
Weekly Rate$x12=$ - 0
Monthly Rate$x12=$ - 0
Pick-up & Delivery$x8=$ - 0
13Subtotal of items 1 through 12 =$ - 0
TECHNICAL SUPPORTCost
14Technical Support on an as needed basisNot to exceed 20% of contract total$ - 0
EMERGENCY SERVICESRATExESTIMATED QUANTITIES
15Notification of 3 hours or less$ - 0x80=$ - 0
EQUIPMENT REPAIRHOURLY RATExESTIMATED NUMBER OF HOURS
16Labor$ - 0x120=$ - 0
PartsESTIMATED COST FOR PARTS=$ 20,000.00
GRAND TOTAL (SUM OF TOTALS FOR ITEMS 1 THROUGH 16) BASIS OF AWARD:$ - 0

AGREEMENT SHALL BE WRITTEN FOR THE STATE'S ESTIMATE OF $ 150,000.00

Contractor may offer a discount on invoices paid within thirty (30) days of receipt. Discount offered must be at least one percent and a minimum of $50.00.

Discount offered on invoices paid within 30 days of receipt = %**

** The percent of discount (highest discount prevails) may be used in the event of tie bids. Refer to the Notice to Prospective Bidders, Bid Submission Requirements.

The CDCR will be under no obligation to rent specific equipment listed herein. The list of equipment on Exhibit B-1, Rate Sheet, is an estimate only of the type of equipment needed. The CDCR does not expressly, or by implication, agree that all of the equipment listed will be used during the term of this contract, nor does it agree that the equipment will be needed for the entire period. Except where specifically requested by the IWL Site Supervisor, all equipment shall be rented exclusively of damage waiver provisions.

&"Arial,Regular"&9California Department of Corrections and Rehabilitation (CDCR) Rate Sheet &"Arial,Regular"&9Bid Number C5612461-D

3 CIM-CIW-CRC

TRENCH SHORING EQUIPMENT RENTAL SERVICES
CONSTRUCTION TRAINING REHABILITATION PROGRAM
CALIFORNIA INSTITUTION FOR MEN
CALIFORNIA INSTITUTION FOR WOMEN
CALIFORNIA REHABILITATION CENTER

Electronic bid packages include an Excel version of the Rate Sheet (Exhibit B-1) in addition to the PDF file in order to assist bidders in computing accurate totals. Bidders should download the Excel version and complete all highlighted cells.

Any quantities listed on Exhibit B-1 are CDCR's estimates only and are offered as a basis for the comparison of bids. The State does not expressly or by implication agree that the actual amount of work will correspond therewith and reserves the right to omit portions of the work as may be deemed necessary or advisable by the State.
Note: Bidder is required to bid each item. Failure to indicate a dollar amount in any item will be grounds to reject the entire bid. A zero dollar ($0.00) amount listed for any and all items will be interpreted and understood by the State to mean that the bidder shall perform any such service at no cost to the State.
HYDRAULIC & MECHANICAL SHORING JACKSRATESxESTIMATED QTY=TOTAL
12' rail X 22"-27" cylinder sizeDaily Rate$x16=$ - 0
Weekly Rate$x16=$ - 0
Monthly Rate$x16=$ - 0
Pick-up & Delivery$x8=$ - 0
23.5'2" rail X 28"-46" cylinder sizeDaily Rate$x24=$ - 0
Weekly Rate$x24=$ - 0
Monthly Rate$x24=$ - 0
Pick-up & Delivery$x8=$ - 0
37" rail X 34"-55" cylinder sizeDaily Rate$x24=$ - 0
Weekly Rate$x24=$ - 0
Monthly Rate$x24=$ - 0
Pick-up & Delivery$x8=$ - 0`
4Plywood shoring-All rail sizesDaily Rate$x48=$ - 0
Weekly Rate$x48=$ - 0
Monthly Rate$x48=$ - 0
Pick-up & Delivery$x48=$ - 0
5Mechanical Screw JackDaily Rate$x24=$ - 0
Weekly Rate$x24=$ - 0
Monthly Rate$x24=$ - 0
Pick-up & Delivery$x8=$ - 0
6Hydraulic Jack AccessoriesDaily Rate$x16=$ - 0
Weekly Rate$x16=$ - 0
Monthly Rate$x16=$ - 0
Pick-up & Delivery$x8=$ - 0
TRENCH PLATESRATESESTIMATED QTYTOTAL
78'X8'Daily Rate$x24=$ - 0
Weekly Rate$x24=$ - 0
Monthly Rate$x24=$ - 0
Pick-up & Delivery$x8=$ - 0
88' x10'Daily Rate$x24=$ - 0
Weekly Rate$x24=$ - 0
Monthly Rate$x24=$ - 0
Pick-up & Delivery$x8=$ - 0
98' x16'Daily Rate$x24=$ - 0
Weekly Rate$x24=$ - 0
Monthly Rate$x24=$ - 0
Pick-up & Delivery$x8=$ - 0
TRENCH BOXESRATESESTIMATED QTYTOTAL
104'x8'x3"Daily Rate$x10=$ - 0
Weekly Rate$x10=$ - 0
Monthly Rate$x10=$ - 0
Pick-up & Delivery$x6=$ - 0
116'x8'x3"Daily Rate$x12=$ - 0
Weekly Rate$x12=$ - 0
Monthly Rate$x12=$ - 0
Pick-up & Delivery$x8=$ - 0
128'x8'x3"Daily Rate$x12=$ - 0
Weekly Rate$x12=$ - 0
Monthly Rate$x12=$ - 0
Pick-up & Delivery$x8=$ - 0
13Subtotal of items 1 through 12 =$ - 0
TECHNICAL SUPPORTCost
14Technical Support on an as needed basisNot to exceed 20% of contract total$ - 0
EMERGENCY SERVICESRATExESTIMATED QUANTITIES
15Notification of 3 hours or less$ - 0x80=$ - 0
EQUIPMENT REPAIRHOURLY RATExESTIMATED NUMBER OF HOURS
16Labor$ - 0X120=$ - 0
PartsESTIMATED COST FOR PARTS=$ 20,000.00
GRAND TOTAL (SUM OF TOTALS FOR ITEMS 1 THROUGH 16) BASIS OF AWARD:$ - 0

AGREEMENT SHALL BE WRITTEN FOR THE STATE'S ESTIMATE OF $ 150,000.00

Contractor may offer a discount on invoices paid within thirty (30) days of receipt. Discount offered must be at least one percent and a minimum of $50.00.

Discount offered on invoices paid within 30 days of receipt=%**
** The percent of discount (highest discount prevails) may be used in the event of tie bids. Refer to the Notice to Prospective Bidders, Bid Submission Requirements.

The CDCR will be under no obligation to rent specific equipment listed herein. The list of equipment on Exhibit B-1, Rate Sheet, is an estimate only of the type of equipment needed. The CDCR does not expressly, or by implication, agree that all of the equipment listed will be used during the term of this contract, nor does it agree that the equipment will be needed for the entire period. Except where specifically requested by the IWL Site Supervisor, all equipment shall be rented exclusively of damage waiver provisions.

Rate Sheet &"Arial,Regular"&9Bid Number C5612461-D

Page &P of &N

4 ISP

TRENCH SHORING EQUIPMENT RENTAL SERVICES
CONSTRUCTION TRAINING REHABILITATION PROGRAM
IRONWOOD STATE PRISON

Electronic bid packages include an Excel version of the Rate Sheet (Exhibit B-1) in addition to the PDF file in order to assist bidders in computing accurate totals. Bidders should download the Excel version and complete all highlighted cells.

Any quantities listed on Exhibit B-1 are CDCR's estimates only and are offered as a basis for the comparison of bids. The State does not expressly or by implication agree that the actual amount of work will correspond therewith and reserves the right to omit portions of the work as may be deemed necessary or advisable by the State.
Note: Bidder is required to bid each item. Failure to indicate a dollar amount in any item will be grounds to reject the entire bid. A zero dollar ($0.00) amount listed for any and all items will be interpreted and understood by the State to mean that the bidder shall perform any such service at no cost to the State.
HYDRAULIC & MECHANICAL SHORING JACKSRATESxESTIMATED QTY=TOTAL
12' rail X 22"-27" cylinder sizeDaily Rate$x8=$ - 0
Weekly Rate$x8=$ - 0
Monthly Rate$x8=$ - 0
Pick-up & Delivery$x4=$ - 0
23.5'2" rail X 28"-46" cylinder sizeDaily Rate$x12=$ - 0
Weekly Rate$x12=$ - 0
Monthly Rate$x12=$ - 0
Pick-up & Delivery$x4=$ - 0
37" rail X 34"-55" cylinder sizeDaily Rate$x12=$ - 0
Weekly Rate$x12=$ - 0
Monthly Rate$x12=$ - 0
Pick-up & Delivery$x4=$ - 0
4Plywood shoring-All rail sizesDaily Rate$x24=$ - 0`
Weekly Rate$x24=$ - 0
Monthly Rate$x24=$ - 0
Pick-up & Delivery$x24=$ - 0
5Mechanical Screw JackDaily Rate$x12=$ - 0
Weekly Rate$x12=$ - 0
Monthly Rate$x12=$ - 0
Pick-up & Delivery$x4=$ - 0
6Hydraulic Jack AccessoriesDaily Rate$x8=$ - 0
Weekly Rate$x8=$ - 0
Monthly Rate$x8=$ - 0
Pick-up & Delivery$x4=$ - 0
TRENCH PLATESRATESESTIMATED QTYTOTAL
78'X8'Daily Rate$x12=$ - 0
Weekly Rate$x12=$ - 0
Monthly Rate$x12=$ - 0
Pick-up & Delivery$x4=$ - 0
88' x10'Daily Rate$x12=$ - 0
Weekly Rate$x12=$ - 0
Monthly Rate$x12=$ - 0
Pick-up & Delivery$x4=$ - 0
98' x16'Daily Rate$x12=$ - 0
Weekly Rate$x12=$ - 0
Monthly Rate$x12=$ - 0
Pick-up & Delivery$x4=$ - 0
TRENCH BOXESRATESESTIMATED QTYTOTAL
104'x8'x3"Daily Rate$x5=$ - 0
Weekly Rate$x5=$ - 0
Monthly Rate$x5=$ - 0
Pick-up & Delivery$x3=$ - 0
116'x8'x3"Daily Rate$x6=$ - 0
Weekly Rate$x6=$ - 0
Monthly Rate$x6=$ - 0
Pick-up & Delivery$x4=$ - 0
128'x8'x3"Daily Rate$x6=$ - 0
Weekly Rate$x6=$ - 0
Monthly Rate$x6=$ - 0
Pick-up & Delivery$x4=$ - 0
13Subtotal of items 1 through 12 =$ - 0
TECHNICAL SUPPORTCost
14Technical Support on an as needed basisNot to exceed 20% of contract total$ - 0
EMERGENCY SERVICESRATExESTIMATED QUANTITIES
15Notification of 3 hours or less$ - 0x40=$ - 0
EQUIPMENT REPAIRHOURLY RATExESTIMATED NUMBER OF HOURS
16Labor$ - 0x60=$ - 0
PartsESTIMATED COST FOR PARTS=$ 10,000.00
GRAND TOTAL (SUM OF TOTALS FOR ITEMS 1 THROUGH 16) BASIS OF AWARD:$ - 0

AGREEMENT SHALL BE WRITTEN FOR THE STATE'S ESTIMATE OF $ 50,000.00

Contractor may offer a discount on invoices paid within thirty (30) days of receipt. Discount offered must be at least one percent and a minimum of $50.00.

Discount offered on invoices paid within 30 days of receipt=%**
** The percent of discount (highest discount prevails) may be used in the event of tie bids. Refer to the Notice to Prospective Bidders, Bid Submission Requirements.

The CDCR will be under no obligation to rent specific equipment listed herein. The list of equipment on Exhibit B-1, Rate Sheet, is an estimate only of the type of equipment needed. The CDCR does not expressly, or by implication, agree that all of the equipment listed will be used during the term of this contract, nor does it agree that the equipment will be needed for the entire period. Except where specifically requested by the IWL Site Supervisor, all equipment shall be rented exclusively of damage waiver provisions.

Rate Sheet &"Arial,Regular"&9Bid Number C5612461-D

5 LAC

TRENCH SHORING EQUIPMENT RENTAL SERVICES
CONSTRUCTION TRAINING REHABILITATION PROGRAM
CALIFORNIA STATE PRISON, LOS ANGELES COUNTY

Electronic bid packages include an Excel version of the Rate Sheet (Exhibit B-1) in addition to the PDF file in order to assist bidders in computing accurate totals. Bidders should download the Excel version and complete all highlighted cells.

Any quantities listed on Exhibit B-1 are CDCR's estimates only and are offered as a basis for the comparison of bids. The State does not expressly or by implication agree that the actual amount of work will correspond therewith and reserves the right to omit portions of the work as may be deemed necessary or advisable by the State.
Note: Bidder is required to bid each item. Failure to indicate a dollar amount in any item will be grounds to reject the entire bid. A zero dollar ($0.00) amount listed for any and all items will be interpreted and understood by the State to mean that the bidder shall perform any such service at no cost to the State.
HYDRAULIC & MECHANICAL SHORING JACKSRATESxESTIMATED QTY=TOTAL
12' rail X 22"-27" cylinder sizeDaily Rate$x16=$ - 0
Weekly Rate$x16=$ - 0
Monthly Rate$x16=$ - 0
Pick-up & Delivery$x8=$ - 0
23.5'2" rail X 28"-46" cylinder sizeDaily Rate$x24=$ - 0
Weekly Rate$x24=$ - 0
Monthly Rate$x24=$ - 0
Pick-up & Delivery$x8=$ - 0
37" rail X 34"-55" cylinder sizeDaily Rate$x24=$ - 0
Weekly Rate$x24=$ - 0
Monthly Rate$x24=$ - 0
Pick-up & Delivery$x8=$ - 0
4Plywood shoring-All rail sizesDaily Rate$x48=$ - 0`
Weekly Rate$x48=$ - 0
Monthly Rate$x48=$ - 0
Pick-up & Delivery$x48=$ - 0
5Mechanical Screw JackDaily Rate$x24=$ - 0
Weekly Rate$x24=$ - 0
Monthly Rate$x24=$ - 0
Pick-up & Delivery$x8=$ - 0
6Hydraulic Jack AccessoriesDaily Rate$x16=$ - 0
Weekly Rate$x16=$ - 0
Monthly Rate$x16=$ - 0
Pick-up & Delivery$x8=$ - 0
TRENCH PLATESRATESESTIMATED QTYTOTAL
78'X8'Daily Rate$x24=$ - 0
Weekly Rate$x24=$ - 0
Monthly Rate$x24=$ - 0
Pick-up & Delivery$x8=$ - 0
88' x10'Daily Rate$x24=$ - 0
Weekly Rate$x24=$ - 0
Monthly Rate$x24=$ - 0
Pick-up & Delivery$x8=$ - 0
98' x16'Daily Rate$x24=$ - 0
Weekly Rate$x24=$ - 0
Monthly Rate$x24=$ - 0
Pick-up & Delivery$x8=$ - 0
TRENCH BOXESRATESESTIMATED QTYTOTAL
104'x8'x3"Daily Rate$x10=$ - 0
Weekly Rate$x10=$ - 0
Monthly Rate$x10=$ - 0
Pick-up & Delivery$x6=$ - 0
116'x8'x3"Daily Rate$x12=$ - 0
Weekly Rate$x12=$ - 0
Monthly Rate$x12=$ - 0
Pick-up & Delivery$x8=$ - 0
128'x8'x3"Daily Rate$x12=$ - 0
Weekly Rate$x12=$ - 0
Monthly Rate$x12=$ - 0
Pick-up & Delivery$x8=$ - 0
13Subtotal of items 1 through 12 =$ - 0
TECHNICAL SUPPORTCost
14Technical Support on an as needed basisNot to exceed 20% of contract total$ - 0
EMERGENCY SERVICESRATExESTIMATED QUANTITIES
15Notification of 3 hours or less$ - 0x80=$ - 0
EQUIPMENT REPAIRHOURLY RATExESTIMATED NUMBER OF HOURS
16Labor$ - 0x120=$ - 0
PartsESTIMATED COST FOR PARTS=$ 20,000.00
GRAND TOTAL (SUM OF TOTALS FOR ITEMS 1 THROUGH 16) BASIS OF AWARD:$ - 0

AGREEMENT SHALL BE WRITTEN FOR THE STATE'S ESTIMATE OF $150,000.00

Contractor may offer a discount on invoices paid within thirty (30) days of receipt. Discount offered must be at least one percent and a minimum of $50.00.

Discount offered on invoices paid within 30 days of receipt = %**

** The percent of discount (highest discount prevails) may be used in the event of tie bids. Refer to the Notice to Prospective Bidders, Bid Submission Requirements.

The CDCR will be under no obligation to rent specific equipment listed herein. The list of equipment on Exhibit B-1, Rate Sheet, is an estimate only of the type of equipment needed. The CDCR does not expressly, or by implication, agree that all of the equipment listed will be used during the term of this contract, nor does it agree that the equipment will be needed for the entire period. Except where specifically requested by the IWL Site Supervisor, all equipment shall be rented exclusively of damage waiver provisions.

Rate Sheet &"Arial,Regular"&9Bid Number C5612461-D

6 RJD

TRENCH SHORING EQUIPMENT RENTAL SERVICES
CONSTRUCTION TRAINING REHABILITATION PROGRAM
RICHARD J. DONOVAN CORRECTIONAL FACILITY

Electronic bid pakages include an Excel version of the Rate Sheet (Exhibit B-1) in addition to the PDF file in order to assist bidders in computing accurate totals. Bidders should download the Excel version and complete all highlighted cells.

Any quantities listed on Exhibit B-1 are CDCR's estimates only and are offered as a basis for the comparison of bids. The State does not expressly or by implication agree that the actual amount of work will correspond therewith and reserves the right to omit portions of the work as may be deemed necessary or advisable by the State.
Note: Bidder is required to bid each item. Failure to indicate a dollar amount in any item will be grounds to reject the entire bid. A zero dollar ($0.00) amount listed for any and all items will be interpreted and understood by the State to mean that the bidder shall perform any such service at no cost to the State.
HYDRAULIC & MECHANICAL SHORING JACKSRATESxESTIMATED QTY=TOTAL
HYDRAULIC & MECHANICAL SHORING JACKS
12' rail X 22"-27" cylinder sizeDaily Rate$x16=$ - 0
Weekly Rate$x16=$ - 0
Monthly Rate$x16=$ - 0
Pick-up & Delivery$x8=$ - 0
23.5'2" rail X 28"-46" cylinder sizeDaily Rate$x24=$ - 0
Weekly Rate$x24=$ - 0
Monthly Rate$x24=$ - 0
Pick-up & Delivery$x8=$ - 0
37" rail X 34"-55" cylinder sizeDaily Rate$x24=$ - 0
Weekly Rate$x24=$ - 0
Monthly Rate$x24=$ - 0
Pick-up & Delivery$x8=$ - 0
4Plywood shoring-All rail sizesDaily Rate$x48=$ - 0
Weekly Rate$x48=$ - 0
Monthly Rate$x48=$ - 0`
Pick-up & Delivery$x48=$ - 0
5Mechanical Screw JackDaily Rate$x24=$ - 0
Weekly Rate$x24=$ - 0
Monthly Rate$x24=$ - 0
Pick-up & Delivery$x8=$ - 0
6Hydraulic Jack AccessoriesDaily Rate$x16=$ - 0
Weekly Rate$x16=$ - 0
Monthly Rate$x16=$ - 0
Pick-up & Delivery$x8=$ - 0
TRENCH PLATESRATESESTIMATED QTYTOTAL
78'X8'Daily Rate$x24=$ - 0
Weekly Rate$x24=$ - 0
Monthly Rate$x24=$ - 0
Pick-up & Delivery$x8=$ - 0
88' x10'Daily Rate$x24=$ - 0
Weekly Rate$x24=$ - 0
Monthly Rate$x24=$ - 0
Pick-up & Delivery$x8=$ - 0
98' x16'Daily Rate$x24=$ - 0
Weekly Rate$x24=$ - 0
Monthly Rate$x24=$ - 0
Pick-up & Delivery$x8=$ - 0
TRENCH BOXESRATESESTIMATED QTYTOTAL
104'x8'x3"Daily Rate$x10=$ - 0
Weekly Rate$x10=$ - 0
Monthly Rate$x10=$ - 0
Pick-up & Delivery$x6=$ - 0
116'x8'x3"Daily Rate$x12=$ - 0
Weekly Rate$x12=$ - 0
Monthly Rate$x12=$ - 0
Pick-up & Delivery$x8=$ - 0
128'x8'x3"Daily Rate$x12=$ - 0
Weekly Rate$x12=$ - 0
Monthly Rate$x12=$ - 0
Pick-up & Delivery$x8=$ - 0
13Subtotal of items 1 through 12 =$ - 0
TECHNICAL SUPPORTCost
14Technical Support on an as needed basisNot to exceed 20% of contract total$ - 0
EMERGENCY SERVICESRATExESTIMATED QUANTITIES
15Notification of 3 hours or less$ - 0x80=$ - 0
EQUIPMENT REPAIRHOURLY RATExESTIMATED QUANTITY OF HOURS
16Labor$ - 0x120=$ - 0
PartsESTIMATED COST FOR PARTS=$ 20,000.00
GRAND TOTAL (SUM OF TOTALS FOR ITEMS 1 THROUGH 16) BASIS OF AWARD:$ - 0

AGREEMENT SHALL BE WRITTEN FOR THE STATE'S ESTIMATE OF $ 120,000.00

Contractor may offer a discount on invoices paid within thirty (30) days of receipt. Discount offered must be at least one percent and a minimum of $50.00.

Discount offered on invoices paid within 30 days of receipt = %**

** The percent of discount (highest discount prevails) may be used in the event of tie bids. Refer to the Notice to Prospective Bidders, Bid Submission Requirements.

The CDCR will be under no obligation to rent specific equipment listed herein. The list of equipment on Exhibit B-1, Rate Sheet, is an estimate only of the type of equipment needed. The CDCR does not expressly, or by implication, agree that all of the equipment listed will be used during the term of this contract, nor does it agree that the equipment will be needed for the entire period. Except where specifically requested by the IWL Site Supervisor, all equipment shall be rented exclusively of damage waiver provisions.

&"Arial,Regular"&9California Department of Corrections and Rehbiliation (CDCR) Rate Sheet &"Arial,Regular"&9Bid Number C5612461-D

File details come from the government source that posted it. Updated .