This document is a Rate Sheet (Exhibit B-1) for a Trench Shoring Equipment Rental Services Invitation for Bid (IFB) issued by the California Department of Corrections and Rehabilitation (CDCR). The IFB covers multiple CDCR facilities, including Calipatria State Prison, Centinela State Prison, California Institution for Men, California Institution for Women, California Rehabilitation Center, Ironwood State Prison, California State Prison - Los Angeles County, and Richard J. Donovan Correctional Facility. The Contractor shall provide trench shoring equipment rentals on an as-needed basis and deliver requested equipment within 24 hours of notification. The CDCR estimates quantities for various shoring equipment, trench plates, and trench boxes but does not guarantee all listed items will be rented. The contract term is undefined, but the estimated contract values range from $50,000 to $200,000 across the facilities.
Pricing for the rental equipment is provided on the Rate Sheet, with daily, weekly, and monthly rates, as well as pick-up and delivery charges. The Contractor may also provide a price list with additional equipment options. If the Contractor's published rates are lower than the Rate Sheet, the lower rates will apply. The Contractor must bid each item, and failure to provide pricing for any item may result in the entire bid being rejected. The CDCR reserves the right to omit portions of the work as deemed necessary.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| C5612461-D_Trench_Shoring_IFB_Packet.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
1 CAL-CEN
| TRENCH SHORING EQUIPMENT RENTAL SERVICES |
| CONSTRUCTION TRAINING REHABILITATION PROGRAM |
| CALIPATRIA STATE PRISON |
| CENTINELA STATE PRISON |
Electronic bid packages include an Excel version of the Rate Sheet (Exhibit B-1) in addition to the PDF file in order to assist bidders in computing accurate totals. Bidders should download the Excel version and complete all highlighted cells.
| Any quantities listed on Exhibit B-1 are CDCR's estimates only and are offered as a basis for the comparison of bids. The State does not expressly or by implication agree that the actual amount of work will correspond therewith and reserves the right to omit portions of the work as may be deemed necessary or advisable by the State. |
| Note: Bidder is required to bid each item. Failure to indicate a dollar amount in any item will be grounds to reject the entire bid. A zero dollar ($0.00) amount listed for any and all items will be interpreted and understood by the State to mean that the bidder shall perform any such service at no cost to the State. |
| HYDRAULIC & MECHANICAL SHORING JACKS | RATES | x | ESTIMATED QTY | = | TOTAL | |||||
| 1 | 2' rail X 22"-27" cylinder size | Daily Rate | $ | x | 16 | = | $ - 0 | |||
| Weekly Rate | $ | x | 16 | = | $ - 0 | |||||
| Monthly Rate | $ | x | 16 | = | $ - 0 | |||||
| Pick-up & Delivery | $ | x | 8 | = | $ - 0 | |||||
| 2 | 3.5'2" rail X 28"-46" cylinder size | Daily Rate | $ | x | 24 | = | $ - 0 | |||
| Weekly Rate | $ | x | 24 | = | $ - 0 | |||||
| Monthly Rate | $ | x | 24 | = | $ - 0 | |||||
| Pick-up & Delivery | $ | x | 8 | = | $ - 0 | |||||
| 3 | 7" rail X 34"-55" cylinder size | Daily Rate | $ | x | 24 | = | $ - 0 | |||
| Weekly Rate | $ | x | 24 | = | $ - 0 | |||||
| Monthly Rate | $ | x | 24 | = | $ - 0 | |||||
| Pick-up & Delivery | $ | x | 8 | = | $ - 0 | ` | ||||
| 4 | Plywood shoring-All rail sizes | Daily Rate | $ | x | 48 | = | $ - 0 | |||
| Weekly Rate | $ | x | 48 | = | $ - 0 | |||||
| Monthly Rate | $ | x | 48 | = | $ - 0 | |||||
| Pick-up & Delivery | $ | x | 48 | = | $ - 0 | |||||
| 5 | Mechanical Screw Jack | Daily Rate | $ | x | 24 | = | $ - 0 | |||
| Weekly Rate | $ | x | 24 | = | $ - 0 | |||||
| Monthly Rate | $ | x | 24 | = | $ - 0 | |||||
| Pick-up & Delivery | $ | x | 8 | = | $ - 0 | |||||
| 6 | Hydraulic Jack Accessories | Daily Rate | $ | x | 16 | = | $ - 0 | |||
| Weekly Rate | $ | x | 16 | = | $ - 0 | |||||
| Monthly Rate | $ | x | 16 | = | $ - 0 | |||||
| Pick-up & Delivery | $ | x | 8 | = | $ - 0 | |||||
| TRENCH PLATES | RATES | ESTIMATED QTY | TOTAL | |||||||
| 7 | 8'X8' | Daily Rate | $ | x | 24 | = | $ - 0 | |||
| Weekly Rate | $ | x | 24 | = | $ - 0 | |||||
| Monthly Rate | $ | x | 24 | = | $ - 0 | |||||
| Pick-up & Delivery | $ | x | 8 | = | $ - 0 | |||||
| 8 | 8' x10' | Daily Rate | $ | x | 24 | = | $ - 0 | |||
| Weekly Rate | $ | x | 24 | = | $ - 0 | |||||
| Monthly Rate | $ | x | 24 | = | $ - 0 | |||||
| Pick-up & Delivery | $ | x | 8 | = | $ - 0 | |||||
| 9 | 8' x16' | Daily Rate | $ | x | 24 | = | $ - 0 | |||
| Weekly Rate | $ | x | 24 | = | $ - 0 | |||||
| Monthly Rate | $ | x | 24 | = | $ - 0 | |||||
| Pick-up & Delivery | $ | x | 8 | = | $ - 0 | |||||
| TRENCH BOXES | RATES | ESTIMATED QTY | TOTAL | |||||||
| 10 | 4'x8'x3" | Daily Rate | $ | x | 10 | = | $ - 0 | |||
| Weekly Rate | $ | x | 10 | = | $ - 0 | |||||
| Monthly Rate | $ | x | 10 | = | $ - 0 | |||||
| Pick-up & Delivery | $ | x | 6 | = | $ - 0 | |||||
| 11 | 6'x8'x3" | Daily Rate | $ | x | 12 | = | $ - 0 | |||
| Weekly Rate | $ | x | 12 | = | $ - 0 | |||||
| Monthly Rate | $ | x | 12 | = | $ - 0 | |||||
| Pick-up & Delivery | $ | x | 8 | = | $ - 0 | |||||
| 12 | 8'x8'x3" | Daily Rate | $ | x | 12 | = | $ - 0 | |||
| Weekly Rate | $ | x | 12 | = | $ - 0 | |||||
| Monthly Rate | $ | x | 12 | = | $ - 0 | |||||
| Pick-up & Delivery | $ | x | 8 | = | $ - 0 | |||||
| 13 | Subtotal of items 1 through 12 = | $ - 0 | ||||||||
| TECHNICAL SUPPORT | Cost | |||||||||
| 14 | Technical Support on an as needed basis | Not to exceed 20% of contract total | $ - 0 | |||||||
| EMERGENCY SERVICES | RATE | x | ESTIMATED QUANTITIES | |||||||
| 15 | Notification of 3 hours or less | x | 80 | = | $ - 0 | |||||
| EQUIPMENT REPAIR | HOURLY RATE | x | ESTIMATED NUMBER OF HOURS |
| 16 | Labor | x | 120 | = | $ - 0 | |
| Parts | ESTIMATED COST FOR PARTS | = | $ 20,000.00 | |||
| GRAND TOTAL (SUM OF TOTALS FOR ITEMS 1 THROUGH 16) BASIS OF AWARD: | $ - 0 |
AGREEMENT SHALL BE WRITTEN FOR THE STATE'S ESTIMATE OF $200,000.00
*The grand total shall be used for determining the Basis of Award.
Contractor may offer a discount on invoices paid within thirty (30) days of receipt. Discount offered must be at least one percent and a minimum of $50.00.
Discount offered on invoices paid within 30 days of receipt = %**
** The percent of discount (highest discount prevails) may be used in the event of tie bids. Refer to the Notice to Prospective Bidders, Bid Submission Requirements.
The CDCR will be under no obligation to rent specific equipment listed herein. The list of equipment on Exhibit B-1, Rate Sheet, is an estimate only of the type of equipment needed. The CDCR does not expressly, or by implication, agree that all of the equipment listed will be used during the term of this contract, nor does it agree that the equipment will be needed for the entire period. Except where specifically requested by the IWL Site Supervisor, all equipment shall be rented exclusively of damage waiver provisions.
California Department of Corrections and Rehabilitation (CDCR) Rate Sheet Bid Number C5612461-D Exhibit B-1
2 CCI
| TRENCH SHORING EQUIPMENT RENTAL SERVICES |
| CONSTRUCTION TRAINING REHABILITATION PROGRAM |
| CALIFORNIA CORRECTIONAL INSTITUTION |
Electronic bid packages include an Excel version of the Rate Sheet (Exhibit B-1) in addition to the PDF file in order to assist bidders in computing accurate totals. Bidders should download the Excel version and complete all highlighted cells.
| Any quantities listed on Exhibit B-1 are CDCR's estimates only and are offered as a basis for the comparison of bids. The State does not expressly or by implication agree that the actual amount of work will correspond therewith and reserves the right to omit portions of the work as may be deemed necessary or advisable by the State. |
| Note: Bidder is required to bid each item. Failure to indicate a dollar amount in any item will be grounds to reject the entire bid. A zero dollar ($0.00) amount listed for any and all items will be interpreted and understood by the State to mean that the bidder shall perform any such service at no cost to the State. |
| HYDRAULIC & MECHANICAL SHORING JACKS | RATES | x | ESTIMATED QTY | = | TOTAL | |||||
| 1 | 2' rail X 22"-27" cylinder size | Daily Rate | $ | x | 16 | = | $ - 0 | |||
| Weekly Rate | $ | x | 16 | = | $ - 0 | |||||
| Monthly Rate | $ | x | 16 | = | $ - 0 | |||||
| Pick-up & Delivery | $ | x | 8 | = | $ - 0 | |||||
| 2 | 3.5'2" rail X 28"-46" cylinder size | Daily Rate | $ | x | 24 | = | $ - 0 | |||
| Weekly Rate | $ | x | 24 | = | $ - 0 | |||||
| Monthly Rate | $ | x | 24 | = | $ - 0 | |||||
| Pick-up & Delivery | $ | x | 8 | = | $ - 0 | |||||
| 3 | 7" rail X 34"-55" cylinder size | Daily Rate | $ | x | 24 | = | $ - 0 | |||
| Weekly Rate | $ | x | 24 | = | $ - 0 | |||||
| Monthly Rate | $ | x | 24 | = | $ - 0 | |||||
| Pick-up & Delivery | $ | x | 8 | = | $ - 0 | ` | ||||
| 4 | Plywood shoring-All rail sizes | Daily Rate | $ | x | 48 | = | $ - 0 | |||
| Weekly Rate | $ | x | 48 | = | $ - 0 | |||||
| Monthly Rate | $ | x | 48 | = | $ - 0 | |||||
| Pick-up & Delivery | $ | x | 48 | = | $ - 0 | |||||
| 5 | Mechanical Screw Jack | Daily Rate | $ | x | 24 | = | $ - 0 | |||
| Weekly Rate | $ | x | 24 | = | $ - 0 | |||||
| Monthly Rate | $ | x | 24 | = | $ - 0 | |||||
| Pick-up & Delivery | $ | x | 8 | = | $ - 0 | |||||
| 6 | Hydraulic Jack Accessories | Daily Rate | $ | x | 16 | = | $ - 0 | |||
| Weekly Rate | $ | x | 16 | = | $ - 0 | |||||
| Monthly Rate | $ | x | 16 | = | $ - 0 | |||||
| Pick-up & Delivery | $ | x | 8 | = | $ - 0 | |||||
| TRENCH PLATES | RATES | ESTIMATED QTY | TOTAL | |||||||
| 7 | 8'X8' | Daily Rate | $ | x | 24 | = | $ - 0 | |||
| Weekly Rate | $ | x | 24 | = | $ - 0 | |||||
| Monthly Rate | $ | x | 24 | = | $ - 0 | |||||
| Pick-up & Delivery | $ | x | 8 | = | $ - 0 | |||||
| 8 | 8' x10' | Daily Rate | $ | x | 24 | = | $ - 0 | |||
| Weekly Rate | $ | x | 24 | = | $ - 0 | |||||
| Monthly Rate | $ | x | 24 | = | $ - 0 | |||||
| Pick-up & Delivery | $ | x | 8 | = | $ - 0 | |||||
| 9 | 8' x16' | Daily Rate | $ | x | 24 | = | $ - 0 | |||
| Weekly Rate | $ | x | 24 | = | $ - 0 | |||||
| Monthly Rate | $ | x | 24 | = | $ - 0 | |||||
| Pick-up & Delivery | $ | x | 8 | = | $ - 0 | |||||
| TRENCH BOXES | RATES | ESTIMATED QTY | TOTAL | |||||||
| 10 | 4'x8'x3" | Daily Rate | $ | x | 10 | = | $ - 0 | |||
| Weekly Rate | $ | x | 10 | = | $ - 0 | |||||
| Monthly Rate | $ | x | 10 | = | $ - 0 | |||||
| Pick-up & Delivery | $ | x | 6 | = | $ - 0 | |||||
| 11 | 6'x8'x3" | Daily Rate | $ | x | 12 | = | $ - 0 | |||
| Weekly Rate | $ | x | 12 | = | $ - 0 | |||||
| Monthly Rate | $ | x | 12 | = | $ - 0 | |||||
| Pick-up & Delivery | $ | x | 8 | = | $ - 0 | |||||
| 12 | 8'x8'x3" | Daily Rate | $ | x | 12 | = | $ - 0 | |||
| Weekly Rate | $ | x | 12 | = | $ - 0 | |||||
| Monthly Rate | $ | x | 12 | = | $ - 0 | |||||
| Pick-up & Delivery | $ | x | 8 | = | $ - 0 | |||||
| 13 | Subtotal of items 1 through 12 = | $ - 0 | ||||||||
| TECHNICAL SUPPORT | Cost | |||||||||
| 14 | Technical Support on an as needed basis | Not to exceed 20% of contract total | $ - 0 | |||||||
| EMERGENCY SERVICES | RATE | x | ESTIMATED QUANTITIES | |||||||
| 15 | Notification of 3 hours or less | $ - 0 | x | 80 | = | $ - 0 | ||||
| EQUIPMENT REPAIR | HOURLY RATE | x | ESTIMATED NUMBER OF HOURS |
| 16 | Labor | $ - 0 | x | 120 | = | $ - 0 |
| Parts | ESTIMATED COST FOR PARTS | = | $ 20,000.00 | |||
| GRAND TOTAL (SUM OF TOTALS FOR ITEMS 1 THROUGH 16) BASIS OF AWARD: | $ - 0 |
AGREEMENT SHALL BE WRITTEN FOR THE STATE'S ESTIMATE OF $ 150,000.00
Contractor may offer a discount on invoices paid within thirty (30) days of receipt. Discount offered must be at least one percent and a minimum of $50.00.
Discount offered on invoices paid within 30 days of receipt = %**
** The percent of discount (highest discount prevails) may be used in the event of tie bids. Refer to the Notice to Prospective Bidders, Bid Submission Requirements.
The CDCR will be under no obligation to rent specific equipment listed herein. The list of equipment on Exhibit B-1, Rate Sheet, is an estimate only of the type of equipment needed. The CDCR does not expressly, or by implication, agree that all of the equipment listed will be used during the term of this contract, nor does it agree that the equipment will be needed for the entire period. Except where specifically requested by the IWL Site Supervisor, all equipment shall be rented exclusively of damage waiver provisions.
&"Arial,Regular"&9California Department of Corrections and Rehabilitation (CDCR) Rate Sheet &"Arial,Regular"&9Bid Number C5612461-D
3 CIM-CIW-CRC
| TRENCH SHORING EQUIPMENT RENTAL SERVICES |
| CONSTRUCTION TRAINING REHABILITATION PROGRAM |
| CALIFORNIA INSTITUTION FOR MEN |
| CALIFORNIA INSTITUTION FOR WOMEN |
| CALIFORNIA REHABILITATION CENTER |
Electronic bid packages include an Excel version of the Rate Sheet (Exhibit B-1) in addition to the PDF file in order to assist bidders in computing accurate totals. Bidders should download the Excel version and complete all highlighted cells.
| Any quantities listed on Exhibit B-1 are CDCR's estimates only and are offered as a basis for the comparison of bids. The State does not expressly or by implication agree that the actual amount of work will correspond therewith and reserves the right to omit portions of the work as may be deemed necessary or advisable by the State. |
| Note: Bidder is required to bid each item. Failure to indicate a dollar amount in any item will be grounds to reject the entire bid. A zero dollar ($0.00) amount listed for any and all items will be interpreted and understood by the State to mean that the bidder shall perform any such service at no cost to the State. |
| HYDRAULIC & MECHANICAL SHORING JACKS | RATES | x | ESTIMATED QTY | = | TOTAL | |||||
| 1 | 2' rail X 22"-27" cylinder size | Daily Rate | $ | x | 16 | = | $ - 0 | |||
| Weekly Rate | $ | x | 16 | = | $ - 0 | |||||
| Monthly Rate | $ | x | 16 | = | $ - 0 | |||||
| Pick-up & Delivery | $ | x | 8 | = | $ - 0 | |||||
| 2 | 3.5'2" rail X 28"-46" cylinder size | Daily Rate | $ | x | 24 | = | $ - 0 | |||
| Weekly Rate | $ | x | 24 | = | $ - 0 | |||||
| Monthly Rate | $ | x | 24 | = | $ - 0 | |||||
| Pick-up & Delivery | $ | x | 8 | = | $ - 0 | |||||
| 3 | 7" rail X 34"-55" cylinder size | Daily Rate | $ | x | 24 | = | $ - 0 | |||
| Weekly Rate | $ | x | 24 | = | $ - 0 | |||||
| Monthly Rate | $ | x | 24 | = | $ - 0 | |||||
| Pick-up & Delivery | $ | x | 8 | = | $ - 0 | ` | ||||
| 4 | Plywood shoring-All rail sizes | Daily Rate | $ | x | 48 | = | $ - 0 | |||
| Weekly Rate | $ | x | 48 | = | $ - 0 | |||||
| Monthly Rate | $ | x | 48 | = | $ - 0 | |||||
| Pick-up & Delivery | $ | x | 48 | = | $ - 0 | |||||
| 5 | Mechanical Screw Jack | Daily Rate | $ | x | 24 | = | $ - 0 | |||
| Weekly Rate | $ | x | 24 | = | $ - 0 | |||||
| Monthly Rate | $ | x | 24 | = | $ - 0 | |||||
| Pick-up & Delivery | $ | x | 8 | = | $ - 0 | |||||
| 6 | Hydraulic Jack Accessories | Daily Rate | $ | x | 16 | = | $ - 0 | |||
| Weekly Rate | $ | x | 16 | = | $ - 0 | |||||
| Monthly Rate | $ | x | 16 | = | $ - 0 | |||||
| Pick-up & Delivery | $ | x | 8 | = | $ - 0 | |||||
| TRENCH PLATES | RATES | ESTIMATED QTY | TOTAL | |||||||
| 7 | 8'X8' | Daily Rate | $ | x | 24 | = | $ - 0 | |||
| Weekly Rate | $ | x | 24 | = | $ - 0 | |||||
| Monthly Rate | $ | x | 24 | = | $ - 0 | |||||
| Pick-up & Delivery | $ | x | 8 | = | $ - 0 | |||||
| 8 | 8' x10' | Daily Rate | $ | x | 24 | = | $ - 0 | |||
| Weekly Rate | $ | x | 24 | = | $ - 0 | |||||
| Monthly Rate | $ | x | 24 | = | $ - 0 | |||||
| Pick-up & Delivery | $ | x | 8 | = | $ - 0 | |||||
| 9 | 8' x16' | Daily Rate | $ | x | 24 | = | $ - 0 | |||
| Weekly Rate | $ | x | 24 | = | $ - 0 | |||||
| Monthly Rate | $ | x | 24 | = | $ - 0 | |||||
| Pick-up & Delivery | $ | x | 8 | = | $ - 0 | |||||
| TRENCH BOXES | RATES | ESTIMATED QTY | TOTAL | |||||||
| 10 | 4'x8'x3" | Daily Rate | $ | x | 10 | = | $ - 0 | |||
| Weekly Rate | $ | x | 10 | = | $ - 0 | |||||
| Monthly Rate | $ | x | 10 | = | $ - 0 | |||||
| Pick-up & Delivery | $ | x | 6 | = | $ - 0 | |||||
| 11 | 6'x8'x3" | Daily Rate | $ | x | 12 | = | $ - 0 | |||
| Weekly Rate | $ | x | 12 | = | $ - 0 | |||||
| Monthly Rate | $ | x | 12 | = | $ - 0 | |||||
| Pick-up & Delivery | $ | x | 8 | = | $ - 0 | |||||
| 12 | 8'x8'x3" | Daily Rate | $ | x | 12 | = | $ - 0 | |||
| Weekly Rate | $ | x | 12 | = | $ - 0 | |||||
| Monthly Rate | $ | x | 12 | = | $ - 0 | |||||
| Pick-up & Delivery | $ | x | 8 | = | $ - 0 | |||||
| 13 | Subtotal of items 1 through 12 = | $ - 0 | ||||||||
| TECHNICAL SUPPORT | Cost | |||||||||
| 14 | Technical Support on an as needed basis | Not to exceed 20% of contract total | $ - 0 | |||||||
| EMERGENCY SERVICES | RATE | x | ESTIMATED QUANTITIES | |||||||
| 15 | Notification of 3 hours or less | $ - 0 | x | 80 | = | $ - 0 | ||||
| EQUIPMENT REPAIR | HOURLY RATE | x | ESTIMATED NUMBER OF HOURS |
| 16 | Labor | $ - 0 | X | 120 | = | $ - 0 |
| Parts | ESTIMATED COST FOR PARTS | = | $ 20,000.00 | |||
| GRAND TOTAL (SUM OF TOTALS FOR ITEMS 1 THROUGH 16) BASIS OF AWARD: | $ - 0 |
AGREEMENT SHALL BE WRITTEN FOR THE STATE'S ESTIMATE OF $ 150,000.00
Contractor may offer a discount on invoices paid within thirty (30) days of receipt. Discount offered must be at least one percent and a minimum of $50.00.
| Discount offered on invoices paid within 30 days of receipt | = | %** |
| ** The percent of discount (highest discount prevails) may be used in the event of tie bids. Refer to the Notice to Prospective Bidders, Bid Submission Requirements. |
The CDCR will be under no obligation to rent specific equipment listed herein. The list of equipment on Exhibit B-1, Rate Sheet, is an estimate only of the type of equipment needed. The CDCR does not expressly, or by implication, agree that all of the equipment listed will be used during the term of this contract, nor does it agree that the equipment will be needed for the entire period. Except where specifically requested by the IWL Site Supervisor, all equipment shall be rented exclusively of damage waiver provisions.
Rate Sheet &"Arial,Regular"&9Bid Number C5612461-D
Page &P of &N
4 ISP
| TRENCH SHORING EQUIPMENT RENTAL SERVICES |
| CONSTRUCTION TRAINING REHABILITATION PROGRAM |
| IRONWOOD STATE PRISON |
Electronic bid packages include an Excel version of the Rate Sheet (Exhibit B-1) in addition to the PDF file in order to assist bidders in computing accurate totals. Bidders should download the Excel version and complete all highlighted cells.
| Any quantities listed on Exhibit B-1 are CDCR's estimates only and are offered as a basis for the comparison of bids. The State does not expressly or by implication agree that the actual amount of work will correspond therewith and reserves the right to omit portions of the work as may be deemed necessary or advisable by the State. |
| Note: Bidder is required to bid each item. Failure to indicate a dollar amount in any item will be grounds to reject the entire bid. A zero dollar ($0.00) amount listed for any and all items will be interpreted and understood by the State to mean that the bidder shall perform any such service at no cost to the State. |
| HYDRAULIC & MECHANICAL SHORING JACKS | RATES | x | ESTIMATED QTY | = | TOTAL | |||||
| 1 | 2' rail X 22"-27" cylinder size | Daily Rate | $ | x | 8 | = | $ - 0 | |||
| Weekly Rate | $ | x | 8 | = | $ - 0 | |||||
| Monthly Rate | $ | x | 8 | = | $ - 0 | |||||
| Pick-up & Delivery | $ | x | 4 | = | $ - 0 | |||||
| 2 | 3.5'2" rail X 28"-46" cylinder size | Daily Rate | $ | x | 12 | = | $ - 0 | |||
| Weekly Rate | $ | x | 12 | = | $ - 0 | |||||
| Monthly Rate | $ | x | 12 | = | $ - 0 | |||||
| Pick-up & Delivery | $ | x | 4 | = | $ - 0 | |||||
| 3 | 7" rail X 34"-55" cylinder size | Daily Rate | $ | x | 12 | = | $ - 0 | |||
| Weekly Rate | $ | x | 12 | = | $ - 0 | |||||
| Monthly Rate | $ | x | 12 | = | $ - 0 | |||||
| Pick-up & Delivery | $ | x | 4 | = | $ - 0 | |||||
| 4 | Plywood shoring-All rail sizes | Daily Rate | $ | x | 24 | = | $ - 0 | ` | ||
| Weekly Rate | $ | x | 24 | = | $ - 0 | |||||
| Monthly Rate | $ | x | 24 | = | $ - 0 | |||||
| Pick-up & Delivery | $ | x | 24 | = | $ - 0 | |||||
| 5 | Mechanical Screw Jack | Daily Rate | $ | x | 12 | = | $ - 0 | |||
| Weekly Rate | $ | x | 12 | = | $ - 0 | |||||
| Monthly Rate | $ | x | 12 | = | $ - 0 | |||||
| Pick-up & Delivery | $ | x | 4 | = | $ - 0 | |||||
| 6 | Hydraulic Jack Accessories | Daily Rate | $ | x | 8 | = | $ - 0 | |||
| Weekly Rate | $ | x | 8 | = | $ - 0 | |||||
| Monthly Rate | $ | x | 8 | = | $ - 0 | |||||
| Pick-up & Delivery | $ | x | 4 | = | $ - 0 | |||||
| TRENCH PLATES | RATES | ESTIMATED QTY | TOTAL | |||||||
| 7 | 8'X8' | Daily Rate | $ | x | 12 | = | $ - 0 | |||
| Weekly Rate | $ | x | 12 | = | $ - 0 | |||||
| Monthly Rate | $ | x | 12 | = | $ - 0 | |||||
| Pick-up & Delivery | $ | x | 4 | = | $ - 0 | |||||
| 8 | 8' x10' | Daily Rate | $ | x | 12 | = | $ - 0 | |||
| Weekly Rate | $ | x | 12 | = | $ - 0 | |||||
| Monthly Rate | $ | x | 12 | = | $ - 0 | |||||
| Pick-up & Delivery | $ | x | 4 | = | $ - 0 | |||||
| 9 | 8' x16' | Daily Rate | $ | x | 12 | = | $ - 0 | |||
| Weekly Rate | $ | x | 12 | = | $ - 0 | |||||
| Monthly Rate | $ | x | 12 | = | $ - 0 | |||||
| Pick-up & Delivery | $ | x | 4 | = | $ - 0 | |||||
| TRENCH BOXES | RATES | ESTIMATED QTY | TOTAL | |||||||
| 10 | 4'x8'x3" | Daily Rate | $ | x | 5 | = | $ - 0 | |||
| Weekly Rate | $ | x | 5 | = | $ - 0 | |||||
| Monthly Rate | $ | x | 5 | = | $ - 0 | |||||
| Pick-up & Delivery | $ | x | 3 | = | $ - 0 | |||||
| 11 | 6'x8'x3" | Daily Rate | $ | x | 6 | = | $ - 0 | |||
| Weekly Rate | $ | x | 6 | = | $ - 0 | |||||
| Monthly Rate | $ | x | 6 | = | $ - 0 | |||||
| Pick-up & Delivery | $ | x | 4 | = | $ - 0 | |||||
| 12 | 8'x8'x3" | Daily Rate | $ | x | 6 | = | $ - 0 | |||
| Weekly Rate | $ | x | 6 | = | $ - 0 | |||||
| Monthly Rate | $ | x | 6 | = | $ - 0 | |||||
| Pick-up & Delivery | $ | x | 4 | = | $ - 0 | |||||
| 13 | Subtotal of items 1 through 12 = | $ - 0 | ||||||||
| TECHNICAL SUPPORT | Cost | |||||||||
| 14 | Technical Support on an as needed basis | Not to exceed 20% of contract total | $ - 0 | |||||||
| EMERGENCY SERVICES | RATE | x | ESTIMATED QUANTITIES | |||||||
| 15 | Notification of 3 hours or less | $ - 0 | x | 40 | = | $ - 0 | ||||
| EQUIPMENT REPAIR | HOURLY RATE | x | ESTIMATED NUMBER OF HOURS |
| 16 | Labor | $ - 0 | x | 60 | = | $ - 0 |
| Parts | ESTIMATED COST FOR PARTS | = | $ 10,000.00 | |||
| GRAND TOTAL (SUM OF TOTALS FOR ITEMS 1 THROUGH 16) BASIS OF AWARD: | $ - 0 |
AGREEMENT SHALL BE WRITTEN FOR THE STATE'S ESTIMATE OF $ 50,000.00
Contractor may offer a discount on invoices paid within thirty (30) days of receipt. Discount offered must be at least one percent and a minimum of $50.00.
| Discount offered on invoices paid within 30 days of receipt | = | %** |
| ** The percent of discount (highest discount prevails) may be used in the event of tie bids. Refer to the Notice to Prospective Bidders, Bid Submission Requirements. |
The CDCR will be under no obligation to rent specific equipment listed herein. The list of equipment on Exhibit B-1, Rate Sheet, is an estimate only of the type of equipment needed. The CDCR does not expressly, or by implication, agree that all of the equipment listed will be used during the term of this contract, nor does it agree that the equipment will be needed for the entire period. Except where specifically requested by the IWL Site Supervisor, all equipment shall be rented exclusively of damage waiver provisions.
Rate Sheet &"Arial,Regular"&9Bid Number C5612461-D
5 LAC
| TRENCH SHORING EQUIPMENT RENTAL SERVICES |
| CONSTRUCTION TRAINING REHABILITATION PROGRAM |
| CALIFORNIA STATE PRISON, LOS ANGELES COUNTY |
Electronic bid packages include an Excel version of the Rate Sheet (Exhibit B-1) in addition to the PDF file in order to assist bidders in computing accurate totals. Bidders should download the Excel version and complete all highlighted cells.
| Any quantities listed on Exhibit B-1 are CDCR's estimates only and are offered as a basis for the comparison of bids. The State does not expressly or by implication agree that the actual amount of work will correspond therewith and reserves the right to omit portions of the work as may be deemed necessary or advisable by the State. |
| Note: Bidder is required to bid each item. Failure to indicate a dollar amount in any item will be grounds to reject the entire bid. A zero dollar ($0.00) amount listed for any and all items will be interpreted and understood by the State to mean that the bidder shall perform any such service at no cost to the State. |
| HYDRAULIC & MECHANICAL SHORING JACKS | RATES | x | ESTIMATED QTY | = | TOTAL | |||||
| 1 | 2' rail X 22"-27" cylinder size | Daily Rate | $ | x | 16 | = | $ - 0 | |||
| Weekly Rate | $ | x | 16 | = | $ - 0 | |||||
| Monthly Rate | $ | x | 16 | = | $ - 0 | |||||
| Pick-up & Delivery | $ | x | 8 | = | $ - 0 | |||||
| 2 | 3.5'2" rail X 28"-46" cylinder size | Daily Rate | $ | x | 24 | = | $ - 0 | |||
| Weekly Rate | $ | x | 24 | = | $ - 0 | |||||
| Monthly Rate | $ | x | 24 | = | $ - 0 | |||||
| Pick-up & Delivery | $ | x | 8 | = | $ - 0 | |||||
| 3 | 7" rail X 34"-55" cylinder size | Daily Rate | $ | x | 24 | = | $ - 0 | |||
| Weekly Rate | $ | x | 24 | = | $ - 0 | |||||
| Monthly Rate | $ | x | 24 | = | $ - 0 | |||||
| Pick-up & Delivery | $ | x | 8 | = | $ - 0 | |||||
| 4 | Plywood shoring-All rail sizes | Daily Rate | $ | x | 48 | = | $ - 0 | ` | ||
| Weekly Rate | $ | x | 48 | = | $ - 0 | |||||
| Monthly Rate | $ | x | 48 | = | $ - 0 | |||||
| Pick-up & Delivery | $ | x | 48 | = | $ - 0 | |||||
| 5 | Mechanical Screw Jack | Daily Rate | $ | x | 24 | = | $ - 0 | |||
| Weekly Rate | $ | x | 24 | = | $ - 0 | |||||
| Monthly Rate | $ | x | 24 | = | $ - 0 | |||||
| Pick-up & Delivery | $ | x | 8 | = | $ - 0 | |||||
| 6 | Hydraulic Jack Accessories | Daily Rate | $ | x | 16 | = | $ - 0 | |||
| Weekly Rate | $ | x | 16 | = | $ - 0 | |||||
| Monthly Rate | $ | x | 16 | = | $ - 0 | |||||
| Pick-up & Delivery | $ | x | 8 | = | $ - 0 | |||||
| TRENCH PLATES | RATES | ESTIMATED QTY | TOTAL | |||||||
| 7 | 8'X8' | Daily Rate | $ | x | 24 | = | $ - 0 | |||
| Weekly Rate | $ | x | 24 | = | $ - 0 | |||||
| Monthly Rate | $ | x | 24 | = | $ - 0 | |||||
| Pick-up & Delivery | $ | x | 8 | = | $ - 0 | |||||
| 8 | 8' x10' | Daily Rate | $ | x | 24 | = | $ - 0 | |||
| Weekly Rate | $ | x | 24 | = | $ - 0 | |||||
| Monthly Rate | $ | x | 24 | = | $ - 0 | |||||
| Pick-up & Delivery | $ | x | 8 | = | $ - 0 | |||||
| 9 | 8' x16' | Daily Rate | $ | x | 24 | = | $ - 0 | |||
| Weekly Rate | $ | x | 24 | = | $ - 0 | |||||
| Monthly Rate | $ | x | 24 | = | $ - 0 | |||||
| Pick-up & Delivery | $ | x | 8 | = | $ - 0 | |||||
| TRENCH BOXES | RATES | ESTIMATED QTY | TOTAL | |||||||
| 10 | 4'x8'x3" | Daily Rate | $ | x | 10 | = | $ - 0 | |||
| Weekly Rate | $ | x | 10 | = | $ - 0 | |||||
| Monthly Rate | $ | x | 10 | = | $ - 0 | |||||
| Pick-up & Delivery | $ | x | 6 | = | $ - 0 | |||||
| 11 | 6'x8'x3" | Daily Rate | $ | x | 12 | = | $ - 0 | |||
| Weekly Rate | $ | x | 12 | = | $ - 0 | |||||
| Monthly Rate | $ | x | 12 | = | $ - 0 | |||||
| Pick-up & Delivery | $ | x | 8 | = | $ - 0 | |||||
| 12 | 8'x8'x3" | Daily Rate | $ | x | 12 | = | $ - 0 | |||
| Weekly Rate | $ | x | 12 | = | $ - 0 | |||||
| Monthly Rate | $ | x | 12 | = | $ - 0 | |||||
| Pick-up & Delivery | $ | x | 8 | = | $ - 0 | |||||
| 13 | Subtotal of items 1 through 12 = | $ - 0 | ||||||||
| TECHNICAL SUPPORT | Cost | |||||||||
| 14 | Technical Support on an as needed basis | Not to exceed 20% of contract total | $ - 0 | |||||||
| EMERGENCY SERVICES | RATE | x | ESTIMATED QUANTITIES | |||||||
| 15 | Notification of 3 hours or less | $ - 0 | x | 80 | = | $ - 0 | ||||
| EQUIPMENT REPAIR | HOURLY RATE | x | ESTIMATED NUMBER OF HOURS |
| 16 | Labor | $ - 0 | x | 120 | = | $ - 0 |
| Parts | ESTIMATED COST FOR PARTS | = | $ 20,000.00 | |||
| GRAND TOTAL (SUM OF TOTALS FOR ITEMS 1 THROUGH 16) BASIS OF AWARD: | $ - 0 |
AGREEMENT SHALL BE WRITTEN FOR THE STATE'S ESTIMATE OF $150,000.00
Contractor may offer a discount on invoices paid within thirty (30) days of receipt. Discount offered must be at least one percent and a minimum of $50.00.
Discount offered on invoices paid within 30 days of receipt = %**
** The percent of discount (highest discount prevails) may be used in the event of tie bids. Refer to the Notice to Prospective Bidders, Bid Submission Requirements.
The CDCR will be under no obligation to rent specific equipment listed herein. The list of equipment on Exhibit B-1, Rate Sheet, is an estimate only of the type of equipment needed. The CDCR does not expressly, or by implication, agree that all of the equipment listed will be used during the term of this contract, nor does it agree that the equipment will be needed for the entire period. Except where specifically requested by the IWL Site Supervisor, all equipment shall be rented exclusively of damage waiver provisions.
Rate Sheet &"Arial,Regular"&9Bid Number C5612461-D
6 RJD
| TRENCH SHORING EQUIPMENT RENTAL SERVICES |
| CONSTRUCTION TRAINING REHABILITATION PROGRAM |
| RICHARD J. DONOVAN CORRECTIONAL FACILITY |
Electronic bid pakages include an Excel version of the Rate Sheet (Exhibit B-1) in addition to the PDF file in order to assist bidders in computing accurate totals. Bidders should download the Excel version and complete all highlighted cells.
| Any quantities listed on Exhibit B-1 are CDCR's estimates only and are offered as a basis for the comparison of bids. The State does not expressly or by implication agree that the actual amount of work will correspond therewith and reserves the right to omit portions of the work as may be deemed necessary or advisable by the State. |
| Note: Bidder is required to bid each item. Failure to indicate a dollar amount in any item will be grounds to reject the entire bid. A zero dollar ($0.00) amount listed for any and all items will be interpreted and understood by the State to mean that the bidder shall perform any such service at no cost to the State. |
| HYDRAULIC & MECHANICAL SHORING JACKS | RATES | x | ESTIMATED QTY | = | TOTAL | |||||
| HYDRAULIC & MECHANICAL SHORING JACKS | ||||||||||
| 1 | 2' rail X 22"-27" cylinder size | Daily Rate | $ | x | 16 | = | $ - 0 | |||
| Weekly Rate | $ | x | 16 | = | $ - 0 | |||||
| Monthly Rate | $ | x | 16 | = | $ - 0 | |||||
| Pick-up & Delivery | $ | x | 8 | = | $ - 0 | |||||
| 2 | 3.5'2" rail X 28"-46" cylinder size | Daily Rate | $ | x | 24 | = | $ - 0 | |||
| Weekly Rate | $ | x | 24 | = | $ - 0 | |||||
| Monthly Rate | $ | x | 24 | = | $ - 0 | |||||
| Pick-up & Delivery | $ | x | 8 | = | $ - 0 | |||||
| 3 | 7" rail X 34"-55" cylinder size | Daily Rate | $ | x | 24 | = | $ - 0 | |||
| Weekly Rate | $ | x | 24 | = | $ - 0 | |||||
| Monthly Rate | $ | x | 24 | = | $ - 0 | |||||
| Pick-up & Delivery | $ | x | 8 | = | $ - 0 | |||||
| 4 | Plywood shoring-All rail sizes | Daily Rate | $ | x | 48 | = | $ - 0 | |||
| Weekly Rate | $ | x | 48 | = | $ - 0 | |||||
| Monthly Rate | $ | x | 48 | = | $ - 0 | ` | ||||
| Pick-up & Delivery | $ | x | 48 | = | $ - 0 | |||||
| 5 | Mechanical Screw Jack | Daily Rate | $ | x | 24 | = | $ - 0 | |||
| Weekly Rate | $ | x | 24 | = | $ - 0 | |||||
| Monthly Rate | $ | x | 24 | = | $ - 0 | |||||
| Pick-up & Delivery | $ | x | 8 | = | $ - 0 | |||||
| 6 | Hydraulic Jack Accessories | Daily Rate | $ | x | 16 | = | $ - 0 | |||
| Weekly Rate | $ | x | 16 | = | $ - 0 | |||||
| Monthly Rate | $ | x | 16 | = | $ - 0 | |||||
| Pick-up & Delivery | $ | x | 8 | = | $ - 0 | |||||
| TRENCH PLATES | RATES | ESTIMATED QTY | TOTAL | |||||||
| 7 | 8'X8' | Daily Rate | $ | x | 24 | = | $ - 0 | |||
| Weekly Rate | $ | x | 24 | = | $ - 0 | |||||
| Monthly Rate | $ | x | 24 | = | $ - 0 | |||||
| Pick-up & Delivery | $ | x | 8 | = | $ - 0 | |||||
| 8 | 8' x10' | Daily Rate | $ | x | 24 | = | $ - 0 | |||
| Weekly Rate | $ | x | 24 | = | $ - 0 | |||||
| Monthly Rate | $ | x | 24 | = | $ - 0 | |||||
| Pick-up & Delivery | $ | x | 8 | = | $ - 0 | |||||
| 9 | 8' x16' | Daily Rate | $ | x | 24 | = | $ - 0 | |||
| Weekly Rate | $ | x | 24 | = | $ - 0 | |||||
| Monthly Rate | $ | x | 24 | = | $ - 0 | |||||
| Pick-up & Delivery | $ | x | 8 | = | $ - 0 | |||||
| TRENCH BOXES | RATES | ESTIMATED QTY | TOTAL | |||||||
| 10 | 4'x8'x3" | Daily Rate | $ | x | 10 | = | $ - 0 | |||
| Weekly Rate | $ | x | 10 | = | $ - 0 | |||||
| Monthly Rate | $ | x | 10 | = | $ - 0 | |||||
| Pick-up & Delivery | $ | x | 6 | = | $ - 0 | |||||
| 11 | 6'x8'x3" | Daily Rate | $ | x | 12 | = | $ - 0 | |||
| Weekly Rate | $ | x | 12 | = | $ - 0 | |||||
| Monthly Rate | $ | x | 12 | = | $ - 0 | |||||
| Pick-up & Delivery | $ | x | 8 | = | $ - 0 | |||||
| 12 | 8'x8'x3" | Daily Rate | $ | x | 12 | = | $ - 0 | |||
| Weekly Rate | $ | x | 12 | = | $ - 0 | |||||
| Monthly Rate | $ | x | 12 | = | $ - 0 | |||||
| Pick-up & Delivery | $ | x | 8 | = | $ - 0 | |||||
| 13 | Subtotal of items 1 through 12 = | $ - 0 | ||||||||
| TECHNICAL SUPPORT | Cost | |||||||||
| 14 | Technical Support on an as needed basis | Not to exceed 20% of contract total | $ - 0 | |||||||
| EMERGENCY SERVICES | RATE | x | ESTIMATED QUANTITIES | |||||||
| 15 | Notification of 3 hours or less | $ - 0 | x | 80 | = | $ - 0 | ||||
| EQUIPMENT REPAIR | HOURLY RATE | x | ESTIMATED QUANTITY OF HOURS |
| 16 | Labor | $ - 0 | x | 120 | = | $ - 0 |
| Parts | ESTIMATED COST FOR PARTS | = | $ 20,000.00 | |||
| GRAND TOTAL (SUM OF TOTALS FOR ITEMS 1 THROUGH 16) BASIS OF AWARD: | $ - 0 |
AGREEMENT SHALL BE WRITTEN FOR THE STATE'S ESTIMATE OF $ 120,000.00
Contractor may offer a discount on invoices paid within thirty (30) days of receipt. Discount offered must be at least one percent and a minimum of $50.00.
Discount offered on invoices paid within 30 days of receipt = %**
** The percent of discount (highest discount prevails) may be used in the event of tie bids. Refer to the Notice to Prospective Bidders, Bid Submission Requirements.
The CDCR will be under no obligation to rent specific equipment listed herein. The list of equipment on Exhibit B-1, Rate Sheet, is an estimate only of the type of equipment needed. The CDCR does not expressly, or by implication, agree that all of the equipment listed will be used during the term of this contract, nor does it agree that the equipment will be needed for the entire period. Except where specifically requested by the IWL Site Supervisor, all equipment shall be rented exclusively of damage waiver provisions.
&"Arial,Regular"&9California Department of Corrections and Rehbiliation (CDCR) Rate Sheet &"Arial,Regular"&9Bid Number C5612461-D
File details come from the government source that posted it. Updated .