C5- HQ0516-23-R-0050 Satellite Teleport-R.pdf

PDF 1 MB Posted

Attached to
Satellite Teleport Federal contract opportunity
Solicitation number
HQ0516-23-R-0050
Issued by
Defense Media Activity

About this file

This is a solicitation for a satellite teleport technical refresh project requiring the installation of new satellite antenna systems, pressurized dehydrator systems, filters, test equipment, cable protectors, and miscellaneous supplies. Offerors must provide capability statements, price quotes, and certifications by August 28, 2023 to the Defense Media Activity. The award will be a fixed-price contract for a 180-day period of performance to the lowest-priced technically acceptable offeror meeting the small business set-aside requirements. The work will occur at the DMA antenna facility located at Fort Meade, Maryland.

View the file

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SEE ADDENDUM

(No Collect Calls)

HQ051623R0050 16-Aug-2023

b. TELEPHONE NUMBER 8. OFFER DUE DATE/LOCAL TIME

10:00 AM 28 Aug 2023

5. SOLICITATION NUMBER 6. SOLICITATION ISSUE DATE

AUTHORIZED FOR LOCAL REPRODUCTION

PREVIOUS EDITION IS NOT USABLE

STANDARD FORM 1449 (REV. 2/2012)

Prescribed by GSA – FAR (48 CFR) 53.212

(TYPE OR PRINT)

(SIGNATURE OF CONTRACTING OFFICER)

ADDENDA ARE

26. TOTAL AWARD AMOUNT (For Gov t. Use Only )

23.

CODE 10. THIS ACQUISITION IS

SUCH ADDRESS IN OFFER

17b. CHECK IF REMITTANCE IS DIFFERENT AND PUT

BELOW IS CHECKED

TELEPHONE NO.

HQ05169. ISSUED BY

18b. SUBMIT INVOICES TO ADDRESS SHOWN IN BLOCK 18a. UNLESS BLOCK

7. FOR SOLICITATION

INFORMATION CALL:

a. NAME

COURTNEY RUSSELL

2. CONTRACT NO. 3. AWARD/EFFECTIVE DATE 4. ORDER NUMBER

(TYPE OR PRINT)

30b. NAME AND TITLE OF SIGNER 30c. DATE SIGNED 31b. NAME OF CONTRACTING OFFICER

30a. SIGNATURE OF OFFEROR/CONTRACTOR 31a.UNITED STATES OF AMERICA

27a. SOLICITATION INCORPORATES BY REFERENCE FAR 52.212-1. 52.212-4. FAR 52.212-3. 52.212-5 ARE ATTACHED.

25. ACCOUNTING AND APPROPRIATION DATA

1. REQUISITION NUMBER

20.

ADDITIONAL SHEETS SUBJECT TO THE TERMS AND CONDITIONS SPECIFIED.

OFFEROR TO COMPLETE BLOCKS 12, 17, 23, 24, AND 30

SOLICITATION/CONTRACT/ORDER FOR COMMERCIAL ITEMS

ARE NOT ATTACHED

27b. CONTRACT/PURCHASE ORDER INCORPORATES BY REFERENCE FAR 52.212-4. FAR 52.212-5 IS ATTACHED. ADDENDA ARE ARE NOT ATTACHED

(BLOCK 5), INCLUDING ANY ADDITIONS OR CHANGES WHICH ARE

SET FORTH HEREIN, IS ACCEPTED AS TO ITEMS:

. YOUR OFFER ON SOLICITATION

28. CONTRACTOR IS REQUIRED TO SIGN THIS DOCUMENT AND RETURN

% FOR:SET ASIDE:UNRESTRICTED OR X

SMALL BUSINESSX

17a.CONTRACTOR/ CODE FACILITY

OFFEROR CODE

DEFENSE MEDIA ACTIVITY

6700 TAYLOR STREET

FORT MEADE MD 20755

18a. PAYMENT WILL BE MADE BY CODE

RATED ORDER UNDER

DPAS (15 CFR 700)

13a. THIS CONTRACT IS A

13b. RATING

CODE15. DELIVER TO CODE 16. ADMINISTERED BY

SEE SCHEDULE

12. DISCOUNT TERMS11. DELIVERY FOR FOB DESTINA-

TION UNLESS BLOCK IS

MARKED

SEE SCHEDULE

14. METHOD OF SOLICITATION

RFQ IFB RFPX

FAX:

TEL: 301-222-6197

SERVICE-DISABLED

VETERAN-OWNED

SMALL BUSINESS

8(A)

HUBZONE SMALL

BUSINESS

SIZE STANDARD:

1,250

NAICS:

334220

X

OFFER DATED

29. AWARD OF CONTRACT: REF.

DELIVER ALL ITEMS SET FORTH OR OTHERWISE IDENTIFIED ABOVE AND ON ANY

COPIES TO ISSUING OFFICE. CONTRACTOR AGREES TO FURNISH AND

EMAIL:

TEL:

31c. DATE SIGNED

SEE SCHEDULE

SCHEDULE OF SUPPLIES/ SERVICESITEM NO. QUANTITY UNIT UNIT PRICE AMOUNT

24.22.21.19.

WOMEN-OWNED SMALL BUSINESS (WOSB)

ELIGIBLE UNDER THE WOMEN-OWNED

SMALL BUSINESS PROGRAM

EDWOSB

32g. E-MAIL OF AUTHORIZED GOVERNMENT REPRESENTATIVE

SOLICITATION/CONTRACT/ORDER FOR COMMERCIAL ITEMS

(CONTINUED)

PAGE 2 OF76

ACCEPTED, AND CONFORMS TO THE CONTRACT, EXCEPT AS NOTED: ______________________________________________________

32a. QUANTITY IN COLUMN 21 HAS BEEN

RECEIVED INSPECTED

32b. SIGNATURE OF AUTHORIZED GOVERNMENT

REPRESENTATIVE

32c. DATE 32d. PRINTED NAME AND TITLE OF AUTHORIZED GOVERNMENT

REPRESENTATIVE

32e. MAILING ADDRESS OF AUTHORIZED GOVERNMENT REPRESENTATIVE 32f . TELEPHONE NUMBER OF AUTHORIZED GOVERNMENT REPRESENTATIVE

37. CHECK NUMBER

FINALPARTIALCOMPLETE

36. PAYMENT35. AMOUNT VERIFIED

CORRECT FOR

34. VOUCHER NUMBER

FINAL

33. SHIP NUMBER

PARTIAL

38. S/R ACCOUNT NUMBER 39. S/R VOUCHER NUMBER 40. PAID BY

41a. I CERTIFY THIS ACCOUNT IS CORRECT AND PROPER FOR PAYMENT

41b. SIGNATURE AND TITLE OF CERTIFYING OFFICER 41c. DATE

42a. RECEIVED BY (Print)

42b. RECEIVED AT (Location)

42c. DATE REC'D (YY/MM/DD) 42d. TOTAL CONTAINERS

STANDARD FORM 1449 (REV. 2/2012) BACK

Prescribed by GSA – FAR (48 CFR) 53.212

AUTHORIZED FOR LOCAL REPRODUCTION

PREVIOUS EDITION IS NOT USABLE

SEE SCHEDULE

20.

SCHEDULE OF SUPPLIES/ SERVICES

21.

QUANTITY UNIT

22. 23.

UNIT PRICE

24.

AMOUNT

19.

ITEM NO.

HQ051623R0050

Section SF 1449 - CONTINUATION SHEET

SALIENT CHARACTERISTICS

Salient Characteristics

CLIN 0001: 3.7m Reflector system (4ea): 3.7m 4pc nominal Antenna Dual Powered

Gibraltar mount system: The contractor shall provide and install four (4ea) full functional motorized 3.7m RX c/KU-band Antenna Systems consisting of the following minimum characteristics:

1. 3.7m 4pc nominal Antenna Dual Powered Gibraltar mount system will consist of: A

3.7m 4pc solid spun aluminum antenna, sectioned into 4 piece completing the antenna. Axial or front feed ATC feedhorn being a 2 port C band and 2 Port Ku band motorized feedhorn with Heavy duty feed struts and a feed horn cover. Feedhorn is RX only linear polarity. Dual Powered Az-El mounting pedestal is motorized in azimuth using a 60:1 gear box powered with a 36V DC hall sensor motor allowing for 200 + degrees of continuous travel. Elevation is powered with a 36” actuator powered supplied by a 36V DC reed count motor allowing for 2 deg to 88 deg of travel without changes to elevation adjustments. Full travel of 0 to 90 achievable with adjustments (Similar to the

DH antenna system). DC motors are driven with and powered using the system Antenna controller, must be able to access via web (Similar to Research Concepts 2000A controller and a RCI 2kpol option supplied in the Rc2000A to allow skew adjustment to the ATC 4 port feed horn. Webserver option board will allow for access to the Rc2000A via web option). Dual Powered Gibraltar is a hot dip galvanized and supporting hardware is Duracon coated. Hardware with threaded rods for adjustment will need cold galvanized after installation. Norsat lnbs for both C band ports are PLL +/-5Khz stable part 3120. Ku band lnbs for each Ku port are part 1107ha, PLL +/-10Khz stable.

2. Full de-icing for the 3.7m will be 208/3 phase offered with a monitor and control remote option including 250’ of cabling De-icing is to be installed at installation site.

3. Filters for 5G frequencies from 4.0 to 4.2Ghz.

4. Lightning Arresting Down Conductors

5. L-Band Cabling and Electrical: L-Band cabling 200' each run and related connectors

Conduit runs between indoor equipment and antenna foundation include installation (50' of excavation) Electrical power for De-ice, Motorization, and Utility at the antenna

6. Engineering and permit: Engineering Local permit, Ground Survey (ground penetration radar if required)

7. Install Concrete Antenna Foundation Pad (4ea)

8. Foundation and Grounding: Foundation, Kit, Halo grounding

9. Labor: Site survey and layout, Installation labor, De-ice installation labor

10. Shipping: 3.7m Antenna Reflector system

CLIN 0002: 5G filters for all C band feed (50ea): The contractor shall provide and install 5G phase 2 filters:

1. C-Band 5G Bandpass Radar Filter (4000-4200 MHz), 5G filter 2nd phase to eliminate interference 5G frequency spectrum will be install on all 3.2m antennas, 5m Simulsat C-band feeds (21 C-Band Feeds), two (2) 4.8m antennas (2 C-Band feeds each).

CLIN 0003: Remove existing 3.2m Satellite Antennas (4ea):

1. Removal of existing antennas (4ea) and mounts (4ea)

CLIN 0004: Miscellaneous Consumables Supplies:

1. Miscellaneous Consumables Supplies: Connectors, cable management systems, cable protective wrap, sealing tape

2. Rental Equipment: crane, man lift, reach forklift, Alignment tape

3. Contractors Travel expenses: Hotel, Airfare, Meals, Rental car

CLIN 0005: Satellite Antenna repair lift: The contractor shall deliver a fully functional electric articulating boom lift consisting of the following minimum characteristics:

1. Electric articulating boom lift, quiet emission-free operation. Can easily work close to buildings or around obstacles and access overhead work from aisles and other congested areas. Zero tail swing and zero front arm swing in stowed and raised positions allow for work in tight spaces. Compact chassis for narrow aisle access, 30% gradeability and 4 mph travel speed 4 ft articulating jib with a 139° vertical rotation to accurately position workers. 180° hydraulic platform rotation and self-levelling platform for easy operation.

Motor controller eliminates the need for forward/reverse contacts or speed sensors, reducing complexity and improving reliability of the drive system. With Max Working

Height 40 ft 6 in, Max Horizontal Reach 22 ft 3 in, Max Up and Over Clearance (riser extended) 15 ft. (similar to the Genie Z-34/22 DC electric Boom)

CLIN 0006: Antenna Pressurized Dehydrator System With Redundance: The contractor shall provide and install a fully functional Antenna Pressurized Dehydrators system with redundance for the existing four (4ea) Satellite Antennas (3.7m,7.3m, [2] 4.8m) consisting of the following minimum characteristics:

1. Output Capacity - Normal: 1,200 SCFD (34 SCMD) Continuous, Maximum: 1,500 SCFD

(42.5 SCMD) Emergency. Power Requirements - 110 - 125 VAC, 7.0 Amps 50/60 Hz.

Outlet Pressure Range - 0.3 - 7.5 PSIG (2.07 - 51.71KPa), Outlet Air Relative Humidity -

Less than 2% RH. Dehydrating Method - Heatless Desiccant, Compressor Type - Two-

Cylinder, 3/4 HP, Oil-less Type. Noise Level - 48 dBA at 10’ (3 m), Alarms - Standard

Alarms - Complete readings of all critical measurement points, individual alarm indication display, Must including SNMP Communication. Outlet Connections - 3/8” Press-to-Lock

Tube Fitting. (Similar to ALTEC AIR P1500WLP Dehydrator).

2. 4 Port Outlet Manifold Kit (Similar to ALTEC AIR P012099 4 port manifold kit).

3. 1000 feet of 3/8” poly tubing (Similar to ALTEC AIR PMP26A20 tubing).

4. Cable (Dehydrator to Cycle Kit)

CLIN 0007: Fiber Tester (2ea.): The contractor shall provide 2ea.

1. Measures Fiber Attenuation, Tests for Electrical Opens and Shorts, Includes both RX and

TX Units, Touch Screen Color Display, Lemo Stainless Steel Connectors. Tests

Performed: Fiber Loss, Electrical Shorts and Opens, Connector Interface: Lemo SMPTE

Socket (RX Unit), Lemo SMPTE Plug (TX Unit), Color Touch Screen Display, Small hand carry 3.125" W x 6.5" H x 1.75" D. (Similar to Clark Wire & Cable CWT-SMPTE

- SMPTE 311/304 Fiber Optic Cable Tester CWT-SMPTE)

CLIN 0008: Fiber Receivers (50ea): The contractor shall provide 50ea.

1. Miniature L-Band/Wideband Fiber Receiver 2307LR (direct connect to back of Evertz

XPRF router Evertz PN/CN 2307LR)

CLIN 0009: Rack Mount Mini Spectrum Analyzer (2ea): The contractor shall provide 2ea.

5 MHz - 2500 MHz Rack Mount Mini Spectrum Analyzer, Single Input, BNC Connector, LNB

Power Option, Mounting Bracket, Ethernet with the following specifications:

• Frequency Range: MSNG-2500C: 5MHz – 2,500MHz

• Span Width: Up to 1300 MHz (Dependent on Center Frequency)

• Resolution Bandwidth: 10KHz, 100KHz, 300KHz, 1MHz

• RF Sensitivity: Greater than -85 dBm Typical

• Reference Levels: Selectable -10 dBm, -30 dBm, & -50dBm (front panel) (5dBm increments in GUI)

• Scale: 5 dB/Div & 2 dB/Div

• Dynamic Range: 40 dBm on Application Window (50dBm GUI window)

• Amplitude Accuracy: ± 1 dB typical

• Frequency Accuracy: ± 1KHz typical

• MAX RF Input: 25 VDC MAX (DC Blocked), +30dBm (1W)

• Input Impedance: 50 Ω

• Amplitude Range: 0 dBm to -85 dBm

• Input Connector: Input 1: “BNC” is standard. F, TNC, SMA, N available. Input 2:

Optional

• LNB Power: 13-18V, 22kHz (Optional)

• Operating Temperature Range: -10°C to +60°C

• Size: 6.625” L x 8.375” W x 5.0” H

• Weight: 4.6lbs

• Power Requirements: +15 VDC @ 1 amp typical

• Display: 5.7” TFT-LCD, 640x480 (VGA), 16-Bit RGB

• (With the similar specifications as AVCOM MSNG-2500C1BLME)

CLIN 0010: 9 kHz to 3 GHz Spectrum Analyzer with Tracking Generator (1ea.): The contractor shall provide. 9 kHz to 3 GHz Spectrum Analyzer with Tracking Generator with the following specifications:

• Frequency range: From 9 kHz to 3 GHz

• Resolution: 1 Hz

• Frequency reference Accuracy: ± (period since last adjustment X aging rate) + stability over temperature + supply voltage stability

• Aging rate: ±1 ppm max.

• Frequency stability: ±0.025 ppm

• Over temperature supply voltage stability: ±0.02 ppm

• Frequency readout accuracy Start, stop, center marker: ± (marker frequency indication X frequency reference accuracy + 10% RBW + frequency resolution)

• Trace points: Max 601 points, min 6 points

• Marker frequency counter resolution: 1 Hz, 10 Hz, 100 Hz, 1 kHz

• Accuracy: ± (marker frequency indication X frequency reference accuracy + counter resolution)

• Frequency span: 0 Hz (zero span), 100 Hz to 3 GHz

• Resolution: 1 Hz

• Accuracy: ± frequency resolution

• Phase noise Offset from carrier: Fc = 1GHz; RBW = 1 kHz, VBW = 10 Hz; Average ≥ 40

• 10 kHz: < -88 dBc/Hz typ.

• 100 kHz: < -95 dBc/Hz typ.

• 1 MHz: < -113 dBc/Hz typ.

• Resolution bandwidth (RBW) filter: From 1 Hz to 1 MHz in 1-3-10 sequence

• Accuracy: ±8 % (RBW = 1 MHz) , ±5 % (RBW < 1 MHz)

• Shape factor: < 4.5:1

• Video bandwidth (VBW) filter bandwidth: From 1 Hz to 1 MHz in 1-3-10 sequence (-3 dB bandwidth)

• (With similar Specifications as AE-167 - 3 GHz Spectrum Analyzer with Tracking

Generator)

CLIN 0011: 3-Channel Low-Profile ADA Cable Protectors for .75" Lines (30ea.): The contractor shall provide. 30ea. 3-Channel Low-Profile ADA Cable Protectors for .75" Lines with the following specifications:

• Load Capacity Per Axle 54000 lbs., Load Capacity Per Tire 27000, length (Inches) 39.75, Width (Inches) 30.38, Height (Inches) 1.25, Max Cable Outside Diameter (Inches) 0.75 in., Number of Channels 3-Channels, Connector Type Dog Bone Connector, Channel

Width 1.25 (Similar to 3-Channel Low-Profile Guard Dog ADA Cable Protectors -

GD3X75-O/B)

CLIN 0012: 4 Wheel Transport Cart for Cable Protectors (3ea): The contractor shall provide

3ea. 4 Wheel Transport Cart for Cable Protectors with the following specifications:

• length (Inches) 32, Width (Inches) 26, Height (Inches) 42.5. (Similar to 4 Wheel

Transport Cart for Cable Protectors - Model No CT4W-ST).

CLIN 0013: Other Direct Costs/Material (ODC): Other Direct Costs/Material. Provides the

Government the ability to account for unforeseen costs associated with this project. All other direct costs (ODCs) shall annotate the specific detail (e.g., quantity, part number, manufacturer, etc.) to include supporting documentation to justify the costs (i.e., price quotes, price history, etc.). No profit will be authorized for ODCs. This ODC will be $25,000.

PWS 9.1.22

PERFORMANCE WORK STATEMENT (PWS)

As of 01/September/2022

Contract Number: TBD

Task Order Number: N/A

Tracking Number: N/A

Follow-on to Previous Contract and Task Order Number:

N/A

1. Contracting Officer Representative (COR).

a. Primary COR.

Name: Bill Dingman

Organization:

Department of Defense Activity

Address Code (DODAAC):

HQ0516

Address: 6700 Taylor Avenue, Fort Meade, MD 20755

Phone Number:

Fax Number:

E-Mail Address:

b. Alternate COR.

Name: James Stegemann

Organization:

DODAAC: HQ0516

Address: 6700 Taylor Avenue, Fort Meade, MD 20755

Phone Number:

Fax Number:

E-Mail Address:

2. Contract or Task Order Title. Scheduled Tech Refresh of Satellite Facility

3. Background. Defense Media Activity is looking to perform a scheduled technical refresh upgrade of their satellite facility. Eleven years ago, DMA Technicians installed dishes at the satellite facility that came from our old facilities at Crystal City, VA and Naval Media Center, Anacostia. The dishes are starting to show wear and tear. In 2011, the mission requirements for

DMA were about 40 to 50 downlinks a year. There were over 150 downlinks last year and we are forecasting to do more than that this year. At our satellite facilities current state, it is hard to keep up with the growing mission of DMA. With this technical refurbishment we look to upgrade satellite facility so we can keep up with the continuous growing mission of DMA.

4. Objectives: This is a new requirement to provide a technical refurbishment to DMA’s satellite facility. This will include new steerable downlink dishes Axial or front feed only with heaters (Ku and C Band with filters). Work to include all cabling from the antenna building to the antennas, any rental equipment needed, or supplies provided by the contractor for a turnkey solution.

5. Scope. The contractor shall provide new fully functional satellite antenna systems, including construction of the concrete pad to support the antenna, Gibraltar mount system Pedestals, all necessary cabling from the dishes to the equipment racks in the antenna building through the existing conduit, and a de-icing system. Additionally, the contractor shall provide new fully functional Redundant Antenna pressurized Dehydrator, all necessary cabling from the dishes to the equipment racks in the antenna building through the existing conduit located at Fort Meade, MD 20755.

6. Performance Requirements.

6.1. Install four (4ea) 3.7M Antenna Systems

6.1.1. The contractor shall install a four (4ea) fully functional motorized 3.7m RX C/Ku-band

Antenna System consisting of the following minimum characteristics:

11. Antenna Reflector system: 3.7-meter 4pc nominal Antenna Dual Powered Gibraltar mount system will consist of: A 3.7m 4pc solid spun aluminum antenna, sectioned into 4 piece completing the antenna. Axial or front feed ATC feedhorn being a 2 port C band and 2 Port Ku band motorized feedhorn with Heavy duty feed struts and a feed horn cover. Feedhorn is RX only linear polarity. Dual Powered Az-El mounting pedestal is motorized in azimuth using a 60:1 gear box powered with a 36V DC hall sensor motor allowing for 200 + degrees of continuous travel. Elevation is powered with a 36” actuator powered supplied by a 36V DC reed count motor allowing for 2 deg to 88 deg of travel without changes to elevation adjustments. Full travel of 0 to 90 achievable with adjustments (Similar to the DH antenna system). DC motors are driven with and powered using the system Antenna controller, must be able to access via web (Similar to

Research Concepts 2000A controller and a RCI 2kpol option supplied in the Rc2000A to allow skew adjustment to the ATC 4 port feed horn. Webserver option board will allow for access to the Rc2000A via web option). Dual Powered Gibraltar is a hot dip galvanized and supporting hardware is Duracon coated. Hardware with threaded rods for adjustment will need cold galvanized after installation. Norsat LNB’s for both C band ports are PLL +/-5Khz stable part 3120. Ku band LNB’s for each Ku port are part

1107ha, PLL +/-10Khz stable.

12. De-ice System: Full de-icing for the 3.7m will be 208/3 phase offered with a monitor and control remote option including 250’ of cabling De-icing is to be installed at installation site.

13. Foundation and Grounding: Foundation, Ground Survey (ground penetration radar if required), dig permits, Halo grounding Kit

• Filters for 5G frequencies from 4.0 to 4.2Ghz.

• Lightning Arresting Down Conductors

• L-Band Cabling and Electrical: L-Band cabling 200' each run and related connectors

Conduit runs between indoor equipment and antenna foundation include installation (50' of excavation) Electrical power for De-ice, Motorization, and Utility at the antenna.

Circuit brakers needed for deicing systems.

• Engineering and permit: Engineering Local permit, dig permit, Ground Survey (ground penetration radar if required)

• Concrete Antenna Foundation Pad,

• Labor: Site survey and layout, Installation labor, De-ice installation labor

6.1.2 The contractor shall test and operate four (4) 3.7m Antenna Systems

• Verify antennas able to receive signals North America Domestic Arc from 83ºW to

139ºW

• Verify De-Icing systems operate properly in auto and manual modes

Deliverables: four (4ea) fully functional motorized 3.7m RX C/Ku-band Antenna Systems

6.2 Install Antenna Pressurized Dehydrator Redundant System

6.2.1. The contractor shall install a fully functional Antenna Pressurized Dehydrator Redundant system that feeds the current satellite antennas 3.7m, 2ea 4.8m, 7.3m, with the following minimum characteristics:

• Output Capacity - Normal: 1,200 SCFD (34 SCMD) Continuous, Maximum: 1,500 SCFD

(42.5 SCMD) Emergency. Power Requirements - 110 - 125 VAC, 7.0 Amps 50/60 Hz.

Outlet Pressure Range - 0.3 - 7.5 PSIG (2.07 - 51.71KPa), Outlet Air Relative Humidity -

Less than 2% RH. Dehydrating Method - Heatless Desiccant, Compressor Type - Two-

Cylinder, 3/4 HP, Oil-less Type. Noise Level - 48 dBA at 10’ (3 m), Alarms - Standard

Alarms - Complete readings of all critical measurement points, individual alarm indication display, Must including SNMP Communication. Outlet Connections - 3/8” Press-to-Lock

Tube Fitting. (Similar to ALTEC AIR P1500WLP Dehydrator).

• 4 Port Outlet Manifold Kit (Similar to ALTEC AIR P012099 4 port manifold kit).

• 1000 feet of 3/8” poly tubing (Similar to ALTEC AIR PMP26A20 tubing).

• Labor: Site survey and layout, Installation labor

6.2.2 The contractor shall test and operate Antenna Pressurized Dehydrator Redundant system

• Verify dehydrator systems deliver proper air pressures to antennas

• Verify the dehydrator system is able to switch to redundant system.

• Make Repairs as necessary to deliver fully functional Dehydrator system.

Deliverables: Fully functional Antenna Pressurized Dehydrator Redundant System that services current satellite antennas 3.7m, 2ea 4.8m, 7.3m.

6.3 Install C-Band 5G Bandpass filters on Antenna Systems

6.3.1 The contractor shall install C-Band 5G Bandpass Radar Filter (4000-4200 MHz), 5G filter

2nd phase.

• Install on all C-Band feeds on four (4) 3.2m antennas

• Install on all C-Band feeds on Simulsat antenna (21 C-Band feeds)

• Install on all C-Band feeds on two (2) 4.8m antennas (2 C-Band feeds each)

Deliverables: Eliminate interference of 5G frequency spectrum on all C-Band feeds.

6.4 Documentation

6.4.1 Contractor shall supply block level drawings to facilitate DMA HQ efforts to successfully create CAD wiring diagrams used for hardware installation. Services include providing all technical and operational materials for the equipment contained in the system, configuration of the system, and operation procedures.

• Assist DMA in creating CAD wiring diagrams used during physical installation of all hardware.

• Provide block level system drawings including cabling required

• Provide IP addressing detail.

Deliverables: Complete drawing for all equipment.

6.5 Other Direct Cost (ODC)

6.5.1 Other Direct Costs/Material. Other Direct Costs/Material. Provides the Government the ability to account for unforeseen costs associated with this project. All other direct costs (ODCs) shall annotate the specific detail (e.g., quantity, part number, manufacturer, etc.) to include supporting documentation to justify the costs (i.e., price quotes, price history, etc.). No profit will be authorized for ODCs. This ODC will be approximately 7% of Contract.

7. Performance Standards.

Performance Standard Acceptable Quality Level

(AQL)

Method of Surveillance

Subtask 6.1.1 - Install four (4) 3.7m Antenna

Systems

Antenna system meets minimum specifications.

Performance occurs with no required rework at least 90% of the time. Problems that occur are minor and are resolved in a satisfactory manner.

Routine inspection of deliverable products and services.

Subtask 6.1.2 – Test and

Operate four (4) 3.7m

Antenna Systems

Antenna system able to see all signals throughout North

America Domestic Arc from

83ºW to 139ºW, de-ice systems functions properly

Auto and manual mode, meets minimum specifications. Performance occurs with no required rework at least 90% of the time. Problems that occur are minor and are resolved in a satisfactory manner.

Routine inspection of deliverable products and services.

Subtask 6.2.1 - Install

Antenna Pressurized

Dehydrator Redundant

System

Dehydrator system meets minimum specifications.

Performance occurs with no required rework at least 90% of the time. Problems that occur are minor and are resolved in a satisfactory manner.

Routine inspection of deliverable products and services.

Subtask 6.2.2 - Test and operate Antenna

Pressurized Dehydrator

Redundant system

Dehydrator systems deliver proper air pressures to antennas, dehydrator system is able to switch to redundant system. Performance occurs with no required rework at least 90% of the time.

Problems that occur are minor and are resolved in a satisfactory manner.

Routine inspection of deliverable products and services.

Subtask 6.3.1 - install

C-Band 5G Bandpass

Radar Filter

All 5G frequency spectrum eliminated interference on all

C-Band feeds.

Routine inspection of deliverable products and services.

Subtask 6.4.1 -

Documentation

The Contractor shall provide all required system topology drawings, manuals, and documentations.

100% Inspection of documentation provided.

8. Incentives. N/A

9. Place of Performance. Work will be completed at DMA’s antenna facility located at 6225

Rock Avenue, Fort Meade, MD 20755.

Alternate Place of Performance - Contingency Only. As determined by the Contracting Officer’s

Representative (COR), contractor employees may be required to work at an alternate place of performance (e.g., home, the contractor's facility, or another approved activity within the local travel area) in cases of unforeseen conditions or contingencies (e.g., pandemic conditions, exercises, government closure due to inclement weather, etc.). Non-emergency/non-essential contractors should not report to a closed government facility. Contractor shall prepare all deliverables and other contract documentation utilizing contractor resources. To the extent possible, the contractor shall use best efforts to provide the same level of support as stated in the

PWS. In the event the services are impacted, reduced, compromised, etc., the Contracting

Officer or the contractor may request an equitable adjustment pursuant to the Changes clause of the contract.

10. Period of Performance. 180 days after contract award. As directed by the COR, the contractor shall continue performance in emergency or mission essential conditions.

Additionally, the contractor may be required to account for the whereabouts of their personnel should this information be requested by the COR.

11. Delivery Schedule.

PWS

Task

Deliverable

Title

Format Due Date Distribution/Cop ies

Frequency and

Remarks

6.1.1 Four (4ea) fully

functional motorized 3.7m

RX C/Ku-band

Antenna

Systems

Contractor-determined format

180 Days after

Contract Award

Standard

Distribution*

6.2.1 Fully functional

Antenna

Pressurized

Redundant

Dehydrator

System

Contractor-determined format

180 Days after

Contract Award

6.3.1 Install C-Band

5G Bandpass filters on

Antenna

Systems

Contractor-determined format

180 Days after

Contract Award

6.4.1 Documentation

Contractor-determined format

180 Days after

Contract Award

*Standard Distribution: 1 copy of the transmittal letter without the deliverable to the

Contracting Officer; 1 copy of the transmittal letter with the deliverable to the Primary COR.

12. Security Requirements. The work performed in accordance with this performance work statement is UNCLASSIFIED for personnel assigned to complete tasks at the DMA-HQ

Satellite Facility located at 6225 Rock Avenue, Fort Meade, MD 20755.

The following security requirements shall apply to this effort.

The Defense Media Activity (DMA) retains the right to request removal of contractor employees, regardless of prior clearance or adjudication status, whose actions, while assigned to this contract, clearly conflict with the interest of the Government.

References:

a. DoDM 5200.02, DOD Personnel Security Program, 3 April 2017, Incorporating Change

1, October 29, 2020.

b. DoD Manual 5220.32, Volume 1, “National Industrial Security Program: Industrial

Security Procedures for Government Activities,” August 1, 2018, as amended.

c. DoD Instruction 5025.01, “DoD Issuances Program,” August 1, 2016, as amended.

d. Part 117 of Title 32, Code of Federal Regulations.

e. Subpart 4.4 of the Federal Acquisition Regulation, “Safeguarding Classified Information within Industry,” current edition.

f. Office of the Under Secretary of Defense for Intelligence and Security Memorandum, “Approval to Cancel Department of Defense 5220.22-M, "National Industrial Security

Program Operating Manual," and Summary of Changes,” November 30, 2021.

g. DoDI 5220.22, National Industrial Security Program (NISP), March 18, 2011, Incorporating Change 3, September 24, 2020.

h. DoDM 5200.01, Information Security Program, Vols. 1-3, 24 February 2012, Incorporating Change 2, December 10, 2021.

i. DoD 5400.7, DoD Freedom of Information Act Program, April 5, 2019.

j. Homeland Security Presidential Directive 12 (HSPD-12): Policy for a Common

Identification Standard for Federal Employees and Contractors, 27 August 2004.

k. DoDI 8500.01, Cybersecurity, March 14, 2014, Incorporating Change 1, October 7, 2019.

l. DoD 8570.01-M Information Assurance Workforce Improvement Program, 19 December

2005, Incorporating Change 4, November 10, 2015.

m. DoDD 5205.02E, DoD Operations Security (OPSEC) Program, 20 June 2012, Incorporating Change 2, August 20, 2020.

n. DoDI 2000.12, DoD Antiterrorism (AT) Program, 01 March 2012, Incorporating Change

3, May 8, 2017.

o. DoDI 5015.02, DoD Records Management Program, 24 February 2015, Incorporating

Change 1, August 17, 2017.

p. DoDI 8170.01, Online Information Management and Electronic Messaging, January 2, 2019, Incorporating Change 1, August 24, 2021.

q. DoDI 5200.46, DoD Investigative and Adjudicative Guidance for Issuing CACs, 9

September 2014, Incorporating Change 2, November 2, 2020.

r. DoDI 5200.48, Controlled Unclassified Information (CUI), March 6, 2020.

12.1 Personnel Locator. The Contractor shall provide the Contracting Officer’s

Representative (COR) with a list of all personnel assigned to the contract at time of award.

The Contractor shall provide the COR with an updated list when personnel changes occur. The

COR will forward all contractor personnel lists and the changes made thereto to the DMA

Security Directorate. All personnel performing on this contract will be U.S. citizens.

12.2 Computer and Network Access Requirements. Contractor personnel will not operate

Government-furnished computer workstations or systems that have access to e-mail systems or government-restricted sites. The Contractor will not be granted privileged access to Government networks.

12.3 Personnel Vetting. Since Contractor personnel associated with this contract will not access established Government Information Systems and their physical access to DMA facilities and task completion will be subjected to escort and surveillance by DMA personnel, background investigations and Common Access Card (CAC) processing will not be initiated. However, as applicable, any individual or team, who will be working at DMA-HQ for two (2) consecutive days or more, will be vetted by the Fort Meade Visitor Control Center (FGGM-VCC) in order to acquire an installation pass/passes. They must complete a Form 191-001-R-E, FGGM

Installation Access Request, and present two forms of acceptable identification.

• Contractor personnel requiring access for more than two days, but not exceeding 30 days must fill out a Form 191-001-R-E at the FGGM-VCC with an authorized sponsor and present two forms of acceptable identification. Sponsor must present identification.

• For contractor personnel requiring longer than 30 days, they must fill out a Form 191-

001-R-E and sponsor must submit the form a minimum of 10 business days prior to visit.

Individual can pick up their pass from the FGGM-VCC without the sponsor.

• Operations during officially designated pandemics or similarly significant events may require contractor personnel, mandated to work on-site at DMA or other Government facilities, to show or provide proofs of vaccination, regular negative tests, completed official forms, etc. to continue to perform on the contract.

DMA facilities that may be visited as part of this effort outside of FGGM will have similar physical access requirements that must be followed. FGGM VCC access requirements occasionally change. The COR will convey these changes to the Contractor, as applicable.

12.4 Security Contacts. DMA Security Personnel can be contacted for security-related questions as follows:

• Primary: Lawrence F. Awalt, III, phone: (301) 222-6091

• Alternate: Humberto Gonzalez, phone: (301) 222-6718

DMA Security Directorate Address:

Defense Media Activity

ATTN: Industrial Security

6700 Taylor Ave

Fort Meade MD 20755

12.5 Information Security.

12.5.1 Sensitive Information Protection and Storage – In the event that Controlled Unclassified

Information (CUI) or sensitive information becomes a part of this effort, even inadvertently, the following must be taken into account: Controlled Unclassified Information (CUI) in its many forms, personally identifiable information (PII) of any type, as well as any otherwise sensitive data, and/or equipment will only be disclosed, as it may be applicable to this contract, to authorized personnel on a need-to-know basis. The contractor shall ensure that appropriate administrative, technical, and physical safeguards are established to ensure the security and confidentiality of this information, data, and/or equipment is properly protected. When no longer required, this information, data, and/or equipment will be returned to Government control, destroyed, or held until otherwise directed. The disposition of all data will be at the written direction of the COR. This may include documents returned to Government control; destroyed;

or held as specified until otherwise directed. Items returned to the Government shall be hand-carried or sent by certified mail to the COR. It is anticipated that this information will be gathered, created, and stored within the primary work location. If contractor personnel must remove any information from the primary work area they should protect it to the same extent they would their proprietary data and/or company trade secrets. The use of any information that is subject to the Privacy Act will be utilized in full accordance with all rules of conduct as applicable to Privacy Act Information. The government will retain unrestricted rights to government data. The ordering activity retains ownership of any user created/loaded data and applications hosted on vendor’s infrastructure, as well as maintains the right to request full copies of these at any time. The data that is processed and stored by the various applications within the network infrastructure contains personally identifiable information (PII). This data and

PII shall be protected against unauthorized access, disclosure or modification, theft, or destruction. The contractor shall ensure that the facilities that house the network infrastructure are physically secure. No data shall be released by the contractor without the consent of the

Government in writing. All requests for release must be submitted in writing to the

COR/ Contracting Officer (CO). At the direction of the COR or authorized representative, in consultation with the DMA Security Directorate, if necessary, some Contractor deliverables or communications, where applicable, may need to be marked Controlled Unclassified

Information or CUI (see Reference r). The Contractor (and any sub-contractor) is required to abide by government and DMA guidance for protecting sensitive and proprietary information.

12.5.2 The contractor is required to obtain DMA Contracting Office approval prior to engaging in any contractual relationship (e.g., a sub-contractor) in support of this contract which would require the disclosure of information, documentary material, and/or records generated under, or relating to this contract.

12.5.3 The contractor shall not retain, use, sell, or disseminate copies of any deliverable that contains information covered by the Privacy Act of 1974, or that is generally protected by the

Freedom of Information Act.

12.5.4 As applicable, contractor employees will be required to comply with all Government security regulations and requirements listed in the references section. If it is found to be necessary for this particular contract, initial and periodic security training and briefings will be provided by Government security personnel. Failure to comply with security requirements will be cause for removal, and the contractor will not be able to provide service on this contract.

12.5.5 The contractor shall not divulge any information about DoD or DMA files, data processing activities or functions, user identifications, passwords, or any other knowledge that may be gained, to anyone who is not authorized to have access to such information.

12.5.6 The contractor shall afford the Government access to the contractor’s facilities, installations, operations, documentation, databases, and personnel used in performance of the contract. Access shall be provided to the extent required to carry out a program of IT inspection

(to include vulnerability testing), investigation, and audit to safeguard against threats and hazards to the integrity, availability and confidentiality of data, or to the function of IT systems operated on behalf of DMA or DoD, and to preserve evidence of computer crime.

12.6 Miscellaneous Security Requirements.

12.6.1 Physical Security. Contractor personnel must comply with local security requirements for entry and exit control for personnel and property at the installation and DMA facilities.

The contractor shall observe and comply with the security provisions in effect at all DoD facilities. Visitor badges shall be worn and prominently displayed at all times.

12.6.2 Potential Operational Constraints. Force Protection Conditions (FPCONs) and Health

Protection Conditions (HPCONs) may affect access to the host installation. FPCONs and

HPCONs are established by the host installation or higher national command authorities. The

Installation Executive Director is responsible for implementing the proper response to progressive levels of terrorist and health threats. FPCONs and HPCONs are normally displayed at entrance gates, building entrances, and office entrances. The contractor shall adhere to and operate in accordance with any restrictions imposed as a result of a FPCON or HPCON.

Measures implemented under the various levels of threat may impact the contractor’s normal operational approach to services. The contractor shall ensure that services are sustained during heightened security measures.

12.6.3 Reporting Requirements. The contractor shall report to the Security Directorate and/or

COR any information or circumstances, of which they are aware, that may pose a threat to the security and/or safety of DoD personnel, contractor personnel, resources, and classified or unclassified defense information. Additionally, the contractor shall report any incident of sexual assault or sexual harassment involving any contractor personnel.

12.6.4 Authorized Visitor Control. Contractor representatives on official business related to the contract shall have the visit coordinated by the COR to gain access to the installation access control. All planned visits shall be scheduled at least three (3) business days in advance. Once on-site, the representative shall obtain a visitor security badge from the Security Directorate and the appropriate escort will be provided to destination.

12.6.5 Drug Screening. The contractor shall have a random employee drug-screening program.

All drug testing shall be performed and documented by a certified, third-party, medical laboratory. The contractor is responsible for all associated costs of drug screening for contract employees. Contractor is responsible to conduct initial drug tests for all employees. Drug testing will meet all state and local requirements. Drug testing will also be conducted anytime a contract employee is involved in a serious accident/incident while on duty. Any positive drug test disqualifies the individual from employment under this contract. Contract personnel are subject to random drug screening at all times. The contractor shall conduct, at a minimum, quarterly random drug screening on 25% of their contract workforce, resulting in a 100% test completed within a one-year period or within the term of this contract, whichever is shorter (e.g., 25 employees under contract shall complete minimum 25 drug test samples within one-year or less).

Drug screening will be completed at no cost to the government.

12.6.6 Temporary Removal of Personnel Posing an Imminent Threat. The DMA-HQ Chief, Security or designated representative, in consultation with the Program Manager, may remove any individual from duty who poses an imminent threat to himself, other personnel, or

Government resources. The contractor will be notified as soon as possible of the action taken.

The temporary removal will last until the incident prompting removal has been resolved to the satisfaction of the Government. Once the incident has been resolved, the individual will either be allowed to return to work on the contract or prohibited from performance on the contract, as the government deems appropriate. Temporary removal of personnel does not relieve the contractor of any performance requirements.

12.6.7 Derogatory Information. If the Government notifies the contractor that the employment or the continued employment of any contractor personnel is prejudicial to the interests of or endangers the security of the United States, that employee shall be removed and barred from the worksite. This includes security deviations/incidents and credible derogatory information concerning contractor personnel during the course of the contract's period of performance. The contractor shall provide qualified, substitute personnel for any permanently or temporarily removed personnel.

12.6.8 Exclusion of Performance. The Government reserves the right to permanently exclude any individual from working under this contract when performance does not meet standards or fails to pass a security parameter as stipulated in this PWS. Such failure includes, but is not limited to, falsifying reports or statements; loss, destruction, or irresponsible use of government equipment; or other criteria identified in this PWS. When so instructed, the contractor shall immediately remove such individual in accordance with the CO’s instructions. Permanent removal of personnel does not relieve the contractor of any performance requirements, or create an entitlement to an equitable adjustment. The contractor shall not, without the CO’s consent, re-instate on this contract any employee who has been permanently removed.

12.6.9 Contractor Personnel Out-Processing Requirements. As might be applicable, Contractor shall notify the CO immediately in writing whenever a contractor employee working on this contract resigns, is reassigned, is terminated, or no longer requires admittance to the Federally-controlled facility, regardless of the duration of the task period. When the contractor employee departs, the contractor will relay departure information to the cognizant DMA Industrial Security

Program Manager.

13. Government-Furnished Equipment (GFE)/Government-Furnished Information (GFI). N/A

14. Other Pertinent Information or Special Considerations.

The qualifications/standards of the Contractor shall be included in the proposal. Proposal must clearly demonstrate the current or potential employees secured for these tasks possess the knowledge, skills, and abilities as required to successfully complete the Performance

Requirements above (i.e., resumes).

a. Identification of Possible Follow-on Work. N/A

b. Identification of Potential Conflicts of Interest (COI). Expected to be N/A. However, the Contractor shall identify, report, and mitigate actual and potential conflicts of interest for itself, its employees, subcontractors and consultants. The existence of such programs and the disclosure of known actual or potential conflicts are material performance requirements of this contract. In the event the Contracting Officer determines that a conflict of interest exists, based on disclosure from the Contractor or from other sources, the Contracting Officer shall take action which may include, but is not limited to, requesting a mitigation plan from the Contractor, terminating part or all of the contract, modifying the contract or obtaining a waiver in accordance with applicable law, including FAR 9.503 as applicable. If the Government determines that an organizational conflict of interest (OCI) exists, that cannot be satisfactorily avoided, neutralized or mitigated or waived, the Contracting Officer may determine that the offeror will not be eligible for award. The Government reserves the right to only consider mitigation plans proposed by the apparent successful offeror.

c. Identification of Non-Disclosure Requirements. N/A

d. Packaging, Packing and Shipping Instructions. Shipped items must be sent to the

COR.

e. Inspection and Acceptance Criteria. The COR will provide an acceptance or feedback to the Contractor on submitted deliverables (expected within 10 days). If the Contractor receives corrective feedback, then the Contractor has 10 days to provide the COR an updated plan based on comments provided by the Government.

f. Property Accountability. The contractor shall submit the attached Electronic Product

List (see below) in addition to complying with all requirements of DFARS 252.211-7003. See

DARS 252.211-9000, Requirement to Submit an Electronic Product List for additional information.

EPL

Worksheet_v1.1_03June2011.xls

g. Department of Defense (DoD) Enterprise Service Management Framework (DESMF)

Compliance. All IT service requirements contained within this PWS shall be conducted in accordance with the DESMF which can be accessed at https://community.apan.org/esmf_consortium_working_groups/m/desmf_ed_ii/default.aspx.

15. Section 508 Accessibility Standards. The following Section 508 Accessibility Standard(s)

(Technical Standards and Functional Performance Criteria) are applicable (if box is checked) to this acquisition.

Technical Standards

1194.21 - Software Applications and Operating Systems

1194.22 - Web Based Intranet and Internet Information and Applications

1194.23 - Telecommunications Products

1194.24 - Video and Multimedia Products

1194.25 - Self-Contained, Closed Products

1194.26 - Desktop and Portable Computers

1194.41 - Information, Documentation and Support

The Technical Standards above facilitate the assurance that the maximum technical standards are provided to the Offerors. Functional Performance Criteria is the minimally acceptable standards to ensure Section 508 compliance. This block is checked to ensure that the minimally acceptable electronic and information technology (E&IT) products are proposed.

Functional Performance Criteria

1194.31 - Functional Performance Criteria https://community.apan.org/esmf_consortium_working_groups/m/desmf_ed_ii/default.aspx

ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

4 Each

3.7m Reflector system

FFP

See Salient Characteristic

FOB: Destination

PSC CD: 5985

NET AMT

50 Each

Alga Blue filters 210031803k

FFP

See Salient Characteristic

Complete Takedown and Removal Antennas

FFP

See Salient Characteristic

1 Lot

Miscellaneous Consumables Supplies

FFP

See Salient Characteristic- 3.7m Turnkey Antenna Installation, Peaking, Testing and Training. Includes: Boom Lift, Labor and a Proof of Performance Report.

1 Lot

Satellite Antenna repair lift

FFP

See Salient Characteristic

Antenna Pressurized Dehydrator Redundant

FFP

See Salient Characteristic

2 Each

Clark Wire & Cable CWT-SMPTE

FFP

See Salient Characteristic

50 Each

Fiber Receivers

FFP

See Salient Characteristic

2 Each

Rack Mount Mini Spectrum Analyzer

FFP

See Salient Characteristic

1 Each

9 kHz to 3 GHz Spectrum Analyzer with Tr

FFP

See Salient Characteristic

30 Each

3-Channel Cable Protectors

FFP

See Salient Characteristic

3 Each

4 Wheel Transport Cart Cable Protector

FFP

See Salient Characteristic

Lot

Other Direct Costs/Material

COST

This ODC is NTE $25,000. See Salient Characteristic.

ESTIMATED COST

CLAUSES INCORPORATED BY REFERENCE

52.203-3 Gratuities APR 1984

52.203-6 Restrictions On Subcontractor Sales To The Government JUN 2020

52.203-11 Certification And Disclosure Regarding Payments To

Influence Certain Federal Transactions

SEP 2007

52.203-12 Limitation On Payments To Influence Certain Federal

Transactions

JUN 2020

52.203-15 Whistleblower Protections Under the American Recovery and

Reinvestment Act of 2009

JUN 2010

52.204-7 System for Award Management OCT 2018

52.204-10 Reporting Executive Compensation and First-Tier

Subcontract Awards

JUN 2020

52.204-12 Unique Entity Identifier Maintenance OCT 2016

52.204-13 System for Award Management Maintenance OCT 2018

52.204-16 Commercial and Government Entity Code Reporting AUG 2020

52.204-17 Ownership or Control of Offeror AUG 2020

52.204-18 Commercial and Government Entity Code Maintenance AUG 2020

52.204-20 Predecessor of Offeror AUG 2020

52.204-21 Basic Safeguarding of Covered Contractor Information

Systems

JUN 2016

52.204-23 Prohibition on Contracting for Hardware, Software, and

Services Developed or Provided by Kaspersky Lab and Other

Covered Entities.

JUL 2018

52.204-25 Prohibition on Contracting for Certain Telecommunications and Video Surveillance Services or Equipment.

AUG 2020

52.209-6 Protecting the Government's Interest When Subcontracting

With Contractors Debarred, Suspended, or Proposed for

Debarment

JUN 2020

52.209-7 Information Regarding Responsibility Matters OCT 2018

52.209-10 Prohibition on Contracting With Inverted Domestic

Corporations

NOV 2015

52.209-11 Representation by Corporations Regarding Delinquent Tax

Liability or a Felony Conviction under any Federal Law

FEB 2016

52.212-4 Contract Terms and Conditions--Commercial Items OCT 2018

52.219-6 Notice Of Total Small Business Set-Aside NOV 2020

52.219-8 Utilization of Small Business Concerns OCT 2018

52.219-33 Nonmanufacturer Rule MAR 2020

52.222-21 Prohibition Of Segregated Facilities APR 2015

52.222-22 Previous Contracts And Compliance Reports FEB 1999

52.222-25 Affirmative Action Compliance APR 1984

52.222-26 Equal Opportunity SEP 2016

52.222-35 Equal Opportunity for Veterans JUN 2020

52.222-36 Equal Opportunity for Workers with Disabilities JUN 2020

52.222-37 Employment Reports on Veterans JUN 2020

52.222-50 Combating Trafficking in Persons OCT 2020

52.223-18 Encouraging Contractor Policies To Ban Text Messaging

While Driving

JUN 2020

52.225-25 Prohibition on Contracting with Entities Engaging in Certain

Activities or Transactions Relating to Iran-- Representation and Certifications.

JUN 2020

52.232-33 Payment by Electronic Funds Transfer--System for Award

Management

OCT 2018

52.232-39 Unenforceability of Unauthorized Obligations JUN 2013

52.232-40 Providing Accelerated Payments to Small Business

Subcontractors

DEC 2013

52.233-3 Protest After Award AUG 1996

52.233-4 Applicable…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .