C4d_Attachment D Dam Repair Map.pdf
PDF 413 KB Posted
- Attached to
- Shawnee NF Dam Repairs
- Solicitation number
- 12444626Q0074
- Issued by
-
Department of Agriculture Forest Service
About this file
This document is a technical specification drawing for the Pounds Hollow Dam Seep Repair project located in the Shawnee National Forest. The drawing illustrates the downstream face of the dam and provides detailed construction specifications for repairing seepage issues at the dam.
The repair work involves constructing a seep cutoff at the downstream face of the dam with specific material requirements and dimensions. The design includes a 6-foot-high by 10-foot-wide section using 12-inch compacted IL CA-05 aggregate as the primary layer, with 12-inch compacted IL CA-06 aggregate as the base layer, sloped at a 2½:1 ratio. Key construction notes specify that dimensions are for estimating purposes only, with the Forest Service to stake the actual work location in the field before work begins. Excavation must begin 2 feet above the seep elevation, and all excavated material shall be reserved and used as fill. All disturbed areas must be raked smooth, seeded, and mulched upon completion. This technical specification document supports the Pounds Hollow Dam Repair project and was drawn on 7/2026.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Project Location
Pounds Hollow Dam Repair Location Map cmorris02 Line
File details come from the government source that posted it. Updated .