C4b_Attachment B Statement of Work 12444626Q0061.pdf
PDF 192 KB Posted
- Attached to
- Superior NF Toilet Vault Cleaning
- Solicitation number
- 12444626Q0061
- Issued by
-
Department of Agriculture Forest Service
About this file
This is a Statement of Work for a USDA Forest Service project to clean and remediate a vault toilet at the White Pine Picnic Area on the Laurentian Ranger District in Lake County, Minnesota.
The contractor must remove all household garbage, carpet scraps, and other illegally dumped items from the vault beneath the toilet building and assume full responsibility for the legal disposal of all removed materials. The White Pine Picnic Area is located 28 miles north of Two Harbors or 18 miles south on Highway 2 from the junction of Highways 1 and 2. All work must be completed by August 15, 2026, in a single phase unless approved by the Contracting Officer. Work hours are restricted to 6:00 AM to 6:00 PM, Monday through Friday, with no work permitted on Federal Holidays or Weekends without prior written approval. The contractor must submit project schedules to the government for approval prior to receiving a Notice to Proceed. The Government will furnish no equipment, materials, or supplies; the contractor must provide all necessary labor, materials, services, and equipment. Travel expenses to and during construction shall be included in mobilization and demobilization costs. The contractor must assign workers experienced in vault toilet cleaning and septic disposal. No specific security requirements apply to this project, and no data rights are involved. Section 508 compliance is required for all project communications and documents but not for information technology supply, which is not part of this contract.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
US Department of Agriculture (USDA)
Statement of Work
Contents Project General Information
1.0 Scope of Work
2.0 Background
Contractor Requirements
3.0 Technical Requirements / Tasks
4.0 Government Furnished
5.0 Deliverables / Schedule
6.0 Travel
7.0 Contractor’s Key Personnel
8.0 Security Requirements
9.0 Data Rights
10.0 Section 508 – Electronic and Information Technology Standards Attachment ............................................................................................................................................. Error! Bookmark not defined.
Project White Pine Toilet Vault Cleaning
General Information
1.0 Scope of Work
The intent of this project is to furnish all labor, materials, services and equipment to remove all household garbage, carpeting and other objects from the vault toilet at the White Pine Picnic Area on the Laurentian Ranger District.
2.0 Background
Household garbage, carpet scraps and other items were illegally dumped in the vault under the toilet building at the White Pine Picnic Area.
White Pine Picnic Area is located 28 miles north of Two Harbors or 18 miles south on Highway 2 from the junction of Highways 1 and 2 in Lake County, MN. 47°25'13.4" N 91°38'43.2"W (47.420401, -91.645321).
Contractor Requirements
3.0 Technical Requirements / Tasks
The contractor shall perform all services necessary to remove all garbage bags, household trash, carpet scraps and other objects from the vault toilet. The contractor is responsible for the legal disposal of all removed items.
In accordance with the terms and conditions of the Contract, the Contractor shall perform the work for the USDA-Forest Service (FS) as described in those documents.
4.0 Government Furnished
The Government will not furnish any equipment, materials or supplies for this project.
5.0 Deliverables / Schedule
• Contractor shall complete all work by August 15, 2026.
• Work shall be completed in a single phase of construction unless approved by CO. The Contractor shall submit project schedules to the government for consideration and approval prior to receiving a notice to proceed.
• The Contractor shall perform all work between the hours of 6:00 AM and 6:00 PM Monday thru Friday. No work shall be performed on Federal Holidays or Weekends without prior written approval from the CO.
6.0 Travel
Travel expenses to the project site and during construction shall be included in the mobilization/demobilization costs for the project.
7.0 Contractor’s Key Personnel
The Contractor shall assign workers who are experienced in vault toilet cleaning and septic disposal to complete the described project.
8.0 Security Requirements
This project does not have any specific security requirements.
9.0 Data Rights
None.
10.0 Section 508 – Electronic and Information Technology Standards Supply of Information technology is not part of this contract, so Section 508 requirements are not required for information technology. Section 508 requirements for all project communication and documents shall be followed.
| Project |
| General Information |
| 1.0 Scope of Work |
| 2.0 Background |
| Contractor Requirements |
| 3.0 Technical Requirements / Tasks |
| 4.0 Government Furnished |
| 5.0 Deliverables / Schedule |
| 6.0 Travel |
| 7.0 Contractor’s Key Personnel |
| 8.0 Security Requirements |
| 9.0 Data Rights |
| 10.0 Section 508 – Electronic and Information Technology Standards |
File details come from the government source that posted it. Updated .