About this file

Request for Statement of Qualifications: CMAR CAWCD Headquarters Building 2 HVAC Replacement

This Request for Statement of Qualifications (RFSQ) is issued by the Central Arizona Water Conservation District (CAWCD), a municipal corporation in Arizona, seeking a Construction Manager at Risk (CMAR) to provide preconstruction services and construction management for the C26010 CAWCD Headquarters Building 2 HVAC Replacement project located at 23636 N. 7th Street, Phoenix, Arizona 85024. The project encompasses approximately 127,400 square feet and involves replacing evaporative cooling systems serving the North, West, and South Quads and packaged direct-expansion equipment serving the Central Core with a chilled water HVAC system and associated electrical improvements. The scope includes supply of all materials, equipment, and labor for installation, acceptance testing, commissioning, and warranty obligations. The presubmittal site visit is scheduled for Wednesday, December 2, 2026, at 9:00 am, with SOQs due on Thursday, December 17, 2026, at 2:00 pm Phoenix time. The anticipated construction start date is September 2027, with project closeout scheduled for December 2028. The selection committee will shortlist three to five contractors for interviews on January 18, 2027, with notification of the top-ranked contractor on January 25, 2027. The CMAR preconstruction contract is anticipated to begin in February 2027, with the construction phase contract awarded in August 2027.

The estimated project budget is $10 million, and cost estimates or hourly/daily rates submitted in the SOQ will result in rejection of the proposal in accordance with Arizona Revised Statutes 34-603. Evaluation criteria are weighted as follows: Project Team Experience and Continuity (30 points), Construction Approach and Protection of Ongoing Operations (25 points), Schedule Development and Compliance (20 points), Resource Availability and Project Commitment (15 points), and Preconstruction Value and Cost Management (10 points). The SOQ submittal is limited to 15 pages, excluding exhibits, certificates of good standing, and corporate resolutions. Mandatory submittals include proof of Arizona good standing certification, W-9 form, evidence of financial stability, bonding information, contractor license details, and certification of compliance with federal immigration laws and A.R.S. Section 23-214(A). The contractor must attest that it is not currently engaged in a boycott of Israel. The CMAR will develop a Guaranteed Maximum Price (GMP) proposal following design phases and will be responsible for project planning, scheduling, constructability reviews, cost estimating, procurement management, and coordination with CAWCD and the design engineer throughout preconstruction and construction phases.

View the file

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

For more information, please visit our online supplier portal, located at https://procurement.opengov.com/portal/centralarizonaproject

REQUEST FOR STATEMENT OF INTEREST

AND QUALIFICATIONS

Construction Manager at Risk (CMAR) for C26010 CMAR CAWCD Headquarters Building 2

HVAC Replacement

Central Arizona Project

Solicitation No. C26010

Site Visit: Wednesday, December 2, 2026

SOQ DUE: Thursday, December 17, 2026

2:00 pm PHOENIX TIME

For more information, please visit our online supplier portal, located at

TABLE OF CONTENTS

1. SOQ PREPARATION INSTRUCTIONS

2. STATEMENT OF QUALIFICATIONS

3. EVALUATION CRITERIA

4. SCOPE OF CMAR PRECONSTRUCTION SERVICES

5. MANDATORY SUBMITTALS

Attachments:

A - Exhibit A - Construction PreAward Phase Guide

B - Exhibit B - GMP Submittal Requirements

1. SOQ PREPARATION INSTRUCTIONS

1.1. Definitions

The following terms have the meanings indicated, applicable in both the singular and plural.

• Request for Statement of Interest and Qualification (RFQ) shall mean the solicitation, preparation instructions, mandatory submittals, and any addenda issued prior to receipt of the

SOQ.

• Contract Documents shall mean and consist of the RFQ, all addenda issued prior to award, and any modifications issued after the award of the contract.

• Addenda shall mean the written or graphic instruments issued by CAWCD prior to the execution of the contract documents. The addenda modify or interpret the contract documents by additions, deletions, clarifications, or corrections.

• Contractor shall mean the person or entity that submits an SOQ.

• Days shall mean calendar days.

All definitions set forth above are applicable throughout the contract documents.

1.2. General Instructions

The Central Arizona Water Conservation District (CAWCD), a municipal corporation organized and existing under and by virtue of the laws of the State of Arizona, is soliciting competitive sealed SOQs for a CMAR to perform preconstruction services for CAWCD Headquarters Building 2 HVAC

Replacement Project. SOQs must be received no later than 2:00 pm on Thursday, December 17, 2026. Response to the solicitation shall be submitted electronically on CAWCD’s OpenGov website:

https://procurement.opengov.com/portal/centralarizonaproject

SOQs must be in the actual possession of the CAWCD at the location indicated, on or prior to the exact time and date indicated above. Late SOQs will not be considered.

No paper documents will be accepted. Responses to the solicitation shall be submitted electronically on OpenGov. Offers submitted different than specified may be rejected at the discretion of CAWCD. Submittal of an SOQ in response to this solicitation shall be construed as the intent to be bound by any resultant contract.

In accordance with ARS 34-603, estimated costs to complete the work shall not be included in the

SOQ. If estimated costs or hourly or daily rates are submitted, the SOQ will be rejected.

The SOQ submittal (excluding Exhibit A, the Certificate of Good Standing, and corporate resolution) must be limited to 15 pages. Adherence to the maximum page criterion is critical. Pages that have project photos, charts, and/or graphs will be counted towards the number of pages. Front and back covers, table of contents pages, and divider (tab) pages will not be counted unless they include qualifications information that could be considered by the selection panel.

SOQ preparation costs are the sole responsibility of the submitting entity, including any costs associated with any requested oral presentation/demonstration in response to this RFQ.

1.3. Copies of Contract Documents

CAWCD assumes no responsibility for errors or misinterpretations resulting from the use of incomplete sets of contract documents.

CAWCD in making contract documents available on the above terms does so only for the purpose of obtaining SOQs on the work and it does not constitute an offer of acceptance.

1.4. Examination of RFQ Documents

It is the responsibility of each entity, before submitting an SOQ, to do the following:

• Examine the RFQ thoroughly.

• Consider federal, state, and local laws and regulations or any other conditions that may affect cost or performance of the work.

• Notify CAWCD of conflicts, errors, or discrepancies in the contract documents.

Upon submission of an SOQ the entity attests that

• It has complied with every requirement of the RFQ preparation instructions.

• The contract documents are sufficient in scope and detail to convey an understanding of all terms and conditions for performing and furnishing the work.

1.5. Interpretations and Addenda

All questions about the meaning or intent of the contract documents must be directed to the following:

Karie Ingles, CAWCD Contracting Officer 623-869-2270 or by email at kingles@cap-az.com.

Interpretations or clarifications considered necessary by CAWCD will be issued prior to the due date to all parties that have obtained or downloaded contract documents directly from CAWCD. Entities that have obtained contract documents from other sources are responsible for obtaining any addenda or updates. Questions received less than seven days prior to the due date may not be answered. Only questions answered by formal written addenda will be binding upon CAWCD. Oral and other interpretations or clarifications will be without legal effect. Addenda may also be issued to modify the contract documents as deemed advisable by CAWCD. The SOQ shall contain an acknowledgement of addenda.

1.6. Amendments to SOQs

Amendments to a submitted SOQ will be considered if the amendment is received prior to the SOQ due date and time and must be submitted in accordance with the General Instructions.

1.7. Presubmittal Conference

Contractors are invited to participate in an optional pre-submittal conference and inspection of the site conducted by CAWCD personnel on Wednesday, December 2, 2026, at 9:00 am, Arizona Time located at 23636 N. 7th Street Phoenix, AZ 85024.

CAWCD is a secure facility, Contractors are encourage to allow at least 15 minutes to be checked in with Security. The site inspection will include navigating multiple sets of stiars acorss several flat roof buildings. Contractors are required to supply their own hard hat, wear long pants, and wear closed-toed shoes to attend the site inspection. The presubmittal conference will be held outdoors near

Building 2 Parking Lot.

Staff may not be available to respond to individual inquiries regarding the project scope outside of this pre-submittal conference. All interested parties are urged to attend this meeting.

1.8. Project Schedule

Anticipated dates for this project:

Issuance and Advertisement of RFQ: November 16, 2026

Pre-Submittal Site Visit (Non-

Mandatory):

December 2, 2026, 9:00am

23636 N. 7th Street Phoenix, AZ 85024

Question Submission Deadline: December 10, 2026, 2:00pm

Submittal of SOQs Required: December 17, 2026, 2:00pm

Notification of Shortlist: January 7, 2027

Interviews (shortlisted contractors only): January 18, 2027

Notification of Top-Ranked Contractor: January 25, 2027

Receipt of Proposal for Preconstruction

Services:

February 8, 2027

Negotiate and Provide Notification of

Intent to Award:

February 18, 2027

Execute Agreement and Provide NTP: March 1, 2027

2. STATEMENT OF QUALIFICATIONS

2.1. Scope of Work

CAWCD anticipates a start date for design and pre-construction activities starting on about March

2027. CAWCD anticipates a start date for construction activities starting on about September 2027.

The CMAR Team will be responsible for construction of complete project requirements for the

C26010 CMAR CAWCD Headquarters Building 2 HVAC Replacement project, and the project is required to stay within the CAWCD estimated budget. The project will include the supply of all materials, equipment, and labor for installation acceptance testing, commissioning, and warranty. The

CMAR Team will control the costs and will be responsible for the project schedule.

2.2. Vertical Construction

The CMAR team may also compete to self-perform limited amounts of work.

The preferred CMAR team should have the following capabilities:

• Experience providing CMAR services for occupied building HVAC and electrical infrastructure replacements.

• Demonstrated experience with air-cooled chilled water systems, air handling equipment, hydronic piping, controls, electrical distribution upgrades, and phased commissioning in operating facilities.

• Expertise in managing projects within a fixed GMP with either no change orders or only client requested changes.

• Understand the dynamics of CMAR for construction operations that include coordination with various CAWCD departments, other agencies, utility companies, etc.

• Fiscal capacity to obtain the necessary bid and performance bonds.

• Planning, scheduling, and demonstrated knowledge and enforcement of strict onsite safety standards.

• Conduct project-specific risk management addressing occupied spaces, temporary HVAC, utility outages, roof loading, lifting operations, underground utilities, procurement, and system changeovers.

2.3. Shortlisting Process

CAWCD will review the SOQs and determine which 3 to 5 contractor SOQs are most advantageous to CAWCD by taking into consideration evaluation of the factors identified above. CAWCD may hold interviews with the shortlisted contractors to aid in determining which SOQ is most advantageous to

CAWCD.

Prior to conducting interviews, additional investigations of each firm's performance history may be performed by CAWCD. The selection committee may ask firms to respond to any performance findings during the interview.

2.4. Final Ranking

The interview will be used to determine the final ranking order of the shortlisted firms.

At the sole discretion of CAWCD, award of the contract shall be made to the entity that is determined to be most advantageous to CAWCD.

2.5. Right of Action or Claim

The successful contractor shall not have any right of action or claim before a contract has been signed by the contractor and CAWCD.

2.6. Protest Procedures

A protest shall be submitted in writing and filed with the contract officer. A protest of a solicitation must be received not less than seven (7) days before the solicitation due date. A protest of a notice of intent to award or notice of award shall be filed within seven (7) days after issuance of the applicable notice. A protest must include the following:

• The name, address, and contact information, including the email address of the protester.

• Identification of the solicitation or contract number.

• Statement of the legal and factual grounds for the protest and requested relief.

• Signature and title of the protester.

A written decision of the contract officer will be issued by email within fourteen (14) days of receipt of the protest. If the protester is not satisfied with the decision, within ten (10) days of receipt of the decision, the protester may submit additional evidence and facts it believes are relevant to its initial protest statement and/or may request to meet with the protest committee, which consists of the contract officer, project management supervisor, and engineering services manager to discuss its evidence. A decision of the protest committee shall be issued within five (5) days of the receipt of the additional evidence and/or meeting. All decisions of the protest committee are final.

Any concerns raised more than seven (7) days after an award is not subject to protest.

2.7. Selection Process

CAWCD in its sole discretion may

• Reject for any reason any or all SOQs.

• Reject an SOQ not accompanied by data required by the SOQ documents.

• Waive minor deviations in SOQs received.

• Reissue an RFQ.

CAWCD expects to award the project to the best qualified contractor based on the requirements in this solicitation. The selected firm will be the one whose qualifications are responsive, responsible, and are the most advantageous to CAWCD, as determined by CAWCD.

3. EVALUATION CRITERIA

In evaluating SOQs, CAWCD will consider the following evaluation criteria.

No. Evaluation Criteria Scoring Method Weight (Points)

1. Project Team Experience and

Continuity

Identify the specific project team, each member’s role, and their experience providing

CMAR services for commercial

HVAC upgrades or replacements in occupied administrative and maintenance facilities. Describe comparable projects completed within the past five years involving air-cooled chilled water systems, electrical distribution, controls, and phased commissioning.

Identify the proposed team members who participated in those projects and provide owner contact information.

Explain how team continuity will be maintained from preconstruction through construction.

Points Based 30 (30% of Total)

2. Construction Approach and

Protection of Ongoing

Operations

Describe your approach to demolition and phased construction within and around an occupied administrative and maintenance building. Explain how your team will investigate existing HVAC and electrical systems, buried utilities, piping routes, roof structural requirements, and equipment access to develop a safe and practical construction approach.

Address protection of contractor employees and CAWCD personnel, temporary conditioning, planned outages, lifting operations, and measures to minimize interruptions to daily operations. Provide examples of comparable work.

Points Based 25 (25% of Total)

3. Schedule Development and

Compliance

Describe the safeguards your team will establish during preconstruction to support timely commencement and completion of construction.

Address long-lead equipment, procurement sequencing, utility coordination, electrical outages, temporary conditioning, crane operations, and phased HVAC changeovers. Provide a preliminary project schedule identifying major activities, durations, dependencies, and required CAWCD decisions.

Explain how the concept alternatives affect construction sequencing and identify the assumptions used.

Provide examples and owner contacts demonstrating successful schedule performance on comparable projects.

Points Based 20 (20% of Total)

4. Resource Availability and

Project Commitment

Describe how your company will provide and maintain the staffing, supervision, subcontractor support, and equipment necessary to meet this project’s requirements while managing other current and anticipated work. Identify the proposed key personnel’s availability and anticipated commitments to other projects.

Explain how competing demands, staffing changes, and resource shortages will be addressed to maintain continuity and meet CAWCD’s schedule and operational needs.

Points Based 15 (15% of Total)

5. Preconstruction Value and

Cost Management

Describe the preconstruction tasks and deliverables your team will provide to help

CAWCD evaluate the HVAC concepts, control construction costs, and reduce project risk.

Address collaboration with

CAWCD and the design engineer, constructability reviews, estimating and cost reconciliation, procurement planning, system reliability, maintenance considerations, and commissioning planning.

Identify the greatest risks to the project’s budget and schedule and explain how your team will address them during preconstruction. Describe how proposed alternatives will be evaluated for value while maintaining required performance.

Points Based 10 (10% of Total)

4. SCOPE OF CMAR PRECONSTRUCTION SERVICES

4.1. Project Description

CAWCD is seeking a qualified CMAR to provide design phase assistance and complete construction services for the C26010 CMAR CAWCD Headquarters Building 2 HVAC Replacement. The estimated construction budget is $10M.

The Central Arizona Project Headquarters is located at 23636 N 7th Street in Phoenix, AZ. HDQ2 consists of a combination of office space, conference rooms, and three large high bay areas serving the auto shop (North Quad), machine shop (West Quad), and warehouse (South Quad). The Central

Core (two-story) of HDQ2 serves as the main office space for CAWCD’s Engineering and

Maintenance organizations. The spaces affected by this project encompass a total area of approximately 127,400 SF. Most of the HVAC system serving the East Quad (17,000 SF) was replaced in 2017 and will not be included in this project. However, a 5-ton (TN) direct expansion (DX) unit, HP-16 (2011), should be evaluated for replacement. Refer to Figure 1 below for general layout information.

The project will replace evaporative cooling serving the North, West, and South Quads and packaged direct-expansion (DX) equipment serving the Central Core with a chilled water HVAC system and associated electrical improvements. The estimated construction budget is $10M.

Project Areas and Scope Limits

Building 2 includes office and interior spaces, the North Quad light and heavy auto shops, the West

Quad CNC machine and weld shops, and the South Quad warehouse. The work includes replacement of Central Core AAON units with variable air volume chilled water air handlers and new air handlers and fan coils for areas currently served by evaporative cooling. The concept layouts include energy recovery ventilation at the light and heavy auto shop air handlers.

The majority of the East Quad is outside the concept scope; however, the layouts identify an East

Quad woodshop fan coil with electric heat. The Titan unit and paint booth are identified as outside the concept scope. The CMAR shall verify scope boundaries and interfaces with CAWCD and the design engineer. Earlier solicitation area figures and exclusions shall not supersede the current design documents.

Concept Alternatives

Concept 1 Traditional Two Pipe Central Plant. A ground-mounted air-cooled chilled water plant in a concrete block mechanical yard would use three screw chillers, with two operating and one standby for building-level N+1 redundancy. Constant-speed primary and variable-speed secondary pumping would serve buried chilled water supply and return piping to Building 2. Air handlers and fan coils would use electric heat. Yard space and distribution provisions could support future expansion; future buildings are not included unless expressly authorized.

Concept 2 Localized Chillers Per Quad. Three independent air-cooled plants would serve the North

Quad, West Quad, and combined South Quad and Central Core. The concept layouts use roof-mounted chillers with new steel platforms and roof reinforcement, local two-pipe chilled water distribution, electric heat, and variable primary pumps with one duty and one standby pump per plant.

Each area would depend on one chiller, with portable chiller connections for temporary cooling. North and West Quad change-over heat pump chillers are a possible alternative requiring further study and are not included in the stated concept estimate.

Concept 3 Four Pipe Modular Heat Pump Central Plant. A ground-mounted plant in a concrete block mechanical yard would use modular heat pump chillers arranged in three banks, with N+2 redundancy at the module level. Buried chilled water piping would serve the building, and a separate heating hot water supply and return system would serve the North and West Quad shops. The

Central Core and South Quad would retain electric heat. Primary and variable-speed secondary pumping would be provided for both water systems. This concept permits simultaneous heating and cooling and requires more piping and refrigeration components to maintain.

Electrical Improvements

Existing distribution includes two 3,000-amp, 480/277-volt, three-phase, four-wire switch sections, SS-1 and SS-2, and five ITE distribution boards, DSH-1 through DSH-5, apparently manufactured in

1986. Load recording indicates spare capacity; the report recommends replacing distribution boards where new load will be added because of equipment age. The CMAR shall review equipment condition, available capacity, replacement sequencing, utility coordination, and outage requirements with the design engineer.

Concepts 1 and 3 anticipate a new 2,000-amp, 480/277-volt, three-phase, four-wire service for the central plant. Concept 1 also anticipates replacement distribution boards for building electric heat.

Concept 2 anticipates replacement of SS-1 and SS-2 and distribution boards to serve chillers, pumps, and electric heat. Electrical ratings and quantities remain subject to engineering verification; the

CMAR shall identify conflicts between preliminary loads, equipment selections, and proposed service capacity before procurement.

Construction Phasing and Operational Continuity

For Concepts 1 and 3, the mechanical yard, equipment pads, chillers, pumps, and buried piping can be constructed while existing HVAC remains in operation. The central plant is intended to be started, commissioned, and operational before replacement air handling equipment is connected area by area. The CMAR shall establish transition sequencing, testing prerequisites, contingency measures, and any temporary conditioning required to maintain operations.

Concept 2 requires structural reinforcement, steel installation, and crane picks over occupied areas.

The CMAR shall identify necessary vacancies, exclusion zones, roof protection, lifting plans, temporary cooling connections, and coordinated work windows. Assess the schedule and operational effects of performing this work around CAP occupancy and the Monday through Thursday work week.

4.2. Anticipated Construction Schedule

CAWCD anticipates a start date for construction activities by about September 2027.

CAWCD anticipates that the selected CMAR will assist in determining the optimal construction schedule that will best accommodate necessary construction activities and the needs of CAWCD.

Project Schedule:

1. CMAR Preconstruction Contract February 2027

2. GMP 1 Due – Long Lead Equipment April 2027

3. Construction Contract Awarded August 2027

4. Construction Phase 1 – West Quad September 2027

5. Construction Phase 2 – North Quad February 2028

6. Construction Phase 3 – Central Quad July 2028

7. Construction Phase 4 – South Quad November 2028

8. Project Closeout December 2028

4.3. Preconstruction Phase Deliverables

Once a CMAR selection has been made, the CMAR will provide a scope of preconstruction phase services that will be reviewed, changed as needed, and approved by CAWCD. The scope of preconstruction-phase services submitted by the CMAR will form the basis of the preconstruction phase contract. The CMAR will provide the agreed-upon services as applicable from the preconstruction phase through the end of the project design and guaranteed maximum price (GMP) process.

The CMAR will begin the project as a CAWCD agency support role for preconstruction phase services and will (if successful) be awarded the construction phase of the project. Prior to construction, the CMAR will assume the risk of delivering the project through a GMP contract. The

CMAR will be responsible for construction means and methods and may be required to solicit bids from prequalified subcontractors to perform the work using the CMAR-approved selection process.

The CMAR may also compete to self-perform limited amounts of work.

4.4. Services by the CMAR

• Provide project planning and scheduling.

• Provide for construction phasing and scheduling that will minimize interruption to CAWCD operations.

• Provide alternate systems evaluation and constructability reviews.

• Advise CAWCD on methods to gain efficiencies in project delivery.

• Provide a long-lead equipment procurement study, including chillers, air handlers, pumps, controls, switchgear, and distribution boards. Identify release dates, submittal and fabrication durations, delivery risks, storage needs, and warranty impacts. Initiate procurement only upon separate written CAWCD authorization.

• Protect CAWCD's interest in quality, safety, and environmental factors.

• Attend regular project meetings with CAWCD and designer.

• Provide detailed cost estimating, value engineering, and knowledge of market conditions.

• Develop a construction cost model from concept information and update it at the 30% and subsequent agreed design milestones, including final unreviewed and final design. Identify assumptions, exclusions, phasing costs, temporary systems, escalation, and unresolved scope.

• Provide complete GMP proposals with schedule-of-value breakouts and any assumptions or exclusions clearly stated.

4.5. Deliverables

• Construct the selected HVAC and associated site, structural, electrical, and controls improvements in accordance with the approved construction documents.

• Arrange procurement, delivery, handling, storage, and installation of materials and equipment.

• Bid, award, and management of all construction-related subcontracts.

• Provide quality control, installation inspections, testing, balancing, startup, and commissioning support.

• Provide required bonds and insurance for the project.

• Coordinate owner issues, training, record documents, operation and maintenance manuals, and warranty obligations.

• Maintain a safe worksite and protect occupants, ongoing operations, existing facilities, and equipment.

4.6. Design Document Reviews

CMTA, Inc. prepared the 15% Design Concept Report. The CMAR will work with CAWCD and its design engineer to develop a project within the approved budget and operational requirements.

Reviews will begin with the concept information and continue through the 30% and subsequent agreed design milestones, including final unreviewed and final design. Responsibility for engineering design remains with the design engineer.

The CMAR will evaluate periodically the availability of labor, materials/equipment, building systems, cost-sensitive aspects of the design, and other factors that may impact the cost estimate, GMP proposals, and/or the project schedule.

The CMAR will recommend, in conjunction with the project team, those additional surface and subsurface investigations that, in its professional opinion, are required to provide the necessary information for the CMAR to construct the project.

The CMAR will meet with CAWCD as required to review designs during their development. The

CMAR will familiarize itself with the evolving documents through the various design phases. The

CMAR will proactively advise CAWCD and make recommendations on factors related to construction costs and concerns pertaining to the feasibility and practicality of any proposed means and methods, selected materials, equipment and building systems, and labor and material availability. The CMAR will address concerns that exist with respect to coordination of the drawings and specifications. The

CMAR will recommend cost-effective alternatives.

The CMAR will routinely conduct constructability and bidability reviews of the drawings and specifications, as necessary, to satisfy the needs of CAWCD. The reviews will attempt to identify all discrepancies and inconsistencies in the construction documents, especially those related to clarity, consistency, and coordination of the work of subcontractors and suppliers.

4.7. Constructability Reviews

The CMAR will evaluate the following:

• The drawings and specifications are configured to enable efficient construction.

• Design elements are standardized.

• Construction efficiency is properly considered in the drawings and specifications.

• The design promotes accessibility of personnel, material and equipment, and facilitates construction under adverse weather conditions.

• Sequences of work required by or inferable from the drawings and specifications are practicable.

• The design has taken into consideration efficiency issues concerning access and entrance to the site, laydown and storage of materials, staging of site facilities, construction parking, and other similar pertinent issues.

4.8. Bidability Reviews

The CMAR will check cross-references and complementary drawings and sections within the specifications and generally evaluate and satisfy themselves of the following:

• The drawings and specifications are sufficiently clear and detailed to minimize ambiguity and reduce scope interpretation discrepancies.

• Named materials and equipment are commercially available and are performing well or otherwise in similar installations.

• Specifications include alternatives in the event a requirement cannot be met in the field.

• In the CMAR's professional opinion, the project is likely to be subject to differing site conditions.

The results of the reviews will be provided to CAWCD in formal, written reports clearly identifying all discovered discrepancies and inconsistencies in the drawings and specifications with notations and recommendations made on the drawings, specifications, and other documents. If requested by

CAWCD, the CMAR will meet with CAWCD and Design Engineer to discuss any findings and review reports.

The CMAR's reviews will be from a contractor's perspective, and though it will serve to reduce the number of requests for information (RFIs) and changes during the construction phase, responsibility for the drawings and specifications will remain with the design engineer and not the CMAR.

4.9. Project Meetings

The CMAR should anticipate submitting a scope of services that accounts for project reporting and adequate attendance at necessary project meetings associated with the preconstruction phase of the project.

4.10. Cost Estimates

Unless otherwise agreed to by CAWCD and the CMAR, within fourteen (14) days after receipt of the design documents for the interim and final unreviewed design stage, the CMAR shall provide a detailed cost estimate and written review of the documents.

If any estimate submitted to CAWCD exceeds previously accepted estimates of the CAWCD project budget, the CMAR shall make appropriate recommendations on methods and materials to the

CAWCD and design engineer that they believe will bring the project back into the project budget.

In between these milestone estimates, the CMAR shall periodically provide a tracking report that identifies the upward or downward movements of costs due to value engineering or scope changes. It shall be the responsibility of the CMAR to keep CAWCD informed as to the major trend changes in costs relative to CAWCD's budget.

If requested by CAWCD, the CMAR shall prepare a preliminary "cash flow" projection based upon historical records of similar projects to assist CAWCD in the financing process.

4.11. Guaranteed Maximum Price (GMP) Proposals

The proposed GMP for the construction phase (or portions thereof) will be presented in a format acceptable to CAWCD (see EXHIBIT B – GMP SUBMITTAL REQUIREMENTS ). In addition to

Exhibit B, the contractor will be required to submit a detailed breakdown for the cost of the work that is reasonably tied to the anticipated progression of the work. The lump sum breakdown will also assist in estimating the progress towards completion of an item.

CAWCD will provide its Division 00 standard contract language to the CMAR before the CMAR is required to submit a GMP.

The GMP is comprised of the following not-to-exceed cost reimbursable and lump sum amounts, defined below.

• The cost of the work is a lump sum, not-to-exceed amount.

• The general conditions costs are a firm, fixed lump sum amount, which will include bonds and insurance based on the full contract price for construction.

• The construction fee is a firm, fixed lump sum.

• Taxes are considered to include all sales, use, consumer, and other taxes that are legally enacted when negotiations of the GMP are concluded. Taxes are actual costs and are a not-to-exceed reimbursable amount. The GMP shall be increased or decreased by the amount of any after-imposed tax, provided the contractor warrants in writing that no amount for such newly imposed excise tax or duty or rate increase or decrease was included in the GMP, as a contingency reserve or otherwise. No adjustment shall be made in the GMP under this section unless the amount of the adjustment exceeds $250.

• An updated/revised project schedule will be included with the GMP proposal(s) that reflects the

GMP plans and specifications. Any such project schedule updates/revisions will continue to comply with the anticipated construction schedule.

GMP proposal(s) review and approval:

• The CMAR will meet with CAWCD to review the GMP proposal(s) and the written statement of its basis.

• In the event CAWCD discovers inconsistencies or inaccuracies in the information presented, the CMAR will make adjustments as necessary to the GMP proposal, its basis, or both.

The CMAR must provide CAWCD a detailed GMP within twenty-one (21) calendar days after receipt of the final design documents.

4.12. Major Subcontractor and Major Supplier Selections

The selection of major subcontractors and suppliers should occur prior to submission of the GMP proposal. Major subcontractors may be selected based on qualifications or a combination of qualifications and price. Subcontractors shall not be selected based on price alone. Except as noted below, the selection of major subcontractors/suppliers is the responsibility of the CMAR. In any case, the CMAR is solely responsible for the performance of the selected subcontractors/suppliers.

The CMAR will prepare a subcontractor/supplier selection plan and submit the plan to CAWCD for approval. This subcontractor selection plan shall identify those subcontractor trades anticipated to be selected by qualifications only per this paragraph and those subcontractor trades anticipated to be selected by qualifications and competitive bid in accordance with the following paragraph. This plan will also identify those subcontractors that will not be selected through a formalized qualifications-based selection process. Selection by qualifications only:

• CAWCD may approve the selection of a subcontractor or supplier based only on their qualifications when the CMAR can demonstrate it is in the best interest of the project.

• The CMAR shall apply the approved subcontractor selection plan in the evaluation of the qualifications of a subcontractors or suppliers and provide CAWCD with its review and recommendation.

• The CMAR must receive CAWCD approval of the selected subcontractor or suppliers.

• The CMAR will negotiate costs for services/supplies from each subcontractor or supplier selected under this method.

Selection by qualifications and competitive bid: The CMAR shall apply the subcontractor selection plan in the evaluation of the qualifications of a subcontractors or suppliers and provide CAWCD with its process to prequalify prospective subcontractors and suppliers. All work for major subcontractors and major suppliers shall then be competitively bid to the prequalified subcontractors unless a subcontractor or supplier was selected pursuant to the previous paragraph:

• If CAWCD objects to any nominated subcontractor or supplier, the CMAR will nominate a substitute subcontractor or supplier acceptable to CAWCD.

• The CMAR will distribute drawings and specifications, and when appropriate, conduct a pre-bid conference with prospective subcontractors and suppliers.

• If the CMAR desires to self-perform certain portions of the work, it will request to be one of the approved subcontractor bidders for those specific bid packages. The CMAR’s bid will be evaluated in accordance with the process identified in the next paragraph. If events warrant it and CAWCD concurs that in order to ensure compliance with the project schedule and/or cost, the CMAR may self-perform work without bidding or rebidding the work.

• The CMAR shall request the prequalified subcontractors to provide a detailed bid for the services requested. The subcontractor bid, provided on the subcontractors’ letterhead, shall contain sufficient information (i.e., unit costs/amounts) to allow an evaluation of the reasonableness of bid costs. The CMAR shall receive, open, record, and evaluate the bids.

The apparent low bidders may also be interviewed to determine the responsiveness of their proposals.

The CMAR will be required to prepare a subcontracting selection report on the subcontracting process within fifteen (15) days after each major subcontractor or supplier bid opening process. The report will provide (a) the name of the recommended subcontractor or supplier and the amount of the subcontractor or supplier bid for each item of work, and (b) trade work and its cost for any work the

CMAR intends to self-perform.

The approved subcontractors or suppliers will provide a schedule of values that reflects their final accepted bid proposal, which will be used to create the overall project schedule of values.

If after receipt of sub-bids or after award of subcontractors and suppliers, CAWCD objects to any nominated subcontractor or supplier, the CMAR will nominate a substitute subcontractor or supplier, preferably if such an option is still available, from those who submitted subcontractor bids for the work affected. Once such substitute subcontractors and suppliers are approved by CAWCD, the CMAR's proposed GMP for the work. or portion thereof. will be correspondingly adjusted to reflect any higher or lower costs from any such substitution.

5. MANDATORY SUBMITTALS

1. SOQ Provisions*

All SOQs are subject to the provisions contained in the RFQ and contract documents. By clicking

"Please confirm", the contractor agrees to furnish all labor, materials, and equipment to complete the work in accordance with the contract documents.

Additional Eligibility Data Under A.R.S. Section 41-4401

A.R.S. Section 41-4401 requires, as a condition of the contract, verification of compliance by the consultant and each subcontractor with the Federal Immigration and Nationality Act, all other federal immigration laws and regulations, and A.R.S. Section 23-214 (A) that relate to their employees.

The contractor/consultant attests that it and all subcontractors that will be performing work under this contract are in compliance with the Federal Immigration and Nationality Act, all other federal immigration laws and regulations, and A.R.S. Section 23-214 (A), as these laws relate to their employees that are performing work under this contract.

Contracting – Prohibitions

Pursuant to A.R.S. Section 35-393.01, contractor certifies that it is not currently engaged in, and agrees for the duration of the contract to not engage in, a boycott of Israel.

☐ Please confirm

*Response required

2. Upload SOQ submission here.*

*Response required

3. Certification*

☐ Sole Proprietorship

☐ Partnership

☐ Corporation

*Response required

4. Arizona Sales Tax Number*

*Response required

5. Good Standing Certification*

Please upload your certificate of good standing from the Arizona Corporation Commission (or other appropriate government regulatory agency) in the state incorporated.

*Response required

6. Resolution Statement*

By clicking "Please confirm", you are authorizing that the person or persons submitting this proposal are legally authorized to bind the Respondent to a contract.

☐ Please confirm

*Response required

7. W9*

Upload a copy of your W-9.

*Response required

8. Evidence of Financial Stability*

*Response required

9. CONTRACTOR INFORMATION

9.1. Enter Contractor Information*

Please include the following in your response:

• Company's Legal Name

• Address

• City, State, Zip

• Contractor's License Classification

• Contractor's License Number

• Telephone Number

• Company Email Address

*Response required

9.2. For Questions Regarding This SOQ

If different than above, please include the following in your response:

• Name

• Phone Number

• E-Mail Address

9.3. Bonding Information*

Provide information on the following:

• Individual Project Bonding Capacity

• Total Bonding Capacity

• Amount of Bonded Contracts Currently in Process

*Response required

1. SOQ PREPARATION INSTRUCTIONS
1.1. Definitions
1.2. General Instructions
1.3. Copies of Contract Documents
1.4. Examination of RFQ Documents
1.5. Interpretations and Addenda
1.6. Amendments to SOQs
1.7. Presubmittal Conference
1.8. Project Schedule
2. STATEMENT OF QUALIFICATIONS
2.1. Scope of Work
2.2. Vertical Construction
2.3. Shortlisting Process
2.4. Final Ranking
2.5. Right of Action or Claim
2.6. Protest Procedures
2.7. Selection Process
3. EVALUATION CRITERIA
4. SCOPE OF CMAR PRECONSTRUCTION SERVICES
4.1. Project Description
4.2. Anticipated Construction Schedule
4.3. Preconstruction Phase Deliverables
4.4. Services by the CMAR
4.5. Deliverables
4.6. Design Document Reviews
4.7. Constructability Reviews
4.8. Bidability Reviews
4.9. Project Meetings
4.10. Cost Estimates
4.11. Guaranteed Maximum Price (GMP) Proposals
4.12. Major Subcontractor and Major Supplier Selections
5. MANDATORY SUBMITTALS
1. SOQ Provisions*
2. Upload SOQ submission here.*
3. Certification*
4. Arizona Sales Tax Number*
5. Good Standing Certification*
6. Resolution Statement*
7. W9*
8. Evidence of Financial Stability*
9. CONTRACTOR INFORMATION
9.1. Enter Contractor Information*
9.2. For Questions Regarding This SOQ
9.3. Bonding Information*