This document is a Request for Qualifications (RFQ) issued by the California Department of Parks and Recreation's Off-Highway Motor Vehicle Recreation Division for Stormwater Management Services (Contract No. C25550001). The solicitation seeks qualified environmental firms to provide comprehensive stormwater management services for State Vehicular Recreation Areas (SVRAs) statewide, with potential project scopes including MS4 permit implementation, soil conservation standard compliance, Storm Water Pollution Prevention Plan (SWPPP) development, public outreach materials creation, best management practices manual updates, project engineering, permitting, design support, and ongoing coordination. The contract will be valid for up to five years, with services to be issued through individual work orders. Proposals are due by 2:00 p.m. on Monday, June 16, 2025, and must be submitted electronically to ohmvr.contracts@parks.ca.gov.

The RFQ indicates potential project values ranging from approximately $50,000 to $15 million, with no guaranteed minimum work volume. While a specific Disabled Veteran Business Enterprise (DVBE) participation requirement has been waived, the state still encourages DVBE involvement and will apply a DVBE incentive program during evaluation. Contractors will be selected based on a comprehensive evaluation process considering factors such as professional experience, work quality, firm reliability, staffing capabilities, key personnel qualifications, and knowledge of applicable standards and regulations. The selection will involve an initial scored review of written submissions followed by interviews with the top-ranked firms, with only one firm ultimately being selected as the primary contractor for stormwater management professional services.

View the file

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Stormwater Management

No. C25550001

Department of Parks and Recreation

Off-Highway Motor Vehicle Recreation

May 2025

TABLE OF CONTENTS

Section Page

Section 1 – General Information

1.1 Introduction

1.2 Type of Professional Services

1.3 RFQ Issuing Office

1.4 SOQ Deadline and Delivery

1.5 Withdrawal of SOQ

1.6 Rejection of SOQ

1.7 Award of Agreement

Section 2 – Scope of Work

2.1 Locations of Potential Projects

2.2 Description of Potential Projects

2.3 Projected Timetable

2.4 Scope of Basic Services

2.5 Detailed Scope of Work

2.6 Work Order Procedure for Potential Projects

2.7 Work Order Issuance Locations

Section 3 – Responding to this RFQ

3.1 Minimum Requirements

3.2 Selection Criteria

3.3 Evaluation and Selection Process

Section 4 – Administrative Process and Requirements

4.1 Agreement for Services

4.2 Insurance Requirements

4.3 Disabled Veteran Business Enterprise Requirements

May 2025

ATTACHMENTS

A. Request for Qualifications Checklist B. Project List – List of Potential Project Areas C. Darfur Contracting Act Certification (DPR 74) (if applicable) D. Sample Forms

1. Standard Agreement (STD 213)

a. Exhibit A, Scope of Work (DPR 603AE)

b. Exhibit A, Attachment 1 Scope of Work and Task List

c. Exhibit B, Budget Detail and Payment Provisions (DPR 604AE)

d. Exhibit B, Attachment I, Work Order template

e. Exhibit C, General Terms and Conditions (GTC 225) by reference

f. Exhibit D, Special Terms and Conditions (DPR 605AE)

2. Payee Data Record

a. Payee Data Record (STD 204)

b. Payee Data Record Supplement (STD 205)

3. Disabled Veteran Business Enterprise Notice – Participation Requirement for Request for Qualifications (DPR 479RFQ)

a. Bidder Declaration (GSPD-05-105)

b. Disabled Veteran Business Enterprise Declarations (STD 843)

4. California Civil Rights Laws Certification (DGS OLS 04)

5. Architect-Engineer Qualifications (Standard Form 330)

State of California Request for Qualifications Bid No. C25550001 Department of Parks and Recreation Architectural and Engineering Professional Services Off-Highway Motor Vehicle Division Stormwater Management Services

May 2025 Page 1 of 16

SECTION 1 – GENERAL INFORMATION

1.1 INTRODUCTION

1.1.1 The California Department of Parks and Recreation (DPR) is requesting Statements of Qualifications (SOQ) from environmental firms that specialize in Storm Water quality and management services in the State of California. These firms must be qualified to develop and maintain stormwater management plans that will be acceptable to the State and Regional Water Quality Control Boards and/or any Federal or local agencies that may have jurisdiction over the various State Vehicular Recreation Areas (SVRAs). These services are needed to comply with current and future storm water and water quality requirements applicable to all SVRAs. The services for projects located in the California State Park System for the disciplines of Storm water management Services for potential projects include, however are not limited to, some or all of the following: study, planning, schematics, preliminary design, design development, preparation of construction documents, estimating, specification writing.

Firms (Contractors) will be selected and designated to perform Professional Services throughout California.

1.1.2 Contractors will be selected on the basis of written response to this Request for Qualifications (RFQ) and an interview. Contractors shall be designated to perform Professional Services for potential projects located within California State Parks for a term not to exceed (5) five years, unless a formal extension of the term of the Agreement is authorized by DPR and issued in the form of an Agreement Amendment.

1.1.3 Because the scope and number of projects and tasks are unknown at the time of Agreement execution, under this RFQ the Agreement is known as an “On-Call Agreement”. Services will be contracted on a Work Order basis, as project(s) requirement(s) dictate (See 2.6 Work Order Procedure for Potential Projects).

DPR and Contractor agree that no specific quantity of work is guaranteed to be provided to Contractor under the terms and conditions of this Agreement.

DPR does not guarantee that Contractor will be assigned a project specific Work Order during the term of the Agreement.

1.1.4 Contractor shall provide all services required by, and in accordance with, each project specific Work Order and such other necessary and incidental services that are required to provide Architectural and Engineering Professional services for the projects.

1.1.5 If Contractor is unable to furnish adequate services, fails to perform tasks such as deliverables, does not achieve project milestones or deadlines, DPR reserves the right to discontinue using Contractor’s services on that project and for any future projects. If Contractor fails to perform or does not have the resources to handle all the projects requiring services, DPR reserves the right to contract with the ranked firm(s) in order of rank, for the services. Contractor must achieve all deliverables

Off-Highway Motor Vehicle Division Stormwater Management Services

May 2025 Page 2 of 16 and deadlines on time in order to facilitate DPR’s goal. Contractor shall communicate any anticipated problem with achieving project deliverables and/or deadlines.

1.1.6 The Agreement is subject to DPR review and approval of Contractor’s performance at six (6)-month intervals.

1.2 TYPE OF PROFESSIONAL SERVICES

1.2.1 Contractors may submit qualifications for any or all of the disciplines listed below and for either or both Service Centers (see Section 2.7 of this RFQ). SOQs shall indicate the discipline type(s), Service Center(s), and shall discuss for each type of professional services for which qualifications are being submitted, the firm’s ability to produce designs, complete construction documents, studies, reports or other required documents and products, including plans, specifications and cost estimates. (Refer to Section 3.1 Minimum Requirements).

Geotechnical Engineering Stormwater Management: Surface and subsurface testing and analysis for the design and placement of public and recreational facilities of all kinds. Experience in road alignments, slope stabilization, erosion protection structures, bridge abutments, water well design and construction standards, onsite wastewater disposal systems and building placement.

Testing – Lab and Field Stormwater Management: Experience in all types of materials testing and sampling both in the field and in the lab. Experience with soils, concrete, asphalt, water and sewer. Experience with Title 24, Caltrans testing procedures and Caltrans Quality Assurance Program (QAP).

Civil Engineering Stormwater Management: Experience in site work development including, however not limited to: grading, roadways, earthwork, utilities, traffic engineering, water systems and conveyance works, water treatment, storm drainage, sewer conveyance systems, sewage treatment, including septic and leach field systems for public recreation facilities. Working knowledge of Storm Water Pollution Prevention Plans (SWPPP) preparation and storm water design as required by the California Construction General Permit from the State Water Resources Control Board (SWRCB).

Environmental Engineering Stormwater Management: Experience in the detection and inspection of hazardous materials, including but not limited to; underground hazardous materials, asbestos, sludge, dredge material, and lead. Ability to prepare recommendations and reports dealing with the treatment and disposal of these hazardous materials.

Ability to prepare construction documents relating to the removal and disposal of hazardous materials, and obtain necessary permits and ability to provide inspection during construction of such facilities.

Off-Highway Motor Vehicle Division Stormwater Management Services

May 2025 Page 3 of 16

1.3 RFQ ISSUING OFFICE

1.3.1 RFQ is issued by the California Department of Parks and Recreation, Off-Highway Motor Vehicle Recreation Division. A copy of this RFQ may be obtained by downloading it from Department of General Services’ (DGS) website at Event Search (ca.gov).

• At the website enter the bid number “C25550001” in the “Event Name” field and click the “Search” button.

• Click on the bid number C25550001 under the Event ID to view the full advertisement.

• Click on “View Event Package” to download the bid documents.

1.3.2 All questions concerning this RFQ shall be submitted in writing directly to the designated point of contact, Amy Woodhull, Contract Analyst, at ohmvr.contracts@parks.ca.gov NO LATER THAN 2 p.m., s calendar days prior to SOQ Submittal Deadline. Should answers to questions amend the RFQ, DPR will issue an Addendum and post on this DGS website.

1.3.3 All notices, clarifications, and addenda to this RFQ shall be posted on the above DGS website. It is the proposing Contractor’s responsibility to monitor this website for all information regarding this RFQ. DPR is not responsible for sending individual notification of changes or updates. It is the sole responsibility of the proposing Contractors to remain apprised of changes to this RFQ.

1.3.4 DPR encourages Small Business Enterprises (SBE) to submit SOQs; however, under the contracting law for Architectural and Engineering Services agreements, preference cannot be given to an SBE in the selection process.

The small business preference is not applicable for RFQ solicitations because the cost is negotiated with the most qualified firm. However, DPR encourages small businesses to participate in the RFQ process.

DPR strongly encourages Contractors responding to this solicitation to consider partnering with qualified California Certified Small Business Enterprises (SB) to foster working partnerships with the small business community.

Information about SBE resources can be found at Office of Small Business and Disabled Veteran Business Enterprise Services (ca.gov) or by calling the Office of Small Business and DVBE Certification at (916) 375-4940.

If your firm is not certified as an SBE, log onto the DGS website at SB/DVBE Certification for information to determine if your firm or subcontractor(s) qualifies as an SBE.

https://caleprocure.ca.gov/pages/Events-BS3/event-search.aspx https://caleprocure.ca.gov/pages/Events-BS3/event-search.aspx https://www.dgs.ca.gov/PD/About/Page-Content/PD-Branch-Intro-Accordion-List/OSDS/OSDS https://www.dgs.ca.gov/PD/About/Page-Content/PD-Branch-Intro-Accordion-List/OSDS/OSDS https://caleprocure.ca.gov/pages/sbdvbe-index.aspx https://caleprocure.ca.gov/pages/sbdvbe-index.aspx

Off-Highway Motor Vehicle Division Stormwater Management Services

May 2025 Page 4 of 16

1.4 SOQ DEADLINE AND DELIVERY

1.4.1 Deadline: SOQs will be accepted no later than 2 p.m., Monday, June 16, 2025 to ohmvr.contracts@parks.ca.gov

Note: DPR will not accept postmarks, or facsimile (Fax) responses. SOQs must be received via email by the deadline indicated above.

1.4.2 Delivery: SOQ emails shall be plainly labeled with Contractor’s name and address (refers to Attachment A, Checklist, page 3 of this RFQ).

1.4.3 SOQs received after the deadline shall be rejected without review and shall be returned to proposing Contractor

1.5 WITHDRAWAL OF SOQ

1.5.1 Contractor may withdraw its SOQ at any time prior to the deadline for submitting SOQs, by notifying DPR in writing to designated point of contact, Amy Woodhull, Contract Analyst, at ohmvr.contracts@parks.ca.gov of its withdrawal. The withdrawal notice must be signed by a duly authorized representative of Contractor.

Contractor may thereafter submit a new or modified SOQ, provided that it is received at DPR no later than the SOQ due date and time. (See Section 1.4 SOQ Deadline and Delivery.)

1.6 REJECTION OF SOQ

1.6.1 DPR reserves the right to reject any or all SOQs received in response to this RFQ, to cancel this RFQ or to terminate the selection proceedings at any time, if DPR determines such action is in the best interest of DPR.

1.7 AWARD OF AGREEMENT

1.7.1 Award of Agreement, if made, will be in accordance with this RFQ to a firm deemed to be the most highly qualified to perform the required services.

(END OF SECTION)

mailto:ohmvr.contracts@parks.ca.gov

Off-Highway Motor Vehicle Division Stormwater Management Services

May 2025 Page 5 of 16

SECTION 2 –SCOPE OF WORK

2.1 LOCATIONS OF POTENTIAL PROJECTS

2.1.1 Various projects are located statewide throughout the California State Park System. Potential projects that may require Architectural and Engineering Professional Services are identified in “Attachment B, List of Potential Project Areas”. Projects on this list may not necessarily receive funding or approval for design.

2.2 DESCRIPTION OF POTENTIAL PROJECTS

2.2.1 Potential projects include new storm water infrastructure, or replacement or repair of existing facilities or infrastructure. Development and implementation of Soil Erosion plans, Storm Water Pollution Prevention Plans, Water Monitoring Plans, Trail Erosion Surveys, hydrological monitoring, environmental permitting and Watershed Assessments. Projects may also include project design, pollution monitoring plans, design and implementation of constructions general permit requirements and assistance with soil conservation plans. Additionally, projects may include specific tasks related to storm water and or compliance with the MS$ Permits.

$50,000 approximately to $15 million

2.3 PROJECTED TIMETABLE

2.3.1 Individual projects will be scheduled throughout the funding life of the projects.

Contract negotiations for individual projects will include time constraints for the specific project in question.

2.4 SCOPE OF BASIC SERVICES

2.4.1 The scope of basic services required by this RFQ shall include some or all, however not limited to, of the following:

A. Contractor shall provide all necessary expertise and services to professionally and diligently prosecute the work authorized by Work Orders to be issued by DPR. Contractor shall:

1. Contract for or employ at Contractor’s expense, subcontractors or personnel to the extent deemed necessary for the work. DPR reserves the right to reject the use of any subcontractor.

2. Coordinate all work with DPR Project Representative on a regular and timely basis.

3. Consult, as necessary, with normal and customary employees, agencies, and/or representatives of DPR regarding the work of each Work Order.

May 2025 Page 6 of 16

4. Attend meetings with DPR, other professionals employed by DPR and local and regional agencies, as needed, and directed by DPR to perform the work.

5. Cooperate with other professionals employed by DPR for other work related to a Work Order.

6. Abide by all regulations imposed by funding sources, such as auditing requirements and payroll affidavits.

7. Be responsible for the professional quality, technical accuracy and the coordination of Contractor’s entire work product and provide a professional level of review of all deliverables to assure quality and technical accuracy of all documents furnished by Contractor under this Agreement. Contractor shall, without additional compensation, correct or revise any errors in its documents and other services.

B. Provision of the Work: Work shall be provided in accordance with Work

Orders to be issued under the Agreement resulting from this RFQ, and shall be subject to the provisions of the Agreement (See Attachment D, Sample Forms, Item 1, Standard Agreement (Form STD 213), including any additional provisions specified in the Work Orders with regard to schedule, key personnel, and subcontractors.

2.5.1 DETAILED SCOPE OF WORK

2.5.1 The scope of work in complexity and scope of services will vary from project to project. (See Section 1.1 Introduction)

All firms will be required to comply with all applicable codes.

2.5.2 Document requirements for the work on projects shall include, however not be limited to:

A. Drawings shall be prepared using AutoCAD. Other programs must be capable of producing DWG and DXF documents. Drawings shall be done on standard DPR drawing sheets which are 22”x 34” on archival quality paper, bond copies and an electronic original shall be provided. AutoCAD documents shall conform to DPR AutoCAD Drawing standards. Specifications shall follow Master Spec formats and Reports and supplemental data shall be submitted in Microsoft Office 2010 or later. The State reserves the right to change these standards to meet DPR needs.

B. Final, original, drawings and specifications, when complete, shall be wet stamped and signed by responsible individuals, licensed by the State of California.

May 2025 Page 7 of 16

2.5.3 Original wet stamped and electronic copies of drawings and specifications shall be given to DPR upon completion of work. Electronic documents shall be submitted in electronic format on CD together with original programs and PDF’s.

2.5.4 Other reproducible format document types will be described in specific contracts awarded.

2.5.5 DPR shall have ownership rights to all Project documents and electronic files.

2.6 WORK ORDER PROCEDURE FOR POTENTIAL PROJECTS

2.6.1 DPR shall authorize Contractor to perform work on a specific project, named in “Stormwater Management Services” “Project List for Potential Project Areas” (See Attachment B of this RFQ), by issuing to Contractor a project specific Work Order.

Each Work Order will identify the park and project name(s), the project-specific scope of services, the schedule for providing the services and the required deliverables.

2.6.2 Work Orders will be primarily based upon fixed fees negotiated for the specific project, including but not limited to, cost of travel and all incidentals necessary to complete the Work Order scope of work. DPR may, at its discretion, negotiate either hourly fee rates or fixed fees for the described services. (See Attachment D “Sample Forms”, Item 1 Standard Agreement (Form STD 213), Item 1.C Exhibit B, Attachment I, Sample Work Order).

2.6.3 Contractor shall submit an estimated cost breakdown based upon the project specific scope which shall include all necessary hours to perform the project specific scope of services, all estimated hours of labor and the corresponding hourly rate, along with any other estimated additional costs for services, including but not limited to, any subcontractors, research, travel time, mileage and per diem, etc.

DPR will review Contractor’s cost estimate and negotiate, as needed. If Contractor’s estimated cost is reasonable, DPR may issue a Work Order authorizing the start of work in accordance with Standard Agreement, Exhibit B, paragraph 1.C. (See Attachment D “Sample Forms”, Item 1.B Standard Agreement (Form STD 213), Exhibit B, Budget Detail and Payment Provisions, DPR 604AE).

2.6.4 DPR, at its discretion, may combine two (2) or more projects to be handled as a single Work Order assignment. If a Work Order assignment includes multiple projects, Contractor shall provide a separate invoice in a format approved by DPR for each individual project for which services are provided under the single Work Order.

2.6.5 There shall not be a Notice to Proceed for any project work until a Work Order has been fully executed.

2.6.6 DPR at its own discretion may choose not to prepare a Work Order and to not have the work performed even though Contractor’s cost was negotiated to a fair and reasonable price.

May 2025 Page 8 of 16

2.7 WORK ORDER ISSUANCE LOCATIONS

2.7.1 Work Orders for specific projects will be issued and managed from OHMVR Division of Department of Parks and Recreation.

(END OF SECTION)

May 2025 Page 9 of 16

SECTION 3 – RESPONDING TO THIS RFQ

3.1 MINIMUM REQUIREMENTS

3.1.1 Statement of Qualifications. Contractor’s Statement of Qualifications (SOQ) shall clearly and accurately demonstrate specialized knowledge and experience required for consideration for services outline in the Statement of Work. Submit four (4) copies in paper form of the SOQ, which consists of a Cover Letter (Letter of Interest) and Standard Form 330. SOQ shall be prepared in a bound 8.5” x 11” booklet format, using tabs to divide sections of the Architect-Engineer Qualifications (Standard Form 330).

3.1.2 In your SOQ provide:

A. RFQ Checklist, Page 1 (Attachment A)

B. Cover letter signed by an authorized representative of Contractor and which includes Contractor’s:

• Legal name as registered with the Secretary of State, California Business Program

• Address (mailing & street, if different)

• Telephone number

• Name, title and email address of Contractor’s contact person for this

RFQ.

C. Architect-Engineer Qualifications (Standard Form 330) may be downloaded from U.S. General Services Administration.

D. Darfur Contracting Act Certification (DPR 74) (See Attachment C if applicable)

E. Payee Data Record (STD 204) and Payee Data Record Supplement (STD

205) (See Attachment D “Sample Forms”, Item 2)

F. California Civil Rights Laws Certification (DGS OLS 04) (See Attachment D “Sample Forms”, Item 4) https://www.gsa.gov/reference/forms/architectengineer-qualifications

May 2025 Page 10 of 19

G. A written statement of Contractor’s qualifications that is responsive to the selection criteria described in 3.2 Selection Criteria. Contractor shall include examples of successful projects within budget.

H. Schedule of Rates. Provide a Schedule of Rates for the principal firm (or firms if there is a joint venture or association). Billing rates shall include all hourly rates for designated employees and reimbursable costs in accordance with the following:

1. Hourly rates shall include all administrative overhead costs, including supervision, clerical, building rent, utilities, telephone (including cell phones), incidental costs, and profit. Only those employees actively providing services for a project specific Work Order shall be entitled to charge time to the project.

2. Contractor shall be reimbursed for all costs for scheduled travel expenses including transportation (mileage), meals, lodgings and incidental costs associated with requested work. Travel allowances shall not exceed the California Department of Human Resources (CALHR) approved subsistence allowances in place at the time the contract is awarded unless previously authorized by DPR.

3. DPR will reimburse Contractor’s field personnel for the actual, necessary and appropriate business and travel expenses incurred fifty (50) miles, or more, from base office, in accordance with the California Department of Human Resources (CALHR) rules.

This is not a Fee Proposal.

I. A written statement of how the firm would approach the discipline of interest in a project, including environmental concerns.

J. Address firm’s ability to provide staff and resources to selected projects within the time constraints and geographic locations of potential projects.

3.1.3 Costs incurred for developing the SOQ and in anticipation of award of the agreement are entirely the responsibility of Contractor and shall not be charged to DPR and/or the State of California. All submittals become the property of DPR upon receipt and will not be returned to Contractor except as described in Paragraph 1.4.3.

3.2 SELECTION CRITERIA

3.2.1 The selection committee will be appointed by DPR’s Deputy Director of Facilitates and Development and will evaluate the SOQs using the following criteria:

Selection Criteria Maximum

Points

May 2025 Page 11 of 19

1. Professional experience of the firm in performing services of a similar nature and scope. DPR expects that the submitting firm have in-house professional expertise to perform the proposed discipline(s) for which the firm is submitting qualifications.

Example: If a project requires a prime discipline, such as, architecture, and supporting disciplines are required, such as structural engineering, the architectural firm may utilize its own subcontractors. The prime architectural firm will not be required to utilize DPR’s top ranked structural engineering firm.

Example: If a project only requires a specific discipline, such as, structural engineering, the DPR top ranked structural engineering firm will be notified for negotiations.

2. Quality and relevance of recently completed or ongoing work.

3. Reliability, continuity, and location of firm to the project management location.

4. Staffing capability and the ability to meet schedules. 20

5. Education and experience of key personnel to be assigned. 15

6. Knowledge of applicable standards, regulations, codes and technology associated with the services performed.

Total Points 100

Contractor shall respond in writing indicating how its firm’s experience fulfills the requirements of these criteria.

3.3 Evaluation and Selection Process

3.3.1 The DPR Selection Committee Members will review, evaluate and score each SOQ based on the above selection criteria. These factors shall be weighed according to the nature of the services to be provided and the needs of DPR.

3.3.2 All SOQs received will be evaluated to determine the extent to which they comply with this solicitation document requirements.

3.3.3 If an SOQ fails to meet a material solicitation document requirement, the SOQ may be rejected. A deviation is material to the extent that a response is not in substantial accord with solicitation document requirements. Immaterial deviations may cause an SOQ to be rejected.

3.3.4 During the evaluation process, DPR may require Contractor to answer questions with regard to the Contractor’s SOQ. Failure of Contractor to demonstrate that the claims made in its SOQ are in fact true may be sufficient cause for deeming an SOQ non-responsive.

May 2025 Page 12 of 19

3.3.5 At least three (3) Contractors with the highest scores will be selected for the "Short List". Each of the “Short List” Contractors will be invited to an interview and asked to make an oral presentation on Contractor’s firm and its qualifications and experience. Contractors not invited to interview will be notified in writing.

3.3.6 At any time, DPR may contact a Contractor’s previous clients and/or project owners to verify the experience and performance of the prospective Contractor, its key personnel, and its subcontractors.

3.3.7 After the interviews, Contractors shall be ranked (1, 2, 3, etc.) based on each

Contractor’s combined interview scores from each Selection Committee Member.

Contractors will be notified in writing of the ranking results. Only one firm (Contractor) will be selected and ranked as number 1 for Stormwater Management professional services.

May 2025 Page 13 of 19

SECTION 4 – ADMINISTRATIVE PROCESS AND REQUIREMENTS

4.1 AGREEMENT FOR SERVICES

4.1.1 The number one ranked (selected) Contractor will be notified in writing and be provided information for entering into the Agreement.

4.1.2 The selected Contractor, with which DPR successfully negotiated, shall be required to execute an Agreement (See Attachment D, “Sample Forms”, Item 1 Standard Agreement). The Standard Agreement shall include the agreement terms and conditions of this RFQ. Contractor shall execute the required number of copies of the Agreement documents and return them within seven (7) calendar days, after Contractor has received written notice of the successfully negotiated agreement.

DPR reserves the right to modify or update the Standard Agreement in the interest of DPR, in whole or in part, at any time up to the negotiation of the Agreement with the Contractor. By submitting for this RFQ, the prospective Contractor and its key subcontractors acknowledge that a) the project team will provide the services required in the Agreement, and b) have no objection to the Standard Agreement.

4.1.3 DPR will determine the Architectural and Engineering Professional Service required on a project-by project basis. As a project becomes available in a Service Center, Contractor shall be notified and provided written instructions for negotiations. Negotiations will follow at which time Contractor will be asked to submit a detailed fee schedule for the project specific Work Order. DPR will attempt to negotiate a satisfactory Agreement and reasonable fee for the services needed.

4.1.4 If a satisfactory contractual agreement on services and compensation cannot be reached between DPR and the selected Contractor, DPR reserves the right to terminate negotiations with the selected Contractor and attempt to reach satisfactory contractual agreement with the remaining qualified Contractors in order of their ranking.

4.2 INSURANCE REQUIREMENTS

4.2.1 Contractor shall be required to furnish evidence of insurance according to requirements included in Exhibit D. (See Attachment D, “Sample Forms”, Item 1e Standard Agreement, Exhibit D - Special Terms and Conditions, paragraph 1 “Insurance Requirements” (Form DPR 605AE)).

4.3 DISABLED VETERAN BUSINESS ENTERPRISE REQUIREMENTS

4.3.1 DPR requires a participation goal of a minimum six percent (6%) for Disabled Veteran Business Enterprises (DVBEs). The selected Contractor shall be required to demonstrate DVBE compliance. (See Attachment D, “Sample Forms”, Item 3a, Bidder Declaration (GSPD-05-105)).

May 2025 Page 14 of 19

4.3.2 Information about DVBE resources can be found at Office of Small Business and

Disabled Veteran Business Enterprise Services (ca.gov) or by calling the Office of Small Business and DVBE Certification at (916) 375-4940.

4.3.3 Compliance forms for this purpose will be provided at the time the Standard

Agreement documentation is sent to Contractor for execution. (See Attachment D, “Sample Forms”, Item 3, Disabled Veteran Business Enterprise Notice – Participation Requirement for Request for Qualifications (DPR 489RFQ)).

4.3.4 DVBE documentation is not submitted with the SOQ. However, documentation will be required of selected Contractor at time the Standard Agreement is signed.

https://www.dgs.ca.gov/PD/About/Page-Content/PD-Branch-Intro-Accordion-List/OSDS/OSDS https://www.dgs.ca.gov/PD/About/Page-Content/PD-Branch-Intro-Accordion-List/OSDS/OSDS

Off-Highway Motor Vehicle Division for Projects in the California State Park System

May 2025 Attachments

ATTACHMENT A

RFQ Checklist

Off-Highway Motor Vehicle Division for Projects in the California State Park System

May 2025 Page 2 of 2

ATTACHMENT A

RFQ CHECKLIST

Name of Firm _________________________________________________________________

Place this checklist at the front of each SOQ copy, as applicable.

Each firm must identify the professional services for which it wants to be considered and select the locations(s) of projects for which it is interested in providing service, the Northern Service Center (NSC), and/or Southern Service Center (SSC) or Statewide.

Check the professional services and location for which your firm is submitting qualifications.

PROFESSIONAL SERVICES NSC SSC

Storm Water Management Services

Geo-technical Engineering

PROFESSIONAL SERVICES STATEWIDE

Firms shall submit one copy electronically of their SOQ for each discipline of interest and for each Service Center for which they would like to be considered. For example:

SOQ for Storm Water Management 2 copies

SOQ for Architecture for NSC 2 copies

Total 4 copies

Testing - Lab and Field

Civil Engineering

Environmental Engineering

Off-Highway Motor Vehicle Division for Projects in the California State Park System

May 2025 Page 2 of 2

Document

___ 1. RFQ Checklist

___ 2. SOQ Cover Letter

___ 3. Architect-Engineer Qualifications (Standard Form 330)

___ 4. Darfur Contracting Act Certification (DPR 74)

___ 5. Payee Data Record (STD 204) and Payee Data Record Supplement (STD 205)

___ 6. California Civil Rights Laws Certification (DGS OLS 04)

___ 7. Written Statement of Qualifications

___ 8. Schedule of Values

___ 9. Written Statement of Approach

___ 10. Firm’s Ability to Provide Staff and Resources

Please mark SOQ electronic submission :

C25550001.Stormwater.VendorName.RFQ

Submit via email to ohmvr.contracts@parks.ca.gov by 2:00pm on Monday, June 16, 2025.

Attachment B

List of Potential Project Areas

For a complete list of potential project areas please go to http://ohv.parks.ca.gov

Carnegie SVRA Clay Pit SVRA Heber Dunes SVRA Hollister Hills SVRA Hungry Valley SVRA Oceano Dunes SVRA Ocotillo Wells SVRA Prairie City SVRA Eastern Kern County SVRA/Onyx Ranch Mammoth Bar OHV Riding Area/A http://ohv.parks.ca.gov/

DPR 74 (Rev. 5/2013)(Excel 5/16/2013)

DO NOT COMPLETE THIS FORM UNLESS YOUR COMPANY MEETS THE CRITERIA OF OPTION #1 OR OPTION #2.

FOR DEPARTMENT USE ONLYState of California - Natural Resources Agency

DEPARTMENT OF PARKS AND RECREATION

DARFUR CONTRACTING ACT CERTIFICATION

Public Contract Code Sections 10475 -10481 applies to any company that currently or within the previous three years has had business activities or other operations outside of the United States.

For such a company to bid on or submit a proposal for a State of California contract, the company must certify that it is either a) not a scrutinized company; or b) a scrutinized company that has been granted permission by the Department of General Services to submit a proposal.

DO NOT COMPLETE OR RETURN THIS FORM IF: Within the previous three years, your company HAS NOT had any business activities or other operations outside of the United States.

AGREEMENT/PAPO NO.

OPTION #1 - CERTIFICATION

If your company, within the previous three years, has had business activities or other operations outside of the United States, in order to be eligible to submit a bid or proposal, please insert your company name and Federal ID Number and complete the certification below.

I, the official named below, CERTIFY UNDER PENALTY OF PERJURY that a) the prospective proposer/bidder named below is not a scrutinized company per Public Contract Code 10476; and b) I am duly authorized to legally bind the prospective proposer/bidder named below. This certification is made under the laws of the State of California.

COMPANY/VENDOR NAME (Printed)

BY (Authorized Signature)

PRINTED NAME AND TITLE OF PERSON SIGNING

DATE EXECUTED EXECUTED IN THE COUNTY AND STATE OF

FEDERAL ID NUMBER

OPTION #2 - WRITTEN PERMISSION FROM DGS

Pursuant to Public Contract Code section 10477(b), the Director of the Department of General Services may permit a scrutinized company, on a case-by-case basis, to bid on or submit a proposal for a contract with a state agency for goods or services, if it is in the best interests of the state. If you are a scrutinized company that has obtained written permission from the DGS to submit a bid or proposal, complete the information below.

We are a scrutinized company as defined in Public Contract Code section 10476, but we have received written permission from the Department of General Services to submit a bid or proposal pursuant to Public Contract Code section 10477(b). A copy of the written permission from DGS is included with our bid or proposal.

COMPANY/VENDOR NAME (Printed)

INITIALS OF SUBMITTER

PRINTED NAME AND TITLE OF PERSON INITIALING

FEDERAL ID NUMBER

All other companies, complete Option #1 or Option #2 and return:

Attachment C

2. The term of this Agreement is:

SAMPLE

Attachment D - Sample Docs

Contractor's Name:

Agreement Number:

Page: 1 1

SCOPE OF WORK

1. Contractor agrees to furnish all labor, tools, materials and equipment necessary to:

2. The work shall be performed at:

3. The work shall be provided during:

4. The project representatives during the term of this agreement will be:

State Agency: Contractor:

Section/Unit: Section/Unit:

Attention: Attention:

Address: Address:

City/State/Zip Code: City/State/Zip Code:

Phone: Phone:

Fax: Fax:

E-mail: E-mail:

DPR 603PW (Rev. 7/2011)(Excel 7/21/2011)

EXHIBIT A — Public Works (Standard Agreement) of

Exhibit A, Attachment 1 Scope of Work and Task List Storm Water Management and Consulting

Basic Scope of Services

The Contractor shall provide a wide range of environmental services in compliance with US Environmental Protection Agency and State Water Resources Control Board guidelines for National Pollutant Discharge Elimination System applicable storm water, erosion and sediment control regulations. The Contractor will assist the Off-Highway Motor Vehicle Recreation (OHMVR) Division with compliance of all applicable federal, state, and local storm water and water quality regulations. The Contractor will support all nine State Vehicular Recreation Areas (SVRAs) as needed with work including but not limited to MS4 permitting support, data collection and management, SWPPP development, monitoring, and support, obtaining relevant environmental permits, and ensuring compliance with the 2020 Soil Conservation Standard.

Task List

Task 1 - MS4 Implementation, Management Support, and Training

Contractor shall provide all services relevant to ensuring full compliance with existing MS4 permits and implementation of new permits including but not limited to developing Storm Water Management Plans, developing training materials, public education and outreach materials and presenting to SVRA staff either in person, virtually, or some combination of both, ensuring SVRA compliance with the Trash Amendments of the permit, database design, support, and updates as needed to house MS4 permit related data, monitoring support, coordination, development and review of annual reports.

Task 2 - Soil Conservation Standard Compliance Support at SVRAs

Contractor will assist as needed, or upon request from an SVRA with approval by OHMVR Division, with aspects of ensuring SVRA compliance with the 2020 Soil Conservation Standard. Services may include but are not limited to: developing erosion assessment methods tailored to an SVRA, reviewing Compliance Reports and Action Plans, providing input on monitoring plans and methods, reviewing Soil Conservation Plans as needed, visiting SVRAs upon request to provide expert opinion on erosional issues for projects focused on soil conservation, and providing erosion and sedimentation Best Management Practices (BMPs) evaluation, recommendations, engineering, and implementation. Monitoring can include but is not limited to: water quality assessments and monitoring for potential pollutants, developing sediment budgets, trail erosion surveys and modeling, and hydrology and watershed level assessments.

Task 3 - SVRA Support for SWPPP Development and Implementation

Contractor shall upon request from an SVRA with approval from OHMVR Division, develop Storm Water Pollution Prevention Plans for projects requiring coverage under the Construction General Permit.

Contractor will deliver all services required under a SWPPP including but not limited to: monitoring, sampling discharges, developing relevant action plans, and ensuring overall compliance with permit and SWPPP. Contractor shall provide both Qualified SWPPP Designer (QSD) and Qualified SWPPP Practitioner (QSP) services as required. Contractor will provide relevant QSP training for staff at SVRAs and OHMVR Division upon request.

Task 4 - Create Public Outreach Materials that Support Storm Water Programs

Contractor shall develop public outreach materials relevant to storm water management programs and MS4 permits specific to SVRAs when requested with approval from OHMVR Division. Contractor will ensure public outreach materials are accessible to the general public by providing translation services into Spanish as requested. Public outreach materials can include but are not limited to: brochures, handouts, digital media, animations, and interpretative panels. Contractor will work with the SVRA requesting the information directly.

Task 5 - Review and Update the Off-Highway Vehicle Best Management Practices Manual

Upon initiation by the OHMVR Division, Contractor shall review revisions by OHMVR Division staff to the 2007 OHV BMP Manual for Erosion and Sediment Control. Provide animations, engineered drawings, and other images to be incorporated into the Manual. Based upon an internal review by OHMVR Division, coordinate and incorporate updates and revisions to the manual. At the request of the OHMVR Division, Contractor may compile the new manual and prepare it for publication and distribution.

Task 6 - Project Engineering, Permitting, and Design Support

Contractor shall upon request by an SVRA and approved by the OHMVR Division provide all aspects of storm water related project design and support including but not limited to: engineering, biological assessments, and preparation of all applicable environmental permits in close coordination with the SVRA requesting assistance. Projects may include but are not limited to: road realignments, erosion and sedimentation BMP development and implementation, low water crossings, grading and drainage plans, and stream or channel alterations.

Task 7 – OHMVR Division Coordination and Reporting

Contractor shall participate in monthly coordination meetings with OHMVR Division, either in person or virtually, to provide updates on work orders in progress, provide budget projections, address any issues, and to facilitate overall project management. Contractor shall supply meeting agendas and notes.

Page: 1 1

BUDGET DETAIL AND PAYMENT PROVISIONS

1. Invoicing and Payment

A. For services satisfactorily rendered, and upon receipt and approval of the invoices, the State agrees to compensate the Contractor for actual expenditures incurred in accordance with the rates specified in the Bid Form, marked Exhibit B, Attachment 1, which is attached hereto and made a part of this Agreement.

B. Invoices shall include the Agreement Number and shall be submitted in triplicate not more frequently than monthly in arrears to:

2. Budget Contingency Clause

A. It is mutually agreed that if the Budget Act of the current year and/or any subsequent years covered under this Agreement does not appropriate sufficient funds for the program, this Agreement shall be of no further force and effect. In this event, the State shall have no liability to pay any funds whatsoever to Contractor or to furnish any other considerations under this Agreement and Contractor shall not be obligated to perform any provisions of this Agreement.

B. If funding for any fiscal year is reduced or deleted by the Budget Act for purposes of this program, the State shall have the option to either cancel this Agreement with no liability occurring to the State, or offer an agreement amendment to Contractor to reflect the reduced amount.

3. Prompt Payment Clause

Payment will be made in accordance with, and within the time specified in, Government Code Chapter 4.5, commencing with Section 927.

4. Compensation

Contractor shall submit to the State an itemized request for payment, in triplicate, no more than once each 30 day period. All invoices or requests for payment, not on Contractor's preprinted stationery, shall be signed by the Contractor or his authorized representative and submitted to the State's Representative as indicated in paragraph 1B above.

Five percent (5%) shall be retained from each progress payment and held by the State as partial security for the fulfillment of the contract by the Contractor. The State shall pay the Contractor the value of such work, as estimated therein, after deducting therefrom all previous payments, and all amounts to be retained under the provisions of this Agreement. No progress payments will be made by the State for project terms less than thirty

(30) days. The one and only payment will be the final payment made by the State upon satisfactory completion of all work required under the contract documents.

DPR 604PW (Rev. 4/2012)(Excel 4/17/2012)

EXHIBIT B — PUBLIC WORKS

(Standard Agreement) of

Contractor's Name: TBD Agreement Number: C2XXXXXXX

Project: Work Order Date:

Park Unit: Work Order Amt:

District: Start Date:

Project No.: Finish Date:

PCA Number: Work Order #:

DEPARTMENT OF PARKS AND RECREATION CONTRACTOR NAME OF FIRM

Name: Name:

Title: Title:

Service Center:

Address: Address:

Telephone: Telephone:

Cell Phone Cell Phone Fax: Fax:

E-Mail: E-Mail:

Scope of Work

Deliverables

DEPARTMENT OF PARKS AND RECREATION CONTRACTOR FIRM NAME

By: By:

Name, State's Representative Date Project Representative, Title

By: Date:

Name, Contract Manager Date

By:

Date

TOTAL THIS WORK ORDER -------->

This work order implements and is hereby made a part of Agreement Number All items shown on this Work Order shall be delivered in accordance with the attached schedule. This work order is agreed to and accepted by:

Kathy Amann. Assistant Deputy Director

CONTACTS:

EXHIBIT B, ATTACHMENT I

WORK ORDER

PROJECT SPECIFIC SCOPE OF SERVICES

CM V8-06 Page 1

Page: 1 1

SPECIAL TERMS AND CONDITIONS

1. Project Manual

2. Public Works - Rules/Regulations

3. Executive Order N-6-22 – Russia Sanctions

4. Generative Artificial Intelligence

DPR 605PW (Rev. 7/2024)(Excel 7/25/2024)

EXHIBIT D — PUBLIC WORKS

(Standard Agreement) of

The Project Manual, marked Exhibit D, Attachment I, containing general conditions, plans and specifications, and other pertinent bid documents related to this project, as enumerated in the Project Manual's Table of Contents, is hereby attached and incorporated into this agreement.

Contractor shall observe and comply with all federal, state, city, and county laws, rules or regulations affecting the work. Any work done that does not comply with any laws, rules, or regulations will be remedied at the Contractor's expense.

On March 4, 2022, Governor Gavin Newsom issued Executive Order N-6-22 (the EO) regarding Economic Sanctions against Russia and Russian entities and individuals. “Economic Sanctions” refers to sanctions imposed by the U.S. government in response to Russia’s actions in Ukraine, as well as any sanctions imposed under state law. The EO directs state agencies to terminate contracts with, and to refrain from entering any new contracts with, individuals or entities that are determined to be a target of Economic Sanctions. Accordingly, should the State determine Contractor is a target of Economic Sanctions or is conducting prohibited transactions with sanctioned individuals or entities, that shall be grounds for termination of this agreement. The State shall provide Contractor advance written notice of such termination, allowing Contractor at least 30 calendar days to provide a written response. Termination shall be at the sole discretion of the State.

The State of California seeks to realize the potential benefits of GenAI, through the development and deployment of GenAI tools, while balancing the risks of these new technologies. Bidders/Offerors must notify the State in writing if their solution or service includes, or makes available, any GenAI technology, including GenAI from third parties or subcontractors. The State has developed a GenAI Disclosure & Factsheet (STD 1000) to be completed by the Bidder/Offeror. Failure to disclose GenAI to the State and submit the GenAI Disclosure & Factsheet will result in disqualification of the Bidder/Offeror and may void any resulting contract The State reserves its right to seek any and all relief it may be entitled to as a result of such non-disclosure. Upon receipt of a Bidder/Offeror GenAI Disclosure & Factsheet, the State reserves the right to incorporate GenAI Special Provisions into the final contract or reject bids/offers that present an unacceptable level of risk to the State.

DPR 479PW (Rev. 10/2022)(Excel 10/19/2022)(Page 1 of 5)

Disabled Veteran Business Enterprise (DVBE) Notice

2. What is a Disabled Veteran Business Enterprise (DVBE)?

a. For a business to be considered a Disabled Veteran Business Enterprise (DVBE), they must be certified with the State of California - Department of General Services in accordance with California Code of Regulations, Title 2, Section 1896.94. Please see the following website for more information about DVBE certification benefits and eligibility requirements:

www.dgs.ca.gov/PD/Services/Page-Content/Procurement-Division-Services-List-Folder/Certify-or-Re-apply-as-Small-Business-Disabled-Veteran-Business-Enterprise

b. Only DVBEs who perform a commercially useful function relevant to this solicitation, may be used to satisfy the DVBE participation and/or incentive program requirements.

3. Commercially Useful Function Definition (CUF)

a. California Code of Regulations, Title 2, § 1896.61(l): The term "DVBE contractor, subcontractor or supplier" means any person or entity that satisfies the ownership (or management) and control requirements of §1896.61(f); is certified in accordance with §1896.70; and provides services or goods that contribute to the fulfillment of the contract requirements by performing a commercially useful function.

b. A person or entity must perform a commercially useful function (CUF) as defined under Military and Veterans Code (MVC) §999.

c. A contractor, subcontractor, or supplier will not be considered to perform a commercially useful function if the contractor's, subcontractor's, or supplier's role is limited to that of an extra participant in a transaction, contract, or project through which funds are passed in order to obtain the appearance of disabled veteran business enterprise participation.

4. What is the DVBE Incentive Program?

a. The DVBE Incentive Program was established by statute and applies to contracts solely financed by State funds. This program is separate from the DVBE Participation Program. The incentive is designed to encourage bidders to partner with DVBE subcontractors.

1. Bidder's attention is directed to the Disabled Veteran Business Enterprise (DVBE) Participation Requirement for bidders, as outlined in the accompanying bid package.

The DVBE Participation Requirement for this solicitation has been waived – however the DVBE Incentive still applies.

There is no minimum DVBE participation requirement for this solicitation.

DVBE Incentive for Request for Proposal (RFP), Primary Method (Participation Requirement Waived)

State of California - Natural Resources Agency

DEPARTMENT OF PARKS AND RECREATION

DPR 479PW (Rev. 10/2022)(Excel 10/19/2022)(Page 2 of 5)

b. The incentive may be combined with other incentives and preferences up to an established cap of $100,000.00. The incentive is used only for evaluation purposes and does not alter the amounts of the actual bids.

5. Who is eligible to receive the incentive?

a. Any responsive and responsible bidder who has attained .01% DVBE participation or higher.

6. Reporting Requirement

a. If, for this agreement, a contractor made a commitment to achieve disabled veteran business…