This is a Level 1 Health, Safety and Environmental Specifications document issued by the Orange County Transportation Authority (OCTA) for RFP 250208 related to the Freeway Bus Rapid Transit/Express Bus Study. The document establishes comprehensive safety and environmental compliance requirements that all contractors, subcontractors, suppliers, and employees must adhere to throughout the duration of their work on OCTA projects. The specifications mandate compliance with California Code of Regulations (CCR) Title 8 standards, federal regulations, and local requirements, and establish minimum standards for personal protective equipment (PPE) including eye protection, hearing protection, head protection, safety reflective vests, and appropriate footwear. Contractors are required to designate a health and safety representative within ten business days of contract award and must provide an Injury/Illness Prevention Program, Substance Abuse Prevention Program, Heat Illness Prevention Program, and Hazard Communication Program to the Authority's Project Manager within 72 hours of request.

The specifications require contractors to immediately notify OCTA of any incidents including property damage, reportable injuries, environmental impacts, and outside agency inspections, with initial written reports due within 24 hours and comprehensive final reports due within seven calendar days. Serious injuries, serious incidents, OSHA recordable injuries/illnesses, and significant near misses require formal incident review presentations by company senior executives within seven days, including root cause analysis and detailed recovery plans. Contractors must also comply with Storm Water Pollution Prevention Plan requirements, ensure proper parking and traffic compliance on Authority property, and maintain safe work practices and conditions. The document emphasizes that repeated unsafe acts, serious violations of safety standards, or non-conformance with HSEC requirements may result in termination of the scope of work at OCTA's sole discretion.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

RFP 250208

EXHIBIT D

EXHBIT D

LEVEL 1 SAFETY SPECIFICATIONS

LEVEL 1 HEALTH, SAFETY AND ENVIRONMENTAL SPECIFICATIONS

Level 1 HSE Specifications PAGE 1 OF 4 Revision 8, 11/11/2019 1008404.1

PART I – GENERAL

1.1 GENERAL HEALTH, SAFETY & ENVIRONMENTAL REQUIREMENTS

A. The Contractor, its subcontractors, suppliers, and employees have the obligation to comply with all Authority health, safety and environmental compliance department (HSEC) requirements of this safety specification, project site requirements, bus yard safety rules, as well as all federal, state, and local regulations pertaining to scope of work, contracts or agreements with the Authority. Additionally, manufacturer requirements are considered incorporated by reference as applicable to this scope of work.

B. Observance of repeated unsafe acts or conditions, serious violation of safety standards, non-conformance of Authority health, safety and environmental compliance department (HSEC) requirements, or disregard for the intent of these safety specifications to protect people and property, by Contractor or its subcontractors may be cause for termination of scope or agreements with the Authority, at the sole discretion of the Authority.

C. The health, safety, and environmental requirements, and references contained within this scope of work shall not be considered all-inclusive as to the hazards that might be encountered. Safe work practices shall be planned and performed, and safe conditions shall be maintained during this work scope.

D. The Authority Project Manager shall be responsible to ensure a safety orientation is conducted of known potential hazards and emergency procedures for all Contractor personnel, subcontractors, suppliers, vendors, and new employees assigned to the project prior to commencement of the project.

E. The Contractor shall ensure that all Contractor vehicles, including those of its subcontractors, suppliers, vendors and employees are parked in designated parking areas, and comply with traffic routes, and posted traffic signs in areas other than the employee parking lots.

F. California Code of Regulations (CCR) Title 8 Standards are minimum requirements;

each Contractor is encouraged to exceed minimum requirements. When the Contractor's safety requirements exceed statutory standards, the more stringent requirements shall be applied for the safeguard of public and employees.

1.2 REGULATORY

A. Injury/Illness Prevention Program

The Contractor shall comply with CCR Title 8, Section with California Code of Regulations (CCR) Title 8, Section 3203. The intent and elements of the IIPP shall be implemented and enforced by the Contractor and its sub-tier contractors, suppliers, and vendors. The program shall be provided to the Authority’s Project Manager, upon request, within 72 hours.

Level 1 HSE Specifications PAGE 2 OF 4 Revision 8, 11/11/2019

B. Substance Abuse Prevention Program Contractor shall comply with the Policy or Program of the Company’s Substance Abuse Prevention Policy that complies with the most recent Drug Free Workplace Act. The program shall be provided to the Authority’s Project Manager, upon request, within 72 hours.

C. Heat Illness Prevention Program Contractor shall comply with CCR Title 8, Section, Section 3395, Heat Illness Prevention. The program shall be provided to the Authority’s Project Manager, upon

D. Hazard Communication Program Contractor shall comply with CCR Title 8, Section 5194 Hazard Communication Standard. Prior to use on Authority property and/or project work areas Contractor shall provide the Authority Project Manager copies of SDS for all applicable chemical products used, if any. The program shall be provided to the Authority’s Project Manager, upon request, within 72 hours.

a. All chemicals including paint, solvents, detergents and similar substances shall comply with South Coast Air Quality Management District (SCAQMD) rules 103, 1113, and 1171.

E. Storm Water Pollution Prevention Plan

The Contractor shall protect property and water resources from fuels and similar products throughout the duration of the contract. Contractor shall comply with Storm Water Pollution Prevention Plan (SWPPP) requirements. The program or plan if required by scope shall be provided to the Authority’s Project Manager, upon

1.3 INCIDENT NOTIFICATION AND INVESTIGATION

A. The Authority shall be promptly notified of any of the following types of incidents including but not limited to:

1. Damage incidents of property (incidents involving third party, contractor or Authority property damage);

2. Reportable and/or Recordable injuries (as defined by the U. S. Occupational

Safety and Health Administration), a minor injury, and near miss incidents;

3. Incidents impacting the environment, i.e. spills or releases on Authority projects or property.

4. Outside Agency Inspections; agencies such as Cal/OSHA, DTSC, SCAQMD, State Water Resources Control Board, FTA, CPUC, EPA, USACE and similar agencies.

B. Notifications shall be made to Authority representatives, employees and/or agents. This includes incidents occurring to contractors, vendors, visitors, or members of the public

Level 1 HSE Specifications PAGE 3 OF 4 Revision 8, 11/11/2019 that arise from the performance of Authority contract work. An immediate verbal notice followed by an initial written incident investigation report shall be submitted to the Authority’s Project Manager within 24 hours of the incident.

C. A final written incident investigative report shall be submitted within seven (7) calendar days and include the following information. The Current Status of anyone injured, photos of the incident area, detailed description of what happened, Photos of the existing conditions and area of the injury/incident, the contributing factors that lead to the incident occurrence, a copy of the company policy or procedure associated with the incident and evaluation of effectiveness, copy of task planning documentation, copy of the Physician’s first report of injury, copy of Cal/OSHA 300 log of work related injuries and illnesses, the Cal/OSHA 301 Injury Illness Incident Report, and corrective actions initiated to prevent recurrence. This information shall be considered the minimum elements required for a comprehensive incident report provided to OCTA.

D. A Serious Injury, Serious Incident, OSHA Recordable Injury/Illness, or a Significant Near Miss shall require a formal incident review at the discretion of the Authority’s Project Manager. The incident review shall be conducted within seven (7) calendar days of the incident. This review shall require a company senior executive, company program or project manager from the Contractors’ organization to participate and present the incident review as determined by the OCTA Project Manager. The serious incident presentation shall include action taken for the welfare of the injured, a status report of the injured, causation factors that lead to the incident, a root cause analysis (using 5 whys and fishbone methods), and a detailed recovery plan that identifies corrective actions to prevent a similar incident, and actions to enhance safety awareness.

1. Serious Injury: includes an injury or illness to one or more employees, occurring in a place of employment or in connection with any employment, which requires inpatient hospitalization for a period in excess of twenty-four hours for other than medical observation, or in which an employee suffers the loss of any member of the body, or suffers any serious degree of physical disfigurement. A serious injury also includes a lost workday or reassignment or restricted injury case as determined by the Physician’s first report of injury or Cal/OSHA definitions.

2. Serious Incident: includes but not limited to property damage of $500.00 or more, an incident requiring emergency services (local fire, paramedics and ambulance response), news media or OCTA media relations response, and/or incidents involving other agencies (Cal/OSHA, EPA, AQMD, DTSC, Metrolink, FTA, FRA etc.) notification or representation.

3. OSHA Recordable Injury / Illness: includes and injury / illness resulting in medical treatment beyond First Aid, an injury / illness which requires restricted duty, or an injury / illness resulting in days away from work.

4. Significant Near Miss Incident; includes incidents where no property was damaged and no personal injury sustained, but where, given a slight shift in time or position, damage and/or injury easily could have occurred.

Level 1 HSE Specifications PAGE 4 OF 4 Revision 8, 11/11/2019

1.4 DESIGNATED HEALTH AND SAFETY REPRESENTATIVE

A. Upon contract award, the contractor within 10 business days shall designate a health and safety representative and provide a resume and qualifications to the Authority project manager, upon request, within 72 hours.

B. This person shall be a competent or qualified individual as defined by the Occupational, Safety, and Health Administration (OSHA), familiar with applicable CCR Title 8 Standards (Cal/OSHA) and has the authority to affect changes in work procedures that may have associated cost, schedule and budget impacts.

1.5 PERSONAL PROTECTIVE EQUIPMENT

A. The Contractor, its subcontractors, suppliers, and employees are required to comply with applicable personal protective equipment (PPE) requirements while performing work at any Authority project or property. Generally minimum PPE requirements include eye protection; hearing protection, head protection, class 2 or 3 safety reflective vests, and appropriate footwear.

B. The Contractor, its subcontractors, suppliers, and employees are required to provide their own PPE, including eye, head, foot, and hand protection, safety vests, or other PPE required to perform their work safely on Authority projects or property. The Authority requires eye protection on construction projects and work areas that meet ANSI Z-87.1 Standards.

1.6 REFERENCES

A. CCR Title 8 Standards (Cal/OSHA) B. FCR Including 1910 and 1926 Standards C. NFPA, NEC, ANSI, NIOSH Standards D. Construction Industry Institute (CII) E. OCTA Yard Safety Rules

END OF SECTION