This document is a Scope of Work and Project Specifications for the El Capitan State Beach Curb and Pavement Maintenance Project in Goleta, California. The project involves installing asphalt curbs, slurry sealing, and painting parking lines, ADA spaces, crosswalks, and crosshatched areas in the main day use parking lot at El Capitan State Beach. The project will be conducted through a public works contract, with the hired contractor responsible for all equipment, operators, and job site safety. The work includes slurry sealing approximately 56,807 square feet of the main day use area, and potential additional slurry sealing of 8,113 square feet and 26,280 square feet under alternates. The contractor must monitor traffic, ensure the slurry seal has cured before reopening the area, and prepare the surface by sweeping, pressure washing, and removing existing markings. The contractor will then re-stripe the parking spaces, ADA spots, and other markings. The project has a 1-year warranty on all work.
The contract will utilize asphalt concrete materials conforming to Caltrans specifications. The contractor must implement a construction waste management plan to divert at least 75% of the project waste from landfills. Small businesses and Disabled Veteran Business Enterprises are strongly encouraged to respond. A mandatory job walk is scheduled for April 5, 2024, and bids are due by April 15, 2024 via email to the Channel Coast District. The contract period is expected to begin in June 2024.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| C23910022_Bid_Documents.pdf | ||
| C23910022_El_Capitan_SB_Curb___Pavement_Maint._Project.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Scope of Project
Channel Coast District – El Capitan State Beach Curb and Pavement Maintenance Project
A. Project Background Information:
1. This project site is the main day use parking lot at El Capitan State Beach. It will involve installing asphalt curbs, slurry sealing, painting the parking lot white lines, ADA spaces, crosswalks, and crosshatched areas.
2. This project will be conducted through a public works contract. The hired contractor will be responsible for all equipment and operators necessary to accomplish and ensure all job site safety that may be necessary to meet the requirements of Cal OSHA.
3. All materials provided and installed by the contractor will be of new quality.
B. SCOPE OF WORK
Paving project located at El Capitan State Beach, Goleta, CA.
Main Day Use Area
Section A (Base Bid) Slurry Seal, and paint parking spots, crosswalks, and crosshatched areas. This area measures approximately 56,807 sq. ft.
Alternate 1 if funding is available;
Slurry Seal. This area measures approximately 8,113 sq. ft.
Alternate 2 Slurry Seal. This area measures approximately 26,280 sq. ft.
Alternate 3 Installing asphalt curbs, approximately 534 liner feet
General specifications for cutting, patching slurry sealing of entrance roads and parking lot areas:
• Contractor shall be responsible for traffic monitoring, and allow no pedestrians or bikes on the area. Ensure that the slurry surfacing has had adequate time to cure prior to reopening to traffic -very often drivers assume that the slurry surfacing is drivable despite of the warning signs and cause damage to the fresh placed treatment
• Surface preparation shall include sweeping or high pressure washing loose sand, dirt, dust, and removal of thermo-plastic markings, vegetation, water, or other foreign material from existing paved surface prior to repairs and slurry seal.
• Cover utility inlets with heavy paper or roofing felt
• Contractor will re-strip / paint, parking spaces, ada parking spots, and other markings (stop, directional arrows, cross walks, and crosshatched areas) with durable thermo-plastic traffic paint, matching the layout of the roads and parking lots before repairs. All ADA parking space striping and paths of travel shall meet shall meet current ADA regulations
• Any broken or missing wheel stops will be replaced as part of this project
• Machine blow and sweep clean the entire surface before striping and before opening up to the public
Monitoring: A State Representative and or State Park Archeologist may be on sight for any ground disturbance. In the event of any significant findings, all work shall cease until State Parks Archeologist determine ground disturbance may continue.
Staging: Staging and storage area for equipment and materials shall be coordinated with the State representative. Staged equipment must have 4 mil plastic sheeting or greater under it at all times. The staging area will be returned to its pre-construction activity condition before the job will be considered fully completed.
Hours of Operation: Contractor shall begin work no earlier than 7:00 am and shall halt no later than 5pm. Monday- Friday, unless directed by State representative. No work shall be done on a state holiday unless coordinated with state representative
Warranty: The contractor shall provide 1 year warranty on all work.
SECTION 017419
CONSTRUCTION WASTE MANAGEMENT AND DISPOSAL
PART 1 - GENERAL
1.1 SUMMARY
A. This section specifies diversion of construction debris from the landfill.
1. Waste Management Goals: a minimum of 75% of the total project waste should be diverted from landfill by, in order of preference 1) weight, 2) volume, whichever is most feasible to measure.
2. Provide a construction waste management plan, a construction waste estimate and a final waste management report to show evidence of recycling, and reuse of recovered materials.
3. Inform the Contracting Officer where Construction Waste Management requirements could detrimentally impact construction schedule.
B. Waste Management Objective for the Project:
1. The Government has established that this Project shall minimize the generation of construction and demolition waste at the site.
Factors that contribute to waste, such as over-packaging, improper storage, ordering error, poor planning, breakage, mishandling, and contamination shall be minimized.
2. Of the inevitable waste that is generated, as many of the waste materials as economically feasible shall be reused or recycled.
Waste disposal in landfills shall be minimized.
C. Diversion From Landfill: Waste categories appropriate for diversion from landfill shall include, but not be limited to, the following:
1. Land clearing debris
2. Soil
3. Wood: Clean dimensional wood, palette wood
4. Sheet Wood: Plywood, OSB and particle board
5. Concrete
6. Asphalt Concrete
7. Paper
a. Bond
b. Newsprint
c. Cardboard and paper packaging materials
Section 017419 – Page 2 Construction Waste Management and Disposal
8. Metals
a. Ferrous
b. Non-Ferrous
9. Glass
10. Plastics
11. Beverage Containers
1.2 RELATED REQUIREMENTS
A. Appendix 017419A: Construction Waste Estimate.
B. Appendix 017419B: Waste Management Report.
C. Section 013300: Submittal Procedures.
D. Section 017700: Closeout Procedures.
1.3 REFERENCES
A. The California Integrated Waste Management Board (CIWMB); including the California Materials Exchange (CalMAX), Telephone 877-520-9703;
www.ciwmb.ca.gov/calmax/. This provides a source of information, statewide, to buy and sell recycled materials.
B. Local Integrated Waste Management Programs and Re-Use Programs in the Project area.
C. The Department of Toxic Substances Control (DTSC).
1.4 CONSTRUCTION WASTE SUMMARY REPORTS
Provide delivery receipts for the recovered materials and waste materials sent to the permitted recycling facilities, processing facilities, or landfill with the following information:
1. Name of firm accepting the recovered materials or waste materials
2. Specify type of facility (e.g. recycler, processor, Class III landfill, MRF)
3. Location of the facility
4. Type of materials
5. Net weights (or volume) of each type of material
6. Date of Delivery
7. Value of the materials or tipping fee paid http://www.ciwmb.ca.gov/calmax/
Section 017419 – Page 3
1.5 APPLICATION FOR PROGRESS PAYMENT
The following should be submitted with the Application for Progress Payment:
1. Construction Waste Summary Reports as stated above in section
1.4 CONSTRUCTION WASTE SUMMARY REPORTS.
2. Payment could be withheld until diversion goals are met. The contractor is ultimately responsible for implementation of the Construction Waste Management Plan and achieving the diversion goals.
1.6 DEFINITIONS
A. Class III Landfill – A landfill that accepts non-hazardous waste such as household, commercial, and industrial waste, including construction, remodeling, repair, and demolition operations.
B. Construction and Demolition Waste – Including solid wastes, such as building materials, packaging, rubbish, debris, and rubble resulting from construction, remodeling, repair, and demolition operations.
1. Rubbish: Including both combustible and noncombustible wastes, such as paper, boxes, glass, crockery, metal and lumber scrap, tin cans, and bones.
2. Debris: Including both combustible and noncombustible wastes, such as leaves and tree trimmings that result from construction or maintenance and repair work.
C. Divert – Using material for any purpose other than disposal in a landfill or transformation facility.
D. Waste Materials – Large and small pieces of listed materials which are excess to contract requirements and generally include materials to be recycled an/or recovered from existing construction and items of trimmings, cuttings, and damaged goods resulting from new installations, which can be effectively used in the Work.
E. Reuse – Using a material or product that is recovered from construction, renovation, or demolition activities.
F. Recycling – The process of collecting and preparing recycle materials and reusing them in their original form or manufacturing processes that do not cause the destruction of recyclable materials in a manner that precludes further use.
Section 017419 – Page 4
G. Recovery – Any process that reclaims materials, substances, energy, or other products contained within or derived from waste on-site.
H. Sources Separation – Sorting recovered materials into specific material types with no or a minimum amount of contamination on site.
I. Commingled or Off-site Separation – Collecting all material types into a single bin or mixed collection system and separating the waste materials into recyclable material types in an off-site facility.
1.7 SUBMITTALS
A. Construction Waste Management Plan, Construction Waste Estimate Before the start of construction, submit a construction waste management plan and a construction waste estimate for approval, including the following:
1. Indicate how the Contractor proposes to recover at least 75% of the construction wastes and debris for reuse and recycling.
2. The Construction Waste Management Plan should coordinate the recovery effort with the construction schedule.
3. Include a list of reuse facilities, recycling facilities and processing facilities that will be receiving the recovered recyclable materials.
4. Identify materials that are not recyclable or not recovered which will be disposed of in a landfill (or other means acceptable by the State of California and local ordinance and regulations) and explain why the materials are not recovered.
5. List the permitted landfill, or other permitted disposal facilities, that will be accepting the disposed waste materials.
6. Indicate instances or situations where compliance with the requirements of this specification do not apply or do not appear to be possible.
7. Prepare the Construction Waste Estimate identifying each type of waste material to be reused or recycled.
1.8 WASTE MANAGEMENT REPORT
A. Upon completion of Work including final cleanup, provide a final Waste Management Report containing the information required on Appendix 017419B, Waste Management Report forms.
1. The total quantity of each waste material generated; and the date(s) removed from the job-site.
2. The percent of the total quantity generated of each material sent to landfill, the identity of the landfill (receiving facility) handling costs, transport costs, tipping fees paid at the landfill, and total landfill
Section 017419 – Page 5 costs. Attach copies of manifests, weight tickets, receipts, and invoices.
3. For each material reused or recycled from the Project, include the percent of the total quantity generated, the identity of the receiving facility, the total costs of handling and transportation, and income.
Attach manifests, weight tickets, receipts, and/or invoices.
4. Contractor shall edit and use forms included in Appendix 017419B, Waste Management Report, or use them as a basis for Contractor’s forms.
5. The Government will provide electronic copies of Appendix 017419B for Contractors’ use.
B. Submit Waste Management Report under provisions of Section 017700
– Closeout Procedures.
PART 2 - PRODUCTS (Not Used)
PART 3 - EXECUTION
3.1 WASTE MANAGEMENT
A. Manager: Contractor shall designate an on-site party (or parties) responsible for instructing workers and subcontractors, and overseeing and documenting results of Waste Management for the Project.
B. Distribution: Contractor shall distribute copies of the Construction Waste Estimate and Waste Management Report forms to the Job Site Foreman, each Subcontractor, and the Contracting Officer.
C. Meetings: Contractor shall conduct Waste Management meetings with subcontractors who generate construction waste. Contractor shall present current status of the Waste Management Report at regular job-site meetings.
D. Material Handling Procedures: Provide means by which waste materials will be protected from contamination, and means to be employed in reuse or recycling of waste material consistent with requirements for acceptance by receiving facilities.
1. Separation Facilities: Contractor shall lay out and label a specific area to facilitate separation of materials for reuse and recycling.
Recycling and waste bin areas shall be kept neat and clean and clearly marked in order to avoid contamination of materials.
Section 017419 – Page 6
2. Hazardous Wastes: Hazardous wastes shall be separated, stored, and disposed of according to local regulations, and in accordance with specifications for such work as may be included in the Project.
3. Instruction: Contractor shall provide on-site instruction of appropriate separation, handling, and recycling, salvage, reuse, and return methods to be used by all parties at appropriate stages of the Project.
END OF SECTION 017419
Construction Waste Estimate 017419-1
Work Order No.
CONSTRUCTION WASTE ESTIMATE DATE: _________
Waste Material (Edit to Suit) Unit Estimated Quantity Percent to Percent Percent
Generated Landfill Reused Recycled
Land Clearing Debris CY
Soil CY
Wood CY
Sheet Wood CY
Concrete CY
Bricks CY
Concrete Masonry Units CY
Asphalt Concrete CY
Paper CY
Cement Fiber Products CY
Metal (ferrous) TON
Metals (non-ferrous) LBS
Paint GAL
Rigid Foam CF
Glass CF
Plastics CF
Carpet and Pad SY
Beverage Containers LBS
Insulation CF
Gypsum Board CF
Porcelain Plumbing Fixtures EA
Fluorescent Light Tubes EA
Waste Management Report 017419-2
Work Order No.
WASTE MANAGEMENT REPORT
COST / INCOME
Waste Material (Edit to Suit) Unit Receiving Facility Landfill Cost Reused Recycled
Handling Transport Fee Cost Income Cost Income
Land Clearing Debris CY
Soil CY
Wood CY
Sheet Wood CY
Concrete CY
Bricks CY
Concrete Masonry Units CY
Asphalt Concrete CY
Paper CY
Cement Fiber Products CY
Metal (ferrous) TON
Metals (non-ferrous) LBS
Paint GAL
Rigid Foam CF
Glass CF
Plastics CF
Carpet and Pad SY
Beverage Containers LBS
Insulation CF
Gypsum Board CF
Porcelain Plumbing Fixtures EA
Fluorescent Light Tubes EA
TOTALS:
SECTION 017700
CLOSEOUT PROCEDURES
PART 1 - GENERAL
1.1 SUMMARY
A. This Section includes administrative and procedural requirements for contract closeout, including, but not limited to, the following:
1. Inspection procedures.
2. Project Record Documents.
3. Operation and maintenance manuals.
4. Warranties.
5. Instruction of the State's personnel.
6. Final cleaning.
1.2 SUBSTANTIAL COMPLETION
A. Preliminary Procedures: Before requesting inspection for determining date of Substantial Completion, complete the following. List items below that are incomplete in request.
1. Prepare a list of items to be completed and corrected (punch list), the value of items on the list, and reasons why the Work is not complete.
2. Make final changeover of permanent locks and deliver keys to the State.
Advise the State's personnel of changeover in security provisions.
3. Complete startup testing of systems. Submit test reports.
4. Submit test/adjust/balance records.
5. Terminate and remove temporary facilities from Project site, along with mockups, construction tools, and similar elements.
6. Advise the State of changeover in heat and other utilities.
7. Submit changeover information related to the State's occupancy, use, operation, and maintenance.
B. Inspection: Submit a written request for inspection for Substantial Completion.
On receipt of request, the State will either proceed with inspection or notify Contractor of unfulfilled requirements. The State will prepare the Certificate of Substantial Completion after inspection or will notify Contractor of items, either on Contractor's list or additional items identified by the State, that must be completed or corrected before certificate will be issued.
1. Reinspection: Request reinspection when the Work identified in previous inspections as incomplete is completed or corrected.
2. Results of completed inspection will form the basis of requirements for Final Completion.
Section 017700 – Page 2 Closeout Procedures
1.3 FINAL COMPLETION
A. Preliminary Procedures: Before requesting final inspection for determining date of Final Completion, complete the following:
1. Submit a final Application for Payment according to Division 1 Section 01290 "Payment Procedures."
2. Submit one copy of the State's Substantial Completion inspection list of items to be completed or corrected (punch list), endorsed and dated by the State. The copy of the list shall state that each item has been completed or otherwise resolved for acceptance.
3. Submit specific warranties, workmanship bonds, maintenance service agreements, final certifications, and similar documents.
4. Prepare and submit Project Record Documents, operation and maintenance manuals, Final Completion construction photographs, damage or settlement surveys, property surveys, and similar final record information.
5. Deliver tools, spare parts, extra materials, and similar items to location designated by the State. Label with manufacturer's name and model number where applicable.
6. Submit pest-control final inspection report and warranty.
7. Instruct the State's personnel in operation, adjustment, and maintenance of products, equipment, and systems.
8. Complete final cleaning requirements, including touchup painting.
9. Touch up and otherwise repair and restore marred exposed finishes to eliminate visual defects.
B. Inspection: Submit a written request for final inspection for acceptance. On receipt of request, the State will either proceed with inspection or notify Contractor of unfulfilled requirements. The State will prepare a final Certificate for Payment after inspection or will notify Contractor of construction that must be completed or corrected before certificate will be issued.
1. Reinspection: Request reinspection when the Work identified in previous inspections as incomplete is completed or corrected.
1.4 LIST OF INCOMPLETE ITEMS (PUNCH LIST)
A. Preparation: Submit one copy of punch list. Include name and identification of each space and area affected by construction operations for incomplete items and items needing correction including, if necessary, areas disturbed by Contractor that are outside the limits of construction.
1. Organize list of spaces in sequential order.
2. Organize items applying to each space by major element, including categories for ceiling, individual walls, floors, equipment, and building systems.
Section 017700 – Page 3
1.5 PROJECT RECORD DOCUMENTS (AS-BUILTS)
A. General: Do not use Project Record Documents for construction purposes.
Protect Project Record Documents from deterioration and loss. Provide access to Project Record Documents for the State's reference during normal working hours.
B. Provide Project Record Documents in accordance with the General Conditions.
1.6 OPERATION AND MAINTENANCE MANUALS
A. Assemble two (2) complete sets of operation and maintenance data indicating the operation and maintenance of each system, subsystem, and piece of equipment not part of a system. Include operation and maintenance data required in individual Specification Sections and as follows:
1. Operation Data: Include emergency instructions and procedures, system and equipment descriptions, operating procedures, and sequence of operations.
2. Maintenance Data: Include manufacturer's information, list of spare parts, maintenance procedures, maintenance and service schedules for preventive and routine maintenance, and copies of warranties and bonds.
B. Organize operation and maintenance manuals into suitable sets of manageable size. Bind and index data in heavy-duty, three-ring, vinyl-covered, loose-leaf binders, in thickness necessary to accommodate contents, with pocket inside the covers to receive folded oversized sheets. Identify each binder on front and spine with the printed title "OPERATION AND MAINTENANCE MANUAL," Project name, and subject matter of contents.
1.7 WARRANTIES
A. Submittal Time: Submit written warranties on request of the State for designated portions of the Work where commencement of warranties other than date of Substantial Completion is indicated.
B. Organize warranty documents into an orderly sequence based on the table of contents of the Project Manual.
1. Bind warranties and bonds in heavy-duty, 3-ring, vinyl-covered, loose-leaf binders, thickness as necessary to accommodate contents, and sized to receive 8-1/2-by-11-inch paper.
2. Provide heavy paper dividers with plastic-covered tabs for each separate warranty. Mark tab to identify the product or installation. Provide a typed description of the product or installation, including the name of the product and the name, address, and telephone number of Installer.
3. Identify each binder on the front and spine with the typed or printed title "WARRANTIES," Project name, and name of Contractor.
Section 017700 – Page 4
C. Provide additional copies of each warranty to include in operation and maintenance manuals.
PART 2 - PRODUCTS
2.1 MATERIALS
A. Cleaning Agents: Use cleaning materials and agents recommended by manufacturer or fabricator of the surface to be cleaned. Do not use cleaning agents that are potentially hazardous to health or property or that might damage finished surfaces.
PART 3 - EXECUTION
3.1 DEMONSTRATION AND TRAINING
A. Instruction: Instruct the State's personnel to adjust, operate, and maintain systems, subsystems, and equipment not part of a system.
1. Provide instructors experienced in operation and maintenance procedures.
2. Provide instruction at mutually agreed-on times. For equipment that requires seasonal operation, provide similar instruction at the start of each season.
3. Schedule training with the State, with at least seven days' advance notice.
4. Coordinate instructors, including providing notification of dates, times, length of instruction, and course content.
B. Program Structure: Develop an instruction program that includes individual training modules for each system and equipment not part of a system, as required by individual Specification Sections. For each training module, develop a learning objective and teaching outline.
1. Include instruction for system design and operational philosophy, review of documentation, operations, adjustments, troubleshooting, maintenance, and repair.
3.2 FINAL CLEANING
A. General: Provide final cleaning. Conduct cleaning and waste-removal operations to comply with local laws and ordinances and Federal and local environmental and antipollution regulations.
B. Cleaning: Employ experienced workers or professional cleaners for final cleaning. Clean each surface or unit to condition expected in an average commercial building cleaning and maintenance program. Comply with manufacturer's written instructions.
Section 017700 – Page 5
1. Complete the following cleaning operations before requesting inspection for certification of Substantial Completion for entire Project or for a portion of Project:
a. Clean Project site, yard, and grounds, in areas disturbed by construction activities, including landscape development areas, of rubbish, waste material, litter, and other foreign substances.
b. Sweep paved areas broom clean. Remove petrochemical spills, stains, and other foreign deposits.
c. Rake grounds that are neither planted nor paved to a smooth, even-textured surface.
d. Remove tools, construction equipment, machinery, and surplus material from Project site.
e. Clean exposed exterior and interior hard-surfaced finishes to a dirt-free condition, free of stains, films, and similar foreign substances.
Avoid disturbing natural weathering of exterior surfaces. Restore reflective surfaces to their original condition.
f. Remove debris and surface dust from limited access spaces, including roofs, plenums, shafts, trenches, equipment vaults, manholes, attics, and similar spaces.
g. Sweep concrete floors broom-clean in unoccupied spaces.
h. Vacuum carpet and similar soft surfaces, removing debris and excess nap; shampoo if visible soil or stains remain.
i. Clean transparent materials, including mirrors and glass in doors and windows. Remove glazing compounds and other noticeable, vision-obscuring materials. Replace chipped or broken glass and other damaged transparent materials. Polish mirrors and glass, taking care not to scratch surfaces.
j. Remove labels that are not permanent.
k. Touch up and otherwise repair and restore marred, exposed finishes and surfaces. Replace finishes and surfaces that cannot be satisfactorily repaired or restored or that already show evidence of repair or restoration.
1) Do not paint over "UL" and similar labels, including mechanical and electrical nameplates.
l. Wipe surfaces of mechanical and electrical equipment. Remove excess lubrication, paint and mortar droppings, and other foreign substances.
m. Replace parts subject to unusual operating conditions.
n. Clean plumbing fixtures to a sanitary condition, free of stains, including stains resulting from water exposure.
o. Replace disposable air filters and clean permanent air filters. Clean exposed surfaces of diffusers, registers, and grills.
p. Clean light fixtures, lamps, globes, and reflectors to function with full efficiency. Replace burned-out bulbs, and those noticeably dimmed
Section 017700 – Page 6 by hours of use, and defective and noisy starters in fluorescent and mercury vapor fixtures to comply with requirements for new fixtures.
q. Leave Project clean and ready for occupancy.
C. Comply with safety standards for cleaning. Do not burn waste materials. Do not bury debris or excess materials on the State's property. Do not discharge volatile, harmful, or dangerous materials into drainage systems. Remove waste materials from Project site and dispose of lawfully.
END OF SECTION 017700
SECTION 321216
ASPHALT PAVING
PART 1 - GENERAL
1.1 SUMMARY
A. This Section includes hot-mix asphalt paving, patching, paving overlay, AC dikes and pavement markings.
1.2 REFERENCE
A. CalTrans Standard Specifications, 2015
1.3 SUBMITTALS
A. Product Data: For each type of product indicated. Include technical data and tested physical and performance properties.
B. Job-Mix Designs: Certification, by State’s Representative, of approval of each job mix proposed for the work.
C. Material certificates of compliance for each type of asphalt binder indicated.
1.4 QUALITY ASSURANCE
A. Manufacturer Qualifications: The Contractor shall furnish asphalt in conformance with Caltrans’ “Certification Program for Suppliers of Asphalt.” Caltrans maintains the program requirements, procedures, and a list of approved suppliers at:
http://www.dot.ca.gov/hq/esc/Translab/fpmcoc.htm
B. The Contractor shall prevent the formation of carbonized particles caused by overheating asphalt during manufacturing or construction.
1.5 PROJECT CONDITIONS
A. Environmental Limitations: Do not apply asphalt materials if subgrade is wet or damp or if the following conditions are not met:
1. Tack Coat: Minimum surface temperature of 50 deg F.
http://www.dot.ca.gov/hq/esc/Translab/fpmcoc.htm http://www.dot.ca.gov/hq/esc/Translab/fpmcoc.htm
Section 321216 – Page 2 Hot-Mix Asphalt Paving
2. Asphalt Concrete: Minimum surface temperature of 50 deg at time of placement.
B. Pavement-Marking Paint: Proceed with pavement marking only on clean, dry surfaces that have cured for at least 30 days. After pavements have cured, marking shall be applied at a minimum ambient or surface temperature of 40 deg F for oil-based materials, 50 deg F for water-based materials, and not exceeding 95 deg F. Refer to Section 321723 “Pavement Markings.”
PART 2 - PRODUCTS
2.1 AGGREGATES
A. Aggregates shall confirm to the ½-inch maximum, medium grading, Type A, specified in Section 39-2.02 of the Caltrans Standard Specification.
2.2 ASPHALT MATERIALS
A. Supply the type of asphalt binder for the following applications:
1. For hot-mix asphalt paving, patching, paving overlay: PG 64-10
2. For AC Dikes: PG 70-10.
B. Asphalt Binder shall conform to the following:
Property AASHTO
TEST
METHOD
PG
64-10
PG
64-16
PG
64-28
PG
70-10
ORIGINAL BINDER
Flash Point Minimum °C T48 230 230 230 230
Solubility Minimum % T44 99 99 99 99
Viscosity @ 135ºC Maximum, Pa·s
T316 3.0 3.0 3.0 3.0
Dynamic Shear, Test Temp at 10 rads/s,ºC
Min G*/sin (delta), kPa
T315
1.00
1.00
1.00
1.00
Section 321216 – Page 3
RTFO Test Mass Loss, Max, %
T240
1.00 1.00 1.00 1.00
RTFO TEST AGED BINDER
Dynamic Shear Test Temp at 10 rads/s,ºC
Min G
T315
2.20
Ductility @ 25 ºC Min, cm
T51 75 75 75 75
PAV Aging, Temp ºC R28 100 100 100 110
RTFO TEST AND PAV AGED BINDER
Dynamic Shear Test Temp at 10 rads/s,ºC
Min G
T315
Creep Stiffness Test Temp, ºC
Max S-value, MPa Max M-Value
T313
0.300
-6
0.300
-18
0.300
0.300
2.3 BASE MATERIALS
A. Aggregate Base: Cement-treated Class 2 Aggregate Base, conforming to the requirements for cement-treated Class 2 Aggregate Base in the “Earthwork” specifications.
2.4 AUXILIARY MATERIALS
A. Pavement-Marking Paint: Refer to Section 321723 “Pavement Markings”
2.5 MIXES
A. Hot-Mix Asphalt: Asphalt concrete shall be produced at a central mixing plant in conformance with Section 39-3 of the Caltrans Standard Specifications, HMA Type A.
Section 321216 – Page 4
2.6 Tack Coat
A. Tack Coat complying with section Section 92 “Asphalt Binder” of the Caltrans Standard Specifications. Binder shall be of same grade as used for HMA Overlay.
PART 3 - EXECUTION
3.1 COLD MILLING
A. General
1. The Surface after Cold Milling shall be uniformly grooved or ridged. The outside lines of the milled pavement shall be neat and uniform
2. The milled pavement shall be true to grade and uniform. When checked with a 10-Ft straightedge parallel to the centerline the surface shall not vary from the straightedge more than 3/8 inch, except at intersections or at changes of grade.
3. Cold Milling operations shall be performed without damage to the remaining pavement. Whenever cold milling is adjacent to existing curbs, gutters, or pavement contractor shall protect these improvements from damage.
4. Repair of any damages during cold milling shall be as directed by the state’s representative. Replaced sections concrete curbs, gutters, or pavement shall be a minimum of 5 feet in length or to the next joint.
B. Milling Machines
1. Milling machines shall be specifically designed and constructed for cold milling of asphalt concrete, concrete, or composite pavements.
2. When milling to specified depth, machinery shall be equipped with automatic grade controls that reference the existing pavement elevations or independent grade references.
C. Milling to Specified Depth
1. Milling the existing asphalt to depth indicated on plans.
2. Independent grade references shall be established by the contractor prior to milling after the surface is milled, and after the overlay is completed at the as required to achieve the required overlay thickness is achieved.
D. Work Site Maintenance
Section 321216 – Page 5
1. A motorized street sweeper shall follow within 50 feet of the cold milling machine, unless approved otherwise by state’s representative.
E. Disposal of Millings
1. Millings shall be considered property of the contractor and shall be legally disposed of off the Work site by the contractor.
3.2 CRACK FILLING
A. After asphalt is milled to required depth, thoroughly clean pavement surface.
B. Clean out debris from all cracks remaining in the pavement and prepare for crack filling.
1. Cracks shall be thoroughly cleaned, cleared of debris, and fully dried prior to applying filling material.
2. If pressurized air is used, equipment shall have the following:
a. Air pressure: 90 psi, minimum
b. Equipment shall be equipped with moisture and oil traps
C. After all cracks have been thoroughly cleaned and dried, hot-apply fiber modified asphalt to cracks greater than 1/8-inch in width for the entire length of the crack. Provide flush fill finish, per Caltrans Standard Specifications 2015, Section 37 – Bituminous Seals, 37-5 Crack Treatment.
1. Provide product data submittal
2. Heat and apply crack treatment per manufacturer’s recommendations, including temperature, rate of application, etc.
3. Provide squeegee flush finish
3.3 PATCHING
A. Hot-Mix Asphalt Pavement: Saw cut perimeter of patch a minimum of one-inch in depth and excavate existing pavement section to sound base.
Excavate rectangular or trapezoidal patches, extending 6 inches minimum into adjacent sound pavement, unless otherwise indicated. Cut excavation faces vertically. Remove excavated material. Recompact existing unbound-aggregate base course to form new subgrade.
B. Tack Coat: Apply uniformly to vertical surfaces abutting or projecting into new, hot-mix asphalt paving at a rate of 0.08 to 0.15 gal./sq. yd.
C. Patching: Fill excavated pavements with hot-mix asphalt base mix and, while still hot, compact flush with adjacent surface.
Section 321216 – Page 6
3.4 SURFACE PREPARATION
A. Proof-roll base course using heavy, pneumatic-tired rollers to locate areas that are unstable or that require further compaction.
B. Immediately before placing asphalt materials, remove loose and deleterious material from substrate surfaces. Ensure that prepared base course is ready to receive paving.
1. Sweep loose granular particles from surface of unbound-aggregate base course. Do not dislodge or disturb aggregate embedded in compacted surface of base course.
C. Asphalt Emulsion Tack Coat: Apply uniformly to surfaces of aggregate base, existing pavement, or adjacent improvements (i.e. retaining wall, existing or new curbs, etc.) at a residual rate of 0.08 to 0.15 gal./sq. yd.
1. Apply tack coat in accordance with CalTrans Standard Specifications Section 94 “Asphaltic Emulsion” unless noted otherwise.
2. Allow tack coat to cure undisturbed before applying hot-mix asphalt paving.
3. Avoid smearing or staining adjoining surfaces, appurtenances, and surroundings. Remove spillage and clean affected surfaces.
3.5 HOT-MIX ASPHALT PLACING
A. Machine place hot-mix asphalt on prepared surface, spread uniformly, and strike off. Place asphalt mix by hand to areas inaccessible to equipment in a manner that prevents segregation of mix. Place each course to required grade, cross section, and thickness when compacted.
1. Spread mix and breakdown at minimum temperature of 250 deg F (121 deg C).
2. Breakdown and intermediate compaction before surface temperature drops below 200 deg F.
3. Finish compaction before surface temperature drops below 140 deg F.
4. Regulate paver machine speed to obtain smooth, continuous surface free of pulls and tears in asphalt-paving mat.
B. Place paving in consecutive strips one-half of the roadway width but not less than 10 feet wide unless infill edge strips of a lesser width are required.
Section 321216 – Page 7
C. Promptly correct surface irregularities in paving course behind paver. Use suitable hand tools to remove excess material forming high spots. Fill depressions with hot-mix asphalt to prevent segregation of mix; use suitable hand tools to smooth surface.
3.6 COMPACTION
A. General: Begin compaction as soon as placed hot-mix paving will bear roller weight without excessive displacement. Compact hot-mix paving with hot, hand tampers or vibratory-plate compactors in areas inaccessible to rollers.
1. Complete compaction before mix temperature cools to 185 deg F.
B. Breakdown Rolling: Complete breakdown or initial rolling immediately after rolling joints and outside edge. Examine surface immediately after breakdown rolling for indicated crown, grade, and smoothness. Correct laydown and rolling operations to comply with requirements.
C. Intermediate Rolling: Begin intermediate rolling immediately after breakdown rolling while hot-mix asphalt is still hot enough to achieve specified density. Continue rolling until hot-mix asphalt course has been uniformly compacted to the following density:
1. Average Density: 92 percent of reference maximum theoretical density according to ASTM D 2041, but not less than 90 percent nor greater than 96 percent.
D. Finish Rolling: Finish roll paved surfaces to remove roller marks while hot-mix asphalt is still warm.
E. Protection: After final rolling, do not permit vehicular traffic on pavement until it has cooled and hardened.
F. Erect barricades to protect paving from traffic until mixture has cooled enough not to become marked.
3.7 INSTALLATION TOLERANCES
A. Thickness: Compact each course to produce the thickness indicated within the following tolerances:
1. Base Course: Plus or minus 1/2 inch.
2. Surface Course: Plus 1/4 inch, no minus.
Section 321216 – Page 8
B. Surface Smoothness: Compact each course to produce a surface smoothness within the following tolerances as determined by using a 10-footstraightedge applied transversely or longitudinally to paved areas:
1. Base Course: 1/4 inch
2. Surface Course: 1/8 inch
3.8 PAVEMENT MARKING
A. General: Pavement marking shall include new in-kind striping for all existing and/or new pavement or at locations shown on the plans or stripping that will be removed or covered due to new improvements.
B. Allow asphalt paving to cure for a minimum of 30 days prior to application of pavement markings.
C. Do not apply pavement-marking paint until layout, colors, and placement have been verified with State Representative.
D. Sweep and clean surface to eliminate loose material and dust.
E. Apply paint with mechanical equipment to produce pavement markings, of equal dimension of existing, with uniform, straight edges. Apply at manufacturer's recommended rates to provide a minimum wet film thickness of 15 mils.
1. Broadcast glass spheres uniformly into wet pavement markings at a rate of 6 lb/gal.
3.9 DISPOSAL
A. Disposal of debris in accordance with Section 0080400 - Disposal of Refuse.
END OF SECTION 321216
SECTION 321713
PARKING BUMPERS (WHEEL STOPS)
PART 1 - GENERAL
1.1 SUMMARY
A. Section includes concrete wheel stops.
1.2 ACTION SUBMITTALS
A. Product Data: For each type of product.
PART 2 - PRODUCTS
2.1 PARKING BUMPERS
A. Concrete Wheel Stops: Precast, steel-reinforced, air-entrained concrete, 4000 psi minimum compressive strength, 4-1/2 inches minimum high by 8 inches wide minimum by 48 inches long. Provide chamfered corners, transverse drainage slots on underside, and a minimum of two factory-formed or -drilled vertical holes through wheel stop for anchoring to substrate.
1. Mounting Hardware: Galvanized-steel spike or dowel, 1/2-inch diameter, 10-inch minimum length.
PART 3 - EXECUTION
3.1 INSTALLATION
A. General: Install wheel stops according to manufacturer's written instructions unless otherwise indicated.
B. See project plans for placement of parking bumper.
C. Install wheel stops in bed of adhesive before anchoring.
D. Securely anchor wheel stops to pavement with hardware in each preformed vertical hole in wheel stop as recommended in writing by manufacturer.
END OF SECTION 321713
SECTION 321723
PAVEMENT MARKINGS
PART 1 - GENERAL
1.1 SUMMARY
A. Section includes painted markings applied to concrete and asphaltic concrete pavement.
1.2 ACTION SUBMITTALS
A. Product Data: For each type of product.
B. Samples: For each exposed product and for each color and texture specified.
PART 2 - PRODUCTS
2.1 MANUFACTURERS
A. Manufacturers: Subject to compliance with requirements, available manufacturers offering products that may be incorporated into the Work include, but are not limited to, the following:
1. Aexcel Inc.
2. Benjamin Moore & Co.
3. Color Wheel Paints & Coatings.
4. Columbia Paint & Coatings.
5. Conco Paints.
6. Coronado Paint; Division of INSL-X Products Corporation.
7. Diamond Vogel Paints.
8. Dunn-Edwards Corporation.
9. Ennis Traffic Safety Solutions, Inc.
10. Frazee Paint.
11. General Paint.
12. Kwal Paint.
13. M.A.B. Paints.
14. McCormick Paints.
15. Miller Paint.
16. Parker Paint Mfg. Co. Inc.
17. PPG Industries.
18. Pratt & Lambert.
19. Rodda Paint Co.
http://www.specagent.com/LookUp/?uid=123456836459&mf=04&src=wd http://www.specagent.com/LookUp/?uid=123456836460&mf=04&src=wd http://www.specagent.com/LookUp/?uid=123456836461&mf=04&src=wd http://www.specagent.com/LookUp/?uid=123456836462&mf=04&src=wd http://www.specagent.com/LookUp/?uid=123456836463&mf=04&src=wd http://www.specagent.com/LookUp/?uid=123456836464&mf=04&src=wd http://www.specagent.com/LookUp/?uid=123456836465&mf=04&src=wd http://www.specagent.com/LookUp/?uid=123456836466&mf=04&src=wd http://www.specagent.com/LookUp/?uid=123456836467&mf=04&src=wd http://www.specagent.com/LookUp/?uid=123456836468&mf=04&src=wd http://www.specagent.com/LookUp/?uid=123456836469&mf=04&src=wd http://www.specagent.com/LookUp/?uid=123456836470&mf=04&src=wd http://www.specagent.com/LookUp/?uid=123456836471&mf=04&src=wd http://www.specagent.com/LookUp/?uid=123456836472&mf=04&src=wd http://www.specagent.com/LookUp/?uid=123456836473&mf=04&src=wd http://www.specagent.com/LookUp/?uid=123456836474&mf=04&src=wd http://www.specagent.com/LookUp/?uid=123456836475&mf=04&src=wd http://www.specagent.com/LookUp/?uid=123456836476&mf=04&src=wd http://www.specagent.com/LookUp/?uid=123456836477&mf=04&src=wd
Section 321723 – Page 2 Pavement Markings
20. Rohm and Haas Company; a subsidiary of The Dow Chemical Company.
21. Scott Paint Company.
22. Sherwin-Williams Company (The).
2.2 PAVEMENT-MARKING PAINT
A. Pavement-Marking Paint: MPI #32, alkyd traffic-marking paint.
1. Color:
a. White and Blue, as shown on the Contract Drawings
b. Red for curb that separates concrete flatwork from parking lot/drive.
PART 3 - EXECUTION
3.1 PAVEMENT MARKING
A. Do not apply pavement-marking paint until layout, colors, and placement have been verified with State’s Representative.
B. Allow paving to age for a minimum of 30 days before starting pavement marking.
C. Sweep and clean surface to eliminate loose material and dust.
D. Do not thin products
E. Apply paint with mechanical equipment to produce pavement markings, of dimensions indicated, with uniform, straight edges. Apply at manufacturer's recommended rates to provide a minimum wet film thickness of 15 mils.
1. Apply graphic symbols and lettering with paint-resistant, die-cut stencils.
Apply paint so that it cannot run beneath the stencil.
END OF SECTION 321723
http://www.specagent.com/LookUp/?uid=123456836478&mf=04&src=wd http://www.specagent.com/LookUp/?uid=123456836479&mf=04&src=wd http://www.specagent.com/LookUp/?uid=123456836480&mf=04&src=wd
SECTION 37 SEAL COATS
Aggregate Gradation Acceptance Criteria
Quality characteristic Test method Requirement
Gradation (% passing by weight) sieve size:
3/8" 5/16" 1/4"
3/4" -- -- --
1/2" 100 -- --
3/8" 85–100 100 100
No. 4 California Test 202
0–15 0–50 60–85
No. 8 0–5 0–15 0–25
No. 16 -- 0–5 0–5
No. 30 -- 0–3 0–3
No. 200 0–2 0–2 0–2
37-2.02B Materials
37-2.02B(1) General
Reserved
37-2.02B(2) Cationic Asphaltic Emulsions
Asphaltic emulsion must be either Grade CRS-2 or CRS-2h.
37-2.02B(3) Aggregate
Aggregate gradation for an asphaltic emulsion chip seal must comply with the requirements shown in the following table:
Asphaltic Emulsion Chip Seal Aggregate Gradation
Quality characteristic Test method Requirement
Gradation (% passing by weight) sieve size:
3/8" 5/16" 1/4"
3/4" -- -- --
1/2" 100 -- --
3/8" 85–100 100 100
No. 4 California Test 202
0–15 0–50 60–85
No. 8 0–5 0–15 0–25
No. 16 -- 0–5 0–5
No. 30 -- 0–3 0–3
No. 200 0–2 0–2 0–2
37-2.02C Construction
37-2.02C(1) General
Reserved
37-2.02C(2) Cationic Asphaltic Emulsions
Asphaltic emulsions must be applied within the application rate ranges shown in the following table:
Asphaltic Emulsion Application Rates Aggregate gradation Application rate range (gal/sq yd)
3/8" 0.30–0.45 5/16" 0.25–0.35 1/4" 0.20–0.30
For double asphaltic emulsion chip seals, the asphaltic emulsions must be applied within the application rates shown in the following table:
Asphaltic Emulsion Application Rates Double chip seals Application rate range (gal/sq yd) 1st application 0.30–0.45 2nd application 0.20–0.30
When applied, the temperature of the asphaltic emulsions must be from 130 to 180 degrees F.
Apply asphaltic emulsions when the ambient air temperature is from 65 to 110 degrees F and the pavement surface temperature is at least 80 degrees F.
Do not apply asphaltic emulsions when weather forecasts predict the ambient air temperature will fall below 39 degrees F within 24 hours after application.
If high winds blow debris on roadway or cause spreading issues for binder, cease operations.
37-2.02C(3) Spreading Aggregates
Aggregate must be spread within the spread rate ranges shown in the following table:
Aggregate Spread Rates Aggregate gradation Spread rate range (lb/sq yd)
3/8" 20–30 5/16" 16–25 1/4" 12–20
For double asphaltic emulsion chip seals, aggregate must be spread within the spread rate ranges shown in the following table:
Aggregate Spread Rates Double chip seal Spread rate range (lb/sq yd) 1st application 23–30 2nd application 12–20
Remove excess aggregate on the 1st application before the 2nd application of asphaltic emulsion.
You may stockpile aggregate for asphaltic emulsion chip seals if you prevent contamination. Aggregate must have a damp surface at spreading. If water visibly separates from the aggregate, do not spread.
You may re-dampen aggregate in the delivery vehicle.
Spread aggregate before an asphaltic emulsion sets or breaks.
Do not spread aggregate more than 2,500 feet ahead of the completed initial rolling.
37-2.02D Payment
Not Used
37-2.03 CATIONIC POLYMER MODIFIED ASPHALTIC EMULSION CHIP SEALS
37-2.03A General
37-2.03A(1) Summary
Section 37-2.03 includes specifications for applying polymer modified asphaltic emulsion chip seals. A polymer modified asphaltic emulsion chip seal includes applying a polymer modified asphaltic emulsion, followed by aggregate, and then a flush coat.
A double polymer modified asphaltic emulsion chip seal is the application of a polymer modified asphaltic emulsion followed by aggregate, applied twice in sequence and then a flush coat.
37-2.03A(2) Definitions
Reserved
37-2.03A(3) Submittals
Immediately after sampling, submit two 1-quart samples of polymer modified asphaltic emulsion taken in the presence of the Engineer.
37-2.03A(4) Quality Assurance
37-2.03A(4)(a) General
Reserved
37-2.03A(4)(b) Quality Control
37-2.03A(4)(b)(i) General
Reserved
37-2.03A(4)(b)(ii) Cationic Polymer Modified Asphaltic Emulsions
Take two 1-quart samples at the specified frequency and location under CT 125 in the presence of the Engineer.
Quality control laboratory must perform sampling and testing at the specified frequency and location for the quality characteristics shown in the following tables:
Rapid-Setting Cationic Polymer Modified Asphaltic Emulsion (If using PMCRS or PMCRS-2h)
Quality characteristic Test method Minimum sampling and testing frequency
Sampling location
Saybolt Furol Viscosity, at 50 °C (Saybolt Furol seconds)
AASHTO T 59 Minimum 1 per day per delivery truck
Distributor truck
Storage stability test, 1 day (max, %) Sieve test (max, %) Demulsibility (min, %) Particle charge Residue by distillation or evaporation (min, %) AASHTO T 59a
Tests on residue from evaporation test:
Penetration, 25 °C AASHTO T 49
Minimum 1 per day per delivery truck
Distributor truck
Penetration, 4 °C, 200 g for 60 seconds AASHTO T 49 Ductility, 25 °C (min, mm) AASHTO T 51 Torsional recovery (min, %) or Elastic recovery, 25 °C (min, %)
California Test
AASHTO T 301
Ring and Ball Softening Point (min, °F) AASHTO T 53 aFollow the temperature guidelines under section 94-1.02F.
Rapid-Setting Polymer-Modified Rejuvenating Asphaltic Emulsion Requirements
Quality characteristic Test method Minimum sampling and testing frequency
Sampling location
Saybolt Furol viscosity, at 50 °C (Saybolt Furol seconds)
AASHTO T 59 Minimum 1 per day per delivery truck
Distributor truck
Storage stability test, 1 day (max, %) Sieve (max, %) Oil distillate (max, %) Particle charge Demulsibility (min, %) Residue from distillation or evaporation test (min, %) pH ASTM E70 Tests on residue:
Viscosity, at 60 °C, (Pa-s) (max) AASHTO T 202 Minimum 1 per day per delivery truck
Distributor truck
Penetration, 4 °C, (dmm) AASHTO T 49 Elastic recovery, 25 °C (min, %) AASHTO T 301
37-2.03A(4)(c) Department Acceptance
Aggregate acceptance is based on the Department's sampling and testing for compliance with the requirements shown in the following table:
Aggregate Gradation Acceptance Criteria
Quality characteristic Test method Requirement
Gradation (% passing by weight) sieve size:
3/8" 5/16" 1/4"
3/4" -- -- --
1/2" 100 -- --
3/8" 85–100 100 100
No. 4 California Test 202
0–15 0–50 60–85
No. 8 0–5 0–15 0–25
No. 16 -- 0–5 0–5
No. 30 -- 0–3 0–3
No. 200 0–2 0–2 0–2
37-2.03B Materials
37-2.03B(1) General
Reserved
37-2.03B(2) Polymer Modified Asphaltic Emulsions
A polymer modified asphaltic emulsion must include elastomeric polymer.
A polymer modified asphaltic emulsion must be either Grade PMCRS-2, PMCRS-2h, or PMRE.
37-2.03B(3) Aggregate
The aggregate gradation for a polymer modified asphaltic emulsion chip seal must comply with the requirements shown in the following table:
Asphaltic Emulsion Chip Seal Aggregate Gradation
Quality characteristic Test method Requirement
Gradation (% passing by weight) sieve size:
3/8" 5/16" 1/4"
3/4" -- -- --
1/2" 100 -- --
3/8" 85–100 100 100
No. 4 California Test 202
0–15 0–50 60–85
No. 8 0–5 0–15 0–25
No. 16 -- 0–5 0–5
No. 30 -- 0–3 0–3
No. 200 0–2 0–2 0–2
37-2.03C Construction
Polymer modified asphaltic emulsions must be applied within the application rate ranges shown in the following table:
Polymer Modified Asphaltic Emulsion Application Rates Aggregate gradation Application rate range (gal/sq yd)
3/8" 0.30–0.45 5/16" 0.25–0.35 1/4" 0.20–0.30
For double polymer modified asphaltic emulsion chip seals, polymer modified asphaltic emulsions must be applied within the application rates shown in the following table:
Polymer Modified Asphaltic Emulsion Application Rates Double application Application rate range (gal/sq yd)
1st application 0.30–0.45 2nd application 0.20–0.30
Apply polymer modified asphaltic emulsions when the ambient air temperature is from 60 to 105 degrees F and the pavement surface temperature is at least 80 degrees F.
Do not apply polymer modified asphaltic emulsions when weather forecasts predict the ambient air temperature will fall below 39 degrees F within 24 hours after application.
Aggregate must be spread within the spread rate ranges shown in the following table:
Aggregate Spread Rates Chip seal type Spread rate range (lb/sq yd)
3/8" 20–30 5/16" 16–25 1/4" 12–20
For double chip seals, aggregate must be spread within spread rate ranges shown in the following table:
Aggregate Spread Rates Double application Spread rate range (lb/sq yd) 1st…