C2 Attachment 2 - Deer TS number 2 Performance Work Statement.pdf

PDF 214 KB Posted

Attached to
Non-Commercial Thin/Sectioning - Deer Thin Sectioning #2 - Wallowa Whitman National Forest
Solicitation number
1240BG26Q0049
Issued by

About this file

This is a Performance Work Statement (PWS) for non-commercial thin/sectioning forestry services issued by the U.S. Department of Agriculture Forest Service for the Wallowa Whitman National Forest.

The contractor is required to perform non-commercial sectioning work on approximately 737 acres across six units (S5, S7, S8, S10, S10A, and S11) in the Deer Thin Sectioning #2 project area within the Whitman Ranger District. The work involves reducing hazardous fuels in open Ponderosa Pine stands by altering fuel bed continuity, managing woody debris buildup on the forest floor, and removing hazardous ladder fuels to create pockets of slash for future prescribed fire application. The primary objectives are to improve firefighter safety, enhance wildfire suppression effectiveness, reduce damage to natural resources, and protect adjacent private property from wildfire impacts. The base period of performance runs from June 15, 2026 to November 30, 2026, with 100 percent completion required no later than November 30, 2026. The contractor must furnish all labor, supervision, equipment, transportation, and incidentals for the work. Key deliverables include a comprehensive work plan with project milestones (35%, 70%, and 100% completion dates), safety plan, fire plan, quality control plan, equipment storage request, and key personnel information, all due within 14 calendar days of contract award. The acceptable quality level is set at 95 percent. No government-furnished property is provided; the contractor bears full responsibility and risk for any equipment or materials stored on National Forest lands. Contact for the project is Trevor Lewis at the Whitman Ranger District office in Baker City, Oregon.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

US Department of Agriculture (USDA)

Performance Work Statement

Non-Commercial Thin/Sectioning Service for the Wallowa Whitman National Forest Deer Thin Sectioning #2

Contents Project General Information

1.0 Scope of Work

Contractor Requirements

3.0 Performance Tasks

4.0 Property

4.1 Government Furnished

4.2 Contractor Property

5.0 Deliverables / Schedule

6.0 Travel. Not used

7.0 Contractor’s Key Personnel

8.0 Security Requirements. Not Used

9.0 Data Rights. Not Used

10.0 Section 508 – Electronic and Information Technology Standards. Not Used Attachments

Project Deer Thin Sectioning #2 Non-Commercial Sectioning Service for the Wallowa Whitman National Forest

General Information

1.0 Scope of Work

The Wallowa Whitman National Forest requires Non-Commercial Thin/Sectioning Service over approximately 737 acres in the Deer Thin Sectioning #2 project units of the Whitman Ranger District to reduce hazardous fuels. Specific performance tasks are listed in paragraph 3.

2.0 Background

2.1 Project Location

The project is located on the Whitman Ranger District.

1550 Dewey Avenue Baker City, OR 97814-3825 541-523-6391 Attn: Trevor Lewis, Desk 541-523-1394, Cell 541-403-0759 trevor.j.lewis@usda.gov .

2.2 Period of Performance

Base Period: June 15th, 2026 to November 30th, 2026.

Contractor Requirements

3.0 Performance Tasks

3.1 General:

3.1.a. This is a non-Personnel Services Contract. The Contractor shall furnish all labor, supervision, equipment, transportation, (except those designated as Government-furnished), and incidentals for Fuels reduction activities within the Wallowa Whitman National Forest within the scope of this contract.

3.1.b. Objective: The overall objective of this project is to alter the continuity of the fuel bed in open ponderosa pine stands; 1) natural buildup of woody debris on the forest floor, and 2) hazardous live fuels (ladder fuels). The end result of activities performed under this call order would produce areas that have pockets of slash where future planned prescribed fire will be applied to the landscape to reduce the overall fuel loading and hazardous live fuels (ladder fuels).

This will provide a safer working environment for firefighters in the future and to improve their probability of success in suppressing wildfires on Forest Service lands, produce less damage to natural resources, and to reduce the impact of wildfire to adjacent private citizens property, structures, and other values at risk.

3.1.c. Contractor Work Plan: The contractor shall submit a work plan for acceptance to the COR within 14 calendar days of award. (Deliverable 01). At a minimum the work plan shall include: 1) project milestone plan depicting 35%, 70% and 100% dates. 2) Key Personnel. 3) Safety Plan. 4) Fire Plan. 5) Contractor’s Quality Control Plan iaw FP-03

153.02 and 6) FS Overload Permits. 7) Contractor equipment storage request.

3.2 Project Area. Deer Thin/Sectioning #2, 737 acres in the Deer Project Area consisting of Deer units S5, S7, S8, S10, S10A, and S11. See Deer Thin Sectioning #2 map.

3.2.a Area Description. Open Ponderosa Pine stands, scattered pockets of natural Ponderosa Pine regeneration, with some scattered pockets of mixed conifer regeneration.

3.2.b Tasks: The contractor shall be required to non-commercially section 737 acres of open Ponderosa Pine stands, scattered pockets of natural Ponderosa Pine regeneration, with some scattered pockets of mixed conifer regeneration in identified units within the project area. Units are identified by pink flagging and yellow Milex tags labeled Deer with mailto:trevor.j.lewis@usda.gov associated unit number. (see attached pdf maps for unit numbers and locations). See attached DUIS sheet for sectioning specifications.

3.2.c. Access: Units will be accessed from Baker City via Hwy 7 towards Sumpter, then CR656/Deer Cr Rd, to FS6550, then associated spurs roads leading to the units.

3.2.d. Special Considerations: Should wet or moist soil conditions be observed in the form of seeps, springs, bogs, etc.

within the cutting unit, it shall be brought to the attention of the COR who will then buffer appropriately.

3.2.e. Deer Thin Sectioning #2 Project Area, Unit Specific spreadsheet

Whitman Ranger District Deer Thin Sectioning #2

Unit Name Unit Number Acres Latitude Longitude Legal Road Access

Boundary Flagging/Tag

Color

Special Features to Project

Deer S5 110 44.739243 118.133441 T9S R37E Sec 35, 36 CR656/FS6550 Pink Flag

Yellow Tag

Deer S7 70 44.739738 118.119582 T9S R37E Sec 36 CR656/FS6550 Pink Flag Yellow Tag

Deer S8 122 44.738103 118.104158 T9S R38E Sec 31 CR656/FS6550 Pink Flag Yellow Tag Adjacent to Private

Deer S10 238 44.741999 118.150605 T9S R37E Sec 35 CR656/FS6550 Pink Flag Yellow Tag

Deer S10A 11 44.744217 118.143189 T9S R37E Sec 35 CR656/FS6550 Pink Flag Yellow Tag

Deer S11 186 44.749401 118.142848 T9S R37E Sec 26 CR656/FS6550 Pink Flag Yellow Tag

Total 737

Standard: Work shall comply with Detailed Unit Information, (DUIS) listed Appendix A of in the Quality Assurance Surveillance Program (QASP) at Attachment 2.

Acceptable quality level, ALQ: 95%

4.0 Property

4.1 Government Furnished. None

4.2 Contractor Property

(a) The contractor may store equipment and materials within the Wallowa Whitman National Forest as approved by the COR. The contractor shall submit an equipment and materials storage to the COR for approval within 7 calendar days of contract award. (Deliverable 02)

(b) The contractor stores equipment and material at its own risk and is responsible for the security of any contractor property stored on Government lands and facilities. The contractor holds the Government harmless for property security and damage.

5.0 Deliverables / Schedule

DELIVERABLE REFERENCE DUE SUBMIT TO

(1) Contractor work Plan

PWS Paragraph 3.1.b. At a minimum the work plan shall include: 1) project milestone plan depicting 35%, 70% and 100% dates. 100% shall be complete NLT 30 November 2024. 2) Key Personnel. 3) Safety Plan. 4) Fire Plan. 5) Contractor’s Quality Control Plan iaw FP-03 153.02 and 6) FS Overload Permits. 7) Contractor equipment storage request.

Within fourteen (14) calendar days after contract award

Contracting Officer’s Representative

(2) Contractor Property Plan

PWS Paragraph 4.2, Contractor Property.

Within fourteen (14) calendar days after contract award

Contracting Officer’s Representative

(3) Key Personnel PWS Paragraph 7, Contractor’s Key Personnel.

Within fourteen (14) calendar days after contract award

Contracting Officer’s Representative

6.0 Travel

Not Used

7.0 Contractor’s Key Personnel

The Contractor shall provide a Contract Manager and designated alternate, as applicable, who has full authority to act for the Contractor on all contract matters relating to this contract. The Contract Manager or alternate shall be available during the Government's regular working hours and shall be available on site within one hour after the Government's regular working hours. The Contractor shall submit the name and contact information of the contract manager in writing to the COR within 7 calendar days of award. (Deliverable 03)

8.0 Security Requirements

9.0 Data Rights

10.0 Section 508 – Electronic and Information Technology Standards

Enclosures:

See Attached maps.

Project
Deer Thin Sectioning #2
General Information
1.0 Scope of Work
Contractor Requirements
3.0 Performance Tasks
3.1.b. Objective: The overall objective of this project is to alter the continuity of the fuel bed in open ponderosa pine stands; 1) natural buildup of woody debris on the forest floor, and 2) hazardous live fuels (ladder fuels). The end result of ac...
3.2.b Tasks: The contractor shall be required to non-commercially section 737 acres of open Ponderosa Pine stands, scattered pockets of natural Ponderosa Pine regeneration, with some scattered pockets of mixed conifer regeneration in identified units ...
4.0 Property
5.0 Deliverables / Schedule
7.0 Contractor’s Key Personnel
8.0 Security Requirements
9.0 Data Rights
10.0 Section 508 – Electronic and Information Technology Standards
Enclosures:
See Attached maps.