C14 Redacted BNJ.pdf

PDF 115 KB Posted

Attached to
Small Business Set Aside for Marley Brand Cooling Tower per attachments
Solicitation number
N61331-24-T-KS26
Issued by

About this file

This document is a Brand Name Justification for the procurement of a Marley 2-cell cooling tower by the Naval Sea Systems Command Naval Surface Warfare Center Panama City Division (NSWC PCD).

The justification explains that NSWC PCD has a need to replace an existing cooling tower and intends to acquire the same Marley brand model to leverage the existing infrastructure and avoid the costs associated with engineering and upgrades required for an alternate cooling tower. The total estimated value of the order is not provided. The Contracting Officer has determined that the Marley cooling tower represents the best value to meet the government's needs. This procurement will be conducted using simplified acquisition procedures as a small business set-aside opportunity. Quotes are due by April 25, 2024 at 12pm Central Time. Offerors must be able to invoice through Wide Area Workflow (WAWF) and provide pricing for the product as well as any applicable shipping costs.

View the file

Other files

File Type Posted
A6 - Part Number Description and Quantity.pdf PDF
C12. Clauses-Supply.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Subj: BRAND NAME JUSTIFICATION FOR COOLING TOWER

1. Identification of the agency and the contracting activity, and specific identification of the document as a “Brand Name Justification.”

This is a brand name justification. Contracting activity is

Naval Sea Systems Command Naval Surface Warfare Center Panama City Division (NSWC PCD) 110 Vernon Avenue, Panama City, FL 32407-7001

2. Nature and/or description of the action being approved.

This action will award a firm fixed price order to the most highly qualified authorized reseller of Marley Cooling Towers.

3. A description of the supplies or services required to meet the agency’s needs

(including the estimated value).

The purchase is to acquire the following: Marley 2-cell cooling tower, as described below.

Line No.

Part Number

Description

Quantity

1 NC8402KAN Factory assembled 2-cell crossflow cooling tower (Tower specifications listed below.)

Marley cooling tower specifications:

Performance Conditions:

Per 2-cell tower: 688 gpm, 96.0°F Hot Water, 85.0°F Cold Water, 80.0°F Entering WB Motor Data:

NEMA 5 HP 1 speed / 1 wind 3 phase / 60 Hz / 230/460V 1.15sf / TEFC

1200 RPM

Premium Efficiency Inverter duty nameplated 60 Hz/120V Space Heater Site Voltage: 480

Tower Dimensions:

Each cell: (without options) Length: 8’-4 ¾” Width: 14’-2” Height: 10’-3” Per 2-cell tower: (with options) Length: 25’-2 7/16” Width: 14’-2” Height: 15’-7 5/16”

Weights:

Per Cell:

Shipping: 7,14 lb Operating: 12,445 lb Per 2-cell tower:

Shipping: 14,027 lb Operating: 24,889 lb

Base Tower Construction / Equipment:

Stainless Steel casing, structure, collection basin, distribution basin, fan guard, and fan cylinder extension Low Sound fan with aluminum blades Marley designed Geareducer® with 5-year warranty.

Motor mounted outside the moist air stream.

15 mil PVC film fill with integral louvers and drift eliminators designed and manufactured by Marley.

Published sound data is independently verified by a CTI licensed test agency CTI certification per STD-201 12 in. fan cylinder extension

Collection Basin Connections and Accessories:

All flanges are to Class 125 ANSI B16.1 standard.

All threds are to American Standard Pipe Taper Thread.

(2) 10 in. diameter depressed side sump outlets with trash screens 6 in. diameter hole and bolt circle for equalization, Cell to Cell

(2) 4 in. diameter Bottom inlet Bypass connections sized for 100% of design flow 4 in. diameter combination drain and overflow in each cell 4 in. additional drain with plug in each cell

(2) 1 in. water make-up float valves 9 kW per cell 480/3 volt/phase electric immersion heater for freeze protection of the collection basin during cold weather shutdown INDEECO basin heater control system with control panel/cell and heater elements Heater system disconnect switch Factory installed basin sweeper piping, 20 PSI Standard

Distribution Basin Inlet and Accessories:

(2) 6 in. diameter top inlet connections per cell.

(2) 6 in. horizontal flow control valves per cell.

Variable flow nozzles.

Maintenance & Maintenance Access Features:

Tower is designed in accordance with OSHA safety standards.

External lube line with dipstick Low oil level switch, Marley Ultrasonic DC sensor + AC interface relay box, with 25 ft sensor cord.

Convenient access to the collection basin and plenum area provided via a large access door located on each endwall.

(2) Access door platforms Stainless Steel (per SS Grade) plenum walkway in each cell

(2) Cased face ladders Ladders extended 72 in. below base of tower Easy fitting ladder safety cage(s) Self-closing safety gates included at the top of the access ladders One davit with hand winch per tower.

Electrical System Requirements:

The following information is provided as guidance for electrical system design criteria to power each cell of the equipment in this tower based on site voltage listed in Mechanical Data above.

Description (See Mechanical Data above for sizes) Amperage at Site Voltage (defined above) Fan Motor 1 1 @ 7.6 Fan Motor 2 N/A Spray Pump N/A Basin Heater 10.8 Auxiliary Load 6 Total Ful Load Amps FLA 24.4 Main Circuit Breaker MCB 35 Maximum Over Current Protection

MOCP

Full Load Amps (FLA) is the full load current at the rated voltage that the fan motor(s) and pump motor(s) will draw to produce rated output horsepower (HP). Values shown for motor full load amps are from NEC table 430.250. Included in this calculation are the amps necessary for optional basin heaters and some auxiliary load for control circuitry.

Full Load Amps per cell = Sum of Fan motor Amps + Sum of Pump motor Amps (when supplied) + Basin Heater Amps (when supplied) + Auxiliary Load (6)

The main circuit breaker (MCB) is an electrical switch designed to protect an electrical circuit from damage caused by overcurrent/overload or short circuit. The MCB value shown above is derived using appropriate overload factors, assuming the full load amps cited are being supported, based on many years of electrical control panel experience on heat rejection equipment. This will be the MCB size incorporated into the tower control panel if provided by Marley.

When provided, the Marley control panel includes an integrated overcurrent device therefore; sizing a remote MOCP type of device is not required to protect the control panel, but it may be sized considering any other installation factors required by code to protect the cable feeding the panel.

Control Systems:

(1) IMI 685A Mechanical sw, DPDT, manual reset + 30’ cord vibration cutoff switch per cell

(1) Field installed VFD ACH580 MCB E-Clipse by-pass Indoor NEMA 12 control panel per cell RTD temperature sensor for VFD standalone operation NEMA 1 VFD output filter

END OF SPECIFICATION

The Government’s minimum needs have been verified by the certifying technical and requirements personnel. This memo does not authorize acquisition for other requirements. This acquisition will be conducted using simplified acquisition procedures with a total dollar value above micro-purchase levels, but not exceeding the simplified acquisition threshold.

4. Identification of the justification rationale and, if applicable, a demonstration of the proposed contractor’s unique qualifications to provide the required supply or service. 10 U.S.C. 2304(c)(1). Application for brand name description FAR 6.302- 1(c).

Only this Brand and no other supplies or services will satisfy agency requirements, FAR 6.302- 1(c). NSWC PCD currently has a need for a cooling tower, as referenced in Section 2 of this document. NSWC PCD intends to replace the current cooling tower with an up- to-date version of the same tower. Marley is the OEM of the original cooling tower. NSWC PCD intends to use all currently existing infrastructure to connect back to the new cooling tower. This strategy will save time and costs associated with engineering and upgrades of the existing system that would be required to accommodate any changes to the cooling tower. If an alternate cooling tower manufacturer were to be used, the entire current system would have to undergo an exhaustive engineering study to ensure compatibility of the alternate cooling tower. Since alternate items would require extensive engineering and probably infrastructure modifications, it is advantageous to the Government to acquire the items listed in Section 2, with no substitutes.

5. A determination by the ordering activity contracting officer that the order represents the best value consistent with FAR 13.106-1(b).

The Contracting Officer has determined that the order represents the best value and results in the lowest overall cost alternative (considering price, recurring cost, special features, administrative costs, engineering and redesign costs, etc.) to meet the Government’s needs.

6. A description of the market research conducted among schedule holders and the results or a statement of the reason market research was not conducted.

The purchase amount will be synopsized on the Contract Opportunities website at sam.gov. No additional market research was conducted for the reasons discussed in paragraph 4 above, for any company other than Marley to provide the products.

7. Any other facts supporting the justification. None.

8. A statement of the actions, if any, the agency may take to remove or overcome any barriers that led to the restricted consideration before any subsequent acquisition for the supplies or services is made.

As stated in paragraph 4 above, Marley is the only brand that can meet this requirement.