This performance work statement outlines maintenance and inspection services requirements for fire suppression systems, paint lockers, and fire extinguishers. The contractor shall perform semi-annual and annual inspections of suppression systems and kitchen range hoods aboard fleet barges, provide emergency repairs, and conduct semi-annual inspection and certification of paint lockers and CO2 bottle repairs and certification for all fleet barges. The period of performance is 12 months from award. This is a 100% small business set-aside under NAICS code 811310 with a business size standard of $12.5M. Offerors must be registered in SAM to receive award. The solicitation was issued by the Department of the Navy Naval Supply Systems Command.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| C09.0 N4523A24Q1053_Government Responses to RFC 01-02.pdf | ||
| C09.0 N4523A24Q1053_Amendment 001.pdf | ||
| C09.0 N4523A24Q1053_Government Responses to RFC 01.pdf | ||
| C08.0 Attachment 3 Corporate Experience Data Sheet.docx | DOCX document | |
| C08.0 N4523A24Q1053 Solicitation.pdf | ||
| C08.0 Attachment 2 - Contractor Badging & Access Requirements.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Performance Work Statement (PWS)
REV 12/07/18
JML # N4523A-3345-6742
Ship/Activity COMPACFLT PNW Berthing and Messing Program Title Fire Suppression Systems Maintenance, Paint Locker certification, and Fire
Extinguisher inspection/certification Place of Performance Puget Sound Naval Shipyard - CIA, Bremerton, WA Period of Performance One year from date of award
1. BACKGROUND:
The Fleet Industrial Supply Center Puget Sound and the Puget Sound Naval Shipyard and Intermediate Maintenance Facility
(PSNS/IMF)
In support of COMPACFLT B/M Program requires testing, cleaning, inspection and emergency repair of the Suppression Systems on board COMPACFLT PNW B/M berthing barges; services cover 24/7 emergency calls and repairs.
2. SCOPE: The contractor shall provide
-Perform semi-annual / annual inspection of Suppression Systems and annual Gaylord kitchen range hood cleaning on board COMPACFLT B/M Program Berthing barges and emergency repairs on a "call" basis including parts and labor; semi/annual inspection/certification of paint lockers; CO2 bottles repair/certification on all COMPACFLT B/M barges;
“NO REPAIR WORK WILL BE PERFORMED OR PARTS WILL BE REPLACED UNLESS APPROVED/AUTHORIZED BY
COMPACFLT B/M REGIONAL PROGRAM MANAGER OR HIS DESIGNATED REPRESENTATIVE”.
CLIN 0001- SUPPRESSION SYSTEM, KITCHEN R/HOODS, GAYLORD CLEANING AND PAINT
LOCKER
BARGE
SUPP
HOODS SUPPRESSION SYSTEM
GAYLORD
KITCHEN
PAINT LOCKER
INSPECTION
KITCHEN RANGE HOOD RANGE HOOD
TESTING/ INSPECTION CLEANING
SEMI ANNUAL ANNUAL SEMI ANNUAL
APL-62 8 9
APL-62 9
APL-4 3
YRBM-30 1
YRBM-31 2
YRBM-50 1
YR-97
PIER 6
o SEMI-ANNUL / ANNUAL KITCHEN RANGE HOOD CLEANING WILL INCLUDE:
o Check Pressure gauge indicator in operable range o All lead and wire seals are intact o There are no visible signs that system has fired or been tampered with o All piping and conduit immobilized with proper hangers and brackets o Position of all nozzle o Duct Plenum nozzles free of grease o Hood plenum nozzles condition o Nozzle need Correction/add o Replace all protective covers on nozzles o Replace fuse links o Test system operation with from terminal link for proper operation o Test system operation with manual remote for proper operation o Test system operation and proper operation of micro switch o System connected to bldg alarm o Panel model #_____ Alarm panel location:____ o System is now visible and free from obstructions o Inspection and service tag on system cylinder
Tank DOT date o Cooking surfaces should be protected o Proper hand portable extinguishers properly serviced o ANNUAL GAYLORD RANGE HOODS SYSTEM TESTING WILL INCUDE:
o All metal surface in the hood plenum o Grease filters o Duct transition from hood plenum to the bottom of the duct where the exhaust fan is situated o The exhaust fan and the fan blade o The duct plenum o The back flashing walls of the cooking appliance o Finishing touch of metal polish application to make SS metal hood plenum inside and outside shiny.
o Post a cleaning certificate on one side of the hood plenum in compliance with NFPA 96 of the fire code with month, date punched o Company’s name with address and contact phone number o A written service report on the spot will be issued for the service performed indicating the condition of the range hood, duct, exhaust fan, etc o Inspect exhaust fan electric wring o Ensure duct plenum interior is accessible per
Chapter 7- Exhaust Duct System NFPA #96 o Ensure access panel is in compliance with NPA
#96-7.4.3.4 & 7.4.4.1 o Exhaust fan hinges in compliance with NFPA
#96-8.1.1.1, Chapter 8 o Grease containment system around exhaust fan
CLIN 0002, Service – Annual Fire Extinguisher Inspection/certification
Numbers of fire extinguishers provided below:
BARGE BOTTLES QTY
APL-62 FIRE EXTINGUISHER 5-LB 81
“K” 4
APL-4 FIRE EXTINGUISHER 5-LB 43
“K” 3
YRBM-30 FIRE EXTINGUISHER 10-LB 33
“K” 1
YRBM-31 FIRE EXTINGUISHER 5-LB 21
“K” 1
YRBM-33 FIRE EXTINGUISHER 5-LB 10
“K” 1
YRB-34 FIRE EXTINGUISHER 5-LB 24
YRBM-50 FIRE EXTINGUISHER 5-LB 15
“K” 1
YRB-97 FIRE EXTINGUISHER 5-LB 14
“K” 2
FIRE EXTINGUISHER 10-LB 21
FIRE EXTINGUISHER 15-LB 3
Tag all CO2 bottles with service completion date
CLIN 0003, Service – Emergency Calls and Repair Services
This line item covers 24/7 emergency calls/repairs to restore suppressions systems, range hood and Gaylord range hood to normal operations.
ADDITIONAL REQUIREMENTS
INSPECTION SCHEDULE: COMPACFLT B/M Barge Mgr or his rep will schedule testing/inspection. Contractor is required to contact COMPACFLT B/M Program four (4) weeks prior to scheduled inspection for additional instructions.
INSPECTION REPORT: Contractor to provide copy of Inspection/Maintenance Report in support of CLINs 0001 to 0003. Report shall be sent via e-mail to COMPACFLT B/M Program to Gov't Surveillance Officer (daniel.l.maryfield@navy.mil).
EMERGENCY REPAIR AND PARTS REPLACEMENT: Contractor shall provide an estimated list of materials, part numbers, quantities, and prices for repair parts found during inspection or emergency services via hard copy or email to Gov't Surveillance Officer (daniel.l.maryfield@navy.mil). No emergency repair parts shall be purchased without a modification to the task order adding additional funds. The government may also provide repair parts directly to the contractor based on the estimated items listed if it is in the best interest to the government based on availability and time constraints.
CALL-OUT PROCEDURES: Contractor must be able to provide reliable after hours, weekends and holidays telephone/cell numbers in case of emergencies.
NOTE: Contractors shall reference the attachment, Contractor Badging and Access Instructions, to enter base community areas as applicable.
3. QUALITY ASSURANCE REQUIREMENTS: COMPACFLT PNW B/M Program Manager or his designated representative is responsible for the quality oversight of services provided.
4. SECURITY: COMPACFLT B/M will determine if a DD254 is required prior to first inspection in accordance with (IAW) Contractor Badge and Access Instructions attachment, and coordinate with contractor for completion of necessary paperwork. There are no other known requirements for access to restricted areas or information connected with the performance of this task.
5. PLACE OF PEFORMANCE: The work to be performed under this contract will be performed at Puget Sound Naval Shipyard, within the CIA, pierside and onboard COMPACFLT PNW B/M berthing barges. Work within the industrial environment may involve physical demands (i.e. uneven walking surfaces, kneeling, stairs, etc.) and may necessitate the use of protective safety equipment which is to be provided by the contractor (i.e. hard hat, safety glasses, safety shoes, etc.).
6. GOVERNMENT SURVEILLANCE OFFICER:
Dan Maryfield Tel: 360-476-3801 Fax: 360-476-3887 E-mail: daniel.l.maryfield@navy.mil
7. OTHER CONSIDERATIONS:
7.1 Estimated Work Hours
Inspections and testing are scheduled for accomplishment between the hours of 8:00AM and 2:00PM, Monday through Friday; emergency repairs will be done on a call basis 24/7 if deemed necessary.
7.2 All technical clarifications will be coordinated through the Government Surveillance Officer.
7.3 Environmental and Safety Concerns:
Not applicable
7.4 Laydown and Utilities Requirements:
Not applicable
7.5 Upon award, the Contractor shall contact COMPACFLT PNW B/M Program Manager Dan Maryfield, Tel: 360- 476-3801, E-mail: Maryfield, Daniel L CIV PSNS/IMF, Code 340 [daniel.l.maryfield@navy.mil] or his designated representative to clarify exact requirements and inspection/testing schedules within the scope of this PWS.