C05_Section L - Initial Delivery Order Table Attachment.xlsx

XLSX spreadsheet 12 KB Posted

Attached to
Plant and Laboratory Equipment Federal contract opportunity
Solicitation number
N6893623R0016
Issued by
Department of the Navy Naval Air Systems Command Naval Air Warfare Center

About this file

This document contains an initial delivery order table and details of a related federal contract opportunity for plant and laboratory equipment. The initial delivery order table lists five items required including two gas chromatography/mass spectrometry systems, five refrigerators and freezers for storing flammable materials, and two explosion proof freezers. Delivery times range from six to twenty-two weeks. Interested firms must respond to the Naval Air Warfare Center Weapons Division in China Lake, California by the deadline of thirty days from the notice date and must be registered in the System for Award Management to supply various types of plant and laboratory equipment and services to the Department of the Navy over five years in accordance with the competitive set-aside terms for small businesses set forth in the Federal Acquisition Regulation.

View the file

Other files for this federal contract opportunity

Other files attached to Plant and Laboratory Equipment, newest first.
File Type Posted
23R0016 Amendment 2.docx DOCX document
Initial Delivery Order Table Attachment Amendment 1.xlsx XLSX spreadsheet
23R0016 Amendment 1.docx DOCX document
Commercial Solicitation N6893623R0016.docx DOCX document
C05_Section J-Wage Determinations San Bernardino 15-5629.pdf PDF
C05_Section J-Wage Determinations Kern 15-5603.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Sheet1

Initial Delivery Orders
For pricing comparison purposes and proposal evaluation, the offeror shall submit a fully completed initial Delivery Order table.
Delivery Point: China Lake, CA
Specifications or other documents: Prices shall include shipping costs to NAWC-WD China Lake, 2400 E Pilot Plant Rd, Bldg 11130, China Lake, CA 93555-6100
Certifications Required: No
Quote Submission Deadline: See page 1 of Standard Form 1449, Block 8.
Vendor/Part NumberItem DescriptionRequired
Delivery TimeQuantityUnit PriceTotal Line
Item PriceTotal Price
Item #1GenTech Scientific
6351 (or equivalent)Thermo LTQ XL

Includes:

- Certified & Refurbished at GenTech

- Warranty Coverage -Thermo LTQ XL MS

- Mechanical Pump

- Computer Loaded with Software

- Windows OS, Monitor, Keyboard & Mouse

14 Weeks2
Installation at China Lake, CA (Both Units)14 Weeks1
Shipping (Both Units)14 Weeks1
Item #2Teledyne FLIR

103-032-0002 (or equivalent) Griffin G510 Field Ready Kit. Griffin G510 DB5 GC/MS with integrated Heated Sample Probe and Liquid Injector. Includes Essentials Kit:

(1) AC Power Adapter,

(2) 2590 Batteries (UBBL13),

(2) 99.995% He Carrier Gas Cartridges,

(1) Syringe,

(1) Standard Tool Kit,

(1) Quick Reference Guide,

(1) Stylus,

(1) Bluetooth keyboard ,

(1) Ruggedized Transport6 Weeks1
Teledyne FLIR

241-005-0076 (or equivalent) GCMS SPME Fiber Kit SPME Fiber Holder, SPME Fibers (3 pk PA), SPME Inlet Liner 1.8

mm ID6 Weeks1
Shipping6 Weeks1
Item #3LabRepCo

LABH-30-RF

(or equivalent)Futura Silver Series 30 Cu. Ft. Flammable Material Storage Refrigerator | Solid Door12 Weeks5
Item #4LabRepCo

LHE-30-FF

(or equivalent)

Ultra Elite Series 30 Cu. Ft. Flammable Material Storage Freezer (-20°C) | Manual Defrost12 Weeks5
Item #5Integrated Dispensing Solutions, Inc. 2002012EX
(or equivalent)(-40c) 21 CF Super Cold Chest Freezer, 230V - Built To Meet Class 1 Div. 1 Group C&D Explosion Proof Specifications22 Weeks2
Integrated Dispensing Solutions, Inc.

EPTR4-20

(or equivalent)Explosion Proof Temperature Retransmit (4-20 ma)
**Customer is responsible for correctly installing and running wires from freezer per Explosion Proof code22 Weeks2
Integrated Dispensing Solutions, Inc.

5006-9 (or equivalent)

Stainless Steel Interior Lining - Super or Ultra Cold Interior (12, 21CF sizes)22 Weeks2
Integrated Dispensing Solutions, Inc. 4100017-1
(or equivalent)Access Port 1" (Super and Ultra Cold Chest models only)22 Weeks2
Total of All Items

File details come from the government source that posted it. Updated .