C05 Attachment_Transformer List of Leaks.xlsx
XLSX spreadsheet 13 KB Posted
- Attached to
- In-Place Transformer Oil Leak Repair & Diagnosis
- Solicitation number
- 140R2021Q0031
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
ALREADY DIAGNOSED
| Photo # | Substation | Equipment # | Leak Description | Qty. |
| 3 | SHASTA POWER PLANT | KU 3 C Phase | Sudden Pressure 4 Bolt Flange | 1 |
8 KU 1 C Phase 6 Bolt Flange 1
12 KESWICK POWER PLANT KU 2 8 Bolt Pump Flange 1
14 KU 1 4 Bolt Pump Flange 1
| 15 | KU 1 | 8 Bolt Pump Flange | 1 | |
| 17 | SPRING CREEK POWER PLANT | SC C Phase | Flapper Valve Stem Leak (Typical) | 3 |
18 SC C Phase 4 Bolt Flange 2
20 SC C Phase 4 Bolt Valve Flange 1
21 SC B Phase Flapper Valve Stem Leak (Typical) 3
22 SC A Phase Valve Stem Leak 2
26 TRINITY POWER PLANT KRA C Phase Flapper Valve Stem Leaks (Typical) 2
27 KRA C Phase 8 Bolt Pump Flange 1
LEAK DIAGNOSIS
| Photo # | Substation | Equipment # | Leak Description | Qty. |
| 1 | SHASTA POWER PLANT | KU 5 A Phase | CT Junction Box | 1 |
2 KU 4 C Phase CT Junction Box 1
4 KU 3 B Phase CT Junction Box 1
5 KU 2 B Phase Above Lid Leak 1
6 KU 2 B Phase CT Junction Box 1
7 KU 1 C Phase Above Lid Leak 1
9 KU 1 C Phase Sudden Pressure Hex to Hex 1
10 KESWICK POWER PLANT KU 3 CT Junction Box 1
11 KU 2 CT Junction Box 1
13 KU 1 CT Junction Box 1
16 KU 1 Sudden Pressure 1
File details come from the government source that posted it. Updated .