This is a request for quotation for repair services at Hoover Dam Power Plant. The Bureau of Reclamation is seeking quotes to repair two exciter armatures in accordance with the attached performance work statement. Quotes are due by February 5, 2024 and award will be made based on a comparative evaluation of price and technical acceptability. The contractor will transport the armatures to their facility, perform cleaning, inspection, testing, repair, and rewinding services per EASA standards, then return the armatures. Optional line items include replacement of cores or commutators. The contractor must have EASA certification and follow all procedures in the performance standard.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
140R3024Q0014 – Repair Exciters at Hoover Power Plant
Combined Synopsis/Solicitation
(i) This is a combined synopsis/solicitation for commercial services prepared in accordance with the format in Subpart 12.6, as supplemented with additional information included in this notice. This announcement constitutes the only solicitation; proposals are being requested and a written solicitation will not be issued.
(ii) To facilitate electronic quote submissions through SAM.gov Contract Opportunities, a request for quote (RFQ No. 140R3024Q0014) is being issued subsequent to this combined solicitation/synopsis.
(iii) This solicitation document and incorporated provisions and clauses are those in effect through
Federal Acquisition Circular number 2023-06 Effective Date 12/04/2023.
(iv) This requirement will have no set-aside. The North American Industry Classification System
(NAICS) Code for this acquisition is: 811310, Commercial and Industrial Machinery and Equipment
(except Automotive and Electronic) Repair and Maintenance. The small business size standard for
NAICS Code 811310 is $12.5 Million.
(v) Line item 00010 – Repair & Rewind of Exciter Armatures
Line item 00020 – Replacement of Core – Option Line Item
Line item 00030 – Replacement of Commutator – Option Line Item
The Performance Work Statement (PWS) provides more detailed information about the requirement and is attached to the RFQ.
(vi) The Bureau of Reclamation (Reclamation), Lower Colorado Basin Region (LCBR) has a requirement for the repair of two Exciters at Hoover Dam Power Plant in accordance with the Performance Work Statement (PWS). Offeror MUST submit supporting documentation along with your quotation to demonstrate the proposed quote meets the PWS.
(vii) The requirement will be accomplished via issuance of a firm fixed price Purchase Order. Work shall start on or about March 2023.
THE FOLLOWING CLAUSES AND PROVISIONS ARE APPLICABLE TO THIS COMMERCIAL
ITEM ACQUISITION:
(viii) FAR provision 52.212-1, Instructions to Offerors - Commercial Products and Commercial Services.
In addition to the requirements of the Instructions to Offerors - Competitive Acquisitions provision of this solicitation, each offeror will submit a quote in accordance with the instructions contained in this provision.
(1) Offer will complete and submit Standard Form (SF)18 - Request for Quotation. Pricing must be submitted on the SF-18.
(2) Submit the following information:
(a) Unique Entity Identifier (UEI): ___________________
(b) Contractor E-mail Address: ______________________
(3) Technical and Past Performance Information Requested:
(a) Technical: Offeror will provide a written narrative detailing how they will complete this requirement, which should entail everything covered under Section D of Attachment 001 PWS.
The Wage Determination included in this RFQ (Attachment 2) is only applicable for contractors in the
County of Clark, Nevada. If your company is located in another location, please provide the applicable wage determination with your quote by visiting the following website:
https://beta.sam.gov/search?index=wd
(b) Past Performance: Offeror is not required to submit any past performance documentation. However, the Government may use past performance information obtained, such from the Contractor Performance
Assessment Reporting System (CPARS) database located at http//www.cpars.gov.
NOTE: An offeror without relevant experience, or for whom information on past performance is not available, will be given a Neutral rating, and will not be evaluated favorably or unfavorably. This rating is neither negative nor positive. Neutral is merely indicative of a lack of prior performance.
(ix) Determination of award will be based on a comparative evaluation that will be performed in accordance with FAR 13.106-2(b)(3). The Government will conduct a direct comparison of one quote with another in order to determine which quote best provides the Government what is needs, as identified in this solicitation. The Government reserves the right to select a quote that exceeds the minimum but is not required to do so. Quotes may exceed the requirement, but the Government is not requesting or accepting alternate quotes. Each quote must respond to the solicitation requirement. Please see
Attachment #1 PWS.
(x) FAR provision 52.212-3, Offeror Representations and Certifications - Commercial Products and
Commercial Services.
Offerors are advised include with their offer, a completed copy of the provision 52.212-3, or indicate completion of the provision online. Offerors may complete the annual representations and certifications online at https://www.sam.gov/.
(xi) FAR clause 52.212-4, Contract Terms and Conditions - Commercial Products and Commercial
Services.
(xii) FAR clause 52.212-5 Contract Terms and Conditions Required to Implement Statutes or Executive
Orders - Commercial Products and Commercial Services.
The following additional FAR clauses cited in this clause are applicable to the acquisition:
52.203-19, Prohibition on Requiring Certain Internal Confidentiality Agreements or Statements (Jan
2017)
52.204-23, Prohibition on Contracting for Hardware, Software, and Services Developed or Provided by
Kaspersky Lab and Other Covered Entities (Dec 2023)
52.204-25, Prohibition on Contracting for Certain Telecommunications and Video Surveillance Services or Equipment. (Nov 2021)
52.209-10, Prohibition on Contracting with Inverted Domestic Corporations (Nov 2015)
52.232-40, Providing Accelerated Payments to Small Business Subcontractors (Mar 2023)
52.233-3, Protest After Award (Aug 1996)
52.233-4, Applicable Law for Breach of Contract Claim (Oct 2004) https://www.sam.gov/
52.203-6, Restrictions on Subcontractor Sales to the Government (Jun 2020)
52.204-10, Reporting Executive Compensation and First-Tier Subcontract Awards (Jun 2020)
52.204-14, Service Contract Reporting Requirements (Oct 2016)
52.204-27 Prohibition on a ByteDance Covered Application (JUN 2023)
52.209-6, Protecting the Government’s Interest When Subcontracting with Contractors Debarred, Suspended, or Proposed for Debarment. (Nov 2021)
52.209-9, Updates of Publicly Available Information Regarding Responsibility Matters (Oct 2018)
52.219-8, Utilization of Small Business Concerns (Sep 2023)
52.219-9, Small Business Subcontracting Plan (Sep 2023)
52.219-28, Post Award Small Business Program Representation (Sep 2023)
52.222-3, Convict Labor (Jun 2003)
52.222-19, Child Labor-Cooperation with Authorities and Remedies (NOV 2023)
52.222-21, Prohibition of Segregated Facilities (Apr 2015)
52.222-26, Equal Opportunity (Sep 2016)
52.222-35, Equal Opportunity for Veterans (Jun 2020)
52.222-36, Equal Opportunity for Workers with Disabilities (Jun 2020)
52.222-37, Employment Reports on Veterans (Jun 2020)
52.222-50, Combating Trafficking in Persons (Nov 2021)
52.222-54, Employment Eligibility Verification (May 2022)
52.223-18, Encouraging Contractor Policies to Ban Text Messaging While Driving (Jun 2020)
52.225-13, Restrictions on Certain Foreign Purchases (Feb 2021)
52.232-33, Payment by Electronic Funds Transfer-System for Award Management (Oct 2018)
52.242-5, Payments to Small Business Subcontractors (Jan 2017)
52.222-41, Service Contract Labor Standards (Aug 2018)
52.222-42, Statement of Equivalent Rates for Federal Hires (May 2014)
52.222-44, Fair Labor Standards Act and Service Contract Labor Standards-Price Adjustment (May 2014)
52.222-55, Minimum Wages for Contractor Workers Under Executive Order 14026 (Jan 2022)
52.222-62, Paid Sick Leave Under Executive Order 13706 (Jan 2022)
(xiii) Additional contract requirements include the following clauses and provisions:
52.252-1 Solicitation Provisions Incorporated by Reference (Feb 1998)
DOI-AAAP-0028 Electronic Invoicing and Payment Requirements-Invoice Processing Platform (IPP)
(Apr 2013)
DOI-AAAP-0050 Contractor Performance Assessment Reporting System (Dec 2015)
52.204-7 System for Award Management (Oct 2018)
52.204-16 Commercial and Government Entity Code Reporting (Aug 2020)
52.204-18 Commercial and Government Entity Code Maintenance (Aug 2020)
52.217-7 Option for Increased Quantity-Separately Priced Line Item (Mar 1989)
52.217-8 Option to Extend Services (Nov 1999)
WBR 1452.223-81 Safety and Health -- Bureau of Reclamation (Aug 2021)
WBR 1452.223-82, Ensuring Adequate Covid-19 Safety Protocols in Federal Buildings and Federally
Controlled Facilities -- Bureau Of Reclamation (Nov 2022)
DIAR 1452.215-71 Use and Disclosure of Proposal Information -- Department Of The Interior (Apr
1984)
52.212-2 Evaluation-Commercial Items (Oct 2014)
52.204-29 Federal Acquisition Supply Chain Security Act Orders – Representation and Disclosures (Dec
2023)
52.204-30 Federal Acquisition Supply Chain Security Act Orders – Prohibition (Dec 2023)
(xiv) Not Applicable
(xv) All questions shall be submitted via email to bwilliamson@usbr.gov no later than January 19, 2024
4:00 P.M. MST.
Offers are due February 05, 2024 10:00 A.M. MST. Responsible offerors are requested to submit a quote for this requirement. Offers shall be submitted via email to bwilliamson@usbr.gov.
(xvi) The Point of Contact for this solicitation is Mr. Bryan Williamson and may be reached via e-mail at bwilliamson@usbr.gov, or by phone at 702-293-8452.
End of Combined Synopsis/Solicitation mailto:bwilliamson@usbr.gov
140R3024Q0014
1. REQUEST NO.
5a. ISSUED BY
NAME
a. NAME
c. STREET ADDRESS
d. CITY
10. PLEASE FURNISH QUOTATIONS TO
THE ISSUING OFFICE IN BLOCK 5a ON
OR BEFORE CLOSE OF BUSINESS (Date)
2. DATE ISSUED 3. REQUISITION/PURCHASE REQUEST NO. 4. CERT. FOR NAT. DEF.
UNDER BDSA REG. 2
AND/OR DMS REG.1
RATING
6. DELIVERY BY (Date)
7. DELIVERY
9. DESTINATION
a. NAME OF CONSIGNEE
b. STREET ADDRESS
PAGE OF PAGES
5b. FOR INFORMATION CALL: (No collect calls)
TELEPHONE NUMBER
AREA CODE NUMBER
8. TO:
b. COMPANY
e. STATE f. ZIP CODE
c. CITY
d. STATE e. ZIP CODE
IMPORTANT: This is a request for information, and quotations furnished are not offers. If you are unable to quote, please so indicate on this form and return it to the address in Block 5a. This request does not commit the Government to pay any costs incurred in the preparation of the submission of this quotation or to contract for supplies or services. Supplies are of domestic origin unless otherwise indicated by quoter. Any representations and/or certifications attached to this Request for Quotations must be completed by the quoter.
11. SCHEDULE (Include applicable Federal, State and local taxes)
THIS RFQ
REQUEST FOR QUOTATION
(THIS IS NOT AN ORDER)
IS IS NOT A SMALL BUSINESS SET ASIDEX
01/04/2024 0040643046
1 2
Lower Colorado Region Regional Office 500 Fir Street
Bureau of Reclamation
Boulder City NV 89005
06/14/2024
Hoover Dam
Boulder City
NV 89006
702 293-8452Bryan Williamson
02/05/2024 1000 MS
FOB DESTINATION
OTHER
(See Schedule)X
ITEM NO.
(a)
SUPPLIES/SERVICES
(b)
QUANTITY
(c)
UNIT
(d)
UNIT PRICE
(e)
AMOUNT
(f)
NAICS: 811310
Project Title: Repair Exciters at Hoover Power Plant
00010 Repair & Rewind of Two Exciter Armatures Product/Service Code: J028 Product/Service Description: MAINT/REPAIR/REBUILD
OF EQUIPMENT- ENGINES, TURBINES, AND COMPONENTS
Delivery: 06/14/2024 Period of Performance: 03/12/2024 to 06/14/2024
Continued ...
12. DISCOUNT FOR PROMPT PAYMENT
a. 10 CALENDAR DAYS (%) b. 20 CALENDAR DAYS (%) c. 30 CALENDAR DAYS (%) d. CALENDAR DAYS
NUMBER PERCENTAGE
NOTE: Additional provisions and representations
13. NAME AND ADDRESS OF QUOTER
b. STREET ADDRESS
c. COUNTY
d. CITY e. STATE f. ZIP CODE
14. SIGNATURE OF PERSON AUTHORIZED TO
SIGN QUOTATION
16. SIGNER
a. NAME (Type or print)
c. TITLE (Type or print)
a. NAME OF QUOTER
AREA CODE
NUMBER
15. DATE OF QUOTATION
b. TELEPHONE are are not attached
AUTHORIZED FOR LOCAL REPRODUCTION
Previous edition not usable
STANDARD FORM 18 (REV. 6-95)
Prescribed by GSA - FAR (48 CFR) 53.215-1(a)
ITEM NO. SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
NAME OF OFFEROR OR CONTRACTOR
2 2
CONTINUATION SHEET
REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGE OF
(A) (B) (C) (D) (E) (F)
140R3024Q0014
00020 Replacement of Core - Option Item
(Option Line Item)
Anticipated Exercise Date 05/10/2024
Product/Service Code: J028
Product/Service Description: MAINT/REPAIR/REBUILD
OF EQUIPMENT- ENGINES, TURBINES, AND COMPONENTS
Delivery: 06/14/2024
Period of Performance: 03/12/2024 to 06/14/2024
00030 Replacement of Commutator - Option Item
(Option Line Item)
Anticipated Exercise Date 05/10/2024
Product/Service Code: J028
Product/Service Description: MAINT/REPAIR/REBUILD
OF EQUIPMENT- ENGINES, TURBINES, AND COMPONENTS
Delivery: 06/14/2024
Period of Performance: 03/12/2024 to 06/14/2024
A comparative evaluation will be performed in accordance with FAR 13.106-2(b)(3). The
Government will conduct a direct comparison of one quote with another in order to determine which quote best provides the Government what it needs, as identified in this solicitation. The
Government reserves the right to select a quote that provides benefit to the Government that exceeds the minimum but is not required to do so.
Quotes may exceed the requirements, but the
Government is not requesting or accepting alternate quotes. Each quote must respond to the solicitation requirements.
The Wage Determination included in this RFQ
(Attachment 2) is only applicable for contractors in the County of Clark, Nevada. If your company is located in another location, please provide the applicable wage determination with your quote by visiting the following website:
https://beta.sam.gov/search?index=wd
**SUBMIT ALL QUESTIONS VIA EMAIL TO BRYAN
WILLIAMSON, CONTRACT SPECIALIST @
BWILLIAMSON@USBR.GOV BY 01/19/2024 4:00 P.M. MST
**SUBMIT YOUR QUOTES TO BRYAN WILLIAMSON VIA
EMAIL @ BWILLIAMSON@USBR.GOV
NSN 7540-01-152-8067 OPTIONAL FORM 336 (4-86)
Attachment 001
PERFORMANCE WORK STATEMENT
A. INTRODUCTION.
The Bureau of Reclamation’s (Reclamation) Hoover Dam generators use static voltage regulators with rotating exciters to inject DC voltage onto main generator field windings. Hoover Dam has two Westinghouse exciters, 425 kW, armature volts 250 VDC, armature amps 1700, class F insulation, 180 RPM, weighing 12,000 lbs. that require cleaning, weighing, measuring, inspection, testing, repair, and rewind. Reclamation needs a qualified Electrical Apparatus Service Association
(EASA) Contractor to perform these services and certify work is completed in accordance with the
EASA Standard (AR100-2015).
B. BACKGROUND.
Generator excitation systems consists of main rotating exciters (armatures), static pilot exciters, voltage regulators and certain excitation control features. The armatures are designed and equipped to be direct-connected, direct current, vertical shaft, shunt-wound-type main rotating exciter mounted on top of a generator. These armatures are rated 250 volts. Reclamation will not provide any additional drawings or information. The continuous capacity of these rotating exciters (armatures) is sufficient to carry the current supplied by the generator’s static pilot exciter and regulator. The continuous capacity of the excitation system is ten percent in excess of the actual capacity (in amperes) required to supply the field excitation current of the generator when operating at 100 percent uprated kilowatt output, rated power factor, and rated voltage. These armatures are stored inside wood crates ready to load and ship to the repair facility. Pickup and delivery shall be at Hoover Dam Central Warehouse. The
Central Warehouse is located on Nevada State Route 172 about eight miles East of Boulder City, Nevada. Take Exit 2 (SR-172) past the Hacienda Hotel & Casino and follow the signs.
C. PERFORMANCE REQUIREMENTS.
1. The Contractor shall furnish the tools, equipment, materials, cranes, rigging, and incidental items necessary to safely unload, open, photograph, clean, measure, diagnostic test; repair, replace the commutator and rewind; final test, photograph, build return shipping crates, and safely reload (onto the return transport vehicle) two armatures at the Contractor’s facility.
2. The Contractor shall transport the two Armatures from Hoover Dam to the Contractor’s facility and return from the Contractor’s facility to Hoover Dam. Contractor will have a place to work at the central warehouse to load the vehicle transporting the two armatures out for repair and unloading them upon their return. Reclamation will have available a forklift and a qualified forklift operator to load and unload the Contractor’s transport vehicles.
Reclamation will also provide an escort for the Contractor’s transport vehicle’s driver while loading or unloading the two Armatures.
3. The Contractor shall provide all the necessary tools, equipment, accessories, etc., to safely secure the Armatures placed on the transport vehicle at the Central Warehouse and at the Contractor’s Facility.
3-1. Armature weigh is approximately 11,000 to 13,000 pounds each.
3-2. Armatures are installed inside crates to minimize damage during shipping.
Approximate crate dimensions are 6 feet (length) x 6 feet (width) x 5 feet (height).
4. The Contractor’s facility shall be Electrical Apparatus Service Association (EASA) certified to repair and rewind rotating exciter armatures.
5. The Contractor’s facility shall provide documentation to certify armature repair work complies with ANSI/EASA Standard (AR100-2015) per Deliverable 3.
6. The Contractor shall provide documentation to certify testing was performed following the repair as specified by EASA Standard (AR100-2015). Contractor shall submit the certified test results to the Contracting Officer’s Representative (COR) and to:
ibr3lcddworkcontrol@usbr.gov per Deliverable 5.
7. The Contracting Officer (CO) will provide the Approval or Disapproval of Deliverable within 5 days of receipt by the COR.
D. SCOPE.
1. The Contractor shall perform all work in compliance with Electrical Apparatus Service
Association (EASA) Standard AR100-2015. Contractor shall not deviate from the EASA
Standard (AR100-2015) without written permission from the CO.
1-1. AR100-2015 lists recommended practices for the repair of rotating electrical apparatus.
1-2. A copy of the standard is available FREE from EASA website at: www.easa.com.
1-3. A repair record of the procedures followed to refurbish armature windings and other components (including its commutator) must be made and certified in accordance with the Standard.
1-4. A copy of the certified repair record is required under Deliverable 6 to be sent to the
COR.
1-5. All parts shall be made accurate to standard gauge to facilitate replacement and repair.
2. The Contractor shall arrange for transportation to pick up the two crated armatures at the
Hoover Dam Central Warehouse and deliver them to the Contractor’s facility. Hoover Dam Central warehouse is open for pick-up and deliveries from 7:30a.m. to 3:30p.m. (PDT), Tuesday through Thursday only, excluding Federal holidays. Pick up or delivery outside these hours shall be done only after approval from the CO or COR.
mailto:ibr3lcddworkcontrol@usbr.govper http://www.easa.com/
3. The Contractor shall notify the COR of the arrival and departure times at least 48-hours in advance. Advance notice is required to allow Warehouse staff to be available for escort, review of the Job Hazard Analysis (JHA) and for issue and release of the Reclamation provided Special Work Permit (SWP); and Warehousemen and Mechanical Craftsmen are available to operate the forklift and perform any rigging duties that may be needed to load or unload the transport vehicle.
4. A Reclamation escort or inspector will be available on the days and hours approved for work.
5. The Contractor shall inspect, photograph, weigh, measure, and document armature condition upon arrival.
5-1. The Contractor shall provide the following information to the COR before beginning repair on each Armature per Deliverable 5 and 6.
a. Photograph the armature (from at least three positions) upon removal from the crate.
b. Record the name plate data and all marks stamped into the metal for each Armature.
c. Record each Armature’s weight and dimensions in inches & millimeters before repair.
(1) Measure and record core shaft outside diameter.
(2) Measure and record core shaft thickness.
(3) Measure and record core shaft height.
(4) Measure and record the commutator outside diameter.
(5) Measure and record commutator thickness.
(6) Measure and record commutator height.
(7) Measure and record the windings’ outside diameter.
(8) Measure and record the windings’ thickness.
(9) Measure and record the windings’ height.
(10) Measure and record the height of the windings and commutator.
(11) Measure and record the height of the shaft.
(12) Measure and record other dimensions the vendor deems necessary.
(13) Weigh and record armature weight in pounds.
5-2. Record Armature dimensions on paper in WORD format.
5-3. Place all measurements on a sketch of the armature.
6. The Contractor shall clean, inspect, test, repair, rewind, and certify the work was completed as instructed in the EASA Standard (AR100-2015).
7. Core, Commutator or both Core and Commutator Replacement (OPTIONAL LINE ITEM
0020, 0030, or 0020 and 0030, Clause 52.217-7, Option for Increased Quantity—
Separately Priced Line Item). If the test and assessments result in conditions which require the core, commutator or both core and commutator to be replaced, the Contractor shall immediately stop work and submit to the CO and COR the diagnostic test reports indicating the hot spots on the commutator. If any Optional Line is exercised (authorized), the CO will issue a modification to exercise the respective Optional Line Item. The exercise of this
Optional Line Item will include a time extension of 30 workdays or other agreeable timeframe but not to exceed 50 work days. Contractor may not proceed without the authorization from the CO; performance of work without the authorization is at the
Contractor’s own expense.
7-1. Inspection, assessment, and additional repair recommendations must be completed using the practices and procedures stated in Sections One (General) and Two
(Mechanical Repair) of the ANSI/EASA AR100-2015 Recommended Practice Standard.
8. The Contractor shall compare commutator diameter to the minimum acceptable diameter to determine whether the commutator can be reused or must be replaced.
8-1. Undercut and chamfer commutator segments, turn and polish the surface (if needed).
8-2. Balance the armature to the ANSI/EASA Standard (AR100-2015) tolerance.
9. A written repair plan for this armature shall be sent to the COR before work begins per
Deliverable 3.
9-1. Contractor shall provide a sketch, a brief description of the repair plan, a material list, a schedule to complete the work, and an estimated date to deliver each individual armature per Deliverable 5.
9-2. Written approval to proceed with the repair plan will come from the CO.
10. The Contractor shall resurface each armature’s commutator following practices and procedures stated in Section Two (Mechanical Repair), paragraph 2.8 (Commutators) of the
ANSI/EASA AR1002015 Recommended Practice Standard.
11. The Contractor must test and record the results following repair to document the armature’s upgraded condition.
12. The Contractor shall run all tests on the armature in accordance with the practices and procedures stated in Section Four (Testing) of the ANSI/EASA AR100-2015 Recommended Practice Standard.
13. The Contractor shall certify armature tests were performed using calibrated test equipment per Deliverable 6.
14. The Contractor shall perform all tests listed in Section 4.3 Recommended Winding Tests of Standard AR100-2015, including tests on each armature to insure there are no grounds, short circuits, open circuits, incorrect connections or high resistance connections.
15. The Contractor shall certify the rewound armature meets the ANSI/EASA standard and include the items listed below, per Deliverable 6.
15-1. Briefly describe the work completed.
15-2. Briefly describe the commutator’s resurface procedure.
15-3. Briefly describe the test procedure and results.
15-4. Certify the tests comply with EASA Standard AR100-2015.
16. The Contractor shall document each armature is ready for return shipping by completing the following tasks.
16-1. Photograph each armature following repair from three different views (side, top and bottom) to document each armature’s upgraded and undamaged condition.
16-2. Document in writing and sketch each rewound armature’s dimensions and weight as instructed in 5-3 and 9-1.
16-3. Certify each armature’s dimensions and weight do not exceed those taken on arrival before repairs began.
16-4. Ship each armature in a new heavy-duty wood crate to ensure it is secure, supported and protected for the return shipping to Hoover Dam.
16-5. Ensure all certifications, records, reports, and tests are completed for each armature.
16-6. Coordinate with the COR before returning each armature to Hoover Dam.
16-7. Return of armature does not relieve the Contractor of the responsibility to conform to all requirements in this performance work statement.
17. The Contractor must dispose of all items removed from the armature in an environmentally friendly manner and in compliance with all laws, rules and regulations.
18. Work shall be performed and completed in a neat, thorough and workmanlike manner following the best modern practices in the manufacture of high-grade machinery.
D. REFERENCE DOCUMENTS.
The Contractor’s shall refer to the Exhibits 1 through 2 in performance of the work; copies of these exhibits are attached.
1. Exhibit 1. The Electrical Apparatus Service Association Standard (AR100-2015).
2. Exhibit 2. Unit A7 Westinghouse Test and Inspection Data
F. SPECIAL REQUIREMENTS.
1. Contractor’s transport drivers shall follow Reclamation Safety Standards while working on-site at the Hoover Dam Central Warehouse.
1-1. Transport drivers shall comply with all federal, state, and local laws and standards as well as the Reclamation manual Reclamation Safety and Health Standards (RSHS), 2014 Edition. The Contractor may order the RSHS manual (Stock item GPO-024-003-
00178-3) from:
The Government Printing Office
Superintendent of Documents
North Capitol and H St. N.W.
MS-SSMC - Room 566
Washington, D.C. 20401
The Contractor may also download or view the electronic version of the RSHS manual at no charge from Reclamation web site: http://www.usbr.gov/ssle/safety/RSHS/rshs.html
1-2. The Contractor’s transport driver must review, discuss, and sign a Job Hazard
Analysis (JHA) before beginning loading or unloading the armatures at the central warehouse. The Contractor’s transport driver must review and sign a Special Work Permit
(SWP) before beginning work securing the load or preparing to unload armatures at the
Central Warehouse. The SWP authorizes personnel, tools, vehicles, etc., to be on-site for the purpose stated.
G. DELIVERABLES.
1. The Contractor shall provide the items Table 1, List of Deliverables to the COR.
2. Reports shall be compatible with Microsoft Office Suite (Word, etc.) or Adobe (pdf).
3. Attach a cover sheet with the job name and Contract Number to each Deliverable.
TABLE 1 - LIST OF DELIVERABLES
No. Deliverable Item Due date
1 Three (3) digital photographs in PDF format of each armature upon arrival at Contractor’s facility
Within seven (7) days after arrival at the repair facility
2 Sketch of each Armature with dimensions, measurements, weight shown in Word format (1 set per page); upon arrival at Contractor’s facility prior to repairs
Within seven (7) days after arrival at the repair facility.
3 Written repair plan to complete each armature repair and rewind
Within seven (7) days after arrival at the repair facility.
4 Three (3) digital photographs in PDF format of each armature after repair and rewind
Before shipping an armature back to Hoover Dam http://www.usbr.gov/ssle/safety/RSHS/rshs.html
5 Sketch of each Armature with dimensions, measurements, weight shown in Word Format (1 set per page); after repair, rewind, and tests are complete
Before shipping an armature back to Hoover Dam.
6 Certified copy of repairs and test results for each armature to include the repair, rewind, resurface, insulation, vibration, balance and other winding test results.
Before shipping an armature back to Hoover Dam.
F. PERIOD OF PERFORMANCE.
1. The Contractor may request from the COR early site access to review the Central warehouse area used for loading and unloading tractor-trailers.
2. The Contractor shall ship back each Armature as soon as work is completed; at minimum, one Armature every 8 weeks. Armature 1 to be completed and returned within 8 weeks (or sooner) after receipt of award, Armature 2 to be completed and returned at week 16 (or sooner).
G. SPECIAL REQUIREMENTS – SECURITY.
The Contractor is responsible for employee compliance with Hoover Dam Security rules. The COR will arrange to have Government escort while on site. Contractor employees must comply with the following:
1. The operation of Hoover Dam and Power-plant requires continuous and effective security measures. Security is carried out by a federal guard system whose regulations provide for controlled access to all areas of the Facility. Additional restrictions apply to switch yards, power-plants, remote sites, and other critical areas.
2. Construction Work Areas - All areas where work is required under this contract are designated as construction work areas. Reclamation will designate suitable access ways to construction work areas for use by Contractor Employees. Unless specifically authorized, Contractor Employees are restricted to these areas. It is the Contractor’s responsibility to insure Employees work only in areas designated.
3. Restricted Areas – Contractor Employees are not permitted to enter restricted areas unless authorized. Restricted area entry must comply with security provisions established for that area. The Contractor must insure his Employees enter only those areas they are authorized to enter.
4. Contractor’s Tractor-Trailer Truck Parking and Entry Procedure.
4-1. Truck drivers approaching the Central Warehouse must observe all traffic rules and park only in designated areas.
4-2. Arriving Truckers must ring the buzzer on the South office wall to alert warehousemen of their arrival, to show their transport documents and to gain entry into the
Yard and the Warehouse.
4-3. After review of transport documents, warehousemen will open the Yard’s roll gate and direct the trucker to the designated loading and unloading area.
H. PERFORMANCE REQUIREMENT SUMMARY TABLE.
Performance Task Paragraph
No.
Acceptable
Quality Level
Method of
Surveillance
Incentive/Disincentive
Three (3) digital C.1, D.5 Contractor submits required photographs within the 7 days as required by the
PWS
COR receives and Incentive: Positive Past photographs in PDF reviews in Performance evaluation format of each armature accordance with Disincentive: Negative upon arrival at the PWS. Past Performance
Contractor’s facility evaluation
Sketch of each Armature D.5 Contractor COR receives and Incentive: Positive Past with dimensions, submits required reviews in Performance evaluation measurements, weight certified copy of accordance with Disincentive: Negative shown in Word format repair record and the PWS. Past Performance
(1 set per page); upon test results within evaluation arrival at Contractor’s the 7 days as facility prior to repairs required by the
PWS.
Written repair plan to D.9 Contractor COR receives and Incentive: Positive Past complete each armature submits required reviews in Performance evaluation repair and rewind sketch before accordance with Disincentive: Negative repair and rewind; the PWS. Past Performance and after repair evaluation and rewind.
Three (3) digital photographs in PDF format of each armature
D.16 Contractor submits required
3 digital
COR receives and reviews in accordance with
Incentive: Positive Past
Performance evaluation Disincentive: Negative after repair and rewind photographs before shipping each Armature.
the PWS. Past Performance evaluation
Sketch of each Armature D.16 Contractor COR receives and Incentive: Positive Past with dimensions, submits required reviews in Performance evaluation measurements, weight sketch before accordance with Disincentive: Negative shown in Word Format shipping each the PWS. Past Performance
(1 set per page); after Armature. evaluation repair, rewind, and tests are complete
Certified copy of repairs C.7, D.6, D- Contractor COR receives Incentive: Positive Past and test results for each 13, D.15 submits required repair record and Performance evaluation armature to include the certified copy of test results in Disincentive: Negative repair, rewind, resurface, test results before accordance with Past Performance insulation, vibration, shipping each the PWS. evaluation balance and other Armature.
winding test results.
Clauses
52.212-4 CONTRACT TERMS AND CONDITIONS –COMMERCIAL PRODUCTS AND COMMERCIAL
SERVICES (NOV 2023)
---Addendum to 52.212-4---
52.252-2 CLAUSES INCORPORATED BY REFERENCE (FEB 1998)
This contract incorporates one or more clauses by reference, with the same force and effect as if they were given in full text. Upon request, the Contracting Officer will make their full text available. Also, the full text of a clause may be accessed electronically at this/these address(es):
Federal Acquisition Regulation: https://www.acquisition.gov/far Department of the Interior Acquisition Regulation: https://www.acquisition.gov/diar
(End of clause)
DOI-AAAP-0028 ELECTRONIC INVOICING AND PAYMENT REQUIREMENTS-INVOICE PROCESSING
PLATFORM (IPP) (APR 2013)
Payment requests must be submitted electronically through the U. S. Department of the Treasury's Invoice Processing Platform System (IPP).
'Payment request' means any request for contract financing payment or invoice payment by the Contractor. To constitute a proper invoice, the payment request must comply with the requirements identified in the applicable Prompt Payment clause included in the contract, or the clause 52.212-4 Contract Terms and Conditions - Commercial Items included in commercial item contracts. The IPP website address is:
https://www.ipp.gov.
Under this contract, the following documents are required to be submitted as an attachment to the IPP invoice:
Company generated invoice
The Contractor shall also submit an electronic copy of the IPP invoice to bwilliamson@usbr.gov once the invoice has been submitted to IPP. Failure to email the invoice may cause significant delay or possible rejection of your payment request.
The Contractor must use the IPP website to register access and use IPP for submitting requests for payment. The Contractor Government Business Point of Contact (as listed in SAM) will receive enrollment instructions via email from the Federal Reserve Bank of St. Louis (FRBSTL) within 3 - 5 business days of the contract award date. Contractor assistance with enrollment can be obtained by contacting the IPP Production Helpdesk via email IPPCustomerSupport@fiscal.treasury.gov or phone
(866) 973-3131.
If the Contractor is unable to comply with the requirement to use IPP for submitting invoices for payment, the Contractor must submit a waiver request in writing to the Contracting Officer with its proposal or quotation.
(End of Local Clause)
DOI-AAAP-0050 CONTRACTOR PERFORMANCE ASSESSMENT REPORTING SYSTEM (DEC 2015)
1) FAR 42.1502 directs all Federal agencies to collect past performance information on contracts. The Department of the Interior (DOI) has implemented the Contractor Performance Assessment Reporting System (CPARS) to comply with this regulation. One or more past performance evaluations will be conducted in order to record your contract performance as required by FAR 42.15.
2) The past performance evaluation process is a totally paperless process using CPARS. CPARS is a web-based system that allows for electronic processing of the performance evaluation report.
Once the report is processed, it is available in the Past Performance Information Retrieval System (PPIRS) for Government use in evaluating past performance as part of a source selection action.
3) We request that you furnish the Contracting Officer (CO) with the name, position title, phone number, and email address for each person designated to have access to your firm's past performance evaluation(s) for the contract no later than 30 days after award. Each person granted access will have the ability to provide comments in the Contractor portion of the report and state whether or not the Contractor agrees with the evaluation, before returning the report to the Assessing Official (AO). Information in the report must be protected as source selection sensitive information not releasable to the public.
4) When your Contractor Representative(s) are registered in CPARS, they will receive an automatically generated email with detailed login instructions. Further details, systems requirements, and training information for CPARS is available at https://www.cpars.gov/.
5) Within 60 days after the end of a performance period, the AO will complete an interim or final past performance evaluation, and the report will be accessible at https://www.cpars.gov/.
a) Contractor Representatives may then provide comments in response to the evaluation, or return the evaluation without comment.
b) Your comments should focus on objective facts in the AO's narrative and should provide your views on the causes and ramifications of the assessed performance.
c) All information provided should be reviewed for accuracy prior to submission.
d) If you elect not to provide comments, please acknowledge receipt of the evaluation by indicating "No comment" in the space provided, and then selecting “Accept the Ratings and Close the Evaluation”.
e) Your response is due within 60 calendar days after receipt of the CPAR. On day 15, the evaluation will become available in PPIRS-RC marked as “Pending” with or without comments and whether or not it has been closed.
f) If you do not sign and submit the CPAR within 60 days, it will automatically be returned to the
Government and will be annotated: "The report was delivered/received by the contractor on (date). The contractor neither signed nor offered comment in response to this assessment."
6) The following guidelines apply concerning your use of the past performance evaluation:
a) Protect the evaluation as source selection information. After review, transmit the evaluation by completing and submitting the form through CPARS. If for some reason you are unable to view and/or submit the form through CPARS, contact the CO for instructions.
b) Strictly control access to the evaluation within your organization. Ensure the evaluation is never released to persons or entities outside of your control.
c) Prohibit the use of or reference to evaluation data for advertising, promotional material, pre-award surveys, responsibility determinations, production readiness reviews, or other similar purposes.
7) If you wish to discuss a past performance evaluation, you should request a meeting in writing to the CO no later than seven days following your receipt of the evaluation. The meeting will be held in person or via telephone or other means during your 60-day review period.
8) A copy of the completed past performance evaluation will be available in CPARS for your viewing and for Government use supporting source selection actions after it has been finalized.
52.204-13 SYSTEM FOR AWARD MANAGEMENT MAINTENANCE (OCT 2018)
52.204-18 COMMERCIAL AND GOVERNMENT ENTITY CODE MAINTENANCE (AUG 2020)
52.217-7 OPTION FOR INCREASED QUANTITY-SEPARATELY PRICED LINE ITEM (MAR 1989)
The Government may require the delivery of the numbered line item, identified in the Schedule as an option item, in the quantity and at the price stated in the Schedule. The Contracting Officer may exercise the option by written notice to the Contractor within 30 days. Delivery of added items shall continue at the same rate that like items are called for under the contract, unless the parties otherwise agree.
(End of clause)
52.217-8 OPTION TO EXTEND SERVICES (NOV 1999)
The Government may require continued performance of any services within the limits and at the rates specified in the contract. These rates may be adjusted only as a result of revisions to prevailing labor rates provided by the Secretary of Labor. The option provision may be exercised more than once, but the total extension of performance hereunder shall not exceed 6 months. The Contracting Officer may exercise the option by written notice to the Contractor within 15 days .
(End of clause)
WBR 1452.223-81 Safety and Health -- Bureau of Reclamation (AUG 2021)
(a) The Contractor shall not require any person employed in the performance of this contract (including subcontracts) to work under conditions which are unsanitary, hazardous, or dangerous to the employee's health or safety.
(b) Contractor shall comply with the most current version of the Bureau of Reclamation Reclamation Safety and Health Standards (RSHS) and, if applicable, the requirements of the Accident Prevention Clause (FAR 52.236-13 ).
The RSHS manual shall be obtained at http://www.usbr.gov/ssle/safety/RSHS/rshs.html
(c) Comply with the standards issued by the Secretary of Labor at 29 CFR Part 1926 and 29 CFR Part
1910 from the Occupational Safety and Health Administration, U.S. Department of Labor, www.osha.gov.
(d) In the event there is a conflict between the requirements contained in paragraphs (b) and (c) referenced herein, the more stringent requirement shall prevail.
(e) The Contractor shall submit a written proposed safety program as prescribed in the RSHS and the written specifications.
(f) The Contractor shall maintain an accurate record of, and shall report to the Contracting Officer (or authorized representative) in the manner prescribed by the Contracting Officer, all cases of death, occupational diseases, or traumatic injury to employees or the public involved, and property damage in accordance with the RSHS and OSHA guidelines.
(g) The rights and remedies of the Government provided in this clause are in addition to any other rights and remedies provided by law or under this contract.
(h) If the RSHS is updated or amended by Reclamation during the course of this contract, the contractor will be notified in writing. The contractor shall comply with the current RSHS immediately upon written notification. Should the contractor feel that the updated version of RSHS constitutes a substantive change to the contract, affecting price or time (or both), the contractor may request an equitable adjustment in the contract price. Any such requests shall include a price proposal submitted in compliance with Contract Clause WBR 1452.243-80, Modification Proposals - Bureau of Reclamation, and in sufficient detail to allow meaningful analysis of labor, equipment and material.
(End of clause)
WBR 1452.223-82, ENSURING ADEQUATE COVID-19 SAFETY PROTOCOLS IN FEDERAL BUILDINGS
AND FEDERALLY CONTROLLED FACILITIES -- BUREAU OF RECLAMATION (NOV 2022)
When accessing Federal buildings and federally controlled facilities under this contract, contractor employees shall comply with the Safer Federal Workforce Task Force’s current guidance for COVID-19 workplace safety protocols for Federal agencies at https://www.saferfederalworkforce.gov/.
https://www.acquisition.gov/far/part-52#FAR_52_236_13 http://www.usbr.gov/ssle/safety/RSHS/rshs.html http://www.osha.gov
--- End of Addendum to 52.212-4---
52.212-5 CONTRACT TERMS AND CONDITIONS REQUIRED TO IMPLEMENT STATUTES OR EXECUTIVE
ORDERS—COMMERCIAL PRODUCTS AND COMMERCIAL SERVICES (NOV 2023)
(a) The Contractor shall comply with the following Federal Acquisition Regulation (FAR) clauses, which are incorporated in this contract by reference, to implement provisions of law or Executive orders applicable to acquisitions of commercial products and commercial services:
(1) 52.203-19, Prohibition on Requiring Certain Internal Confidentiality Agreements or Statements (Jan 2017) (section 743 of Division E, Title VII, of the Consolidated and Further Continuing Appropriations Act, 2015 (Pub. L. 113-235) and its successor provisions in subsequent appropriations acts (and as extended in continuing resolutions)).
(2) 52.204-23, Prohibition on Contracting for Hardware, Software, and Services Developed or Provided by Kaspersky Lab and Other Covered Entities (Nov 2021) (Section 1634 of Pub. L. 115-91).
(3) 52.204-25, Prohibition on Contracting for Certain Telecommunications and Video Surveillance Services or Equipment. (Nov 2021) (Section 889(a)(1)(A) of Pub. L. 115-232).
(4) 52.209-10, Prohibition on Contracting with Inverted Domestic Corporations (Nov 2015).
(5) 52.232-40, Providing Accelerated Payments to Small Business Subcontractors (Mar 2023) ( 31 U.S.C.
3903 and 10 U.S.C. 3801).
(6) 52.233-3, Protest After Award (Aug 1996) (31 U.S.C. 3553).
(7) 52.233-4, Applicable Law for Breach of Contract Claim (Oct 2004) (Public Laws 108-77 and 108-78 ( 19 U.S.C. 3805 note)).
(b) The Contractor shall comply with the FAR clauses in this paragraph (b) that the Contracting Officer has indicated as being incorporated in this contract by reference to implement provisions of law or Executive orders applicable to acquisitions of commercial products and commercial services:
[X] (1) 52.203-6, Restrictions on Subcontractor Sales to the Government (Jun 2020), with Alternate I (Nov
2021) (41 U.S.C. 4704 and 10 U.S.C. 4655).
[ ] (2) 52.203-13, Contractor Code of Business Ethics and Conduct (Nov 2021) (41 U.S.C. 3509)).
[ ] (3) 52.203-15, Whistleblower Protections under the American Recovery and Reinvestment Act of 2009
(Jun 2010) (Section 1553 of Pub. L. 111-5). (Applies to contracts funded by the American Recovery and Reinvestment Act of 2009.)
[X] (4) 52.204-10, Reporting Executive Compensation and First-Tier Subcontract Awards (Jun 2020) (Pub. L.
109-282) ( 31 U.S.C. 6101 note).
[ ] (5) [Reserved].
[X] (6) 52.204-14, Service Contract Reporting Requirements (Oct 2016) (Pub. L. 111-117, section 743 of Div.
C).
[ ] (7) 52.204-15, Service Contract Reporting Requirements for Indefinite-Delivery Contracts (Oct 2016)
(Pub. L. 111-117, section 743 of Div. C).
[X] (8) 52.204-27 Prohibition on a ByteDance Covered Application (JUN 2023) [X] (9) 52.209-6, Protecting the Government’s Interest When Subcontracting with Contractors Debarred, Suspended, or Proposed for Debarment. (Nov 2021) (31 U.S.C. 6101 note).
[X] (10) 52.209-9, Updates of Publicly Available Information Regarding Responsibility Matters (Oct 2018)
(41 U.S.C. 2313).
[ ] (11) [Reserved].
[ ] (12) 52.219-3, Notice of HUBZone Set-Aside or Sole-Source Award (Oct 2022) (15 U.S.C. 657a).
[ ] (13) 52.219-4, Notice of Price Evaluation Preference for HUBZone Small Business Concerns (Oct 2022) (if the offeror elects to waive the preference, it shall so indicate in its offer) (15 U.S.C. 657a).
[ ] (14) [Reserved] [ ] (15) (i) 52.219-6, Notice of Total Small Business Set-Aside (Nov 2020) (15 U.S.C. 644).
[ ] (ii) Alternate I (Mar 2020) of 52.219-6.
[ ] (16) (i) 52.219-7, Notice of Partial Small Business Set-Aside (Nov 2020) (15 U.S.C. 644).
[ ] (ii) Alternate I (Mar 2020) of 52.219-7.
[X] (17) 52.219-8, Utilization of Small Business Concerns (Sep 2023) (15 U.S.C. 637(d)(2) and (3)).
[X] (18) (i) 52.219-9, Small Business Subcontracting Plan (Sep 2023) (15 U.S.C. 637(d)(4)).
[ ] (ii) Alternate I (Nov 2016) of 52.219-9.
[ ] (iii) Alternate II (Nov 2016) of 52.219-9.
[ ] (iv) Alternate III (Jun 2020) of 52.219-9.
[ ] (v) Alternate IV (Sep 2023) of 52.219-9
[ ] (19) (i) 52.219-13, Notice of Set-Aside of Orders (Mar 2020) (15 U.S.C. 644(r)).
[ ] (ii) Alternate I (Mar 2020) of 52.219-13.
[ ] (20) 52.219-14, Limitations on Subcontracting (Oct 2022) (15 U.S.C. 637(a)(14)).
[ ] (21) 52.219-16, Liquidated Damages-Subcontracting Plan (Sep 2021) (15 U.S.C. 637(d)(4)(F)(i)).
[ ] (22) 52.219-27, Notice of Service-Disabled Veteran-Owned Small Business Set-Aside (Oct 2022) (15
U.S.C. 657f).
[X] (23) (i) 52.219-28, Post Award Small Business Program Representation (Sep 2023) (15 U.S.C. 632(a)(2)).
[ ] (ii) Alternate I (MAR 2020) of 52.219-28.
[ ] (24) 52.219-29, Notice of Set-Aside for, or Sole Source Award to, Economically Disadvantaged Women-
Owned Small Business Concerns (Oct 2022) (15 U.S.C. 637(m)).
[ ] (25) 52.219-30, Notice of Set-Aside for, or Sole Source Award to, Women-Owned Small Business
Concerns Eligible Under the Women-Owned Small Business Program (Oct 2022) (15 U.S.C.
637(m)).
[ ] (26) 52.219-32, Orders Issued Directly Under Small Business Reserves (Mar 2020) (15 U.S.C. 644(r)).
[ ] (27) 52.219-33, Nonmanufacturer Rule (Sep 2021) (15U.S.C. 637(a)(17)).
[X] (28) 52.222-3, Convict Labor (Jun 2003) (E.O.11755).
[X] (29) 52.222-19, Child Labor-Cooperation with Authorities and Remedies (NOV 2023) (E.O.13126).
[X] (30) 52.222-21, Prohibition of Segregated Facilities (Apr 2015).
[X] (31) (i) 52.222-26, Equal Opportunity (Sep 2016) (E.O.11246).
[ ] (ii) Alternate I (Feb 1999) of 52.222-26.
[X] (32) (i) 52.222-35, Equal Opportunity for Veterans (Jun 2020) (38 U.S.C. 4212).
[ ] (ii) Alternate I (Jul 2014) of 52.222-35.
[X] (33) (i) 52.222-36, Equal Opportunity for Workers with Disabilities (Jun 2020) (29 U.S.C. 793).
[ ] (ii) Alternate I (Jul 2014) of 52.222-36.
[X] (34) 52.222-37, Employment Reports on Veterans (Jun 2020) (38 U.S.C. 4212).
[ ] (35) 52.222-40, Notification of Employee Rights Under the National Labor Relations Act (Dec 2010) (E.O.
13496).
[X] (36) (i) 52.222-50, Combating Trafficking in Persons (Nov 2021) (22 U.S.C. chapter 78 and E.O. 13627).
[ ] (ii) Alternate I (Mar 2015) of 52.222-50 (22 U.S.C. chapter 78 and E.O. 13627).
[X] (37) 52.222-54, Employment Eligibility Verification (May 2022). (Executive Order 12989). (Not applicable to the acquisition of commercially available off-the-shelf items or certain other types of commercial products or commercial services as prescribed in 22.1803.)
[] (38) (i) 52.223-9, Estimate of Percentage of Recovered Material Content for EPA–Designated Items (May 2008) ( 42 U.S.C. 6962(c)(3)(A)(ii)). (Not applicable to the acquisition of commercially available off-the-shelf items.)
[ ] (ii) Alternate I (May 2008) of 52.223-9 (42 U.S.C. 6962(i)(2)(C)). (Not applicable to the acquisition of commercially available…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .