C05_01_140R2024Q0029_Solicitation.pdf
PDF 3 MB Posted
- Attached to
- NCAO Spring Creek Powerplant Lead Paint Removal
- Solicitation number
- 140R2024Q0029
About this file
This solicitation is for lead paint removal services at the Spring Creek Powerplant in Redding, California. The Bureau of Reclamation seeks a contractor to remove lead paint from approximately 956 square feet of metal surfaces inside power generation Unit 1. The contractor must complete the work within 14 calendar days between April and May 2024 for a price between $100,000 to $250,000. The solicitation is set aside for small businesses and requires the contractor to follow lead abatement best practices, conduct air monitoring, and obtain employee credentials including security badges for site access.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Solicitation No.140R2024Q0029
NCAO Spring Creek Powerplant Lead Paint Removal
Northern California Area Office (NCAO)
This page intentionally left blank.
TABLE OF CONTENTS
SECTION A - Solicitation, Offer and Award Form (SF 1442)
SECTION B - Pricing Schedule
SECTION C - Statement of Work
SECTION D - Packaging and Marking
SECTION E - Inspection and Acceptance
SECTION F - Deliveries or Performance
SECTION G - Contract Administration Data
SECTION H - Special Contract Requirements
SECTION I - Contract Clauses
SECTION J - List of Documents, Exhibits, and Other Attachments
SECTION K - Representations, Certifications and Other Statements of Offerors
SECTION L - Instructions, Conditions and Notices to Offerors
SECTION M - Evaluation Factors for Award
SOLICITATION, OFFER,
AND AWARD
2. TYPE OF SOLICITATION
6. PROJECT NO. 4. CONTRACT NO. 5. REQUISITION/PURCHASE REQUEST NO.
PAGE OF PAGES
7. ISSUED BY CODE 8. ADDRESS OFFER TO
SOLICITATION
(Construction, Alteration, or Repair)
1. SOLICITATION NO. 3. DATE ISSUED
IMPORTANT -- The "offer" section on the reverse must be fully completed by offeror.
9.
INFORMATION CALL
a. NAME b. TELEPHONE NO. (Include area code) (NO COLLECT CALLS)
NOTE: In sealed bid solicitations "offer" and "offeror" mean "bid" and "bidder."
FOR
SEALED BID (IFB)
NEGOTIATED (RFP)
0040645499
Bureau of Reclamation
Mid-Pacific Region
Regional Office Division of Acquisition Services
R20
2800 Cottage Way, Room E-1815
Sacramento CA 95825-1898
Bureau of Reclamation - Interior Region 10
2800 Cottage Way, Rm. E-1815
Sacramento, CA 95825-1898 rgamo@usbr.gov
Ronald Gamo 916-978-4304
140R2024Q0029
INVITATION FOR BID
REQUEST FOR PROPOSAL
10. THE GOVERNMENT REQUIRES PERFORMANCE OF THE WORK DESCRIBED IN THESE DOCUMENTS (Title, identifying no., date)
A. NCAO Spring Creek Power Plant Lead Paint Removal
B. Work Site Location: Work is located at the Spring Creek Powerplant, Redding, CA.
C. Estimated Price Range: $100,000.00 to $250,000.00.
D. Set-aside Information: This requirement is being procured under the Simplified
Acquisition Procedures, Federal Acquisition Regulation (FAR) Part 13. NAICS Code:
562910 and applicable size standard $45 million.
11. The Contractor shall begin performance within
12a. THE CONTRACTOR MUST FURNISH ANY REQUIRED PERFORMANCE AND PAYMENT BONDS?
award, notice to proceed. The performance period is mandatory negotiable. (See ________________________________________________.)
13. ADDITIONAL SOLICITATION REQUIREMENTS:
a. Sealed offers in original and is not required.is, b. An offer guarantee
c. All offers are subject to the (1) work requirements, and (2) other provisions and clauses incorporated in the solicitation in full text or by reference.
(date). If this is a sealed bid solicitation, offers will be publicly opened at that time. Sealed envelopes containing offers shall be marked to show the offeror's name and address, the solicitation number, and the date and time offers are due.
d. Offers providing less than
12b. CALENDAR DAYSYES NO
(If "YES", indicate within how many calendar days after award in Item 12b.)
7 100 calendar days and complete it within ________________ ________________ calendar days after receiving
Section F
NSN 7540-01-155-3212
x x x x copies to perform the work required are due at the place specified in Item 8 by _____________ ___________________ (hour) local time calendar days for Government acceptance after the date offers are due will not be considered and will be rejected . _________________
STANDARD FORM 1442 (Rev. 12/2022)
Prescribed by GSA
FAR(48 CFR) 53.236-1(d)
X
17. The offeror agrees to perform the work required at the prices specified below in strict accordance with the terms of this solicitation, if this offer is accepted by the Government in writing within ____________________ calendar days after the date offers are due. (Insert any number equal to or greater than the minimum requirement stated in item 13d. Failure to insert any number means the offeror accepts the minimum in item 13d.)
14. NAME AND ADDRESS OF OFFEROR (Include ZIP Code) 15. TELEPHONE NO. (Include area code)
16. REMITTANCE ADDRESS (Include only if different than item 14.)
CODE FACILITY CODE
AMOUNTS
18. The offeror agrees to furnish any required performance and payment bonds.
19. ACKNOWLEDGEMENT OF AMENDMENTS
OFFER (Must be fully completed by offeror)
(The offeror acknowledges receipt of amendments to the solicitation -- give number and date of each)
AMENDMENT NO.
DATE.
20a. NAME AND TITLE OF PERSON AUTHORIZED TO SIGN OFFER (Type or print) 20b. SIGNATURE 20c. OFFER DATE
AWARD (To be completed by Government)
21. ITEMS ACCEPTED:
22. AMOUNT 23. ACCOUNTING AND APPROPRIATION DATA
24. SUBMIT INVOICES TO ADDRESS SHOWN IN
(4 copies unless otherwise specified)
ITEM 25. OTHER THAN FULL AND OPEN COMPETITION PURSUANT TO THE UNITED STATES CODE AT
26. ADMINISTERED BY CODE 27. PAYMENT WILL BE MADE BY
CONTRACTING OFFICER WILL COMPLETE ITEM 28 OR 29 AS APPLICABLE
(Contractor is required to sign this document solicitation is hereby accepted as to the items listed. This award consummates the contract, which consists of (a) the Government solicitation and your offer, and (b) this contract award. No further contractual document is necessary.
30a. NAME AND TITLE OF CONTRACTOR OR PERSON AUTHORIZED TO SIGN (Type or print) 31a. NAME OF CONTRACTING OFFICER (Type or print)
30b. SIGNATURE 30c. DATE 31b. UNITED STATES OF AMERICA 31c. DATE
BY
2PAGE OF
Abelardo Lopez
28. NEGOTIATED AGREEMENT 29. AWARD
and deliver all items or perform all work requirements identified on this form and any continuation sheets for the consideration stated in this contract. The rights and obligations of the parties to this contract shall be governed by (a) this contract award, (b) the solicitation, and (c) the clauses, representations,certifications, and specifications incorporated by reference in or attached to this contract.
copies to issuing office.) Contractor agrees to furnish
10 U.S.C. 3204(a) 41 U.S.C. 3304(a)
STANDARD FORM 1442 (REV. 12/2022) BACK
Continued...
and return
(Contractor is not required to sign this document.) Your offer on this
ITEM NO.
(A)
SUPPLIES/SERVICES
(B)
QUANTITY
(C)
UNIT
(D)
UNIT PRICE
(E)
AMOUNT
(F)
NAME OF OFFEROR OR CONTRACTOR
3 3
CONTINUATION SHEET
REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGE OF
140R2024Q0029
00010
Section B - Supplies and Services and Prices "AU" - Activity Unit is used solely for the purpose of allowing progress payments under the Department of Interior's Financial Business System (FBMS)
NCAO Spring Creek Powerplant Lead Paint Removal
Pricing Schedule: CLIN 1-2
NSN 7540-01-152-8067 OPTIONAL FORM 336 (4-86)
Sponsored by GSA
FAR (48 CFR) 53.110
1 AU
NCAO Spring Creek Powerplant Lead Paint Removal Solicitation No. 140R2024Q0029 Redding, California
Price Schedule
B - 1
CONTINUATION OF
SECTION B – SUPPLIES OR SERVICES AND PRICES/COSTS
NCAO Spring Creek Powerplant Lead Paint Removal
B.1 PRICE SCHEDULES
(a) Quotes will be considered for award on the following Price Schedule, but no offer will be considered for award on only a part of the Price Schedule.
(b) Quotes are subject to the terms and conditions of this solicitation.
(c) See the contract clause at WBR 1452.232-81, Payment for Mobilization and Preparatory
Work, for CLIN 0010.
B.2 DEFINITIONS
(a) CLIN – Contract Line Item Number.
CLIN Section Supplies or Services Quantity and Unit
Unit
Price
Amount
0010 WBR
1452.232-81
Mobilization
& Preparation
For the lump sum of $
0020 C - SOW Paint Removal and Lead
Abatement For the lump sum of $
TOTAL FOR PRICE SCHEDULE $ ______________
NCAO Spring Creek Powerplant Lead Paint Removal Solicitation No. 140R2024Q0029 Redding, California
Price Schedule
B - 2
B.2. Prevision:
WBR 1452.236-85 INSTRUCTION FOR MOBILIZATION AND MAR 2022
PREPARATORY WORK SCHEDULE LINE
ITEM – BUREAU OF RECLAMATION
The Contracting Officer estimates that the Section B Mobilization and Preparatory Work schedule line item should not exceed 10 percent of the total bid price. Your attention is directed to contract clause WBR 1452.232-81 Payment for Mobilization and Preparatory Work, which reflects how the Government will pay for this line item, including how payment will be made when the price bid for this schedule line item is higher than the percentage stated herein.
END OF SUPPLIES OR SERVICES AND PRICES
Spring Creek Powerplant, Trinity River Division, Central Valley Project, California Unit 1 Lead Paint Removal - NCAO .
STATEMENT OF WORK
Spring Creek Powerplant Lead Paint Removal Northern California Area Office
Spring Creek Powerplant, Trinity River Division, Central Valley Project, California
Bureau of Reclamation
1. BACKGROUND/PROJECT CONDITIONS
1.1. Background: Spring Creek Powerplant is located along Iron Mountain Mine Road. 1 mile north of Keswick, CA. The powerplant has two 70 MW generation units. Unit 1 will undergo refurbishment in the spring of 2024. The Unit will be disassembled so that a major component, the turbine, can be replaced. Several interior metal surfaces of the unit must be machined or piping modifications done in order to accept the new turbine and systems. These surfaces are coated with lead paint, which must be removed prior to machining.
1.2. Access. The painted surfaces are available for work only after Unit disassembly.
Scaffolding and/or ladders may be required to reach surfaces. Contractor to verify from plans and at pre-construction site visit.
1.3. Testing. The paint has been tested for lead or other contaminants. Contractor shall assume that all paint subject to this work contains lead.
2. SCOPE OF WORK
2.1. Contractor shall
2.1.1. Prevent contamination from dust and debris generated by paint removal activities by providing containment immediately around the work area,
2.1.2. Hold point for Contractor once Containment is built for BOR to perform a base line lead survey of work area prior to any paint removal.
2.1.3. remove paint from metal surfaces designated by the government. The major surfaces are circular, with approximate painted areas as follows:
Location Area (ft2)
Turbine Pit and Unit barrel 278
Draft Tube 264
Servo Alcoves 340
Oil Pump Alcove 74
Total Surface Area is Approx 956
The surfaces are mostly vertical; however, some are horizontal, others angled.
Exhibit 1 is a sectional elevation of the turbine with the paint removal areas highlighted. Contractor to verify from plans and at pre-construction site visit.
2.1.4. employ paint removal techniques that avoid unduly damaging the underlying metal.
2.1.5. properly dispose of all removed paint, blast media if used
2.1.6. vacuum and wipe down all surfaces inside the containment area to remove all particulate matter generated by paint removal activities.
2.1.7. Hold point for Contractor while BOR conduct a post paint removal lead contamination survey. This will be compared to pre paint removal survey.
2.1.8. Remove Containment once lead survey is complete and passes industry standards for lead dust.
2.2. Critical Work. Time is of the essence. Paint removal lies on the critical path of the overall refurbishment of Unit 1. Refurbishment work on Unit 1 cannot proceed until the work area is free of paint and cleaned of contaminant surface particles. Contractor needs to remove paint in approximately 1 week's time once containment is set and pre work lead survey is completed.
3. ADMINISTRATIVE INFORMATION
3.1. This part covers the basics of day-to-day operations and normal hours of work.
3.2. Place of Performance: The work to be performed under this contract shall be performed at
Sprint Creek Powerplant, 11757 Iron Mountain Road, Redding CA 96003
3.3. Period of Performance: The performance period for this shall be 14 calendar days.
Project duration includes mobilization, demo and disposal. Start Date can be anywhere between 4/15/24 and 5/15/24 depending on how long it takes Government to disassemble unit. Contractor has 1 week to mobilize once start date is confirmed by Government.
3.4. Hours of Operations: The Contractor is responsible for conducting business, between the hours of 7:00 am-5:00 pm Pacific Standard Time, Monday thru Friday. The Offeror shall, at all times, maintain an adequate workforce for the uninterrupted performance of all tasks defined within this Statement of Work when the Government facility is not closed for the above reasons. When hiring personnel, the Contractor shall keep in mind that the stability and continuity of the workforce are essential.
3.5. Definitions: The follow acronyms, terms, and wording will be used throughout this
Statement of work.
NCAO – Northern California Area Office
CO – Contracting Officer
COR – Contracting Officers Representative
Offeror – Prime Contractor
OGR – Onsite Government Representative
RSHS – Reclamation Safety and Health Standards
3.6. Post Award Meeting: A brief post award meeting will be held prior to commencement of work. The Contractor shall meet with the designated Bureau of Reclamation Field
Engineer and or Onsite Government Representative. The post award meeting shall provide the Contractor an opportunity to discuss and outline both the safety and work plans, ask any questions relative to the project and to review the proposed time schedule.
3.7. Security: The Contractor shall be responsible for safeguarding all Government equipment, information, and property provided for contractor use. At the close of each work period, Government facilities, equipment, and materials shall be secured.
3.7.1. All vehicles entering the worksite may be subject to search by government security forces.
3.7.2. The Contractor shall maintain a current and updated list of authorized persons, including subcontractors, and provide a copy to the COR.
3.7.2.1. Submit RSN-1: List of Employees
3.7.2.1.1. Country of citizenship.
3.7.2.1.2. Duration and frequency on site.
3.7.2.1.3. Company affiliation and title/classification.
4. COMPLETION REQUIREMENTS: The Contractor’s schedule and plan of work may differ from the order of items described below except where specified.
4.1. Site Cleanup:
4.1.1. Remove all construction waste/debris for recycle/disposal at appropriate facilities.
4.2. Final Acceptance Inspection of All Items:
4.2.1. Review completion of work with OGR.
4.2.2. Make any corrective actions determined as required during Final Acceptance
Inspection.
4.2.3. Final Inspection may uncover items not discovered during previous inspections.
Contractor shall correct all pertinent items upon discovery.
5. GENERAL REQUIREMENTS
5.1. Cleanup and Disposal of Waste Material: The Contractor shall be responsible for all waste materials or rubbish generated by their work.
5.2. Waste Characterization, Handling and Disposal Plan. Provide this plan in accordance with paragraph 6.5.3.
5.3. Safety and Health:
5.3.1. Do not allow Contractor employees (including subcontractors), Government personnel, or the Public to be exposed to, or work under, conditions which are
Spring Creek Powerplant, Trinity River Division, Central Valley Project, California Unit 1 Lead Paint Removal - NCAO .
unsanitary, physically hazardous, or a potential exposure danger to their health or safety during performance of the contract.
5.3.2. Since this project will involve removal of lead material, ensure contractor employees (including their subcontractors) and government personnel on site in the vicinity are protected from exposure to these compounds during the removal and disposal process.
5.3.3. The minimum work crew at any time on the construction site shall consist of no less than two people and shall be in accordance with other contractual obligations.
5.4. When violations of safety and health requirements contained in these specifications or referenced standards are called to the Contractor’s attention by the CO, COR, or the OGR, immediately correct the condition to which attention has been directed.
5.4.1. When the Contractor fails or refuses to promptly correct a compliance directive, the CO or the COR may issue an order to stop all or any part of the work.
5.4.1.1. When satisfactory corrective action is taken, an order to resume work will be issued.
5.4.1.2. The Contractor shall not be entitled to extension of time, nor to claim for damage or to additional compensation by reason of either the directive or the stop order.
5.4.1.3. Failure of the CO, COR, or the OGR to order discontinuance of any or all of the Contractor’s operations shall not relieve the Contractor of the responsibility for the safety of personnel and property.
5.4.2. Maintain an accurate record of, and report to the COR in the manner prescribed by the CO for all near misses, accidents or incidents, occupational diseases, traumatic injury, cases of death to Contractor employees (including subcontractors), Government personnel, or the Public, and any property damage occurring during the performance of work under this contract.
5.4.3. The rights and remedies of the Government provided in this section are in addition to any other rights and remedies provided by law or under this contract.
5.4.4. In the event there is a conflict between requirements contained in the Reclamation
Safety and Health Standards (RSHS), specification paragraphs, Contractor’s approved Safety Program, referenced safety and health codes, and standards, or the
U.S. Department of Labor Construction Safety and Health Standards, promulgated under Section 107 of the Contract Work Hours and Safety Standards Act (40
U.S.C. 327 et seq.), as amended, the more protective requirement having jurisdiction shall prevail.
5.5. First Aid and Communication:
5.5.1. Provide first-aid kits in accordance with Reclamation RSHS Section 5.
5.5.2. Make first aid and communication services available for providing emergency aid to employees and subcontractor employees.
5.6. Contractor's Onsite Safety Personnel:
5.6.1. Maintain records to comply with all applicable portions of CA Dept of Health, OSHA and EPA requirements, and other requirements of this specification.
5.6.2. Ensure Contractor (and or subcontractor) personnel are currently licensed and registered with the State of California and have necessary training and personnel to perform lead work and abatement under the laws and regulations of Title 17 of the
California Code of Regulations as a certified lead worker.
5.6.2.1. Contractor must demonstrate that they have (or will have) a sufficient number of skilled trades and licensed abatement workers who have successfully completed EPA model curriculum training in lead-based paint abatement, so as to be able to complete all aspects of work covered.
5.6.2.2. Contractor shall specify an on-site supervisor/competent person who is fully qualified in all aspects of lead abatement practices and procedures and meets all EPA/OSHA supervisor/competent person requirements.
5.6.3. Contractor shall ensure they have a respiratory protection program and current fit testing for all personnel and are providing medical examinations as per 29
CFR1926.58 and 1926.62 in addition the contractors physician shall perform an evaluation of each workers ability to work in heat stress environments.
5.6.4. Contractor to perform air monitoring and sampling in accordance with California
CCR for ensuring compliance and providing copies of these reports upon request to the COR.
5.6.4.1. Personal air sampling (OSHA required monitoring) activities must be conducted by the Contractor or his duly authorized representative during lead-based paint abatement work or any other work involving lead containing materials. The results of such sampling shall be posted, provided to individual workers within the OSHA required timeframe, and provided to the COR upon request within 24 hours after Contractor receipt of results.
Contractor must ensure analytical result receipt no later than 5 calendar days after sample collection.
5.6.4.2. The Contractor's air sample testing lab shall be an independent third party and shall be a successful participant in the National Lead Laboratory
Accreditation Program (NLLAP). Air sample analyses will be by NIOSH
Method 7082.
5.6.4.3. Air samples shall be taken for the duration of the work shift or for a minimum of seven hours at the Contractor's expense. Personal samples must also be taken every time there is a change in the removal operation, either in terms of the location, the type of work, method of abatement, method of engineering control, change in the personnel completing abatement or other change in abatement process that might affect the exposure to lead of the workers. Sampling will be used to determine eight-hour Time-Weighted
Averages (TWA). Personal air sampling will be conducted as outlined in
NIOSH Method 7082 and OSHA Standard 29 CFR 1926.62. The laboratory results of the air sampling will determine the degree of respiratory protection and decontamination required, subject to the regulations. It will also help determine other safety requirements for the workers, as well as the engineering controls that are required. It will help evaluate the effectiveness of engineering controls and worker protection measures. All air sampling will be solely at the Contractor's expense.
5.6.4.4. Air sampling results shall be submitted to individual workers and the COR upon request available at the job site in written form no more than 5 days after the completion of a sampling cycle. The reporting document shall list each sample's result, sampling time and date, personnel's name who were monitored and their social security number, flow rate, cassette size, analysts' name, laboratory name and laboratory's NLLAP accreditation number, certificate copy. The document shall include an interpretation of the results.
All air samples analysis results shall be reported in gg/m.
5.6.4.5. Air Monitoring Frequency. The air monitoring frequency for Contractor operations shall at least be established in accordance with the requirements set forth in 29 CFR 1926.62.
5.7. Temporary Utilities: Applies to utilities available for use by the contractor.
5.7.1. Electricity.
5.7.1.1. Contractor shall coordinate with OGR for use of facility electrical power.
If facility power is unavailable, contractor shall provide required electrical power for construction.
5.7.1.2. Remove temporary equipment and facilities upon completion of work.
5.7.2. Water.
5.7.2.1. Government shall provide water required for construction purposes.
Contractor shall provide backflow preventer at point of connection.
Location to be coordinated with the OGR.
5.7.2.2. Provide means of conveying water to points of use.
5.7.2.3. Remove temporary equipment and facilities upon completion of work.
5.8. Vehicular Access and Parking:
5.8.1. Onsite parking is available for contractor use.
5.8.2. Promptly repair ruts, broken pavement, potholes, low areas with standing water, and other deficiencies caused by contractor (or subcontractor) to maintain road surfacing and drainage in original or specified condition.
5.9. Protection of Existing Installations:
5.9.1. Provide protection for personnel and existing facilities from harm due to the
Contractor's operations. Protection shall be subject to approval of the
Government.
5.9.2. Arrange protective installations to permit operation of existing equipment and facilities by the Government while work is in progress.
5.9.3. Do not discharge anything but clear water into onsite drainage system.
5.9.4. Repair, at Contractor's expense, damage to existing installations due to
Contractor's operations or Contractor's failure to provide proper protection. At the
Government's option, damage may be repaired by the Government, and the
Contractor will be back charged repair costs.
5.10. Protection of Existing Utilities:
5.10.1. Dust Abatement:
5.10.1.1. Provide dust control and abatement as required during construction to keep emissions at or below required air quality levels.
5.10.1.2. Prevent, control; and abate dust pollution during performance of work to prevent dust nuisance or damage to persons or property.
5.10.1.3. Contractor shall be responsible for damages resulting from dust originating from Contractor operations in accordance with clause at
FAR 52.236-7 "Permits and Responsibilities".
5.10.2. Noise Control:
5.10.2.1. Comply with all applicable Federal laws and regulations, and with applicable requirements of RSHS regarding the prevention, control, and abatement of harmful noise levels.
5.11. Hazardous Materials and Wastes: Remove and dispose of all hazardous materials and waste products encountered during construction.
5.11.1. Provide Waste Characterization, Handling Disposal Plan.
5.11.2. Hazardous waste shall be disposed of at a facility properly licensed and permitted for disposal of hazardous materials
5.11.3. Upon transportation of hazardous waste for disposal coordinate with NCAO
Environmental Hazardous Material Specialist to be present while transportation services are picking up waste for disposal. NCAO Environmental Specialist will sign manifest and will track waste final disposal from that point on.
6. SUBMITTALS
6.1. The Contractor shall submit Required Submittal Notices (RSN) necessary to start work within 14 calendar days of the Notice to Proceed.
6.2. The Government will review the Required Submittal Notices within 14 calendar days of official receipt.
6.2.1. Submittals will be returned as Approved, Conditionally Approved, or Not
Approved.
6.2.2. The Contractor shall resubmit Required Submittal Notices within 14 calendar days of receipt for Required Submittal Notices that are Conditionally Approved or Not
Approved.
6.2.3. The Government will review resubmitted Required Submittal Notices within 14 days of official receipt.
6.3. Address submittal to:
6.3.1. Email to: Contracting Officer and COR. Email addresses will be provided with
Notice to Proceed.
6.3.2. One hard copy to the Contracting Officer:
Bureau of Reclamation
California Great Basin Region, Attn: CGB-3800
Federal Office Building
2800 Cottage Way
Sacramento CA 95825-1898
One hard copy to the COR:
Bureau of Reclamation
Northern California Area Office, Attn: John Dotter
16349 Shasta Dam Blvd
Shasta Lake, CA 96019
6.4. Preparation:
6.4.1. Prepare in English.
6.4.2. Label with contract number and title, and RSN.
6.4.3. Measurement units: US Customary Units.
6.4.4. Sign and seal submittals requiring certification by a California registered professional.
6.4.5. Submittals must be reviewed by Contractor. Submittals without evidence of
Contractor's approval will be returned for resubmission.
6.4.6. Include the following information in transmittal letters:
6.4.6.1. Contract number and title.
6.4.6.2. RSN for each attached submittal.
6.4.6.3. Responsible code.
6.4.6.4. Identify submittal as initial or resubmittal.
6.4.7. More than one RSN may be submitted under a transmittal letter, provided the responsible code is the same.
6.4.8. Submittals not listed in this Statement of Work:
6.4.8.1. Submit in accordance with this section.
6.5. Submittal List and Requirements:
6.5.1. RSN-1, List of Employees:
6.5.1.1. Country of citizenship.
6.5.1.2. Duration and frequency on site.
6.5.1.3. Company affiliation and title/classification.
6.5.2. RSN-2, Safety Plan: Written Safety Program in accordance with Section 3 of the
RSHS.
6.5.2.1. Cover all aspects of on site and applicable off-site operations and activities associated with this contract.
6.5.2.2. Program shall follow the format of the outline in Appendix B of RSHS.
Submittal will not be accepted for review by the COR/OGR unless it addresses, in order, lettered and numbered per Appendix B, a narrative for each applicable item in the outline.
6.5.2.3. For items in the outline that do not apply to this contract write “Not
Applicable to Contract” next to the number/letter.
6.5.2.4. Provide a list of Job Hazard Analyses (JHA) – outlines of work safety regarding protective equipment to be used/ required for removal of hazardous material.
6.5.3. RSN-3, Waste Characterization, Handling Disposal Plan. Provide a waste characterization, handling and disposal plan for lead-containing hazardous material, plus any additional materials that must be disposed.
7. INSPECTIONS
7.1. The COR will make four (4) mandatory inspections during the abatement work. Each inspection must be requested by the Contractor to be performed by the COR. The COR must approve the inspected work before work may begin for the next phase of work.
Failure on the part of the Contractor to obtain the CORs approval before proceeding to the next phase is regarded as a violation of the contract. In the event of this occurring, the COR may recommend that all work be stopped until all required work is shown to be completed to the satisfaction of the COR. The four inspections are as follows:
7.1.1. Work area preparation completed - Contractor shall have all Pre-Abatement preparations of the work area completed and approved by the COR before proceeding to the next step.
7.1.2. Completion of lead-based paint abatement – Contractor shall have all abatement work completed, inspected, and approved before moving to the next step.
7.1.3. Completion of final cleaning inspection - Contractor shall have the final cleanup of all visible debris, waste, dust and residue approved before moving to the next step.
The Contractor shall perform final cleaning techniques of HEPA vacuuming, washing with lead removal agent, and HEPA vacuuming before requesting final clearance sampling. Final clearance sampling will not occur until all surfaces are completely dry.
7.1.4. Final Clearance Sampling. COR will perform final clearance wipe testing after final clean-up activities are completed and surfaces have been properly sealed with appropriate approved materials for the substrate. The Contractor shall notify the
COR. Representative at least 24 hours in advance of the need for clearance wipe sampling.
7.1.5. A final punch list inspection is also required after all work is completed.
8. EXECUTION
8.1. All damages to the structure or property occurring as a result of any and all contract work and/or sub-contractor work activities or actions shall be repaired or replaced at the
Contractor’s sole expense, to the satisfaction of the COR/OGR Representative with no additional cost to the COR/OGR Representative. The Contractor will not be allowed any additional time allowances or extensions for any such circumstance or event.
8.2. General Removal Procedures.
8.2.1. Abrasive Blasting-if using abrasive blasting NCAO strongly encourages the use of environmentally friendly products such as Clean Blast or like product.
8.2.2. Vapor Blasting-the use of vapor blasting is also encouraged as an option for abatement. All grey water must be contained and disposed of properly.
8.2.3. Chemical Removal- SDS sheets must be on site for COR to review upon request.
8.2.4. Laser Removal-ensure proper PPE is utilized
9. REFERENCES
9.1. Bureau of Reclamation Documents:
9.1.1. Reclamation Safety and Health Standards (RSHS) may be downloaded at www.usbr.gov/ssle/safety/RSHS/rshs.html.
9.2. Plans and photos of generation Unit 1, provided below.
http://www.usbr.gov/ssle/safety/RSHS/rshs.html
Exhibit 1: Turbine Section Elevation
Exhibit 2: Draft Tube Section Elevation
Photos: Areas where paint is to be removed (Examples from Unit 2 when disassembled)
Solicitation No. 140R2024Q0029 j
D-1
SECTION D - PACKAGING AND MARKING
There are no clauses in this section.
E-1
SECTION E - INSPECTION AND ACCEPTANCE
Clause
Title
Date
52.246-12
Inspection of Construction
AUG 1996
F-1
SECTION F - DELIVERIES OR PERFORMANCE
Clause Title Date
52.242-14 Suspension of Work APR 1984
FAR 52.211-10 COMMENCEMENT, PROSECUTION, AND APR 1984
COMPLETION OF WORK
The Contractor shall be required to
(a) commence work under this contract within 7 calendar days after the date the Contractor receives the notice to proceed,
(b) prosecute the work diligently, and
(c) complete the entire work ready for use not later than 100 calendar days after the date the
Contractor receives the notice to proceed. The time stated for completion shall include final cleanup of the premises.
(End of clause)
FAR 52.211-12 LIQUIDATED DAMAGES – CONSTRUCTION SEP 2000
(a) If the Contractor fails to complete the work within the time specified in the contract, the Contractor shall pay liquidated damages to the Government in the amount of $200.00 for each calendar day of delay until the work is completed or accepted.
(b) If the Government terminates the Contractor’s right to proceed, liquidated damages will continue to accrue until the work is completed. These liquidated damages are in addition to excess costs of repurchase under the Termination clause.
G-1
SECTION G - CONTRACT ADMINISTRATION DATA
G.1 This contract shall be administered by the California Great Basin Regional Office, 2800
Cottage Way, Sacramento, California 95825-1898.
G.2 DIAR 1452.201-70 AUTHORITIES AND DELEGATIONS SEP 2011
(a) The Contracting Officer is the only individual authorized to enter into or terminate this contract, modify any term or condition of this contract, waive any requirement of this contract, or accept nonconforming work.
(b) The Contracting Officer will designate a Contracting Officer's Representative (COR) at time of award. The COR will be responsible for technical monitoring of the contractor's performance and deliveries. The COR will be appointed in writing, and a copy of the appointment will be furnished to the Contractor. Changes to this delegation will be made by written changes to the existing appointment or by issuance of a new appointment.
The COR will be named at time of award.
(c) The COR is not authorized to perform, formally or informally, any of the following actions:
(1) Promise, award, agree to award, or execute any contract, contract modification, or notice of intent that changes or may change this contract;
(2) Waive or agree to modification of the delivery schedule;
(3) Make any final decision on any contract matter subject to the Disputes Clause;
(4) Terminate, for any reason, the Contractor's right to proceed;
(5) Obligate in any way, the payment of money by the Government.
(d) The Contractor shall comply with the written or oral direction of the Contracting Officer or authorized representative(s) acting within the scope and authority of the appointment memorandum. The Contractor need not proceed with direction that it considers to have been issued without proper authority. The Contractor shall notify the Contracting Officer in writing, with as much detail as possible, when the COR has taken an action or has issued direction
(written or oral) that the Contractor considers to exceed the COR's appointment, within 3 days of the occurrence. Unless otherwise provided in this contract, the Contractor assumes all costs, risks, liabilities, and consequences of performing any work it is directed to perform that falls within any of the categories defined in paragraph (c) prior to receipt of the Contracting Officer's response issued under paragraph (e) of this clause.
(e) The Contracting Officer shall respond in writing within 30 days to any notice made under paragraph (d) of this clause. A failure of the parties to agree upon the nature of a direction, or upon the contract action to be taken with respect thereto, shall be subject to the provisions of the
Disputes clause of this contract.
(f) The Contractor shall provide copies of all correspondence to the Contracting Officer and the
COR.
(g) Any action(s) taken by the Contractor, in response to any direction given by any person acting on behalf of the Government or any Government official other than the Contracting
Officer or the COR acting within his or her appointment, shall be at the Contractor's risk.
G-2
G.3. WBR 1452.201-80 CONTRACTING OFFICER’S MAY 2018
REPRESENTATIVE’S AUTHORITIES
AND LIMITATIONS – BUREAU OF
RECLAMATION
(a) Performance of the work under this contract shall be subject to the technical direction of the
Reclamation Contracting Officer's Representative (COR). The term “technical direction” is defined to include, without limitation:
(1) Inspecting and accepting or rejecting work performed under the contract.
(2) Representing the Government in technical phases of the work. The COR is responsible for the technical administration of the contract and will provide instructions and interpretations to the Contractor on all technical matters relating to the contract. The COR will supervise or oversee all Government technical and administrative personnel assigned to assist the COR.
(3) Reviewing and, where required by the contract, approving submittals of technical data, shop drawings, samples, literature, plans, or other data required to be delivered by the Contractor to the Government.
(b) The Contractor will receive a copy of the written COR designation from the Contracting
Officer. It will specify the extent of the COR's authority to act on behalf of the Contracting
Officer.
(c) Technical direction must be within the scope of work stated in the contract. Only the
Contracting Officer is authorized to determine if a change is within the scope of the contract;
therefore, the COR does not have the authority to, and may not, issue any technical direction that
(1) Constitutes a direction of additional work outside the Contract requirements;
(2) Constitutes a change as defined in the contract clause entitled “Changes;”
(3) In any manner causes an increase or decrease in the total contract cost, or the time required for contract performance;
(4) Changes any of the expressed terms, conditions or specifications of the contract; or
(5) Interferes with the Contractor's right to perform the terms and conditions of the contract.
(d) All technical direction shall be issued in writing by the COR.
(e) The Contractor must proceed promptly with the performance of technical direction duly issued by the COR in the manner prescribed by this clause and within its authority under the provisions of this clause. If, in the opinion of the Contractor, any instruction or direction by the
COR falls within one of the categories defined in (c)(1) through (c)(5) of this clause, the
Contractor must not proceed and must notify the Contracting Officer in writing within five (5) working days after receipt of any such instruction or direction and must request the Contracting
Officer to modify the contract accordingly. Upon receiving the notification from the Contractor, the Contracting Officer must -
(1) Advise the Contractor in writing after receipt of the Contractor's letter that the technical direction is within the scope of the contract effort and does not constitute a change under the
Changes clause of the contract; or
(2) Advise the Contractor that the Government will issue a written change order.
(f) A failure of the Contractor and Contracting Officer either to agree that the technical direction
G-3 is within the scope of the contract or to agree upon the contract action to be taken with respect to the technical direction will be subject to the provisions of the clause entitled “Disputes.”
H-1
SECTION H – SPECIAL CONTRACT REQUIREMENTS
H.1 - INTERMEDIATE MILESTONES AND LIMITATIONS
A) The information provided below refers to the time period specified in FAR Clause 52.211-10 located in Section F of this solicitation.
a) The contractor shall complete all work in accordance with Section F and in accordance with all sections in the SOW.
B) WBR 1452.242-80 POSTAWARD CONFERENCE—BUREAU MAR 2022
OF RECLAMATION
(a) Prior to the Contractor starting work, a post-award conference (as described in FAR
Subpart 42.5), will be convened by the contracting activity or contract administration office.
The Contractor's Project Manager shall attend the conference. If the contract involves subcontractors, a representative of each major subcontractor is also required to attend.
(b) The conference will be held by conference call.
(c) The Contracting Officer and the Contractor will agree to the date and time of the conference after award of the contract. In event of a conflict in schedules, the Contracting
Officer shall establish the date for the conference.
(d) The Contractor shall include any associated costs for attendance at the conference, in its quote.
e) (End of clause)
I-1
SECTION I - CONTRACT CLAUSES
FAR 52.252-2 CLAUSES INCORPORATED BY REFERENCE FEB 1998
This contract incorporates one or more clauses by reference, with the same force and effect as if they were given in full text. Upon request, the Contracting Officer will make their full text available. Also, the full text of a clause may be accessed electronically at this/these address(es):
https://www.acquisition.gov/browse/index/far (FAR 52.XXX-XX formatted clauses)
FAR Clauses Title Date
52.203-15 Whistleblower Protections Under the American Recovery and Reinvestment Act of 2009
JUN 2010
52.203-19 Prohibition on Requiring Certain Internal Confidentiality Agreements or Statements
JAN 2017
52.204-1 Approval of Contract DEC 1989
52.204-2 Security Requirements. MAR 2021
52.204-9 Personal Identity Verification of Contractor Personnel JAN 2011
52.204-10 Reporting Executive Compensation and First-Tier Subcontract Awards
JAN 2020
52.204-12 Unique Entity Identifier Maintenance OCT 2016
52.204-13 System for Award Management Maintenance OCT 2018
52.204-18 Commercial and Government Entity Code
Maintenance
AUG 2020
52.204-19 Incorporation by Reference of Representations and Certifications
DEC 2014
http://www.acquisition.gov/browse/index/far(FAR
I-2
52.204-21 Basic Safeguarding of Covered Contractor Information
Systems
NOV 2021
52.204-23 Prohibition on Contracting for Hardware, Software, and Services Developed or Provided by Kaspersky Lab and Other Covered Entities
NOV2021
52.204-25 Prohibition on Contracting for Certain
Telecommunications and Video Surveillance Services or Equipment
NOV 2021
52.204-27 Prohibition on a ByteDance Covered Application JUN 2023
52.207-5 Option to Purchase Equipment FEB 1995
52.208-9 Contractor Use of Mandatory Sources of Supply or
Services
MAY 2014
52.209-9 Updates of Publicly Available Information Regarding
Responsibility Matters
OCT 2018
52.209-10 Prohibition on Contracting with Inverted Domestic Corporations
NOV 2015
52.209-14 Reserve Officer Training Corps and Military Recruiting on Campus
NOV 2021
52.211-15 Defense Priority and Allocation Requirements APR 2008
52.213-4 Terms and Conditions—Simplified Acquisitions (Other Than Commercial Products and Commercial Services)
SEPT 2023
52.215-21 Requirements for Certified Cost or Pricing Data and
Data Other Than Certified Cost or Pricing Data-
Modifications
NOV 2021
52.216-23 Execution and Commencement of Work APR 1984
52.216-24 Limitation of Government Liability APR 1984
52.219-1 Small Business Program Representations SEP 2023
52.219-6 Notice of Total Small Business Set-Aside NOV 2020
52.219-13 Notice of Set-Aside of Orders MAR 2020
52.219-28 Post-Award Small Business Program Representation SEP 2023
52.219-31 Notice of Small Business Reserve MAR 2020
52.219-32 Orders Issued Directly Under Small Business Reserves MAR 2020
52.219-33 Nonmanufacturer Rule SEP 2021
52.222-1 Notice to the Government of Labor Disputes FEB 1997
52.222-3 Convict Labor JUN 2003
52.222-6 Construction Wage Rate Requirements AUG 2018
52.222-7 Withholding of Funds MAY 2014
I-3
52.222-8 Payrolls and Basic Records JUL 2021
52.222-9 Apprentices and Trainees JUL 2005
52.222-10 Compliance with Copeland Act Requirements FEB 1988
52.222-11 Subcontracts (Labor Standards) MAY 2014
52.222-12 Contract Termination – Debarment MAY 2014
52.222-13 Compliance with Construction Wage Rate Requirements and Related Regulations
MAY 2014
52.222-14 Disputes Concerning Labor Standards FEB 1988
52.222-15 Certification of Eligibility MAY 2014
52.222-20 Contracts for Materials, Supplies, Articles, and Equipment
JUN 2020
52.222-21 Prohibition of Segregated Facilities APR 2015
52.222-22 Previous Contracts and Compliance Reports. FEB 1999
52.222-23 Notice of Requirement for Affirmative Action to Ensure Equal Employment Opportunity for Construction
FEB 1999
52.222-26 Equal Opportunity SEP 2016
52.222-27 Affirmative Action Compliance Requirements for Construction
APR 2015
52.222-36 Equal Opportunity for Workers with Disabilities JUN 2020
52.222-50 Combating Trafficking in Persons NOV 2021
52.222-55 Minimum Wages for Contractor Workers Under Executive Order 14026
JAN 2022
52.222-62 Paid Sick Leave Under Executive Order 13706 JAN 2022
52.223-17 Affirmative Procurement of EPA-Designated Items in Service and Construction Contracts
AUG 2018
52.223-18 Encouraging Contractor Policies to Ban Text
Messaging While Driving
JUN 2020
52.225-13 Restrictions on Certain Foreign Purchases FEB 2021
52.228-2 Additional Bond Security OCT 1997
52.228-11 Pledges of Assets FEB 2021
52.228-12 Prospective Subcontractor Requests for Bonds DEC 2022
52.228-14 Irrevocable Letter of Credit NOV 2014
52.228-15 Performance and Payment Bonds - Construction JUN 2020
I-4
52.232-5 Payments under Fixed-Price Construction Contracts MAY 2014
52.232-17 Interest MAY 2014
52.232-18 Availability of Funds APR 1984
52.232-23 Assignment Of Claims MAY 2014
52.232-27 Prompt Payment for Construction Contracts JAN 2017
52.232-33 Payment by Electronic Funds Transfer – System for
Award Management
OCT 2018
52.232-39 Unenforceability of Unauthorized Obligations JUN 2013
52.232-40 Providing Accelerated Payments to Small Business
Subcontractors.
MAR 2023
52.233-1 Alt I Disputes - Alternate I MAY 2014
52.233-3 Protest After Award AUG 1996
52.233-4 Applicable Law For Breach Of Contract Claim OCT 2004
52.236-2 Differing Site Conditions APR 1984
52.236-3 Site Investigation and Conditions Affecting the Work APR 1984
52.236-5 Material and Workmanship APR 1984
52.236-6 Superintendence by the Contractor APR 1984
52.236-7 Permits and Responsibilities NOV 1991
52.236-8 Other Contracts APR 1984
52.236-9 Protection of Existing Vegetation, Structures, Equipment, Utilities, and Improvements
APR 1984
52.236-10 Operations and Storage Areas APR 1984
52.236-11 Use and Possession Prior to Completion APR 1984
52.236-12 Cleaning Up APR 1984
52.236-13 Accident Prevention NOV 1991
52.236-15 Construction Schedules for Construction Contracts APR 1984
52.243-5 Changes and Changed Conditions JUN 2007
52.244-6 Subcontracts for Commercial Products and Commercial Services
SEP 2023
52.246-21 Warranty of Construction MAR 1994
52.248-3 Value Engineering – Construction OCT 2020
52.249-2 Alt I Termination for Convenience of the Government (Fixed- Price) – Alternate I
APR 2012
52.249-10 Default (Fixed-Price Construction) APR 1984
I-5
FAR 52.225-9 BUY AMERICAN— CONSTRUCTION MATERIALS OCT 2022
(a) Definitions . As used in this clause—
Commercially available off-the-shelf (COTS) item —
(1) Means any item of supply (including construction material ) that is–
(i) A commercial product (as defined in paragraph (1) of the definition of “commercial product ” at Federal Acquisition Regulation (FAR) 2.101);
(ii) Sold in substantial quantities in the commercial marketplace; and
(iii) Quoted to the Government, under a contract or subcontract at any tier, without modification, in the same form in which it is sold in the commercial marketplace; and
(2) Does not include bulk cargo, as defined in 46 U.S.C. 40102(4), such as agricultural products and petroleum products .
"Construction material " means an article, material , or supply brought to the construction site by the Contractor or a subcontractor for incorporation into the building or work . The term also includes an item brought to the site preassembled from articles, materials , or supplies .
However, emergency life safety systems, such as emergency lighting, fire alarm, and audio evacuation systems, that are discrete systems incorporated into a public building or work and that are produced as complete systems, are evaluated as a single and distinct construction material regardless of when or how the individual parts or components of those systems are delivered to the construction site. Materials purchased directly by the Government are supplies , not construction material .
Cost of components means —
(1) For components purchased by the Contractor , the acquisition cost, including transportation costs to the place of incorporation into the construction material (whether or not such costs are paid to a domestic firm), and any applicable duty (whether or not a duty-free entry certificate is issued); or
(2) For components manufactured by the Contractor , all costs associated with the manufacture of the component , including transportation costs as described in paragraph (1) of this definition , plus allocable overhead costs, but excluding profit. Cost of components does not include any costs associated with the manufacture of the construction material .
Domestic construction material means—
(1) For construction material that does not consist wholly or predominantly of iron or steel or a combination of both -
(i) An unmanufactured construction material mined or produced in the United States ; or
(ii) A construction material manufactured in the United States , if–
(A) The cost of its components mined, produced, or manufactured in the United
States exceeds 55 percent of the cost of all its components. Components of foreign origin of the same class or kind for which nonavailability determinations have been made are treated as domestic.
Components of unknown origin are treated as foreign; or
(B) The construction material is a COTS item; or
(2) For construction material that consists wholly or predominantly of iron or steel or a combination of both , a construction material manufactured in the United States if the cost of foreign iron and steel constitutes less than 5 percent of the cost of all components used in such construction material . The cost of foreign iron and steel includes but is not limited to the cost of foreign iron or steel mill products (such as bar, billet, slab, wire, plate, or sheet), castings, or forgings utilized in the manufacture of the construction material and a good faith estimate of the cost of all foreign iron https://www.acquisition.gov/far/part-2#FAR_2_101
I-6 or steel components excluding COTS fasteners. Iron or steel components of unknown origin are treated as foreign. If the construction material contains multiple components, the cost of all the materials used in such construction material is calculated in accordance with the definition of
"cost of components ".
Fastener means a hardware device that mechanically joins or affixes two or more objects together. Examples of fasteners are nuts, bolts, pins, rivets, nails, clips, and screws.
Foreign construction…
This is the start of the file's text. The full file is on GovTribe.