C04e 2026SNF_UpperBigWoodBPA_Survey_Priority1_04082026_1284LM26Q0077.pdf
PDF 2 MB Posted
- Solicitation number
- 1284LM26Q0077
- Issued by
-
Department of Agriculture Forest Service
About this file
This is a vegetation treatment planning map for the Upper Big Wood project area located in Idaho. The map displays the Area of Potential Effects (APE) and two priority inventory zones across township and range coordinates T6N, R15E, S3-4; T7N, R15E, S34-35, referenced to the Horton Peak USGS 7.5 quadrangle. The primary treatment area (UBW_Priority1) is depicted in red with diagonal line hatching and covers multiple non-contiguous parcels distributed across the mapped region. A secondary priority zone (UBW_Priority2) is shown in yellow with diagonal line hatching and is concentrated in the eastern portion of the map. The APE is indicated with cross-hatching along the boundaries. The map scale is 1:14,000 with a distance reference of 0 to 1 mile. A location inset map in the lower left corner indicates the project's position within Idaho. The document does not contain solicitation requirements, response deadlines, pricing information, or contract-specific terms.
View the file
Other files
Show all 11
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Upper Big Wood Vegetation Treatments APE & Priority 1 Inventory Map T6N, R15E, S3-4; T7N, R15E,S34-35, Horton Peak, ID USGS 7.5 Quad
0 0.5 10.25 Miles
Scale=1:14,000
APE
UBW_Priority1
UBW_Priority2
File details come from the government source that posted it. Updated .