C04b Attachment 1 Statement of Work.pdf

PDF 477 KB Posted

Attached to
Sewer Line and Tank Placement Bldg. 13 USDA ARS Starkville, MS (Amended)
Solicitation number
1232SA26Q0663
Issued by

About this file

This is a Statement of Work (SOW) for a sewage line and tank installation project at a USDA Agricultural Research Service facility in Mississippi State, Mississippi (Asset ID #606400B013).

The project requires a licensed contractor to install a 1,000-gallon two-chamber septic tank and run four-inch PVC pipe downhill approximately 440 feet to the nearest manhole to replace an existing inadequate lift station system. The contractor must provide all materials, labor, and equipment; flush the system to verify proper operation; and clean up and dispose of all debris offsite. The work is located at 606 Spring Street, MS State, Mississippi 39762, a locked compound housing animal research. Site visit attendance is mandatory for prospective vendors before submitting quotes. The project completion deadline is ninety (90) calendar days from the Notice to Proceed. The contractor must submit a detailed project schedule with milestone dates within fourteen (14) days of contract award, coordinate all work dates with the Contracting Officer's Representative (COR), and work Monday through Friday from 7:00 am to 3:30 pm local time, excluding federal holidays. All work must comply with current building codes and be coordinated with the Location Point of Contact and Research Leader to ensure safety and health protocols are observed given the animal research environment. The Contracting Officer is Michael Sherlock (Michael.Sherlock@usda.gov). The contractor must verify all dimensions and site conditions prior to work commencement, provide their own restroom facility, and obtain written CO approval for any schedule changes or time extension requests.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Agricultural Research Service

U.S. DEPARTMENT OF AGRICULTURE

Statement of Work

Sewage Line and Tank Install

Asset ID #606400B013

USDA-ARS

Mississippi State, Mississippi

Prepared by:

Jason Johnson

February 9, 2026

1. PROJECT INTRODUCTION

1.1. PROJECT TITLE

Install septic tank (1,000 gallon) and gravity feed sewage line to manhole.

1.2. PROJECT BACKGROUND AND PURPOSE

The USDA, Agricultural Research Service (ARS), Poultry Research Unit is housed in its own fenced compound at 606 Spring Street, MS State, MS 39762. Some of the research activities for this unit are housed in Building 13 which had a major renovation in the early 1990’s. When the building was renovated a sewage lift station was installed to remove bird waste, two sinks, one toilet and floor drains. A lift station was installed, and waste was pumped uphill approximately 350 feet uphill to a manhole using two-inch PVC pipe. A modular building was placed on top of the two-inch PVC line in 2002. Research usage of the building has changed over time. More solid waste is now being placed into this system. The current pump is not built to handle the larger solid particles and the larger volume. The purpose of this project is to place a two-chamber septic tank (at least 1,000 gallon) and gravity feed sewage with 4-inch PVC down hill to the nearest manhole (about 440 feet of line). All plumping work with be installed to current building codes.

1.3. PROJECT CONTACT PERSONS

CONTRACTING OFFICER’S REPRESENTATIVE (COR)

TBD

LOCATION POINT OF CONTACT (LPOC)

TBD

Research Leader (RL)

TBD

CONTRACTING OFFICER (CO)

Michael Sherlock

USDA, ARS

Michael.Sherlock@usda.gov

ADMINISTRATIVE OFFICER (AO)

ENGINEER PROJECT MANAGER (EPM)

mailto:Michael.Sherlock@usda.gov

2. SCOPE AND OBJECTIVES

2.1. DESCRIPTION OF WORK

Provide all materials, labor, and equipment to install the new septic tank and PVC pipe to downhill manhole. Contractor services must be performed by a licensed Contractor. The Contractor must:

2.1.1. Install 1,000-gallon two chamber septic tank and run four-inch PVC downhill to manhole.

2.1.2. Flush water to make sure all is correct..

2.1.3. Clean up all debris and dispose at a proper location off site.

2.2. The Contractor will verify all dimensions and site conditions prior to beginning work. No

Government equipment will be available for use by the Contractor. The Contractor must provide their own restroom facility.

2.3. LOCATION OF WORK

The project is located at 606 Spring Street, MS State, Mississippi 39762.

2.4. SITE VISIT

Site Visit Attendance is mandatory to submit a quote. Review the solicitation for the exact time and date of the site visit. No quotes will be accepted from vendors that do not attend the site visit.

3. PROJECT SCHEDULE

3.1. The completion of the project must not exceed ninety (90) calendar days from the date of the Notice to Proceed (NTP).

3.2. The Contractor must prepare an overall project schedule including milestone dates for all phases of work and completion date; submit to the COR for approval. This schedule is due fourteen (14) days after contract award. The Contractor must track all work progress to ensure that the project is completed according to the schedule. Include work week schedule with daily starting and stopping time.

3.3. The Contractor must coordinate and confirm the dates for all work with the COR. If necessary, any request for a time extension must be submitted to the Contracting Specialist in writing before the expiration of the Period of Performance. Each request must include specific and detailed reasons in support of the schedule alteration and provide an updated schedule for completion. No extension of the period of performance may be given without the written authority of the CO.

3.4. Project work hours are 7:00 am and 3:30 pm, local time, Monday through Friday; federal holidays are excluded. The contractor is not required to provide services on recognized Federal holidays established by Federal law (5 U.S.C. 6103). Any changes to work schedule must be submitted to CO for written approval prior to any schedule change.

3.5. This work location is inside of a locked compound that houses animal research;

therefore, site security and animal welfare are serious concerns due to disease transmission, etc. All work must be coordinated with the LPOC and RL to ensure that safety and health protocols are observed and the research animals as well as workers are protected.