C04a Attachment 1 Statement of Work 1232SA26Q0785.pdf

PDF 755 KB Posted

Attached to
Interior Painting for USDA ARS Stuttgart, AR Federal contract opportunity
Solicitation number
1232SA26Q0785
Issued by
Department of Agriculture Agricultural Research Service

About this file

This is a Statement of Work (SOW) for paint and repair services at the Dale Bumper National Rice Research Center (DBNRRC) located at 2980 Highway 130 East, Stuttgart, Arkansas 72160, prepared by Robert Ideker on March 31, 2026.

The contractor must repair sheetrock walls and paint approximately 9,400 square feet of wall space, including patching light damage to drywall, caulking cracks or gaps, and applying durable premium paint matched to existing colors. The contractor is responsible for providing all materials, equipment, tools, scaffolding, personal protective equipment, and labor necessary for project completion. Work must be performed Monday through Friday from 7:00 A.M. to 4:00 P.M., excluding government holidays, with any schedule changes requiring written approval from the Contracting Officer. The project completion deadline is 90 days after contract award, with time extension requests requiring specific and detailed written justification. The contractor must cover all laboratory furniture and floors for protection, keep the work area clean daily, remove construction debris daily and from the site weekly, maintain a jobsite superintendent during installation, provide their own restroom facility, and leave premises in clean and acceptable condition upon completion. A Site-Specific Safety Plan in industry-standard format must be submitted within 14 days of contract award. The contractor must schedule inspections with a minimum of 10 days' advance written notice to the location point of contact. All materials and supplies require approval from the Contracting Officer Representative and must conform to applicable Federal Specifications and Standards. Applicable codes and standards include ANSI, ASME, NEC/NFPA 72, OSHA, and ADA. Any damage to government buildings or utilities caused by contractor activities must be repaired or replaced to government satisfaction. The SOW includes photographs documenting the current site conditions requiring work.

View the file

Other files for this federal contract opportunity

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

United States Department of Agriculture Agricultural Research Service

STATEMENT OF WORK

Paint and repair walls Dale Bumper National Rice Research Center

(DBNRRC)

2980 Hwy.130 East Stuttgart, AR 72160

Prepared by Robert Ideker

March, 31, 2026

Statement of Work USDA, Agricultural Research Service

Scope Statement

This is for the repair of sheetrock walls and painting at the Dale Bumpers National Rice Research Center. There will be areas where the drywall needs minor repairs. There is approximately 9,400 square feet to be painted. The contractor will be responsible for matching the existing paint color. The contractor will use premium paint that is durable paint.

Summary of services:

Contractor will be responsible for providing all necessary equipment, materials, supplies, tools, scaffolding, hoisting, transportation, unloading, and handling required for the completion of this project.

The contractor shall include all services and field labor, equipment and personal protective equipment necessary to perform the work.

The contractor will be responsible for the proper disposal of all the material used.

Applicable Codes and Standards apply and are not limited to the following:

ANSI - American National Standards Institute.

ASME - American Society of Mechanical Engineers.

NEC - National Electrical Code, NFPA 72.

OSHA - Occupational Safety and Health Administration ADA – Americans with Disabilities Act

Project Objectives The project consists of the following elements:

1.Contractor will provide all paint, caulk and spackling material 2.Contractor will cover all lab furniture and floors for protection.

3.Contractor will patch light damage to sheetrock walls.

4. Contractor will paint all walls in the construction area. Approximately 9,400 square feet.

5. Contractor will caulk any cracks or gaps in the sheetrock.

Site Visit

Contractors are encouraged to visit the site and be escorted by a government representative to confirm locations, dimensions, and conditions of the project before a bid is submitted. The site visit shall be for the purpose of observing first-hand any conditions relevant to the completion of this project. No consideration will be given to claims based on lack of knowledge of existing conditions, except where Contract Documents make definite provisions for adjustment in cost or extension due to existing conditions not readily foreseeable.

Utilization of Bio-Based Products

The contractor shall utilize products and material based from bio- based materials as applicable, (e.g. bio-based greases; bio-based hydraulic fluids, bio-based absorbents), to the maximum extent possible without jeopardizing the intended end use of detracting from the overall quality delivered to the end user. All supplies and materials shall be of a type and quality that conform to the applicable Federal Specifications and Standards. All supplies and materials to be used in the performance of work described herein are subject to the approval of the Contracting Officer Representative (COR). Products can be found at:

www.biopreferred.gov

Safety

The contractor will submit a Site Safety Specific Plan/Accident Prevention Plan in industry recognizable format to the Contracting Officer within 14 days of contract award.

Contractor shall furnish a Site-Specific Safety Plan (SSSP) and the Government shall review http://www.biopreferred.gov/ the SSSP prior to the start any construction activities. SSSP shall be in typically accepted industry format.

Base Bid

Contractor shall perform the work as specified in the Statement of Work.

Contractor Responsibilities

The project has a base bid to be performed per the following specifications:

1. Contractor will verify all dimensions and existing site conditions prior to beginning work.

2. Contractor shall keep work area clean daily and take measures to control debris while work is being performed.

3. Contractor is required to manage the project and consult with the Government prior to beginning all work phases.

4. Contractor shall perform work in a manner that minimizes the impact of the work on Government operations, research, and functions.

5. All work must be performed in such a manner as to not adversely affect daily operations of the facility and its workers.

6. Contractor shall remove and dispose of all construction related materials from all work areas daily and remove these waste materials from the site on a weekly basis.

7. Contractor must have a superintendent on the jobsite when crews are performing the installation work.

8. Contactor will provide their own restroom facility.

Material / Submittals:

The material for the entire work shall include but are not limited to those detailed above necessary to successfully complete the project and deliver a functioning system as required. Submittals on all material used on this project shall be submitted to the EPM, Site RL, and Contracting Specialist as noted in this document. Electronic submittals are acceptable.

Installation Procedure:

Contractor will verify all dimensions and site conditions prior to beginning work.

Contractor is required to provide labor, specified material, equipment, and other tools required to perform the job fully and completely. No Government equipment will be available for use by the contractor. The contractor shall always be responsible for protecting his work and ensuring the safety of his crew and ARS employees. Upon completion of the project, the contractor shall remove from the premises all accumulated materials and rubbish caused by the project. Premises shall be left in a clean, orderly, and acceptable condition.

Damage to Property:

Any damage to the Government buildings, utilities, etc. caused as the result of the contractor’s activities shall be repaired or replaced to the satisfaction of the Government.

Inspection and Acceptance:

A government representative shall inspect and approve the work performed on this project. The Contractor shall schedule inspection a minimum of 10 days in advance, in writing, to the location POC.

Project Schedule:

The completion of this project shall be no later than 90 days after award. A request for time extension must be submitted to the Contracting Officer in writing. Each request must include specific and detailed reasons in support of the schedule alteration.

Work Hours:

Contractor work hours shall be Monday through Friday, seven (7) A.M. to four (4) P.M.

with the exception of Government holidays. Any changes to work schedule shall be submitted to Contacting Officer for written approval prior to schedule change.

Photos of Work Site

Scope Statement
Summary of services:
Applicable Codes and Standards apply and are not limited to the following:
Project Objectives
Site Visit
Utilization of Bio-Based Products
Safety
Base Bid
Contractor Responsibilities
Material / Submittals:
Installation Procedure:
Damage to Property:
Inspection and Acceptance:
Project Schedule:
Work Hours: