This is a Statement of Work for the FY26 BRL Security Gate Replacement project at the Biosciences Research Laboratory in Fargo, North Dakota. The contractor must remove existing North and South entry barricade gates and install two new gates measuring 4 feet tall by 24 feet wide, complete with electronic gate operators, safety systems, and integration into the existing door security system. The scope includes setting all gate posts in concrete footings, installing 1-hp electronic gate operator systems with safety edges, detectors, heaters, and keypad pedestals at both entrances. Additional requirements include boring two conduits to each operator from the closest electrical panel with installation of six handholes (three for low voltage and three for power), two concrete pedestals for card readers, two 120V dedicated circuits, two Lenel-compatible card readers, one LNL-1320-S3 module, all cabling and underground conduit tie-ins with Lenel remote programming, and eight steel bollards (6 inches in diameter) set in concrete at both entrances to protect equipment from vehicles and traffic.

The performance period extends 90 days from notice to proceed, with submittals due within 30 days of award. A minimum one-year parts and labor or manufacturer's warranty is required. The contractor must assign personnel skilled in construction and electronic gate installation, ensure all personnel possess valid U.S. photo identification, and meet with Maintenance Staff on the first construction day to coordinate parking permits, badges, and access keys. All work must conform to State and Federal Building Codes, all items will be inspected before payment, and digital submittals must be in Adobe PDF format. No government-furnished resources or travel are required.

View the file

Other files

File Type Posted
C04_Sol_1232SA26Q0980.pdf PDF
C04_Wage Determination.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Statement of Work – BRL Security Gate Replacement

Revision Date: April 20, 2026

Project: FY26 BRL Security Gate Replacement

Location:

Biosciences Research Laboratory (BRL), 1616 Albrecht Blvd N, Fargo, ND 58102

General Requirements

1.0 Scope of Work:

The contractor shall provide all labor and materials required to remove the existing North and South entry barricade gates and replace them with two new gates, 4 feet tall and 24 feet wide, including electronic gate operators and associated safety systems integrated into the existing door security system. The work includes installation of safety bollards.

2.0 Background:

BRL requires improved perimeter security and controlled access at both the north and south entrances. New electronic gates and supporting infrastructure are needed to enhance reliability, safety, and operational control.

Contractor Requirements

3.0 Technical Requirements:

• Remove existing barricade gates.

• Install two new 4' tall × 24' wide gates.

• Set all gate posts in concrete footings.

• Install electronic gate operators with 1-hp operator system including safety edges, detectors, heater, and keypad pedestal at north and south parking lot entrances.

• Boring of two conduits to each operator from closest electrical panel, including installation of six handholes with covers – 3 for low voltage, and three for power.

• Two concrete pedestals for card readers

• Installation of two 120V dedicated circuits

• Two Lenel-compatible card readers and one LNL-1320-S3 module

• All cabling, underground conduit tie-ins, and Lenel remote programming

• Install 8 steel bollards (6" diameter) – 4 in north entrance and 4 in south entrance, set in concrete to protect operator and card readers from vehicles, equipment and traffic.

4.0 Deliverables and Schedule

• Performance Period: 90 days after notice to proceed.

• Submittals: Due within 30 days after award.

• Warranty: Minimum one-year parts and labor or manufacturer’s warranty.

5.0 Government Furnished Resources

None

6.0 Travel

None.

7.0 Contractor Key Personnel

Contractor shall assign personnel skilled in construction and electronic gate installation.

8.0 Security Requirements

All personnel shall have a U.S. photo ID, such as a U.S. Driver License, or U.S. Passport.

Contractor shall meet with the Maintenance Staff on 1st day of construction to coordinate temporary parking permits, badges and keys as necessary.

9.0 Compliance Requirements

Must conform to State and Federal Building Codes.

10. Performance Requirements

All items will be inspected before payment is rendered.

11.0 Electronic Submittal Requirements

All digital materials must be in Adobe PDF format.