Summary of Statement of Work: Silver Lake Restroom Roof Replacement
This Statement of Work (SOW) details a roof replacement project for a restroom building on the Salt Lake Ranger District of the Uinta-Wasatch Cache National Forest in Salt Lake County, Utah, located 14.2 miles east of Big Cottonwood Canyon. The project involves removing and replacing a timber-framed roof structure damaged in winter 2023, with work including selective demolition of existing roof framing, protection and reinstatement of ceiling-mounted electrical systems, and complete roof reconstruction per plans and specifications. The contract has a base duration of 120 calendar days with an August 17, 2026 start date. The work encompasses general building construction conditions, demolition, wood framing, structural insulated panels (SIPs), moisture protection, rough and finish carpentry, insulation, plastic paneling, electrical work, and lighting. All site conditions are considered incidental to the contract, including public safety measures, equipment security, stream protection, temporary toilet facilities (three units including one ADA-compliant), and traffic control conforming to the Manual of Uniform Traffic Control Devices (MUTCD).
The specifications sections address key technical requirements across multiple construction disciplines: mobilization (with staged payment up to 10 percent of contract value); submittal procedures requiring three copies with 14-day review periods; selective demolition with detailed salvage and reinstallation of electrical fixtures and other components; rough carpentry using Douglas Fir No. 2 grade lumber and pressure-treated materials; structural insulated panels (SIPs) with 8-inch EPS core and R-28.6 thermal resistance from ICC-ES certified manufacturers; wood decking in cedar tongue-and-groove; structural glued laminated timber (Glulam) meeting ANSI/AITC A190.1 standards; finish carpentry in redwood or cedar; metal roofing using 5V-Crimp panels with fluoropolymer finish and snow cleat system; and painting and coatings systems specified by MPI standards. Contractor submissions must include construction schedules, traffic control plans, product data, shop drawings, warranties, and quality assurance documentation. The project requires coordination with the open visitor center, 72-hour notice for activities affecting operations, and restoration of staging areas upon completion.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 1240LT26Q0120 amendment.pdf | ||
| C04 WD Salt Lake County UT 1240LT26Q0120.pdf | ||
| C04 Drawings 1240LT26Q0120.pdf | ||
| C04 1240LT26Q0120.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
STATEMENT OF WORK
GENERAL SPECIFICATIONS
SILVER LAKE RESTROOM ROOF REPLACEMENT
SCOPE OF CONTRACT
This project consists of removing and replacing the Silver Lake restroom timber framed roof structure that was damaged in the winter of 2023. Work includes the removal of existing roof framing, protecting in place all existing amenities, disconnecting, salvaging, reinstalling all ceiling mounted electrical, and reconstructing the roof as shown on the plans and in the specifications.
PROJECT LOCATION
The project is located on the Salt Lake Ranger District of the Uinta-Wasatch Cache National Forest in Salt Lake County, Utah. The site is located 14.2 miles east of the mouth of Big Cottonwood Canyon. For further directions, please refer to drawing cover sheet.
SITE INFORMATION AND LIMITATIONS
The following site conditions are considered incidental to the contract and the contractor will not be paid directly for any of the following items:
The Visitor Center, adjacent to the construction sites will be open to the public during construction. The Contractor will be responsible for signing, limiting public access, and safety of public and/or government employees in the area.
The Contractor is responsible for the security or the Contractor’s equipment and materials.
Utilities are available at the site for construction purposes.
Contractor will provide all materials and labor necessary to protect streams, wet or dry, during construction activities.
The Contractor shall provide temporary toilet facilities (porta-potty) for the public at the site during all construction work. Three toilet facilities shall be provided, including 1 ADA unit.
TRAFFIC CONTROL AND CONSTRUCTION SIGNING
No work that endangers, interferes, or conflicts with traffic or access to work sites shall be performed until a plan for satisfactory warning and handling of traffic has been submitted by the contractor and approved by the COR and Utah Department of Transportation. Construction signing for traffic control shall conform to the Manual of Uniform Traffic Control Devices (MUTCD). All traffic control signs will be placed in areas adequate for a truck pulling a fifth wheel trailer to be turned around. Contractor shall not be paid directly for this item, rather it will be considered incidental to other items of work listed in the Schedule of Items.
WORK CAMPS, STAGING AND STORAGE AREAS
Areas for staging operations and storage of materials shall be approved by the CO. The Contractor must request in writing for approval from the CO to stage trailers (work or housing) on site. Approved areas shall be signed and fenced by the contractor to prevent access by the public and facilitate traffic through the parking lot.
No overnight camping will be allowed on site.
INSPECTION OF WORKSITE
The contractor acknowledges they have taken the necessary steps to ascertain the nature and location of work, and have investigated and satisfied themselves as to the general and local conditions that can affect the work or its cost. Any failure of the contractor to take the actions described and acknowledged in this paragraph will not relieve the Contractor from the responsibility of estimating properly the difficulty and cost of successfully performing the work, or for proceeding to successfully perform the work without additional expenses to the government.
START DATE
August 17th, 2026
CONTRACT TIME
Base: 120 Calendar Days
SPECIFICATIONS
Section 000501 – Roof Replacement Section 011900 – Mobilization Section 013300 – Submittal Procedures Section 015100 – Temporary Traffic Control Section 024100 – Waste Material Disposal Section 024119 – Selective Demolition Section 061000 – Rough Carpentry Section 061200 – Structural Insulated Panels Section 061500 – Wood Decking Section 061700 – Structural Glued Laminated Units Section 062000 – Finish Carpentry Section 062030 – Misc Carpentry Section 066400 – Plastic Paneling Section 074113 – Formed Metal Roof Panels Section 099123 – Painting And Coatings Section 099300 – Staining And Transparent Finishing
END OF SECTION C
MARCH 2026
SECTION C 000001-1
USDA FOREST SERVICE, R-4
SILVER LAKE ROOF REPLACEMENT
SECTION 000501 – ROOF REPLACEMENT
1. GENERAL
SUMMARY
This Section includes the following:
Work covered by this bid item.
Use of premises.
Work restrictions.
Specification formats and conventions.
WORK COVERED BY THIS SECTION
The Work consists of the following:
The Work includes:
This portion of the contract includes roof replacement of a restroom building on the US Forest Service, Uinta Wasatch Cache National Forest. The bid item includes work shown in the drawings and covered in the specifications noted below and all work required to provide a new water-tight roof structure. The bid item includes all work within 10’ of the building perimeter. The work includes but is not limited to: General conditions for building construction, demolition, wood framing, glulam framing, structural insulated panels, moisture protection, asphalt shingle roofing, rough and finish carpentry, insulation, plastic paneling, electrical, lighting, and power heating.
MEASUREMENT AND PAYMENT:
Measurement and payment will be as listed in the Schedule of Items. Payment will include all items of work required to complete the new restroom roof, ready for use and complete.
Base Bid: Payment shall include all work to complete the new toilet building roof.
SUMMARY OF DRAWINGS:
G1 – Vicinity Map, Location Description, Project Title, and Index of Sheets A1 – Existing Floor Plan A2 – Roof Demolition Plan A3 – Roof Framing Plan A4 – Elevations A5 – Building Sections A6 – Connection Details A7 – Connection Details
PRODUCTS (NOT USED)
EXECUTION (NOT USED)
END OF SECTION 000500
MARCH 2026
ROOF REPLACEMENT 0005014-1
USDA FOREST SERVICE, R-4
SILVER LAKE ROOF REPLACEMENT
SECTION 011900 - MOBILIZATION
1. GENERAL
SUMMARY
This item is intended to compensate the Contractor for operations including, but not limited to, those necessary for the movement of personnel, equipment, supplies, and incidentals to the project site; for payment of premiums for bonds and insurance for the project; and for any other work and operations which must be performed or costs that must be incurred incident to the initiation of meaningful work at the site and for which payment is not otherwise provided for under the contract.
MEASUREMENT AND PAYMENT
The measurement shall be lump sum for mobilization. Payment shall be as follows:
Bond premiums will be reimbursed after receipt of the evidence of payment.
50% of the lump sum, not to exceed 5% of the original contract amount, will be paid following completion of 5% of the original contract amount not including mobilization and bond premiums.
Payment of the remaining portion of the lump sum, up to 10% of the original contract amount, will be paid following completion of 10% of the original contract amount not including mobilization and bond premiums.
Any portion of the lump sum in excess of 10% of the original contract amount will be paid after final acceptance.
Progress payments for mobilization and preparatory work shall be subject to retainage.
PRODUCTS (NOT USED)
EXECUTION (NOT USED)
END OF SECTION 011900
AUGUST 2017
MOBILIZATION 011900-1
USDA FOREST SERVICE, R-4
SILVER LAKE ROOF REPLACEMENT
SECTION 013300 - SUBMITTAL PROCEDURES
1. GENERAL
SUMMARY
This Section includes administrative and procedural requirements for submitting Shop Drawings, Product Data, Samples, Test Reports and other miscellaneous submittals. See Table 013300-1 for a summary of required submittals.
See other specification section within this package for additional requirements on submittals.
SUBMITTAL PROCEDURES
Coordination: Coordinate preparation and processing of submittals with performance of construction activities.
Coordinate transmittal of different types of submittals for related parts of the Work so processing will not be delayed because of need to review submittals concurrently for coordination.
The Contracting Officer (CO) reserves the right to withhold action on a submittal requiring coordination with other submittals until related submittals are received.
Processing Time: Allow enough time for submittal review, including time for re-submittals, as follows. Time for review shall commence on CO's receipt of submittal.
Initial Review: Allow 14 days for initial review of each submittal. Allow additional time if processing must be delayed to permit coordination with subsequent submittals. CO will advise Contractor when a submittal being processed must be delayed for coordination.
If intermediate submittal is necessary, process it in same manner as initial submittal.
Allow 14 days for processing each re-submittal.
No extension of the Contract Time will be authorized because of failure to transmit submittals enough in advance of the Work to permit processing.
Identification: Place a permanent label or title block on each submittal for identification.
Indicate name of firm or entity that prepared each submittal on label or title block.
Provide a space on label or beside title block to record Contractor's review and approval markings and action taken by CO.
Include the following information on label for processing and recording action taken:
Project name.
Date.
Name and address of Contractor.
Name of manufacturer.
Unique identifier, including revision number.
Number and title of appropriate Specification Section.
Drawing number and detail references, as appropriate.
If more than one item is shown on submittal sheet, identify item.
Deviations: Highlight, encircle, or otherwise identify deviations from the Contract Documents on submittals.
Additional Copies: Unless additional copies are required for final submittal, and unless CO observes noncompliance with provisions of the Contract Documents, initial submittal may serve as final submittal.
Use for Construction: Use only final submittals with mark indicating action taken by CO in connection with construction.
MEASUREMENT AND PAYMENT
No separate measurement and/or payment will be made for this section. Payment shall be included with work shown in the schedule of items.
PRODUCTS
ACTION SUBMITTALS – (Submittals requiring CO approval) General: Prepare and submit Action Submittals required by individual Specification Sections.
Number of Copies: Submit three copies of each submittal, unless otherwise indicated. CO will return two copies. Mark up and retain one returned copy as a Project Record Document.
Product Data: Collect information into a single submittal for each element of construction and type of product or equipment.
If information must be specially prepared for submittal because standard printed data are not suitable for use, submit as Shop Drawings, not as Product Data.
Mark each copy of each submittal to show which products and options are applicable.
Include the following information, as applicable:
Manufacturer's written recommendations.
Manufacturer's product specifications.
Manufacturer's installation instructions.
Manufacturer's catalog cuts.
Wiring diagrams showing factory-installed wiring.
Compliance with recognized trade association standards.
Compliance with recognized testing agency standards.
Shop Drawings: Prepare Project-specific information, drawn accurately to scale. Do not base Shop Drawings on reproductions of the Contract Documents or standard printed data.
Preparation: Include the following information, as applicable:
Dimensions.
Identification of products.
Fabrication and installation drawings.
Roughing-in and setting diagrams.
Notation of dimensions established by field measurement.
Contractor's Construction Schedule: The contractor shall submit a Construction Schedule, for approval by CO, in accordance with the contract provisions within 5 day of commencement of work.
Samples: Prepare physical units of materials or products, including the following:
Samples for Initial Selection: Submit manufacturer's color charts consisting of units or sections of units showing the full range of colors, textures, and patterns available.
INFORMATIONAL SUBMITTALS – (Submittals NOT requiring CO approval) General: Prepare and submit Informational Submittals required by other Specification Sections.
Number of Copies: Submit three copies of each submittal, unless otherwise indicated. CO will not return copies.
Certificates and Certifications: Certificates and certifications shall be signed by an officer or other individual authorized to sign documents on behalf of that entity.
Test and Inspection Reports: Comply with requirements in Section 014100 "Quality Control” Material Test Reports: Prepare reports written by a qualified testing agency, on testing agency's standard form, indicating and interpreting test results of material for compliance with requirements.
Field Test Reports: Prepare reports written by a qualified testing agency, on testing agency's standard form, indicating and interpreting results of field tests performed either during installation of product or after product is installed in its final location, for compliance with requirements.
Maintenance Data: Prepare written and graphic instructions and procedures for operation and normal maintenance of products and equipment.
Manufacturer's Instructions: Prepare written or published information that documents manufacturer's recommendations, guidelines, and procedures for installing or operating a product or equipment. Include name of product and name, address, and telephone number of manufacturer.
EXECUTION
GENERAL
Review each submittal and check for compliance with the Contract Documents. Note corrections and field dimensions. Mark with approval stamp before submitting to CO.
Approval Stamp: Stamp each submittal with a uniform, approval stamp. Include Project name and location, submittal number, Specification Section title and number, name of reviewer, date of Contractor's approval, and statement certifying that submittal has been reviewed, checked, and approved for compliance with the Contract Documents.
CO will not review submittals that do not bear Contractor's approval stamp and will return them without action.
Submittals not required by the Contract Documents will not be reviewed and may be discarded.
Substitutions – Whenever materials, products, and equipment are listed by name or brand in the specifications and/or on the drawings, it is used as a measure of quality, utility, or standard. If the Contractor prefers to use any other brand or manufacturer of same quality, appearance and utility to that specified, he shall request substitution as provided below, not less than 30 days before the planned installation of the item. The Contracting Officer will approve or disapprove the request for substitution.
Requests for substitutions will only be considered if contractor submits the following:
Complete technical data including drawings, complete performance specifications, test data, samples and performance tests of the article proposed for substitution. Submit additional information if required by Contracting Officer. All items in the above information shall be circled, tagged, or marked in some way to indicate all deviations or differences which the proposed item differs from the originally specified item.
Similar data as above for item originally specified. All items shall be marked to identify where/how the proposed substitution will differ.
A statement by the Contractor that the proposed substitution is in full compliance with the contract documents, applicable codes, and laws.
The Contractor shall be responsible for any effect upon related work in the project for any substitution and shall pay any additional costs generated by any substitutions.
SUBMITTAL SCHEDULE – Submittals shall be made as required by and called for in the drawings and specifications. The following table is a summary of the required submittals for the project - the table is to assist the Contractor and may not be all inclusive – additional submittals may be required by specific specifications:
TABLE 013300-1
| Spec. Section |
| Section Title |
| Subsection |
| Required Submittal |
| Section C |
| Section C |
| C4 |
| Traffic Control and Signing Plan |
| 024119 |
| Selective Demolition |
| 1.4A |
| Schedule |
| 024119 |
| Selective Demolition |
| 1.4B |
| Waste Manifests |
| 061000 |
| Rough Carpentry |
| 1.3A |
| Certificates |
| 061000 |
| Rough Carpentry |
| 1.3B |
| Treatment Data |
| 061200 |
| Structural Insulated Panels |
| 1.5A |
| Product Data |
| 061200 |
| Structural Insulated Panels |
| 1.5B |
| Calculations |
| 061200 |
| Structural Insulated Panels |
| 1.5C |
| Shop Drawings |
| 061200 |
| Structural Insulated Panels |
| 1.5D |
| Quality Assurance Docs |
| 061200 |
| Structural Insulated Panels |
| 1.5E |
| Warranty |
| 061500 |
| Wood Decking |
| 1.2A |
| Product Data |
| 061700 |
| Structural Glue Laminated Units |
| 1.3A |
| Product Data |
| 064023 |
| Interior Architectural Woodwork |
| 1.3A |
| Product Data |
| 064023 |
| Interior Architectural Woodwork |
| 1.3B |
| Shop Drawings |
| 064023 |
| Interior Architectural Woodwork |
| 1.3C |
| Samples |
| 066400 |
| Plastic Paneling |
| 1.2A |
| Product Data |
| 066400 |
| Plastic Paneling |
| 1.2B |
| Samples |
| 074113 |
| Formed Metal Roof Panels |
| 1.3A |
| Product Data |
| 074113 |
| Formed Metal Roof Panels |
| 1.3B |
| Shop Drawings |
| 074113 |
| Formed Metal Roof Panels |
| 1.3C |
| Samples |
| 074113 |
| Formed Metal Roof Panels |
| 1.4A |
| Test Reports |
| 074113 |
| Formed Metal Roof Panels |
| 1.4B |
| Warranties |
| 099123 |
| Painting and Coatings |
| 1.2A |
| Product Data |
| 099123 |
| Painting and Coatings |
| 1.2B |
| Samples |
| 099123 |
| Staining and Transparent Finish |
| 1.2A |
| Product Data |
| 099123 |
| Staining and Transparent Finish |
| 1.2A |
| Product List |
END OF SECTION 013300
MARCH 2026
SUBMITTAL PROCEDURES 013300-4
USDA FOREST SERVICE, R-4
SILVER LAKE ROOF REPLACEMENT
SECTION 015100 - TEMPORARY TRAFFIC CONTROL
1. GENERAL
SUMMARY
This work consists of furnishing, maintaining, relocating, and removing temporary traffic control and safety devices and services for the control and protection of public traffic near the project site. Prior to beginning construction the Contractor shall submit a traffic control and safety plan to the Contracting Officer for review and approval. As a minimum the traffic control and safety plan shall address signing in and near the project site and at all road and highway junctions that will be used as access to the project site, material sources, water sources and disposal sites as well as any other areas where the Contractor will be performing work under this contract.
MEASUREMENT AND PAYMENT
No separate measurement or payment will be made for work specified in this section. All work will be included in other items listed in the Schedule of Items.
PRODUCTS
TRAFFIC CONTROL
Traffic control and safety device (barricades, cones, tubular markers, vertical panels, drums, portable barriers and so forth) designs and configurations shall conform to the MUTCD. When interpreting the requirements in the applicable MUTCD sections, replace the word should with the word shall.
EXECUTION
GENERAL
All signs shall be constructed to comply with the requirements of MUTCD for the construction operations. Install and maintain temporary traffic control and safety devices adjacent to and within the project as shown on the approved traffic control and safety plan and MUTCD. Install and maintain traffic control and safety devices as follows:
Furnish and install traffic control and safety devices before the start of construction operations.
Install only those traffic control and safety devices needed for each stage or phase.
Relocate temporary traffic control devices as necessary.
Immediately replace any device that is lost, stolen, destroyed, or inoperative.
Keep temporary traffic control and safety devices clean.
Remove all temporary traffic control devices upon contract completion or when approved.
Construction Signs Use type III or IV reflective sheeting. Use wood, metal, fiberglass, or other approved posts.
END OF SECTION 015100
AUGUST 2017
TEMPORARY TRAFFIC CONTROL 015100-1
USDA FOREST SERVICE, R-4
SILVER LAKE ROOF REPLACEMENT
SECTION 024100 - WASTE MATERIAL DISPOSAL
1. GENERAL
SUMMARY
This Section includes the loading, handling, hauling, and placing of excess excavation material, unsuitable excavation material, clearing and grubbing debris, and construction and demolition debris.
MEASUREMENT AND PAYMENT
There will be no separate measurement or payment for work in this Section. Waste material disposal is considered incidental to other items of work shown in the Schedule of Items.
PRODUCTS – NOT APPLICABLE
EXECUTION
WASTE MATERIAL TO BE HAULED TO A LANDFILL
All excavated material not used in the construction of embankments or backfilling of trenches, or other excess material resulting from the excavation and embankment operation shall be hauled to an approved landfill.
Approved excavated material can be placed as fill in the existing trailhead parking area west of the project. All material placed in the parking area shall be approved by the Contracting Officer’s Representative. The trailhead parking area will be removed and restored to its original conditions as part of this project. All unsuitable excavated material that cannot be used at the trailhead parking shall be hauled to an approved landfill.
Oversized boulders may be broken into sizes small enough to incorporate into the embankment according to Specification 312225.
Approved organic materials, such as stumps, logs, and slash can be placed in the existing trailhead parking area west of the project. All material placed in the parking area shall be approved by the Contracting Officer’s Representative. All other unsuitable material shall be hauled to an approved landfill.
All demolition materials, garbage, and other refuse generated shall be removed from the project site and legally disposed of off Government property in an approved landfill.
END OF SECTION 024100
AUGUST 2017
WASTE MATERIAL DISPOSAL 024100-1
USDA FOREST SERVICE, R-4
SILVER LAKE ROOF REPLACEMENT
SECTION 024119 - SELECTIVE DEMOLITION
1. GENERAL
5.1 SUMMARY
A. This Section includes demolition and removal of the following:
1. Selected portions of a building.
2. Repair procedures for selective demolition operations.
5.2 DEFINITIONS
A. Remove: Detach items from existing construction and legally dispose of them off-site, unless indicated to be removed and salvaged or removed and reinstalled.
B. Remove and Salvage: Detach items from existing construction and deliver them to Government.
C. Remove and Reinstall: Detach items from existing construction, prepare them for reuse, and reinstall them where indicated.
D. Existing to Remain: Existing items of construction that are not to be removed and that are not otherwise indicated to be removed, removed and salvaged, or removed and reinstalled.
5.3 MATERIALS OWNERSHIP
A. Except for items or materials indicated to be reused, salvaged, reinstalled, or otherwise indicated to remain Government property, demolished materials shall become Contractor's property and shall be removed from Project site.
5.4 SUBMITTALS
A. Schedule of Selective Demolition Activities: Indicate detailed sequence of selective demolition and removal work, with starting and ending dates for each activity, including interruption of utility services.
B. Waste Manifests for materials deemed hazardous by the State of Utah including refrigerant and fluorescent lights.
5.5 QUALITY ASSURANCE
A. Regulatory Requirements: Comply with governing EPA notification regulations before beginning selective demolition. Comply with hauling and disposal regulations of authorities having jurisdiction.
B. Standards: Comply with ANSI A10.6 and NFPA 241.
C. Pre-demolition Conference: Conduct conference at Project site with contractor, subcontractors and Contracting Officer’s Representative.
5.6 PROJECT CONDITIONS
A. Conduct demolition so Government operations will not be disrupted. Provide not less than 72 hours' notice to CO of activities that will affect the Silver Lake Visitor’s Center or parking lot.
B. Maintain access to existing building amenities, pathways, and other adjacent occupied or used facilities.
1. Do not close or obstruct walkways, corridors, or other occupied or used facilities without written permission from the COR.
C. Government assumes no responsibility for condition of areas to be selectively demolished.
1. Conditions existing at time of inspection for bidding purpose will be maintained by Government as far as practical.
D. Hazardous Materials: Hazardous materials were not found to be present in building to be selectively demolished.
1. Do not disturb hazardous materials or items suspected of containing hazardous materials except under procedures specified elsewhere in the Contract Documents. Notify the CO immediately of suspected hazardous materials.
E. Storage or sale of removed items or materials on-site will not be permitted.
5.7 MEASUREMENT AND PAYMENT
A. The measurement shall be lump sum for selective demolition as shown on the Schedule of Items.
PART 6 - PRODUCTS
6.1 REPAIR MATERIALS
A. Use repair materials identical to existing materials.
1. If identical materials are unavailable or cannot be used for exposed surfaces, use materials that visually match existing adjacent surfaces to the fullest extent possible.
2. Use materials whose installed performance equal or surpasses that of existing materials.
3. Salvage ceiling mounted electrical fixtures and conduit as noted in the plans and store for reinstallation.
PART 7 - EXECUTION
7.1 EXAMINATION
A. Verify that utilities have been disconnected and capped.
B. Survey existing conditions and correlate with requirements indicated to determine extent of selective demolition required.
C. When unanticipated mechanical, electrical, or structural elements that conflict with intended function or design are encountered, investigate and measure the nature and extent of conflict. Promptly submit a written report to CO.
7.2 PREPARATION
A. Site Access and Temporary Controls: Conduct selective demolition and debris-removal operations to ensure minimum interference with roads, streets, walks, walkways, and other adjacent occupied and used facilities.
1. Do not close or obstruct roads, without permission from CO. Provide alternate routes around closed or obstructed traffic ways if required by governing regulations.
2. Erect temporary protection, such as walks, fences, railings, canopies, and covered passageways, where required by authorities having jurisdiction.
3. Protect existing site improvements, appurtenances, and landscaping to remain.
B. Temporary Facilities: Provide temporary barricades, fencing, and other protection required to prevent injury to people and damage to adjacent buildings and facilities to remain.
C. Temporary Enclosures: Provide temporary enclosures for protection of existing building and construction, in progress and completed, from exposure, foul weather, other construction operations, and similar activities. Provide temporary weathertight enclosure for building exterior.
7.3 POLLUTION CONTROLS
A. Dust Control: Use temporary enclosures, and other suitable methods to limit spread of dust and dirt. Comply with governing environmental-protection regulations.
B. Disposal: Remove and transport debris in a manner that will prevent spillage on adjacent surfaces and areas.
1. Remove debris from elevated portions of building by chute, hoist, or other device that will convey debris to grade level in a controlled descent.
C. Dispose of hazardous materials at:
1. Trans-Jordan Landfill Household Hazardous Waste Facility 10473 South Bacchus Highway (SR-111) South Jordan, UT 84009
2. Other authorized landfills that are equipped to properly dispose of hazardous waste.
D. Cleaning: Clean adjacent structures and improvements of dust, dirt, and debris caused by selective demolition operations. Return adjacent areas to condition existing before selective demolition operations began.
7.4 SELECTIVE DEMOLITION
A. General: Demolish and remove existing construction only to the extent required by new construction and as indicated. Use methods required to complete the Work within limitations of governing regulations.
1. Neatly cut openings and holes plumb, square, and true to dimensions required. Use cutting methods least likely to damage construction to remain or adjoining construction.
2. Cut or drill from the exposed or finished side into concealed surfaces to avoid marring existing finished surfaces.
3. Do not use cutting torches until work area is cleared of flammable materials. At concealed spaces, such as duct and pipe interiors, verify condition and contents of hidden space before starting flame-cutting operations. Maintain portable fire-suppression devices during flame-cutting operations.
4. Locate selective demolition equipment and remove debris and materials so as not to impose excessive loads on supporting walls, floors, or framing.
5. Dispose of universal hazardous waste as required by EPA and State laws. A disposal site is listed above.
B. Removed and Reinstalled Items:
1. Clean and repair items to functional condition adequate for intended reuse.
2. Pack or crate items after cleaning and repairing. Identify contents of containers.
3. Protect items from damage during transport and storage.
4. Reinstall items in locations indicated. Comply with installation requirements for new materials and equipment. Provide connections, supports, and miscellaneous materials necessary to make items functional for use indicated.
C. Existing Items to Remain: Protect construction indicated to remain against damage and soiling during selective demolition. When permitted by CO, items may be removed to a suitable, protected storage location during selective demolition and cleaned and reinstalled in their original locations after selective demolition operations are complete.
7.5 PATCHING AND REPAIRS
A. General: Promptly repair damage to adjacent construction caused by selective demolition operations.
B. Repairs: Where repairs to existing surfaces are required, patch to produce surfaces suitable for new materials.
1. Completely fill holes and depressions in existing masonry walls that are to remain with an approved masonry patching material applied according to manufacturer's written recommendations.
C. Finishes: Restore exposed finishes of patched areas and extend restoration into adjoining construction in a manner that eliminates evidence of patching and refinishing.
D. Floors and Walls: Where walls or partitions that are demolished extend one finished area into another, patch and repair floor and wall surfaces in the new space. Provide an even surface of uniform finish color, texture, and appearance. Remove existing floor and wall coverings and replace with new materials, if necessary, to achieve uniform color and appearance.
E. Ceilings: Patch and repair existing ceilings as necessary to provide an even-plane surface of uniform appearance.
7.6 DISPOSAL OF DEMOLISHED MATERIALS
A. General: Promptly dispose of demolished materials. Do not allow demolished materials to accumulate on-site.
B. Dispose of universal hazardous waste as required above.
C. Burning: Do not burn demolished materials.
D. Disposal: Transport demolished materials off Government property and legally dispose of them.
END OF SECTION 024119
MARCH 2026
SELECTIVE DEMOLITION 024119-4
USDA FOREST SERVICE, R-4
SILVER LAKE ROOF REPLACEMENT
SECTION 061000 - ROUGH CARPENTRY
1. GENERAL
DESCRIPTION OF WORK
Definition: Rough carpentry includes carpentry work not specified as part of other sections and which is generally not exposed, except as otherwise indicated. Types of work in this section include rough carpentry for:
Wood framing.
Wood grounds, nailers, blocking and sleepers.
Sheathing.
Finish Carpentry: Finish carpentry is specified in another Division-6 section.
QUALITY ASSURANCE
Lumber Standards: Comply with PS 20 and with applicable rules of the respective grading and inspecting agencies for species and products indicated.
Plywood Product Standards: Comply with PS 1 (ANSI A 199.1) or, for products not manufactured under PS 1 provisions, with applicable APA Performance Standard for type of panel indicated.
Source Inspection: Lumber of the specified species furnished under this section shall be inspected and comply with the grading rules of the appropriate following associations:
Western Wood Products Association (WWPA).
Factory-mark each piece of lumber with type, grade, mill and grading agency, except omit marking from surfaces to be exposed with transparent finish or without finish.
SUBMITTALS
Material Certificates: Where dimensional lumber is provided to comply with minimum allowable unit stresses, submit listing of species and grade selected for each use, and submit evidence of compliance with specified requirements. Compliance may be in form of a signed copy of applicable portion of lumber producer's grading rules showing design values for selected species and grade. Design values shall be as approved by the Board of Review of American Lumber Standards Committee.
Wood Treatment Data: Submit treatment manufacturer's instructions for proper use of each type of treated material.
Pressure Treatment: For each type specified, include certification by treating plant stating chemicals and process used, net amount of preservative retained and conformance with applicable standards.
Water-Borne Preservatives: Include statement that moisture content of treated materials was reduced to a maximum of 15% prior to shipment to project site.
PRODUCT HANDLING
Delivery and Storage: Keep materials dry at all times. Protect against exposure to weather and contact with damp or wet surfaces. Stack lumber and plywood, and provide air circulation within stacks.
JOB CONDITIONS
Coordination: Fit carpentry work to other work; scribe and cope as required for accurate fit. Correlate location of furring, nailers, blocking, grounds and similar supports to allow proper attachment of other work.
MEASUREMENT AND PAYMENT:
The measurement shall be lump sum for rough carpentry as shown on the Schedule of Items.
PRODUCTS
MATERIALS
Lumber, General:
Nominal sizes are indicated, except as shown by detail dimensions. Provide actual sizes as required by PS 20, for moisture content specified for each use.
For structural framing provide the following grade and species:
No. 2 grade.
Douglas Fir (WWPA).
Miscellaneous Lumber: Provide wood for support or attachment of other work including cant strips, bucks, nails, blocking, furring, grounds, stripping and similar members. Provide lumber of sizes indicated, worked into shapes shown, with a moisture content of 15% maximum for lumber items not specified to receive wood preservative treatment.
Plywood (PWD):
Trademark: Identify each plywood panel with appropriate American Plywood Association (APA) trademark.
Concealed Performance-Rated Plywood: Where plywood panels will be used for the following concealed types of applications, provide APA Performance-Rated Panels complying with requirements indicated for grade designation, span rating, exposure durability classification, edge detail (where applicable) and thickness.
Wall Sheathing: APA RATED SHEATHING.
Exposure Durability Classification: EXTERIOR.
Exposure Durability Classification: EXPOSURE 2.
Span Rating: Siding: 16.
Roof Sheathing: APA RATED SHEATHING.
Exposure Durability Classification: EXTERIOR.
Exposure Durability Classification: EXPOSURE 2.
Span Rating: As required to suit rafter spacing indicated.
Span Rating: 24/0.
Miscellaneous Materials:
Fasteners and Anchorages: Provide size, type, material and finish as indicated and as recommended by applicable standards, complying with applicable Federal Specifications for nails, staples, screws, bolts, nuts, washers and anchoring devices. Provide metal hangers and framing anchors of the size and type recommended by the manufacturer for each use including recommended nails.
Where rough carpentry work is exposed to weather, in ground contact, or in area of high relative humidity, provide fasteners and anchorages with a hot-dip zinc coating (ASTM A 153).
WOOD TREATMENT
Preservative Treatment: Where lumber or plywood is indicated as "Trt-Wd" or "Treated," or is specified herein to be treated, comply with applicable requirements of American Wood Preservers Association (AWPA) Standards C2 (Lumber) and C9 (Plywood) and of American Wood Preservers Bureau (AWPB) Standards listed below. Mark each treated item with the AWPB Quality Mark Requirements.
Pressure-treat above-ground items with water-borne preservatives complying with AWPB LP-2. After treatment, kiln-dry to a maximum moisture content of 15%. Treat indicated items and the following:
Wood cants, nailers, curbs, blocking, stripping, and similar members in connection with roofing, flashing, vapor barriers and waterproofing.
Wood sills, sleepers, blocking, furring, stripping and similar concealed members in contact with masonry or concrete.
Complete all fabrication of treated items prior to treatment, where possible. If cut after treatment, coat cut surfaces with heavy brush coat of same chemical used for treatment. Inspect each piece of lumber or plywood after drying and discard damaged or defective pieces.
Inspection: Inspect each piece of treated lumber or plywood after drying and discard damaged or defective pieces.
EXECUTION
INSTALLATION
General:
Discard units of material with defects which might impair quality of work, and units which are too small to use in fabricating work with minimum joints or optimum joint arrangement.
Set carpentry work accurately to required levels and lines, with members plumb and true and accurately cut and fitted.
Securely attach carpentry work to substrate by anchoring and fastening as shown and as required by recognized standards. Countersink nail heads on exposed carpentry work and fill holes.
Use common wire nails, except as otherwise indicated. Use finishing nails for finish work. Select fasteners of size that will not penetrate members where opposite side will be exposed to view or will receive finish materials. Make tight connections between members. Install fasteners without splitting of wood; predrill as required.
Wood Grounds, Nailers, Blocking and Sleepers:
Provide wherever shown and where required for screeding or attachment of other work. Form to shapes as shown and cut as required for true line and level of work to be attached. Coordinate location with other work involved.
Attach to substrates as required to support applied loading. Countersink bolts and nuts flush with surfaces, unless otherwise show. Build into masonry during installation of masonry work. Where possible, anchor to formwork before concrete placement.
Provide permanent grounds of dressed, preservative treated, key-bevelled lumber not less than 1-1/2" wide and of thickness required to bring face of ground to exact thickness of finish material involved. Remove temporary grounds when no longer required.
Wood Framing, General (Wd-Frm):
Provide framing members of sizes and on spacings shown, and frame openings as shown, or if not shown, comply with recommendations of "Manual for House Framing" of National Forest Products Association (N.F.P.A.). Do not splice structural members between supports.
Anchor and nail as shown, and to comply with "Recommended Nailing Schedule" of "Manual for House Framing" and other recommendations of N.F.P.A.
Stud Framing:
General: Provide stud framing where shown. Unless otherwise shown, use 2" x 4" wood studs spaced 16" o.c. with 4" face perpendicular to direction of wall or partition. Provide single bottom plate and double-top plates 2" thick by width of studs; except single top plate may be used for non-load-bearing partitions. Nail or anchor plates to supporting construction.
Construct corners and intersections with not less than 3 studs. Provide miscellaneous blocking and framing as shown and as required for support of facing materials, fixtures, specialty items and trim.
Frame openings with multiple studs and headers. Provide nailed header members of thickness equal to width of studs. Set headers on edge and support on jamb studs.
For non-bearing partitions, provide double-jamb studs and headers not less than 4" deep for openings 3' and less in width, and not less than 6" deep for wider openings.
For load-bearing partitions, provide double-jamb studs for openings 6' and less in width, and triple-jamb studs for wider openings. Provide headers of depth shown, or if not shown, provide as recommended by N.F.P.A. "Manual for House Framing".
Installation of Plywood:
General: Comply with applicable recommendations contained in Form No. E 30G, "APA Design/Construction Guide - Residential & Commercial", for types of plywood products and applications indicated.
Fastening Methods: Fasten panels as indicated below:
Sheathing: Nail to framing. Do not penetrate wood decking.
Plywood Backing Panels: Nail to supports.
END OF SECTION 061000
AUGUST 2017
ROUGH CARPENTRY 061000-1
STRUCTURAL INSULATED PANELS 061200-1
USDA FOREST SERVICE, R-4
SILVER LAKE ROOF REPLACEMENT
SECTION 061200 - STRUCTURAL INSULATED PANELS
1. GENERAL
SUMMARY
Section Includes: Structural Insulated Panels (SIPs) Related Sections: Sections related to this section include:
Section 013300 Submittal Procedures Section 061000 Rough Carpentry Section 076000 Flashing and Sheet Metal Section 079219 Joint Sealants
SYSTEM DESCRIPTION
Structural Insulated Panels (SIPs) consist of performance-rated oriented strand board (OSB) structurally laminated to expanded polystyrene (EPS) rigid insulation core. A SIP system incorporates manufacturer-specific spline connectors, sealants and SIP screws.
REFERENCES
American Society of Civil Engineers (ASCE) Publications ASCE 7 – Minimum Loads for Buildings and Other Structures.
ASTM INTERNATIONAL PUBLICATIONS:
ASTM C578 – Standard Specifications for Rigid, Cellular Polystyrene Thermal Insulation.
ASTM E72 – Standard Test Methods of Conducting Strength Tests of Panels for Building Construction ASTM E119 – Standard Test Methods for Fire Tests of Building Construction and Materials ASTM E1803 – Standard Test Method for Determining Structural Capacities of Insulated Panels.
APA The Engineered Wood Association Publications:
DOC PS2 – Performance Standard for Wood-Based Structural-Use Panels.
APA PRP-108 – Performance Standards and Qualification Policy for Structural-Use Panels ICC-ES Acceptance Criteria:
ICC-ES AC04 – Acceptance Criteria for Sandwich Panels.
ICC-ES AC05 – Acceptance Criteria for Sandwich Panel Adhesives.
ICC ES AC12 – Acceptance Criteria for Foam Plastic Insulation.
International Code Council Publications International Building Code (IBC)
DESIGN REQUIREMENTS
Provide SIPs which have been manufactured, fabricated and installed to withstand specified loads as determined by design in accordance with the local building codes and to maintain performance criteria as stated by the SIP manufacturer without defects, damage or product failure.
SUBMITTALS
Product Data: Submit product data for specific products.
SIP Code Compliance: Provide code report for SIP with evidence of compliance with code requirements for alternate method of construction as per applicable code. Submit current compliance report number from ICC ES showing conformance to the IBC. Code report shall include confirmation of compliance with applicable evaluation criteria.
EPS Code compliance: Provide evaluation report for EPS insulation with evidence of compliance with applicable code. Submit current compliance report numbers from ICC ES showing conformance to the IBC. Code report shall include confirmation of compliance with applicable evaluation criteria.
Calculations: Provide structural calculation prepared by a design professional registered in the State of Utah where the work is being performed.
Shop drawings: Submit SIP shop drawings showing panel layout, elevations, SIP connection details, product components and accessories.
Quality Assurance Submittals: Submit the following:
Third-Party Quality Control: Provide proof of manufacturer participation in recognized third party certification program to assure conformance with SIP System specified performance characteristics and physical properties in accordance with Section 013300 - Submittal Procedures.
Submit copy of third party certification label demonstrating that manufacture of panels complies with specified performance characteristics and physical properties.
Submit manufacturer-specific installation instructions for SIP system.
Warranty: Provide limited warranty documents as specified herein.
QUALITY ASSURANCE
Installer Qualifications: Installer to have demonstrated experience acceptable to SIP Manufacturer for installation work similar in scope and size to this project. Manufacturer to confirm availability of site advisory service.
Field Measurements: Request field measurements prior to completion of shop drawings and fabrication. Coordinate fabrication schedule with construction progress to avoid delay of work. NOTE: Field fabrication is allowed to ensure proper fit after consultation with manufacturer, but must be kept to minimum with majority of SIP fabrication being done under controlled shop conditions.
Source limitations: Obtain all SIPs through one source. All accessories to be furnished or recommended by the SIP manufacturer.
REGULATORY REQUIREMENTS:
SIPs shall be recognized for compliance with the applicable building code with an ICC-ES evaluation report demonstrating compliance with the International Building Code (IBC).
Pre-installation Meeting: Conduct pre-installation meeting to verify project requirements, structural system/substrate conditions, review SIP manufacturer installation instructions and requirements for SIP manufacturer warranty.
DELIVERY, STORAGE AND HANDLING
Ordering: Comply with SIP manufacturer ordering instructions and lead time requirements to avoid construction delays.
Delivery: Deliver materials from SIP manufacturer with identification labels or markings intact.
Unloading: Off-load SIPs from delivery truck and handle using fork lift, crane or other means to prevent damage to SIPs.
Storage: SIPs shall be fully supported in level storage and prevented from contact with the ground. Stack SIPs with a minimum of three supports for every eight feet of SIP length.
Protection: SIPs shall be fully protected from the weather. Protect against exposure to rain, water, dirt, mud, and other residue that may affect SIP performance. Cover stored SIPs with breathable protective wraps. Sips shall be stored in a protected area.
WARRANTY
SIP Manufacturer Warranty: Submit SIP manufacturer standard warranty document for execution by an authorized company official for a period of 20 years after the completion of the project.
MEASUREMENT AND PAYMENT
There will be no separate measurement or payment for work in this section. Payment will be included in the contract unit price for items shown in the schedule of items.
PRODUCTS
MANUFACTURERS/SUPPLIERS
Basis of Design Product: Insulspan Incorporated:
9012 East US 233, Blissfield, MI, USA 49228-0026, Telephone 800-726-3510.
Approved equal.
MATERIALS
SIPs consist of the following:
Expanded polystyrene (EPS) core –EPS insulation complying with ASTM C578, Type I. Insulation manufacturer shall be identified with label of accredited Third Party Certification agency.
Oriented Strand Board (OSB) – a performance rating mark shall be identified on the panel, with an Exposure 1 durability rating; minimum physical properties shall be tested and described in DOC PS2, APA PRP-108.
Adhesives shall be in conformance with ICC ES AC05 – Acceptance Criteria for Sandwich Panel adhesives.
ACCESSORIES
Splines:
OSB, dimensional lumber, engineered wood or I-beam for use in joining SIPs shall be supplied by the SIP manufacturer as specified on approved SIP shop drawings.
Fasteners:
Nails as per SIP manufacturer design requirements shall be used for spline and plate attachments following fastening requirements specified on approved SIP shop drawings. Nails for field installation of spline and plates to be supplied by the SIP installer.
Panel Screws as per SIP manufacturer design requirements shall be used following fastening requirements specified on approved SIP shop drawings. Panel screws are to be supplied by the SIP manufacturer or approved equal supplied by the SIP installer.
SIP Sealant:
Sealants shall be specifically designed for use with SIPs. Sealant must be compatible with all components of the SIP. Sealant is to be supplied by the SIP manufacturer or approved equal supplied by the SIP installer.
FABRICATION
Panel sizes shall be fabricated in accordance with approved shop drawings. Maximum panel size shall be 8’ X 24’. Fabrication tolerances shall comply with values in manufacturer product specification.
Manufacturing Standards: SIPs shall be manufactured under a third party certification program monitored by an accredited agency and manufacturer shall maintain a quality management system in accordance with ISO 9001: 2000.
SIP Thermal Resistance at a Mean Temperature of 75° F for SIP only consisting of 7/16” OSB structurally laminated to both faces of EPS insulation core.
NOTE: SIP effective thermal resistance values are for Insulspan SIPs with OSB surface spline or Insulspline panel to panel connection type. Thermal resistance value does not include interior/exterior cladding or finish materials and air films. R-value (Inch-pound) units of measure are (ft2•hr•F)/BTU.
8 ¼” (210 mm) thick SIP with R-28.6.
SOURCE QUALITY
Source Quality Assurance: Each SIP component required shall be supplied by SIP manufacturer and shall be obtained from the selected SIP manufacturer of its approved supplier.
Each SIP shall be labeled indicating Third Party Certification.
Provide evidence of Third Party Certification and labeling of all insulation used in the manufacturing of SIPs.
SIP manufacturer shall provide lamination, R-value (RSI-value) and warranty document for building owner acceptance and execution.
Dimensional Tolerance – shall comply with values listed in the SIP manufacturer Quality Control Manual.
Source Quality: Obtain SIPs from a single manufacturer.
INSTALLATION
MANUFACTURER INSTRUCTIONS
Compliance: Comply with SIP manufacturer ICC-ES evaluation reports, published Load Design Charts, Construction Assembly Drawings, Approved Shop Drawings and product data including Technical Bulletins and Product Information Bulletins for design and installation.
Construction Documents and Shop drawings shall be reviewed by a qualified architect/engineer and shall be signed and sealed. Deviations from standard details or load design values shall be calculated for the specific use and the calculations and details shall be signed and sealed by a registered…
This is the start of the file's text. The full file is on GovTribe.