C04.0 N4523A21R1050 YC-1647 - Attachment J-2 Price Proposal Worksheet.xlsx

XLSX spreadsheet 26 KB Posted

Attached to
Maintenance, repair, and preservation of YC-1647
Solicitation number
N4523A21R1050
Issued by

About this file

This document contains a pre-solicitation notice and draft statement of work for maintenance, repair, and preservation services for a YC-1647 Open Lighter Barge. The Department of the Navy, Naval Supply Systems Command will seek proposals for a firm-fixed-price contract to accomplish maintenance, repair, and preservation of one YC-1647 Open Lighter Barge, including washing and cleaning the vessel, blasting and preserving exterior surfaces, inspecting hull and tanks, repairing fenders and hatches, and reinstalling non-skid deck coating. The period of performance is from February 3, 2021 to April 6, 2021. The solicitation is anticipated to be posted in November 2020 with award of the contract in January 2021 on a lowest-price technically acceptable basis. The procurement will be set aside for small businesses classified under NAICS code 336611 with a size standard of 1,250 employees.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

vessel name

INSERT CONTRACTOR/COMPANY NAME HERE
Project =YC-1647DATE: =
PRIMESUBCONTRACTORPRIME
Carney, Sean R CIV PSNS&IMF, Code 411: =MH*Labor Rate*G&APRIME

Carney, Sean R CIV PSNS&IMF, Code 411: =(Prime Material Price+Subcontractor Total)*Profit Rate

PARAGRAPH No.TITLEM/HMATERIAL PRICETOTAL
Carney, Sean R CIV PSNS&IMF, Code 411: =(MH*Labor Rate)+Material PriceLabor CostMaterial CostTOTAL

Carney, Sean R CIV PSNS&IMF, Code 411: =Sub Cost (F)

Carney, Sean R CIV PSNS&IMF, Code 411: =MH*Labor Rate*G&A Carney, Sean R CIV PSNS&IMF, Code 411: =(Prime Material Price+Subcontractor Total)*Profit Rate Other Direct Cost (ODC)* G&A PROFIT Line Item Total Carney, Sean R CIV PSNS&IMF, Code 411: =SUM(Prime Total+Subcontractor Total+ODC+G&A+Profit)

1.4Arrival Conference$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00
1.5Required Documents$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00
1.6Progress Meetings$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00
1.7Availability Requirements$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00
1.7.1Transport Vessel$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00
1.8Care of Vessel$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00
1.11CFR Reports$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00
1.13Safety Requirements$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00
1.14Hotwork/ Welding/ Inspection$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00
1.16Preservation OQE$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00
1.17Enviromental/ Hazwaste Management$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00
1.20Gas Free$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00
1.21Develop & Maintain Test Plan$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00
3.1.1Personnel & Equipment$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00
3.1.2Docking Procedures$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00
3.1.3Blocking Plan$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00
3.1.4Crib and Brace Blocking$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00
3.1.5Setting and Aligning Blocks$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00
3.1.6Docking Conference$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00
3.1.7Docking the Vessel$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00
3.1.8Post Docking$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00
3.1.9Undocking Vessel$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00
3.1.11Final Docking Report$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00
3.2.1Indentify Distinguishing Figures & Markings$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00
3.2.2Steel Half Pipe Fenders$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00
3.2.3Zinc's Replacement$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00
3.2.4Rubber fenders$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00
3.2.5Hull Blasting and Preservation$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00
3.2.6Hull and Freeboard Visual Inspection$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00
3.2.7Hull and Freeboard U/T Inspection$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00
3.3.1Handrail Removals$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00
3.3.2Towing Pad Eyes$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00
3.4.1Open, Pump, Clean, Vent, Gas Free, Close all Tanks$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00
3.4.2Tank/Void Visual Inspection$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00
3.4.3Indentfy Color Schemes and Markings$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00
3.4.4Pre-Lim Air Test$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00
3.4.5Tank/Void Preservation$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00
3.4.6Access Cover / Preservation$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00
3.4.7Watertight Hatch repairs$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00
3.4.9Final Air Test$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00
3.4.10Tank Clooseout Inspection$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00
3.5.1Main Deck Non-skid Preservation$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00
3.5.2Main Deck Visual Inspection$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00
3.5.3Main Deck U/T Inspection$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00
Column Totals0$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00
Scope (SOW/PWS)Labor Rate/MH:0G&A Rate0.00%Profit Rate:0.00%$0.00
Total Proposed Price

********DOLLAR ENTRIES ARE AUTOMATICALLY ROUNDED UP TO THE NEAREST WHOLE DOLLAR*********

*ODC-Defined as anything other than labor, subcontracts, and/or material that is directly attributable to a contract per FAR 31.202. Examples include rental charges and travel etc.

NOTE: Please fill in within the yellow highlighted boxes, the fixed labor rate, proposed G&A and proposed Profit rates.

NOTE: Labor rates and Profit rates used to calculate for the overall price of the base contract award shall be the basis for pricing on all modifications under this contract to include Reservation Tasking.

File details come from the government source that posted it. Updated .