This document contains a price worksheet template and solicitation for a firm-fixed-price contract to perform blocking and life cycle maintenance on four small boats located in the Puget Sound, Washington region. The contractor will be responsible for transporting the vessels to their facility, blasting and painting the hulls and decks, replacing non-skid and rubber materials, inspecting and cleaning fuel systems, replacing hydraulic hoses, and transporting the vessels back to the government. The solicitation was issued by the Regional Maintenance Center at Puget Sound Naval Shipyard with proposals due in August 2021 and award anticipated later that month. The work must be completed by October 2021 and is set aside for small businesses with fewer than 1,250 employees under NAICS code 336611.
View the file
Other files
Show all 12
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
CLIN 0001
| INSERT CONTRACTOR/COMPANY NAME HERE | |||||||||||
| Project = | Harbor Screening Boat 32HS1412 | DATE: = | |||||||||
| PRIME | SUBCONTRACTOR | PRIME | PRIME | ||||||||
| PARAGRAPH No. | TITLE | M/H | MATERIAL PRICE | TOTAL | Labor Cost | Material Cost | TOTAL | Other Direct Cost (ODC)* | G&A | PROFIT | Line Item Total |
| 3.1.1 | Transport, Delivery, and Recovery | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||
| 3.1.2-5 | Blocking | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||
| 3.1.6 | FME | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||
| 3.1.8 | HAZMAT Disposal | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||
| 3.1.9 | Cleanliness and Preparation for Transportation | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||
| 3.1.10 | Sketches of Current Vessel Characteristics | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||
| 3.2 | Non-Skid Replacement | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||
| 3.3 | Paint Hull | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||
| 3.4 | Blast/Paint, Sweep Blast Rubber, Zinc Anodes | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||
| 3.5 | Replace and Hydro Exterior Hoses | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||
| Column Totals | 0 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |
| Scope (PWS) | Labor Rate/MH: | G&A Rate: | Profit Rate: | ||||||||
| CLIN 0001 Total Price: | $0.00 |
&C********DOLLAR ENTRIES ARE AUTOMATICALLY ROUNDED UP TO THE NEAREST WHOLE DOLLAR********* =MH*Labor Rate*G&A =(Prime Material Price+Subcontractor Total)*Profit Rate =SUM(Prime Total+Subcontractor Total+ODC+G&A+Profit) =(MH*Labor Rate)+Material Price =Sub Cost (F) *ODC-Defined as anything other than labor, subcontracts, and/or material that is directly attributable to a contract per FAR 31.202. Examples include rental charges and travel etc.
NOTE: Please fill in within the yellow highlighted boxes, the fixed labor rate, proposed G&A and proposed Profit rates.
NOTE: Labor, G&A and Profit rates used to calculate for the overall price of the base contract award shall be the basis for pricing on all modifications under this contract.
CLIN 0002
| INSERT CONTRACTOR/COMPANY NAME HERE | |||||||||||
| Project = | Harbor Screening Boat 28HS0802 | DATE: = | |||||||||
| PRIME | SUBCONTRACTOR | PRIME | PRIME | ||||||||
| PARAGRAPH No. | TITLE | M/H | MATERIAL PRICE | TOTAL | Labor Cost | Material Cost | TOTAL | Other Direct Cost (ODC)* | G&A | PROFIT | Line Item Total |
| 3.1.1 | Transport, Delivery, and Recovery | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||
| 3.1.2-5 | Blocking | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||
| 3.1.6 | FME | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||
| 3.1.8 | HAZMAT Disposal | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||
| 3.1.9 | Cleanliness and Preparation for Transportation | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||
| 3.1.10 | Sketches of Current Vessel Characteristics | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||
| 3.2 | Non-Skid Replacement | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||
| 3.3 | Paint Hull | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||
| 3.4 | Blast/Paint, Sweep Blast Rubber, Zinc Anodes | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||
| 3.5 | Replace and Hydro Exterior Hoses | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||
| Column Totals | 0 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |
| Scope (PWS) | Labor Rate/MH: | G&A Rate: | Profit Rate: | ||||||||
| CLIN 0002 Total Price: | $0.00 |
&C********DOLLAR ENTRIES ARE AUTOMATICALLY ROUNDED UP TO THE NEAREST WHOLE DOLLAR********* =MH*Labor Rate*G&A =(Prime Material Price+Subcontractor Total)*Profit Rate =(MH*Labor Rate)+Material Price =Sub Cost (F) =SUM(Prime Total+Subcontractor Total+ODC+G&A+Profit) *ODC-Defined as anything other than labor, subcontracts, and/or material that is directly attributable to a contract per FAR 31.202. Examples include rental charges and travel etc.
NOTE: Please fill in within the yellow highlighted boxes, the fixed labor rate, proposed G&A and proposed Profit rates.
NOTE: Labor, G&A and Profit rates used to calculate for the overall price of the base contract award shall be the basis for pricing on all modifications under this contract.
CLIN 0003
| INSERT CONTRACTOR/COMPANY NAME HERE | |||||||||||
| Project = | Barrier Boat 25BB0403 | DATE: = | |||||||||
| PRIME | SUBCONTRACTOR | PRIME | PRIME | ||||||||
| PARAGRAPH No. | TITLE | M/H | MATERIAL PRICE | TOTAL | Labor Cost | Material Cost | TOTAL | Other Direct Cost (ODC)* | G&A | PROFIT | Line Item Total |
| 3.1.1 | Transport, Delivery, and Recovery | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||
| 3.1.2-5 | Blocking | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||
| 3.1.6 | FME | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||
| 3.1.8 | HAZMAT Disposal | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||
| 3.1.9 | Cleanliness and Preparation for Transportation | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||
| 3.1.10 | Sketches of Current Vessel Characteristics | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||
| 3.2 | Non-Skid Replacement | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||
| 3.3 | Paint Hull | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||
| 3.4 | Blast/Paint, Sweep Blast Rubber, Zinc Anodes | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||
| 3.5 | Replace and Hydro Exterior Hoses | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||
| Column Totals | 0 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |
| Scope (PWS) | Labor Rate/MH: | G&A Rate: | Profit Rate: | ||||||||
| CLIN 0003 Total Price: | $0.00 |
&C********DOLLAR ENTRIES ARE AUTOMATICALLY ROUNDED UP TO THE NEAREST WHOLE DOLLAR********* =MH*Labor Rate*G&A =(Prime Material Price+Subcontractor Total)*Profit Rate =(MH*Labor Rate)+Material Price =Sub Cost (F) =SUM(Prime Total+Subcontractor Total+ODC+G&A+Profit) *ODC-Defined as anything other than labor, subcontracts, and/or material that is directly attributable to a contract per FAR 31.202. Examples include rental charges and travel etc.
NOTE: Please fill in within the yellow highlighted boxes, the fixed labor rate, proposed G&A and proposed Profit rates.
NOTE: Labor, G&A and Profit rates used to calculate for the overall price of the base contract award shall be the basis for pricing on all modifications under this contract.
CLIN 0004
| INSERT CONTRACTOR/COMPANY NAME HERE | |||||||||||
| Project = | Work Boat 25WB1201 | DATE: = | |||||||||
| PRIME | SUBCONTRACTOR | PRIME | PRIME | ||||||||
| PARAGRAPH No. | TITLE | M/H | MATERIAL PRICE | TOTAL | Labor Cost | Material Cost | TOTAL | Other Direct Cost (ODC)* | G&A | PROFIT | Line Item Total |
| 3.1.1 | Transport, Delivery, and Recovery | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||
| 3.1.2-5 | Blocking | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||
| 3.1.6 | FME | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||
| 3.1.8 | HAZMAT Disposal | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||
| 3.1.9 | Cleanliness and Preparation for Transportation | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||
| 3.1.10 | Sketches of Current Vessel Characteristics | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||
| 3.2 | Non-Skid Replacement | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||
| 3.3 | Paint Hull | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||
| 3.4 | Blast/Paint, Sweep Blast Rubber, Zinc Anodes | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||
| 3.5 | Replace and Hydro Exterior Hoses | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||
| Column Totals | 0 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |
| Scope (PWS) | Labor Rate/MH: | G&A Rate: | Profit Rate: | ||||||||
| CLIN 0004 Total Price: | $0.00 |
&C********DOLLAR ENTRIES ARE AUTOMATICALLY ROUNDED UP TO THE NEAREST WHOLE DOLLAR********* =MH*Labor Rate*G&A =(Prime Material Price+Subcontractor Total)*Profit Rate =(MH*Labor Rate)+Material Price =Sub Cost (F) =SUM(Prime Total+Subcontractor Total+ODC+G&A+Profit) *ODC-Defined as anything other than labor, subcontracts, and/or material that is directly attributable to a contract per FAR 31.202. Examples include rental charges and travel etc.
NOTE: Please fill in within the yellow highlighted boxes, the fixed labor rate, proposed G&A and proposed Profit rates.
NOTE: Labor, G&A and Profit rates used to calculate for the overall price of the base contract award shall be the basis for pricing on all modifications under this contract.
TOTAL PRICE
| CLIN 0001 | $0.00 |
| CLIN 0002 | $0.00 |
| CLIN 0003 | $0.00 |
| CLIN 0004 | $0.00 |
| TOTAL PRICE | $0.00 |