C04.0 Attachment J-2 Price Worksheet.xls

XLS spreadsheet 121 KB Posted

Attached to
Blocking & Life Cycle Maintenance of Four (4) Small Boats
Solicitation number
N4523A21Q1054
Issued by

About this file

This document contains a price worksheet template and solicitation for a firm-fixed-price contract to perform blocking and life cycle maintenance on four small boats located in the Puget Sound, Washington region. The contractor will be responsible for transporting the vessels to their facility, blasting and painting the hulls and decks, replacing non-skid and rubber materials, inspecting and cleaning fuel systems, replacing hydraulic hoses, and transporting the vessels back to the government. The solicitation was issued by the Regional Maintenance Center at Puget Sound Naval Shipyard with proposals due in August 2021 and award anticipated later that month. The work must be completed by October 2021 and is set aside for small businesses with fewer than 1,250 employees under NAICS code 336611.

View the file

Other files

Show all 12

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

CLIN 0001

INSERT CONTRACTOR/COMPANY NAME HERE
Project =Harbor Screening Boat 32HS1412DATE: =
PRIMESUBCONTRACTORPRIMEPRIME
PARAGRAPH No.TITLEM/HMATERIAL PRICETOTALLabor CostMaterial CostTOTALOther Direct Cost (ODC)*G&APROFITLine Item Total
3.1.1Transport, Delivery, and Recovery$0.00$0.00$0.00$0.00$0.00
3.1.2-5Blocking$0.00$0.00$0.00$0.00$0.00
3.1.6FME$0.00$0.00$0.00$0.00$0.00
3.1.8HAZMAT Disposal$0.00$0.00$0.00$0.00$0.00
3.1.9Cleanliness and Preparation for Transportation$0.00$0.00$0.00$0.00$0.00
3.1.10Sketches of Current Vessel Characteristics$0.00$0.00$0.00$0.00$0.00
3.2Non-Skid Replacement$0.00$0.00$0.00$0.00$0.00
3.3Paint Hull$0.00$0.00$0.00$0.00$0.00
3.4Blast/Paint, Sweep Blast Rubber, Zinc Anodes$0.00$0.00$0.00$0.00$0.00
3.5Replace and Hydro Exterior Hoses$0.00$0.00$0.00$0.00$0.00
Column Totals0$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00
Scope (PWS)Labor Rate/MH:G&A Rate:Profit Rate:
CLIN 0001 Total Price:$0.00

&C********DOLLAR ENTRIES ARE AUTOMATICALLY ROUNDED UP TO THE NEAREST WHOLE DOLLAR********* =MH*Labor Rate*G&A =(Prime Material Price+Subcontractor Total)*Profit Rate =SUM(Prime Total+Subcontractor Total+ODC+G&A+Profit) =(MH*Labor Rate)+Material Price =Sub Cost (F) *ODC-Defined as anything other than labor, subcontracts, and/or material that is directly attributable to a contract per FAR 31.202. Examples include rental charges and travel etc.

NOTE: Please fill in within the yellow highlighted boxes, the fixed labor rate, proposed G&A and proposed Profit rates.

NOTE: Labor, G&A and Profit rates used to calculate for the overall price of the base contract award shall be the basis for pricing on all modifications under this contract.

CLIN 0002

INSERT CONTRACTOR/COMPANY NAME HERE
Project =Harbor Screening Boat 28HS0802DATE: =
PRIMESUBCONTRACTORPRIMEPRIME
PARAGRAPH No.TITLEM/HMATERIAL PRICETOTALLabor CostMaterial CostTOTALOther Direct Cost (ODC)*G&APROFITLine Item Total
3.1.1Transport, Delivery, and Recovery$0.00$0.00$0.00$0.00$0.00
3.1.2-5Blocking$0.00$0.00$0.00$0.00$0.00
3.1.6FME$0.00$0.00$0.00$0.00$0.00
3.1.8HAZMAT Disposal$0.00$0.00$0.00$0.00$0.00
3.1.9Cleanliness and Preparation for Transportation$0.00$0.00$0.00$0.00$0.00
3.1.10Sketches of Current Vessel Characteristics$0.00$0.00$0.00$0.00$0.00
3.2Non-Skid Replacement$0.00$0.00$0.00$0.00$0.00
3.3Paint Hull$0.00$0.00$0.00$0.00$0.00
3.4Blast/Paint, Sweep Blast Rubber, Zinc Anodes$0.00$0.00$0.00$0.00$0.00
3.5Replace and Hydro Exterior Hoses$0.00$0.00$0.00$0.00$0.00
Column Totals0$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00
Scope (PWS)Labor Rate/MH:G&A Rate:Profit Rate:
CLIN 0002 Total Price:$0.00

&C********DOLLAR ENTRIES ARE AUTOMATICALLY ROUNDED UP TO THE NEAREST WHOLE DOLLAR********* =MH*Labor Rate*G&A =(Prime Material Price+Subcontractor Total)*Profit Rate =(MH*Labor Rate)+Material Price =Sub Cost (F) =SUM(Prime Total+Subcontractor Total+ODC+G&A+Profit) *ODC-Defined as anything other than labor, subcontracts, and/or material that is directly attributable to a contract per FAR 31.202. Examples include rental charges and travel etc.

NOTE: Please fill in within the yellow highlighted boxes, the fixed labor rate, proposed G&A and proposed Profit rates.

NOTE: Labor, G&A and Profit rates used to calculate for the overall price of the base contract award shall be the basis for pricing on all modifications under this contract.

CLIN 0003

INSERT CONTRACTOR/COMPANY NAME HERE
Project =Barrier Boat 25BB0403DATE: =
PRIMESUBCONTRACTORPRIMEPRIME
PARAGRAPH No.TITLEM/HMATERIAL PRICETOTALLabor CostMaterial CostTOTALOther Direct Cost (ODC)*G&APROFITLine Item Total
3.1.1Transport, Delivery, and Recovery$0.00$0.00$0.00$0.00$0.00
3.1.2-5Blocking$0.00$0.00$0.00$0.00$0.00
3.1.6FME$0.00$0.00$0.00$0.00$0.00
3.1.8HAZMAT Disposal$0.00$0.00$0.00$0.00$0.00
3.1.9Cleanliness and Preparation for Transportation$0.00$0.00$0.00$0.00$0.00
3.1.10Sketches of Current Vessel Characteristics$0.00$0.00$0.00$0.00$0.00
3.2Non-Skid Replacement$0.00$0.00$0.00$0.00$0.00
3.3Paint Hull$0.00$0.00$0.00$0.00$0.00
3.4Blast/Paint, Sweep Blast Rubber, Zinc Anodes$0.00$0.00$0.00$0.00$0.00
3.5Replace and Hydro Exterior Hoses$0.00$0.00$0.00$0.00$0.00
Column Totals0$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00
Scope (PWS)Labor Rate/MH:G&A Rate:Profit Rate:
CLIN 0003 Total Price:$0.00

&C********DOLLAR ENTRIES ARE AUTOMATICALLY ROUNDED UP TO THE NEAREST WHOLE DOLLAR********* =MH*Labor Rate*G&A =(Prime Material Price+Subcontractor Total)*Profit Rate =(MH*Labor Rate)+Material Price =Sub Cost (F) =SUM(Prime Total+Subcontractor Total+ODC+G&A+Profit) *ODC-Defined as anything other than labor, subcontracts, and/or material that is directly attributable to a contract per FAR 31.202. Examples include rental charges and travel etc.

NOTE: Please fill in within the yellow highlighted boxes, the fixed labor rate, proposed G&A and proposed Profit rates.

NOTE: Labor, G&A and Profit rates used to calculate for the overall price of the base contract award shall be the basis for pricing on all modifications under this contract.

CLIN 0004

INSERT CONTRACTOR/COMPANY NAME HERE
Project =Work Boat 25WB1201DATE: =
PRIMESUBCONTRACTORPRIMEPRIME
PARAGRAPH No.TITLEM/HMATERIAL PRICETOTALLabor CostMaterial CostTOTALOther Direct Cost (ODC)*G&APROFITLine Item Total
3.1.1Transport, Delivery, and Recovery$0.00$0.00$0.00$0.00$0.00
3.1.2-5Blocking$0.00$0.00$0.00$0.00$0.00
3.1.6FME$0.00$0.00$0.00$0.00$0.00
3.1.8HAZMAT Disposal$0.00$0.00$0.00$0.00$0.00
3.1.9Cleanliness and Preparation for Transportation$0.00$0.00$0.00$0.00$0.00
3.1.10Sketches of Current Vessel Characteristics$0.00$0.00$0.00$0.00$0.00
3.2Non-Skid Replacement$0.00$0.00$0.00$0.00$0.00
3.3Paint Hull$0.00$0.00$0.00$0.00$0.00
3.4Blast/Paint, Sweep Blast Rubber, Zinc Anodes$0.00$0.00$0.00$0.00$0.00
3.5Replace and Hydro Exterior Hoses$0.00$0.00$0.00$0.00$0.00
Column Totals0$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00
Scope (PWS)Labor Rate/MH:G&A Rate:Profit Rate:
CLIN 0004 Total Price:$0.00

&C********DOLLAR ENTRIES ARE AUTOMATICALLY ROUNDED UP TO THE NEAREST WHOLE DOLLAR********* =MH*Labor Rate*G&A =(Prime Material Price+Subcontractor Total)*Profit Rate =(MH*Labor Rate)+Material Price =Sub Cost (F) =SUM(Prime Total+Subcontractor Total+ODC+G&A+Profit) *ODC-Defined as anything other than labor, subcontracts, and/or material that is directly attributable to a contract per FAR 31.202. Examples include rental charges and travel etc.

NOTE: Please fill in within the yellow highlighted boxes, the fixed labor rate, proposed G&A and proposed Profit rates.

NOTE: Labor, G&A and Profit rates used to calculate for the overall price of the base contract award shall be the basis for pricing on all modifications under this contract.

TOTAL PRICE

CLIN 0001$0.00
CLIN 0002$0.00
CLIN 0003$0.00
CLIN 0004$0.00
TOTAL PRICE$0.00

File details come from the government source that posted it. Updated .