C04.0 Attachment J-2 Price Proposal WS YT-801 N4523A23R1052.xls

XLS spreadsheet 171 KB Posted

Attached to
Maintenance, Repair, and Modernization of YT-801
Solicitation number
N4523A23R1052
Issued by

About this file

This document package includes an Excel pricing template and instructions for contractors to complete when bidding on a firm-fixed-price contract for maintenance, repair and modernization services for a YT-801 Harbor Tug. The scope of work involves delivering the vessel to the contractor's Puget Sound, WA region facility by 1 August 2023, cleaning and undertaking alterations such as generator foundation modifications, deck and electrical system work, piping replacements, and fender replacements. Additional requirements include undocking the vessel and returning it to the Government by 31 October 2023. Offerors must be registered in SAM and the procurement is a 100% small business set-aside under NAICS code 336611 with a size standard of 1,250 employees. The solicitation number is N4523A23R1052 and is being conducted by the Department of the Navy Naval Supply Systems Command.

View the file

Other files

Show all 12

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Instruction Sheet

Instructions for Contractors for Filling-out J-2 Price Proposal Worksheet
All yellow fields are to be filled out by the Contractor prior to submittal to The Government.
DO NOT FILL IN ANY CELL THAT IS NOT BRIGHT YELLOW.
Labor Mix & Rates Sheet
1Enter Company Name and Date
2Fill in each rate in its applicable yellow cell
3Fill in each labor category and ensure all yellow boxes are filled in
a.Example Labor Categories
Shipfitter
Sheetmetal
Welder/Burer
Electrician
Inside Machinist
Outside Machinist
Boilermaker
Pipefitter
Insulator/Lagger
Shipwright/Carpenter
EX/Ord
Painter/Blaster
Rigger/Laborer
QA/NDT
4Next, fill in each yellow cell for Regular Labor Hours and Overtime Labor Hours
5Your Total Direct Labor Rate Per Hour will autopopulate in each sheet. All other rates entered will also auto populate.
Price Proposal Worksheet
1All company and contract information and rates will be autopopulated from previous sheet.
2Fill in each yellow cell with its applicable information
3Anything that is not in yellow is locked, these cells will auto-calculate.
4Before submitting, ensure there are no more bright yellow cells.
IF USING FCCOM
Facilities Capital Cost of Money (FCCOM) is not required. If you are not inputting FCCOM please enter N/A in all cells. However, if your company is inputting FCCOM, it needs to be calculated based on the proper CASB-CMF form. Please include the CASB-CMF form with your submission.
Labor Hour Breakdown
1Enter each labor categoy will autofill from the "labor Mix & Rates" sheet
2Fill in each Regular and Overtime hour for each labor category and line item.

Labor Mix & Rates

Contractor/Company Name:
Project/Vessel Name:YT-801Date:
Base Rates:Regular Labor$0.00FringeOverheadG&AProfitFCCOM
Labor Mix and Rates
Labor CategoryRegular HoursOvertime HoursTotal Category HoursTotal Regular $/hourTotal Overtime $/hourTotal Category Dollars
0$0.00
0$0.00
0$0.00
0$0.00
0$0.00
0$0.00
0$0.00
0$0.00
0$0.00
0$0.00
0$0.00
0$0.00
0$0.00
0$0.00
0$0.00
0$0.00
0$0.00
0$0.00
0$0.00
0$0.00
0$0.00
0$0.00
0$0.00
0$0.00
0$0.00
0$0.00
Column Totals000$0.00$0.00$0.00
Direct Labor Rate Per Hour0

Example Labor Categories Shipfitter Sheetmetal Welder/Burer Electrician Inside Machinist Outside Machinist Boilermaker Pipefitter Insulator/Lagger Shipwright/Carpenter EX/Ord Painter/Blaster Rigger/Laborer QA/NDT

Price Proposal Worksheet

Contractor/Company Name:0
Project/Vessel Name:YT-801Date:12/31/99
Base Rates:Labor$0.00Fringe0.00%Overhead0.00%G&A0.00%Profit0.00%FCCOM0.00
Base Work Package Proposal
PARAGRAPH No.TITLEPRIMESUBCONTRACTOROther Direct Cost (ODC)*PRIMELine Item Total
M/HLabor CostMATERIAL PRICETOTALLabor CostMaterial CostTOTALODCTravel ODCTOTALFringeOverheadG&AProfitFCCOM
1.4Arrival Conference$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00
1.5Required Documents$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00
1.6Progress Meetings$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00
1.7Availability Requirements$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00
1.8Care of Vessel$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00
1.11Condition Found Reports$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00
1.13Safety Requirements$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00
1.16Preservation$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00
1.17Enviromental and Hazardous Waste Management$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00
1.22Gas Free$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00
1.23General Requirements for Testing$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00
1.24Compartment Arrival/Closeout Inspection$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00
1.25Process Control Procedure Requirements$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00
3.1.1Personnnel & Equipment$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00
3.1.2Docking Procedure$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00
3.1.3Blocking Plan$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00
3.1.4Crib and Brace Blocking$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00
3.1.5Setting and Aligning Docking Blocks$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00
3.1.6Stability Calculations$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00
3.1.7Docking Conference$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00
3.1.8Docking The Vessel$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00
3.1.9Post Docking$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00
3.1.10Undocking The Vessel$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00
3.1.12Final Docking Report$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00
3.2.1Identify Distinguishing Figures and Markings$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00
3.2.2Rubber Fender Replacement$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00
3.3.1Ship Service Diesel Generator Foundations Alteration$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00
3.10.1Electrical Distribution Switchboard AlterationMain Deck U/T Inspection$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00
3.10.2Interior Communications Alarm Alteration$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00
3.10.3Automated Emergency Shutdown System Alteration$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00
3.10.4Ship Service Diesel Generator Alteration$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00
3.10.5Power Brow HPU Relocation Alteration$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00
3.11.1Fuel System Piping Alteration$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00
3.11.2Cooling System Piping AlterationMain Deck U/T Inspection$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00
3.11.3Generation Exhaust Piping Alteration$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00
3.11.4Start Air Piping Alteration$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00
3.13.1Operational Responsibility$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00
3.13.2Final Sea Trial$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00
3.13.3Post Sea Trial$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00
LOELOE$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00$0.00$0.00
Column Totals0$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00
Base Work Package$0.00
OPTION YEAR TABLE IF NEEDED:
Level of Effort to Completion
PARAGRAPH No.TITLEM/HLabor CostMATERIAL PRICETOTALLabor CostMaterial CostTOTALODCTravel ODCTOTALFringeOverheadG&AProfitFCCOMLine Item Total
Level of Effort (LOE) to Completion - Growth1261017501.83$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00
Column Totals12610$17,501.83$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00
Total LOE to Completion:$0.00
TOTAL PROPOSED PRICE:$0.00

*ODC-Defined as anything other than labor, subcontracts, and/or material that is directly attributable to a contract per FAR 31.202. Examples include rental charges and travel etc.

NOTE: Please fill in within the yellow highlighted boxes, the fixed labor rate, proposed G&A and proposed Profit rates.

NOTE: Labor rates and Profit rates used to calculate for the overall price of the base contract award shall be the basis for pricing on all modifications under this contract.

Labor Hour Breakdown

Contractor/Company Name:0
Project/Vessel Name:YT-801Date:12/31/99
Base Rates:Regular Labor Rate$0.00
NameRateTotal CostNameRateTotal Cost
Labor Hour Breakdown
PARAGRAPH No.TITLELabor CategoriesTotal Overall Labor Cost
000000000000000000Total Regular HoursTotal Overtime Hours
REGOTREGOTREGOTREGOTREGOTREGOTREGOTREGOTREGOTREGOTREGOTREGOTREGOTREGOTREGOTREGOTREGOTREGOT
1.4Arrival Conference00$0.00
1.5Required Documents00$0.00
1.6Progress Meetings00$0.00
1.7Availability Requirements00$0.00
1.8Care of Vessel00$0.00
1.11Condition Found Reports00$0.00
1.13Safety Requirements00$0.00
1.16Preservation00$0.00
1.17Enviromental and Hazardous Waste Management00$0.00
1.22Gas Free00$0.00
1.23General Requirements for Testing00$0.00
1.24Compartment Arrival/Closeout Inspection00$0.00
1.25Process Control Procedure Requirements00$0.00
3.1.1Personnnel & Equipment00$0.00
3.1.2Docking Procedure00$0.00
3.1.3Blocking Plan00$0.00
3.1.4Crib and Brace Blocking00$0.00
3.1.5Setting and Aligning Docking Blocks00$0.00
3.1.6Stability Calculations00$0.00
3.1.7Docking Conference00$0.00
3.1.8Docking The Vessel00$0.00
3.1.9Post Docking00$0.00
0000$0.00
3.1.10Undocking The Vessel00$0.00
3.1.12Final Docking Report00$0.00
3.2.1Identify Distinguishing Figures and Markings00$0.00
3.2.2Rubber Fender Replacement00$0.00
0000$0.00
0000$0.00
0000$0.00
0000$0.00
3.3.1Ship Service Diesel Generator Foundations Alteration00$0.00
0000$0.00
0000$0.00
0000$0.00
0000$0.00
0000$0.00
3.11.2Cooling System Piping Alteration00$0.00
3.11.3Generation Exhaust Piping Alteration00$0.00
3.11.4Start Air Piping Alteration00$0.00
0000$0.00
0000$0.00
0000$0.00
0000$0.00
0000$0.00
0000$0.00
0000$0.00
0000$0.00
0000$0.00
0000$0.00
0000$0.00
0000$0.00
0000$0.00
LOELOE00$0.00
0000$0.00
0000$0.00
0000$0.00
0000$0.00
0000$0.00
0000$0.00
$0.00$0.000$0.00$0.00
$0.00$0.000$0.00$0.00
$0.00$0.000$0.00$0.00
$0.00$0.000$0.00$0.00
$0.00$0.000$0.00$0.00
$0.00$0.000$0.00$0.00
$0.00$0.000$0.00$0.00
$0.00$0.000$0.00$0.00
$0.00$0.000$0.00$0.00
$0.00$0.000$0.00$0.00
$0.00$0.000$0.00$0.00
$0.00$0.000$0.00$0.00
$0.00$0.000$0.00$0.00
$0.00$0.000$0.00$0.00
$0.00$0.000$0.00$0.00
$0.00$0.000$0.00$0.00
$0.00$0.000$0.00$0.00
$0.00$0.000$0.00$0.00
$0.00$0.000$0.00$0.00
$0.00$0.000$0.00$0.00
$0.00$0.000$0.00$0.00
$0.00$0.000$0.00$0.00
$0.00$0.000$0.00$0.00
Column Totals00000000000000000000000000000000000000$0.00
Base Work Package$0.00
OPTION YEAR TABLE IF NEEDED:
Labor Hour Breakdown
PARAGRAPH No.TITLELabor CategoriesTotal Overall Labor Cost
000000000000000000Total Direct HoursTotal Overtime Hours
REGOTREGOTREGOTREGOTREGOTREGOTREGOTREGOTREGOTREGOTREGOTREGOTREGOTREGOTREGOTREGOTREGOTREGOT
0Level of Effort (LOE) to Completion - Growth00$0.00
0000$0.00
0000$0.00
0000$0.00
Column Totals00000000000000000000000000000000000000$0.00
Total Option Items (O):$0.00
TOTAL DIRECT LABOR COSTS BY WORK ITEM$0.00

File details come from the government source that posted it. Updated .