C04.0 Attachment J-2 Price Proposal Worksheet.xls
XLS spreadsheet 219 KB Posted
- Solicitation number
- N4523A22R1056
About this file
This document contains a solicitation for maintenance, repair, and preservation services for a large harbor tug. The Regional Maintenance Center at Puget Sound Naval Shipyard and Intermediate Maintenance Facility intends to award a firm-fixed-price, stand-alone contract in May 2022 for work on YT-803, a large harbor tug with specifications detailed in the attached statement of work. The delivery schedule is from June 1, 2022 through October 5, 2022. The contractor's facility must be capable of accommodating the tug. Services include drydocking, hull blasting and preservation, inspections, and electrical, mechanical and engine repairs. Offerors must register with the System for Award Management and submit responses for a lowest-price, technically acceptable award by the Department of the Navy Naval Supply Systems Command.
View the file
Other files
Show all 11
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Instruction Sheet
| Instructions for Contractors for Filling-out J-2 Price Proposal Worksheet | ||
| All yellow fields are to be filled out by the Contractor prior to submittal to The Government. | ||
| DO NOT FILL IN ANY CELL THAT IS NOT BRIGHT YELLOW. | ||
| Labor Mix & Rates Sheet | ||
| 1 | Enter Company Name and Date | |
| 2 | Fill in each rate in its applicable yellow cell | |
| 3 | Fill in each labor category and ensure all yellow boxes are filled in | |
| a. | Example Labor Categories | |
| Shipfitter | ||
| Sheetmetal | ||
| Welder/Burer | ||
| Electrician | ||
| Inside Machinist | ||
| Outside Machinist | ||
| Boilermaker | ||
| Pipefitter | ||
| Insulator/Lagger | ||
| Shipwright/Carpenter | ||
| EX/Ord | ||
| Painter/Blaster | ||
| Rigger/Laborer | ||
| QA/NDT | ||
| 4 | Next, fill in each yellow cell for Regular Labor Hours and Overtime Labor Hours | |
| 5 | Your Total Direct Labor Rate Per Hour will autopopulate in each sheet. All other rates entered will also auto populate. | |
| Price Proposal Worksheet | ||
| 1 | All company and contract information and rates will be autopopulated from previous sheet. | |
| 2 | Fill in each yellow cell with its applicable information | |
| 3 | Anything that is not in yellow is locked, these cells will auto-calculate. | |
| 4 | Before submitting, ensure there are no more bright yellow cells. | |
| IF USING FCCOM | ||
| Facilities Capital Cost of Money (FCCOM) is not required. If you are not inputting FCCOM please enter N/A in all cells. However, if your company is inputting FCCOM, it needs to be calculated based on the proper CASB-CMF form. Please include the CASB-CMF form with your submission. | ||
| Labor Hour Breakdown | ||
| 1 | Enter each labor categoy will autofill from the "labor Mix & Rates" sheet | |
| 2 | Fill in each Regular and Overtime hour for each labor category and line item. |
Labor Mix & Rates
| Contractor/Company Name: | |||||||||
| Project/Vessel Name: | YT 803 | Date: | |||||||
| Base Rates: | Regular Labor | $0.00 | Fringe | Overhead | G&A | Profit | FCCOM | ||
| Labor Mix and Rates | |||||||||
| Labor Category | Regular Hours | Overtime Hours | Total Category Hours | Total Regular $/hour | Total Overtime $/hour | Total Category Dollars | |||
| 0 | $0.00 | ||||||||
| 0 | $0.00 | ||||||||
| 0 | $0.00 | ||||||||
| 0 | $0.00 | ||||||||
| 0 | $0.00 | ||||||||
| 0 | $0.00 | ||||||||
| 0 | $0.00 | ||||||||
| 0 | $0.00 | ||||||||
| 0 | $0.00 | ||||||||
| 0 | $0.00 | ||||||||
| 0 | $0.00 | ||||||||
| 0 | $0.00 | ||||||||
| 0 | $0.00 | ||||||||
| 0 | $0.00 | ||||||||
| 0 | $0.00 | ||||||||
| 0 | $0.00 | ||||||||
| 0 | $0.00 | ||||||||
| 0 | $0.00 | ||||||||
| 0 | $0.00 | ||||||||
| 0 | $0.00 | ||||||||
| 0 | $0.00 | ||||||||
| 0 | $0.00 | ||||||||
| 0 | $0.00 | ||||||||
| 0 | $0.00 | ||||||||
| 0 | $0.00 | ||||||||
| 0 | $0.00 | ||||||||
| Column Totals | 0 | 0 | 0 | $0.00 | $0.00 | $0.00 | |||
| Direct Labor Rate Per Hour | 0 |
Example Labor Categories Shipfitter Sheetmetal Welder/Burer Electrician Inside Machinist Outside Machinist Boilermaker Pipefitter Insulator/Lagger Shipwright/Carpenter EX/Ord Painter/Blaster Rigger/Laborer QA/NDT
Price Proposal Worksheet
| Contractor/Company Name: | 0 | |||||||||||||||||
| Project/Vessel Name: | YT 803 | Date: | 12/31/99 | |||||||||||||||
| Base Rates: | Labor | $0.00 | Fringe | 0.00% | Overhead | 0.00% | G&A | 0.00% | Profit | 0.00% | FCCOM | 0.00 | ||||||
| Base Work Package Proposal | ||||||||||||||||||
| PARAGRAPH No. | TITLE | PRIME | SUBCONTRACTOR | Other Direct Cost (ODC)* | PRIME | Line Item Total | ||||||||||||
| M/H | Labor Cost | MATERIAL PRICE | TOTAL | Labor Cost | Material Cost | TOTAL | ODC | Travel ODC | TOTAL | Fringe | Overhead | G&A | Profit | FCCOM | ||||
| 1.4 | Arrival Conference | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||||
| 1.5 | Required Documents | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||||
| 1.6 | Progress Meetings | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||||
| 1.7 | Availability Requirements | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||||
| 1.8 | Care of Vessel | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||||
| 1.11 | Condition Found Reports | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||||
| 1.13 | Safety Requirements | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||||
| 1.16 | Preservation | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||||
| 1.17 | Enviromental and Hazardous Waste Management | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||||
| 1.22 | Gas Free | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||||
| 1.23 | General Requirements for testing | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||||
| 1.24 | Compartment Arrival/Closeout Inspection | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||||
| 1.25 | PCP Procedure Requirements | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||||
| 3.1.1 | Personnnel & Equipment | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||||
| 3.1.2 | Docking Proceedures | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||||
| 3.1.3 | Blocking Plan | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||||
| 3.1.4 | Crib and Brace Blocking | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||||
| 3.1.5 | Setting and Aligning Blocks | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||||
| 3.1.6 | Stability Calculations | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||||
| 3.1.7 | Docking Conference | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||||
| 3.1.8 | Docking The Vessel | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||||
| 3.1.9 | Post Docking | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||||
| 3.1.10 | Shifting the Vessel | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||||
| 3.1.11 | Undocking The Vessel | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||||
| 3.1.13 | Final Docking Report | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||||
| 3.2.1 | Identifie Distinguishing Figures and Markings | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||||
| 3.2.2 | Rubber Fenders | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||||
| 3.2.3 | Zinc Anodes | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||||
| 3.2.4 | Hull Blasting & Preservation | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||||
| 3.2.5 | Hull & Freeboard Visual Inspection | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||||
| 3.2.6 | Hull & Freeboard UT | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||||
| 3.3.1 | Stern Rubber Fender Strap Repair | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||||
| 3.3.2 | Bow Rubber Fender Strap Repair | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||||
| 3.3.3 | Engine Room Escape Hatch Modification | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||||
| 3.3.4 | Lower Crew Berthing Escape Hatch Modification | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||||
| 3.3.5 | Drive Room Escape Modification | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||||
| 3.3.6 | Winch Locker Handrail Modification | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||||
| 3.3.7 | Drive Port & Stbd Vent Modification | Main Deck U/T Inspection | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||||||
| 3.3.8 | Handrail Modification | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||||
| 3.3.9 | FWD Void Bilge pump Reach Rod Bushing Repair | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||||
| 3.3.10 | FWD Winch Locker Door Repair and Preservation | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||||
| 3.3.11 | Port/Stbd/FiFi Seachest Vent Modification | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||||
| 3.3.12 | Aft Rope Locker Access Hatch Safety Bar Modification | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||||
| 3.3.13 | AFT Rope Locker Access Modification | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||||
| 3.3.14 | Rubber Fender Retention Mod | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||||
| 3.4.1 | Open,Pump,Clean,Ventilate and Gass Free tanks & Voids | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||||
| 3.4.2 | Tank/Void Visual Inspection | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||||
| 3.4.3 | Identify Color Schemes and Markings | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||||
| 3.4.4 | Preliminary Air Test | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||||
| 3.4.5 | Tank/Void Touch Up Preservation | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||||
| 3.4.6 | Black Water Tank Preservation | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||||
| 3.4.7 | Tank Void Manhole Covers | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||||
| 3.4.8 | Clean, Flush, Disenfection of Potable Water System | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||||
| 3.4.9 | Certification of Potable Water Piping and Tank | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||||
| 3.4.10 | Final Air Test | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||||
| 3.4.11 | Tank/Void Closeout Inspection | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||||
| 3.5.1 | Main Deck Non Skid Repair | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||||
| 3.5.2 | Visual Inspection for Structural Defects | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||||
| 3.5.3 | Main Deck Ultrasonic test (UT) Inspection | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||||
| 3.5.4 | Galley and Crews Mess Deck Covering | Main Deck U/T Inspection | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||||||
| 3.5.5 | Engineer's Stateroom Decking?Carpet Replacement | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||||
| 3.6.1 | Winch System Groom and Preservation | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||||
| 3.6.2 | Mast Hose Repair | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||||
| 3.6.3 | Brow Hose Repair | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||||
| 3.6.4 | Wheelhouse Deck and Pilot House Roof Non Skid Repairs | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||||
| 3.6.5 | Galley Seating and Table Modifications | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||||
| 3.6.6 | Deck House Expansion Joint Repairs | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||||
| 3.6.7 | Schottel Rudder Angle Modification | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||||
| 3.6.8 | Wheel House Door Preservation | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||||
| 3.6.9 | Port/Stbd Life Raft Modification | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||||
| 3.6.10 | Port Wheel House MOB Light Bracket Repair | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||||
| 3.6.11 | Stbd Wheel House MOB Light Bracket Repair. | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||||
| 3.6.12 | Fire Safety Rail Monitor Railing Modification | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||||
| 3.6.13 | Port and STBD Line Hook Modifications | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||||
| 3.6.14 | Engine Room Air Intake Fan Room Preservation | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||||
| 3.6.15 | Port and STBD Main Engine Intake Plenums | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||||
| 3.6.16 | HVAC and Galley Vent Plenums Preservation | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||||
| 3.6.17 | Backboard Support Hooks Modification. | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||||
| 3.6.18 | Wheelhouse Top Preservation | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||||
| 3.6.19 | Aft Stub Mast Modification | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||||
| 3.7.1 | Schottel Z-Drive Repair | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||||
| 3.7.2 | Power Transmission Repairs | Main Deck U/T Inspection | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||||||
| 3.7.3 | Hydrualic Systems Repair | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||||
| 3.7.4 | Propeller Repair | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||||
| 3.7.5 | Engine Repair | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||||
| 3.7.6 | MCD Schottel Steering Drive Pump Repair | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||||
| 3.9.1 | Main Enggine room Bilge Preservation | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||||
| 3.10.1 | Shore Power Panel Repair | Main Deck U/T Inspection | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||||||
| 3.10.2 | Tank Indicators Touch Screens Repair | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||||
| 3.10.3 | Battery Chargers Repair | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||||
| 3.10.4 | MVAC System Repairs | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||||
| 3.10.5 | Speed Doppler Repair | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||||
| 3.10.6 | Depth Sounder Repair | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||||
| 3.10.7 | Navigation Light System Repair | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||||
| 3.10.8 | Wheelhouse Junction Box Repair | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||||
| 3.10.9 | Wheelhouse FWD and AFT Search Light Repairs | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||||
| 3.10.10 | Schottel System Repair | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||||
| 3.10.11 | McCann Hailer System Repair | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||||
| 3.10.12 | CFL Deck Lights Repair | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||||
| 3.10.13 | FWD Berthing Emergency Lighting | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||||
| 3.10.14 | Engine Room Emergency Lighting | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||||
| 3.10.15 | Jacket Water Heater Port Main Engine Install | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||||
| 3.10.10 | Schottel System Repair | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||||
| 3.10.11 | McCann Hailer System Repair | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||||
| 3.10.12 | CFL Deck Lights Repair | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||||
| 3.10.13 | FWD Berthing Emergency Lighting | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||||
| 3.10.14 | Engine Room Emergency Lighting | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||||
| 3.10.15 | Jacket Water Heater Port Main Engine Install | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||||
| 3.11.1 | Sea Valves | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||||
| 3.11.2 | Main Deck Commode and Flush-O- Meter | Main Deck U/T Inspection | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||||||
| 3.11.3 | Crew's Head Commode and Flush-O-Meter | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||||
| 3.11.4 | MCD Heat Exchanger Repair | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||||
| 3.11.5 | Winch HPU Heat Exchanger Repair | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||||
| 3.11.6 | Generators Heat Exchanger Repair | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||||
| 3.11.7 | Port and STBD Main Engine Jacket Water Piping Repair | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||||
| 3.11.8 | Port and STBD Main Engine After Cooler Repair | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||||
| 3.11.9 | Port and STBD Main Engine Sea Water Pump Repairs | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||||
| 3.11.10 | Main Fire Pump Repair | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||||
| 3.11.11 | Steering Cooling Heat Exchanger Repairs | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||||
| 3.11.12 | HVAC Piping Repair | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||||
| 3.11.13 | "Z" Drive Steeriing Oil and Lube Oil Fill Valves Repair | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||||
| 3.11.14 | FWD Head and Storeroom Vents Repair and Preservation | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||||
| 3.11.15 | FWD Void/Rope Locker Valve Repair and Preservation | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||||
| 3.11.16 | Potable Water Deck Vents Repair | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||||
| 3.11.17 | Sea Strainer Repairs | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||||
| 3.13.1 | Operational Responsibility | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||||
| 3.13.2 | Sea Trial Baseline Testing | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||||
| 3.13.3 | Dock Trial | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||||
| 3.13.4 | Final Sea Trial | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||||
| 3.13.5 | Post Sea Trial | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||||
| LOE | LOE | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||||
| $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||||||
| $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||||||
| $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||||||
| $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||||||
| $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||||||
| $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||||||
| $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||||||||||
| $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||||||||||
| $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||||||||||
| $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||||||||||
| $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||||||||||
| $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||||||||||
| $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||||||||||
| $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||||||||||
| $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||||||||||
| $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||||||||||
| $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||||||||||
| $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||||||||||
| $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||||||||||
| $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||||||||||
| $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||||||||||
| $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||||||||||
| $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||||||||||
| $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||||||||||
| $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||||||||||
| $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||||||||||
| $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||||||||||
| $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||||||||||
| $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||||||||||
| Column Totals | 0 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||
| Base Work Package | $0.00 | |||||||||||||||||
| OPTION YEAR TABLE IF NEEDED: | ||||||||||||||||||
| Level of Effort to Completion | ||||||||||||||||||
| PARAGRAPH No. | TITLE | M/H | Labor Cost | MATERIAL PRICE | TOTAL | Labor Cost | Material Cost | TOTAL | ODC | Travel ODC | TOTAL | Fringe | Overhead | G&A | Profit | FCCOM | Line Item Total | |
| Level of Effort (LOE) to Completion - Growth | 2160 | 0 | 37966 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||
| $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||||||
| $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||||||
| $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||||||
| $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||||||
| Column Totals | 2160 | 0 | $37,966.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||
| Total LOE to Completion: | $0.00 | |||||||||||||||||
| TOTAL PROPOSED PRICE: | $0.00 |
*ODC-Defined as anything other than labor, subcontracts, and/or material that is directly attributable to a contract per FAR 31.202. Examples include rental charges and travel etc.
NOTE: Please fill in within the yellow highlighted boxes, the fixed labor rate, proposed G&A and proposed Profit rates.
NOTE: Labor rates and Profit rates used to calculate for the overall price of the base contract award shall be the basis for pricing on all modifications under this contract.
Labor Hour Breakdown
| Contractor/Company Name: | 0 | |||||||||||||||||||||||||||||||||||||||
| Project/Vessel Name: | YT 803 | Date: | 12/31/99 | |||||||||||||||||||||||||||||||||||||
| Base Rates: | Regular Labor Rate | $0.00 | ||||||||||||||||||||||||||||||||||||||
| Name | Rate | Total Cost | Name | Rate | Total Cost | |||||||||||||||||||||||||||||||||||
| Labor Hour Breakdown | ||||||||||||||||||||||||||||||||||||||||
| PARAGRAPH No. | TITLE | Labor Categories | Total Overall Labor Cost | |||||||||||||||||||||||||||||||||||||
| 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | Total Regular Hours | Total Overtime Hours | |||||||||||||||||||||
| REG | OT | REG | OT | REG | OT | REG | OT | REG | OT | REG | OT | REG | OT | REG | OT | REG | OT | REG | OT | REG | OT | REG | OT | REG | OT | REG | OT | REG | OT | REG | OT | REG | OT | REG | OT | |||||
| 1.4 | Arrival Conference | 0 | 0 | $0.00 | ||||||||||||||||||||||||||||||||||||
| 1.5 | Required Documents | 0 | 0 | $0.00 | ||||||||||||||||||||||||||||||||||||
| 1.6 | Progress Meetings | 0 | 0 | $0.00 | ||||||||||||||||||||||||||||||||||||
| 1.7 | Availability Requirements | 0 | 0 | $0.00 | ||||||||||||||||||||||||||||||||||||
| 1.8 | Care of Vessel | 0 | 0 | $0.00 | ||||||||||||||||||||||||||||||||||||
| 1.11 | Condition Found Reports | 0 | 0 | $0.00 | ||||||||||||||||||||||||||||||||||||
| 1.13 | Safety Requirements | 0 | 0 | $0.00 | ||||||||||||||||||||||||||||||||||||
| 1.16 | Preservation | 0 | 0 | $0.00 | ||||||||||||||||||||||||||||||||||||
| 1.17 | Enviromental and Hazardous Waste Management | 0 | 0 | $0.00 | ||||||||||||||||||||||||||||||||||||
| 1.22 | Gas Free | 0 | 0 | $0.00 | ||||||||||||||||||||||||||||||||||||
| 1.23 | General Requirements for testing | 0 | 0 | $0.00 | ||||||||||||||||||||||||||||||||||||
| 1.24 | Compartment Arrival/Closeout Inspection | 0 | 0 | $0.00 | ||||||||||||||||||||||||||||||||||||
| 1.25 | PCP Procedure Requirements | 0 | 0 | $0.00 | ||||||||||||||||||||||||||||||||||||
| 3.1.1 | Personnnel & Equipment | 0 | 0 | $0.00 | ||||||||||||||||||||||||||||||||||||
| 3.1.2 | Docking Proceedures | 0 | 0 | $0.00 | ||||||||||||||||||||||||||||||||||||
| 3.1.3 | Blocking Plan | 0 | 0 | $0.00 | ||||||||||||||||||||||||||||||||||||
| 3.1.4 | Crib and Brace Blocking | 0 | 0 | $0.00 | ||||||||||||||||||||||||||||||||||||
| 3.1.5 | Setting and Aligning Blocks | 0 | 0 | $0.00 | ||||||||||||||||||||||||||||||||||||
| 3.1.6 | Stability Calculations | 0 | 0 | $0.00 | ||||||||||||||||||||||||||||||||||||
| 3.1.7 | Docking Conference | 0 | 0 | $0.00 | ||||||||||||||||||||||||||||||||||||
| 3.1.8 | Docking The Vessel | 0 | 0 | $0.00 | ||||||||||||||||||||||||||||||||||||
| 3.1.9 | Post Docking | 0 | 0 | $0.00 | ||||||||||||||||||||||||||||||||||||
| 3.1.10 | Shifting the Vessel | 0 | 0 | $0.00 | ||||||||||||||||||||||||||||||||||||
| 3.1.11 | Undocking The Vessel | 0 | 0 | $0.00 | ||||||||||||||||||||||||||||||||||||
| 3.1.13 | Final Docking Report | 0 | 0 | $0.00 | ||||||||||||||||||||||||||||||||||||
| 3.2.1 | Identifie Distinguishing Figures and Markings | 0 | 0 | $0.00 | ||||||||||||||||||||||||||||||||||||
| 3.2.2 | Rubber Fenders | 0 | 0 | $0.00 | ||||||||||||||||||||||||||||||||||||
| 3.2.3 | Zinc Anodes | 0 | 0 | $0.00 | ||||||||||||||||||||||||||||||||||||
| 3.2.4 | Hull Blasting & Preservation | 0 | 0 | $0.00 | ||||||||||||||||||||||||||||||||||||
| 3.2.5 | Hull & Freeboard Visual Inspection | 0 | 0 | $0.00 | ||||||||||||||||||||||||||||||||||||
| 3.2.6 | Hull & Freeboard UT | 0 | 0 | $0.00 | ||||||||||||||||||||||||||||||||||||
| 3.3.1 | Stern Rubber Fender Strap Repair | 0 | 0 | $0.00 | ||||||||||||||||||||||||||||||||||||
| 3.3.2 | Bow Rubber Fender Strap Repair | 0 | 0 | $0.00 | ||||||||||||||||||||||||||||||||||||
| 3.3.3 | Engine Room Escape Hatch Modification | 0 | 0 | $0.00 | ||||||||||||||||||||||||||||||||||||
| 3.3.4 | Lower Crew Berthing Escape Hatch Modification | 0 | 0 | $0.00 | ||||||||||||||||||||||||||||||||||||
| 3.3.5 | Drive Room Escape Modification | 0 | 0 | $0.00 | ||||||||||||||||||||||||||||||||||||
| 3.3.6 | Winch Locker Handrail Modification | 0 | 0 | $0.00 | ||||||||||||||||||||||||||||||||||||
| 3.11.2 | Main Deck Commode and Flush-O- Meter | 0 | 0 | $0.00 | ||||||||||||||||||||||||||||||||||||
| 3.11.3 | Crew's Head Commode and Flush-O-Meter | 0 | 0 | $0.00 | ||||||||||||||||||||||||||||||||||||
| 3.11.4 | MCD Heat Exchanger Repair | 0 | 0 | $0.00 | ||||||||||||||||||||||||||||||||||||
| 3.11.5 | Winch HPU Heat Exchanger Repair | 0 | 0 | $0.00 | ||||||||||||||||||||||||||||||||||||
| 3.11.6 | Generators Heat Exchanger Repair | 0 | 0 | $0.00 | ||||||||||||||||||||||||||||||||||||
| 3.11.7 | Port and STBD Main Engine Jacket Water Piping Repair | 0 | 0 | $0.00 | ||||||||||||||||||||||||||||||||||||
| 3.11.8 | Port and STBD Main Engine After Cooler Repair | 0 | 0 | $0.00 | ||||||||||||||||||||||||||||||||||||
| 3.11.9 | Port and STBD Main Engine Sea Water Pump Repairs | 0 | 0 | $0.00 | ||||||||||||||||||||||||||||||||||||
| 3.11.10 | Main Fire Pump Repair | 0 | 0 | $0.00 | ||||||||||||||||||||||||||||||||||||
| 3.11.11 | Steering Cooling Heat Exchanger Repairs | 0 | 0 | $0.00 | ||||||||||||||||||||||||||||||||||||
| 3.11.12 | HVAC Piping Repair | 0 | 0 | $0.00 | ||||||||||||||||||||||||||||||||||||
| 3.11.13 | "Z" Drive Steeriing Oil and Lube Oil Fill Valves Repair | 0 | 0 | $0.00 | ||||||||||||||||||||||||||||||||||||
| 3.11.14 | FWD Head and Storeroom Vents Repair and Preservation | 0 | 0 | $0.00 | ||||||||||||||||||||||||||||||||||||
| 3.11.15 | FWD Void/Rope Locker Valve Repair and Preservation | 0 | 0 | $0.00 | ||||||||||||||||||||||||||||||||||||
| 3.11.16 | Potable Water Deck Vents Repair | 0 | 0 | $0.00 | ||||||||||||||||||||||||||||||||||||
| 3.11.17 | Sea Strainer Repairs | 0 | 0 | $0.00 | ||||||||||||||||||||||||||||||||||||
| LOE | LOE | 0 | 0 | $0.00 | ||||||||||||||||||||||||||||||||||||
| 0 | 0 | 0 | 0 | $0.00 | ||||||||||||||||||||||||||||||||||||
| 0 | 0 | 0 | 0 | $0.00 | ||||||||||||||||||||||||||||||||||||
| 0 | 0 | 0 | 0 | $0.00 | ||||||||||||||||||||||||||||||||||||
| 0 | 0 | 0 | 0 | $0.00 | ||||||||||||||||||||||||||||||||||||
| 0 | 0 | 0 | 0 | $0.00 | ||||||||||||||||||||||||||||||||||||
| 0 | 0 | 0 | 0 | $0.00 | ||||||||||||||||||||||||||||||||||||
| $0.00 | $0.00 | 0 | $0.00 | $0.00 | ||||||||||||||||||||||||||||||||||||
| $0.00 | $0.00 | 0 | $0.00 | $0.00 | ||||||||||||||||||||||||||||||||||||
| $0.00 | $0.00 | 0 | $0.00 | $0.00 | ||||||||||||||||||||||||||||||||||||
| $0.00 | $0.00 | 0 | $0.00 | $0.00 | ||||||||||||||||||||||||||||||||||||
| $0.00 | $0.00 | 0 | $0.00 | $0.00 | ||||||||||||||||||||||||||||||||||||
| $0.00 | $0.00 | 0 | $0.00 | $0.00 | ||||||||||||||||||||||||||||||||||||
| $0.00 | $0.00 | 0 | $0.00 | $0.00 | ||||||||||||||||||||||||||||||||||||
| $0.00 | $0.00 | 0 | $0.00 | $0.00 | ||||||||||||||||||||||||||||||||||||
| $0.00 | $0.00 | 0 | $0.00 | $0.00 | ||||||||||||||||||||||||||||||||||||
| $0.00 | $0.00 | 0 | $0.00 | $0.00 | ||||||||||||||||||||||||||||||||||||
| $0.00 | $0.00 | 0 | $0.00 | $0.00 | ||||||||||||||||||||||||||||||||||||
| $0.00 | $0.00 | 0 | $0.00 | $0.00 | ||||||||||||||||||||||||||||||||||||
| $0.00 | $0.00 | 0 | $0.00 | $0.00 | ||||||||||||||||||||||||||||||||||||
| $0.00 | $0.00 | 0 | $0.00 | $0.00 | ||||||||||||||||||||||||||||||||||||
| $0.00 | $0.00 | 0 | $0.00 | $0.00 | ||||||||||||||||||||||||||||||||||||
| $0.00 | $0.00 | 0 | $0.00 | $0.00 | ||||||||||||||||||||||||||||||||||||
| $0.00 | $0.00 | 0 | $0.00 | $0.00 | ||||||||||||||||||||||||||||||||||||
| $0.00 | $0.00 | 0 | $0.00 | $0.00 | ||||||||||||||||||||||||||||||||||||
| $0.00 | $0.00 | 0 | $0.00 | $0.00 | ||||||||||||||||||||||||||||||||||||
| $0.00 | $0.00 | 0 | $0.00 | $0.00 | ||||||||||||||||||||||||||||||||||||
| $0.00 | $0.00 | 0 | $0.00 | $0.00 | ||||||||||||||||||||||||||||||||||||
| $0.00 | $0.00 | 0 | $0.00 | $0.00 | ||||||||||||||||||||||||||||||||||||
| $0.00 | $0.00 | 0 | $0.00 | $0.00 | ||||||||||||||||||||||||||||||||||||
| Column Totals | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | $0.00 | |
| Base Work Package | $0.00 | |||||||||||||||||||||||||||||||||||||||
| OPTION YEAR TABLE IF NEEDED: | ||||||||||||||||||||||||||||||||||||||||
| Labor Hour Breakdown | ||||||||||||||||||||||||||||||||||||||||
| PARAGRAPH No. | TITLE | Labor Categories | Total Overall Labor Cost | |||||||||||||||||||||||||||||||||||||
| 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | Total Direct Hours | Total Overtime Hours | |||||||||||||||||||||
| REG | OT | REG | OT | REG | OT | REG | OT | REG | OT | REG | OT | REG | OT | REG | OT | REG | OT | REG | OT | REG | OT | REG | OT | REG | OT | REG | OT | REG | OT | REG | OT | REG | OT | REG | OT | |||||
| 0 | Level of Effort (LOE) to Completion - Growth | 0 | 0 | $0.00 | ||||||||||||||||||||||||||||||||||||
| 0 | 0 | 0 | 0 | $0.00 | ||||||||||||||||||||||||||||||||||||
| 0 | 0 | 0 | 0 | $0.00 | ||||||||||||||||||||||||||||||||||||
| 0 | 0 | 0 | 0 | $0.00 | ||||||||||||||||||||||||||||||||||||
| Column Totals | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | $0.00 | |
| Total Option Items (O): | $0.00 | |||||||||||||||||||||||||||||||||||||||
| TOTAL DIRECT LABOR COSTS BY WORK ITEM | $0.00 |