USDA Statement of Work Summary: Steam Sterilizer Replacement
This Statement of Work (SOW) is a federal contract document from the U.S. Department of Agriculture (USDA) Agricultural Research Service (ARS) for the replacement of a steam sterilizer at the Northern Plains Agricultural Research Laboratory (NPARL) in Sidney, Montana. The contractor is required to furnish a complete turn-key quotation that includes removal and proper disposal of the existing Getinge steam sterilizer from Building #18, procurement and installation of a new Getinge USA, Inc. Model #733LS or equivalent unit, and all necessary plumbing and electrical connections including shutoff valves, supply/return piping, condenser/pressure relief valves, and other components per manufacturer specifications. The contractor must conduct a mandatory site visit and inspection prior to work commencement. Key personnel must have demonstrated experience with setup, operations, maintenance, training, and troubleshooting of steam sterilizers.
The contractor's obligations include obtaining all required permits and licenses at contractor expense, complying with ARS Facilities Design Standards and applicable local, state, and federal building codes and regulations, and coordinating all work with site personnel to prevent disruption to ongoing research activities. The contractor must maintain quality control throughout execution, keep the construction site clean and free of debris, divert project waste to recycling where practical with documentation, and restore disturbed areas to original condition. Temporary utilities may be provided by the Government upon request. The contractor must provide 10 days' written notice prior to final inspection readiness. A one-year warranty from final acceptance is required, covering all defects in equipment, material, design, and workmanship. The contractor should include travel and delivery fees in estimated costs. No specific contract value, response deadline, or award date is provided in this document.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
US Department of Agriculture (USDA)
Statement of Work
Steam Sterilizer
Requisition Number:
NPARL Sidney, Montana
c. New installation shall include all required plumbing and electrical connections/terminations including but not limited to shutoff valves, supply/return piping connections, condenser/pressure relief valves etc, in accordance with manufacturer's recommendations.
5. References & Standards: All construction shall comply with ARS Facilities Design Standards (ARS Manual 242.1, 5-01-12), ARS Energy, Water, and Sustainability Policy (ARS Policy & Procedures 134.2, 11-12-13), ARS Energy, Water, and Sustainability Policy Bulletin (ARS Policy & Procedures Bulletin 15-134.2), governing Building Codes, and all applicable local, regional, State, and Federal regulations. Where one or more Codes or regulations conflict, the more stringent shall apply.
6. Permits: Where governing regulations and imposed codes and standards require notices, permits, licenses, inspections, tests, and similar items or actions in order to lawfully proceed with the required work, the Contractor shall obtain items and take those actions in accordance with the regulations of the governing authority. The costs of such permits, licenses, inspections, etc., are the obligation of the Contractor.
7. Existing Installations/Demolition:
a. Contractor shall modify existing installations as needed to accommodate the new installation. Where applicable contractor shall coordinate demolition or modification of existing installations with the Owner. All disturbances of existing systems shall be thoroughly coordinated with the Owner to prevent disconnecting equipment that may potentially jeopardize in-progress research.
b. The Owner reserves the right to retain any equipment or materials removed as part of this scope of work. The Contractor shall coordinate any equipment or materials to be retained with the Owner prior to starting demolition operations.
The Contractor shall legally dispose all equipment or material removed that will not be retained.
c. The contractor shall divert project waste to recycle where practical. The Contractor shall track and document the amount of waste diverted to recycle. The contractor shall submit diversion documentation as part of closeout. If no waste is diverted to recycle, the contractor shall submit a letter stating so and why diversion was not practical.
8. Quality Control:
The work performed under this contract shall be subject to continuous audit by the Location Monitor. Quality control is the exclusive responsibility of the Contractor.
9. Temporary Facilities:
a. Temporary utilities (water and electricity) may be furnished to the Contractor by the Government, if so requested. The Contractor shall maintain and protect all such utilities during the course of construction and shall repair or replace any items damaged through its own negligence.
b. Should the Contractor require any power or utility shutdowns during construction, the Contractor shall obtain approval for such shutdown from the Location Monitor three working days prior to the need
10. Site Cleanup:
The construction site shall be kept clean and free of debris at all times.
Restore areas disturbed as nearly as possible to the original appearance and condition. Upon completion of the project, and prior to final inspection, the Contractor shall remove from the premises all unused material, trash, and debris resulting from the work to the satisfaction of the COR.
11. Travel The only travel required will be on the part of the contractor removal & installation. The contractor should include a travel and delivery fee in the estimated costs.
12. Contractor’s Key Personnel Contractors’ key personnel shall be experienced with setup, operations, maintenance, training and troubleshooting problems related to the steam sterilizer.
13. Security Requirements Security Requirements should be conducted in accordance with the policies and procedures of USDA, ARS and the NPARL location in Sidney, Montana.
14. Submittals:
a. For all proposed material, contractor shall provide relevant illustrations, standard schedules, performance charts, instructions, brochures, diagrams, manufacturer descriptive literature, or catalog data.
b. The descriptive literature shall be annotated/highlighted to show its conformance with contract requirements.
c. Submittals are required for all building materials and equipment and shall be provided to the CO and COR for review and approval.
d. Contractor is responsible for any costs incurred for equipment ordered without prior approval.
15. Final Inspection:
a. The Contractor shall notify the Contracting Officer and Owner in writing 10 days prior to the date that the project will be ready for final inspection. An inspection of the project will be made by the Contracting Officer and Contractor at a mutually agreed upon time. COR and contractor shall compile a “punch list” prior to final acceptance of the installation and submit completed warranty documentation to manufacturer.
16. Warranty:
In addition to any other warranties set out elsewhere in this contract, the Contractor warrants that work performed under this contract conforms to the contract requirements and is free of any defect of equipment, material or design furnished, or workmanship performed by the Contractor or any of his subcontractors or suppliers at any tier. Such warranty shall continue for a period of one year from the date of final acceptance of the project. Under this warranty, the Contractor shall remedy at his own expense any such failure to conform or any such defect. In addition, the Contractor shall remedy at his own expense any damage to Government owned or controlled real or personal property, when that damage is the result of the Contractor's failure to conform to contract requirements or any such defect of equipment, material, workmanship, or design. The Contractor shall also restore any work damaged in fulfilling the terms of this clause. The Contractor's warranty with respect to work repaired or replaced hereunder will run for one year from the date of such repair or replacement.
17. Notification and Compliance: The Government shall notify the Contractor in writing within a reasonable time after the discovery of any failure, defect, or damage. Should the Contractor fail to remedy any failure, defect, or damage within a reasonable time after receipt of notice thereof, the Government shall have the right to replace or repair and have the cost billed to the Contractor.
18. Latent Defects:
The Warranty specified herein shall not limit the Government’s rights with respect to latent defects, gross mistake, or fraud.
19. Acceptance:
Upon satisfactory submittal of the above documents the Contracting Officer shall issue to the Owner a certificate recommending final acceptance of the project. Minor unfinished items of work may be listed on the certificate and accepted from final acceptance. A sum sufficient to cover the cost of completing these unfinished items of work will be withheld by the Owner from the final payment. All other funds including retainage shall be due and payable upon receipt by the Owner of the Contracting Officer's certificate. Upon certification by the Contracting Officer that the items of work have been completed, all monies withheld by the Owner shall be due the Contractor.