This is a Statement of Work (SOW) from the US Department of Agriculture for removal and restoration of gypsum board affected by mold damage.

The contractor must complete mold remediation and gypsum board restoration work within 10 days after Notice to Proceed. The scope encompasses four primary task areas: (1) Safety & Preparation, including deployment of certified technicians with proper PPE per OSHA regulations, containment barriers, decontamination chambers, negative air filtration devices, dehumidifiers, and protective plastic coverings; (2) Mold Remediation Procedures, involving HEPA vacuuming of affected areas, application of antimicrobial agents to all surfaces and floors, air cycling to remove contaminated particles, and compliance with IICRC and OSHA safety standards; (3) Cleaning & Surface Treatment, including light cleaning of walls and ceilings, floor cleaning with antimicrobial treatment, and comprehensive cleaning of furniture and fixtures in affected zones; and (4) Construction & Restoration, requiring demolition and installation of new gypsum board wall in the identified affected area, along with reinstallation of the existing A/C unit. No government-furnished materials or travel are required. The contractor must identify key personnel with relevant experience in mold remediation and construction restoration, though specific resume requirements are to be inserted. No security requirements, data rights restrictions, or Section 508 electronic accessibility standards apply to this contract.

View the file

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

US Department of Agriculture (USDA)

Statement of Work

Contents Project

General Information

1.0 Scope of Work

2.0 Background ....................................................................................................................................... Error! Bookmark not defined.

Contractor Requirements

3.0 Technical Requirements / Tasks

4.0 Government Furnished

5.0 Deliverables / Schedule

6.0 Travel

7.0 Contractor’s Key Personnel

8.0 Security Requirements

9.0 Data Rights

10.0 Section 508 – Electronic and Information Technology Standards

Attachment

Project Removal and Restoration of Gypsum Board

General Information

1.0 Scope of Work

Demolition and installation of a new gypsum board, insulation, and reinstallation of the current A/C unit are needed. Application of antimicrobial agent to floors and all surfaces to eliminate residual microbial presence. We need this removal due to the present mold in the wall and the insulation inside of it. Only cleaning the wall will not resolve the problem, since the evaluation showed the mold and moisture is coming from the inside insulation.

Contractor Requirements

3.0 Technical Requirements / Tasks

1. Safety & Preparation Certified technician equipped with proper PPE per OSHA regulations.

Setup of containment barriers and decontamination chambers to prevent cross-contamination in unaffected areas.

Air Filtration Device (Negative Air Fan / Air Scrubber) installed and operated continuously during the project for air purification.

Dehumidifier installed to stabilize and control humidity throughout the remediation period.

Protective plastic covering applied to isolate work zones and protect unaffected areas.

2. Mold Remediation Procedures HEPA vacuuming of all affected areas including floors, walls, and ceilings.

Use of HEPA filters for canister or backpack vacuums to remove fine particulate contaminants. Application of antimicrobial agent to floors and all surfaces to eliminate residual microbial presence. Air cycling maintained throughout the process to remove contaminated particles from the air.

All equipment setup, monitoring, and takedown performed according to IICRC and OSHA safety standards.

3. Cleaning & Surface Treatment Light cleaning of all walls and ceilings.

Floor cleaning and antimicrobial treatment as preventive measure.

Comprehensive content manipulation and cleaning of furniture, fixtures, and exposed items in affected zones.

4. Construction & Restoration Demolition and installation of new gypsum board wall in the identified affected area.

4.0 Government Furnished

N/A

5.0 Deliverables / Schedule

Period of Performance: 10 Days after the NTP

6.0 Travel

7.0 Contractor’s Key Personnel

Describe positions which are considered key to successful performance of the contract and the information required to support key personnel qualifications, e.g., experience which correlates to SOW requirements, education, and past performance on similar projects. Specify if resumes are required and provide resume format if appropriate.

Insert Contractor’s Key Personnel Here

8.0 Security Requirements

9.0 Data Rights

10.0 Section 508 – Electronic and Information Technology Standards

Attachment If applicable, include an Attachment stating Evaluation Factors and significant Subfactors representing the key areas of importance and emphasis to be considered in the source selection decision.