This is a Specifications document for a federal construction contract involving barbed wire fencing work at a government facility (MARC sections).

The work scope encompasses approximately 2.5 miles of barbed wire fencing removal and installation across four locations: removal of approximately ½ mile of combination barbed wire/sheep fencing on the west side of MARC section 26C; installation of approximately ½ mile of 5-wire barbed wire fence; removal and installation of approximately 1 mile of 5-wire barbed wire fence on the east side of MARC sections 34A and 34B; and removal and installation of approximately ½ mile of 5-wire barbed wire fence on the south side of MARC section 85D. The contractor must provide all labor, materials, tools, and equipment for these operations. Material specifications include 12-1/2 gauge, 2-point barbed wire conforming to ASTM A121 Class 1 (Red Brand or equal); steel line posts (T-section, 1-3/8" x 1-3/8" x 6'-6", 1.33 lbs/ft.); 8" x 8" wood vertical posts (hedge/osage orange); 2-3/8" heavy steel pipe brace posts; and 3-1/2" x 6' wood gate posts. Installation requirements specify 5'-0" overall fence height, line posts set no more than 16'-6" apart, barbed wire pre-stretched to 600 pounds tension then backed off to 300 pounds, double brace systems spaced no more than ¼ mile apart, and staple specifications per ASTM A116 Class 2. Contractor responsibilities include providing landmarks every quarter mile during demolition, removing no more than 1 mile of fence at any one time, and replacing damaged posts at no cost to the government. The owner is responsible for removing livestock prior to contractor work and for site grading, fill, and vegetation removal after demolition. General requirements include shop drawing submissions in four copies, contractor-provided toilet facilities, work hours Monday through Friday 7:30 AM to 4:00 PM, site cleanup with contractor-arranged disposal, and security badge requirements for all personnel.

View the file

Other files

Show all 13

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

TABLE OF CONTENTS

DIVISION 1- GENERAL REQUIREMENTS

0101 - SUMMARY OF WORK

0130 - SHOP DRAWINGS

0160 - USE OF GOVERNMENT FACILITIES (UTILITIES, ETC.)

0180 CLEANUP

DIVISION 2 SITE WORK

0211 DEMOLITION

0221 SITE GRADING

0271 BARBED WIRE FENCING

DIVISION 1

SECTION 0101

SUMMARY OF WORK

The work consists of providing all labor, material, tools, and equipment for the removal of existing barbed wire fencing and the installation of new barbed wire fencing. This work shall include but shall not be limited to the following:

1. Removal of approximately ½ mile of a combination barbed wire upper, sheep lower fence on the west side of MARC section 26C.

2. Installation of approximately ½ mile of a 5-wire barbed wire fence.

3. Removal and installation of approximately 1 mile of a 5-wire barbed wire fence on the east side of MARC section 34A and 34B.

4. Removal and installation of approximately ½ mile of a 5-wire barbed wire fence on the south side of MARC section 85D.

SECTION 0130

SHOP DRAWINGS

1. Submit shop drawings to the Contractin approval prior to installation. Information in the form of drawings, product literature, following:

Specification Description Drawings Literature Schedule

a. Fencing Materials x x

1. The Contracting Officer may request submittals in addition to those listed when deemed necessary to adequately describe the work covered in the respective sections.

2. Each submittal shall be complete and in sufficient detail for ready determination of compliance with the contract requirements.

3. Submittal shall be submitted in four (4) copies to the COR using the transmittal form.

The form shall be properly completed by filling out all the heading block spaces and identifying each item submitted. Special care should be exercised to insure proper listing of the specification paragraph and/or sheet number of the contract drawings pertinent to the data submitted for each item. A separate transmittal form shall be attached to each copy of the data being submitted.

0130-1, 0160-1

4. Brand Name: Identification of items in the contract documents is intended to be descriptive, not restrictive, and is to indicate the quality and characteristics of products that will be satisfactory.

SECTION 0160

USE OF GOVERNMENT FACILITIES (UTILITIES, ETC.)

1. Water, Gas, Electricity:

a. As mutually agreed upon between the Contractor and the COR, the Contractor may use nearby utilities required for his performance under this contract.

b. Contractor shall bear the cost of temporary connections (if necessary) and restoration upon conclusion of use.

c. The Government shall bear the cost of reasonable utility consumption.

Government will not pay the cost of utilities if usage is abused.

d. The Contractor shall submit for approval written notification not less than 4 working days in advance of requirement to shut down any utilities or other services to or within existing building or facilities used by others.

2. Telephone:

a. Contractor shall arrange and pay for any telephone service they choose to provide for themselves.

3. Toilet:

a. Contractor shall provide his or her own toilet facilities for his personnel as

(COR).

4. Access to Property:

a.

being performed.

5. Protection of Existing Facility:

a. Contractor shall protect the existing Facility from damage during construction. If

0130-2, 0160-1

6. Material Receiving:

a. Contractor shall be on-site to receive materials. Contractor shall arrange for their own storage of materials unless other arrangements have been agreed to by owner.

7. Security:

a. All contract personnel shall complete a visitor information sheet and shall be issued a contractor badge that shall be worn at all times while on-site.

b. Work hours shall be Monday through Friday, 7:30 AM to 4:00 PM, except for

Holidays. Contractors shall be off the premises by 4:00 PM.

SECTION 0180

CLEANUP

1. Cleanup:

a. The Contractor shall keep the premises clean during construction and shall remove all rejected material, rubbish, etc., after completion of work and prior to final inspection.

b. Materials removed by the Contractor shall become the property of the contractor and shall be removed from the site unless otherwise agreed to by the owner.

c. Government dumpsters shall not be used by the contractor.

0160-2, 0180-1

* End of Section

SECTION 0211

DEMOLITION

1. Contractor shall provide all labor, equipment, and material to remove and dispose of all fencing shown to be removed and replaced. Other fencing materials not listed are also intended to be removed as part of the removal of the existing fence.

a. 1 week notice is required for all fence removal. Fence removal shall be coordinated and approved by owner.

b. Owner shall be responsible f each area.

c. Contractor shall provide landmarks every quarter mile during demolition to identify the location of the removed fence to be used to install the new fence.

d. No more than 1 mile of fence shall be removed at any one time. Contractor shall remove no more fence than can be put back the same day.

0211-1

SECTION 0221

SITE GRADING

1. It shall be the responsibility of the owner to grade, fill, and remove vegetation, as required in order to install the new fence prior to the installation of the new fence, but after demolition. Contactor shall give a minimum of two days notice to owner to allow owner time to schedule their grading, fill, and vegetation removal prior to the installation of the new fence.

0221-1

SECTION 0271

BARBED WIRE FENCING

1. General:

a. -from the ground surface to the top strand as indicated on drawings. Locations where new fence is to be installed are shown on the drawings. Fencing shall have all components for a completely functional, safe, and secure barbed wire fence.

2. Materials:

a. Barbed wire shall be a 12-1/2 gauge, 2 point (barbs), spaced every 4 inches. It must conform to ASTM A121, Class 1

b. Steel Line Post - - -

1.33 lbs/ft., factory painted.

c. Wood Vertical Post .

d. Wood Brace Post 2-3/8" heavy steel pipe.

e. Wood Gate Post 3- . There shall be six strands of barbed wire at 5 spaces of equal space as shown on the drawings.

f. All wood posts shall be hedge posts (osage orange). Posts shall be substantially straight through their length, sound and free from decay.

g. Dimensions- Wood fence posts shall be of the dimensions shown in the plans.

Posts will be accepted only when the top diameter equals, or exceeds by not more than 7/8 inch, the specified diameter, except that posts of specified diameter of seven inches and larger may exceed the specified diameter by not more than 1- 3/4" inches. The diameter, after peeling, shall be determined with a circumference- diameter tape or by dividing the circumference measurement in inches by 3.14. Posts will be furnished in the length specified plus or minimum

2.0 percent.

h. Brace Wire No. 9 gauge galvanized.

i. Staples 1-

j. Barbed Wire Ties Galvanized wire no. 11 gauge.

k. Nails Galvanized, sized for intended use. Nails for braces shall be galvanized 20d (0.192" x 4") steel.

0271-1

l. Barbed wire gate closers shall be a gate closer as manufactured by Trucatch Traps, gate latch 234. Gate closer shall be approved by owner prior to ordering.

3. Installation:

a. The installed fence shall conform to the alignment and details indicated on the drawings and in the same location as the fence to be removed unless shown otherwise. The gate, corner, anchor, and terminal posts shall be set prior to setting apart. Barbed wire shall be fastened to wood posts with staples, and to steel posts with wire ties.

b. All posts shall be set plumb. Wood posts shall be either set in full sized pre-bored -bored holes with holes e post pushed in the ground. Back filled holes shall be compacted by mechanical means to the satisfaction of the owner.

c. Contractor shall assume responsibility for posts splitting or breaking. Damaged posts shall be replaced at no cost to the government.

d. Fence construction shall be in a straight line between corner, gate, anchor, and terminal posts. If fence cannot be constructed in a straight line, then straight line segments shall be used and angles shall be appropriately braced.

f. Existing gate locations will be reconstructed along with new fence construction.

g. See drawings for locations where fence intersects an existing fence or where fence crosses a stream or drainage location.

h. Barbed wire shall be drawn taut with an approved mechanical device and securely fastened to each post. Wires shall be pre-stretched to 600 pounds tension then backed off to 300 pounds tension when stapled in place. The wire shall be looped around the corner and terminal posts, and fastened with sufficient staples to anchor the wire securely. Brace wires shall consist of two complete loops of wire (four strands) twisted both above and below the brace post until satisfactorily tight.

i. Staple no. 9 cross-brace wires to gate, brace, and corner posts at quarter points of posts. At brace posts and gate bars, double-staple each wire. Drive staples diagonal to wood grain and at a slightly downward angle. Wire shall be wrapped around and tied at each gate post and one brace post in the fence line.

i. Stretch system shall consist of a double brace as shown on the drawings and shall be installed such that there shall be no more than ¼ mile distance between stretch systems. 0271-2