C04_Attachment 2. FSSS_1240LU26Q0105.pdf

PDF 72 KB Posted

Attached to
Nez Perce - Clearwater National Forest - Kelly Forks Work Center Emergency Electrical Repairs
Solicitation number
1240LU26Q0105
Issued by

About this file

This document is a specification section set for the Kelly Forks Powerline Replacement project, containing contract administration and product requirements sections.

The project scope involves replacement of approximately 600 linear feet of overhead power lines, one power pole, and reinstallation of existing pole-mounted transformers to restore the overhead electrical distribution system to complete working order. The contractor must schedule work to accommodate owner occupancy upon substantial completion and minimize operational conflicts. Payment applications must be submitted electronically with three hard copies at intervals stipulated in the agreement, using architect-approved electronic formats rather than handwritten forms. Substitution requests for products, assemblies, materials, and equipment require complete documentation demonstrating compliance with contract documents, with the proposer bearing the burden of proof. Each substitution request is limited to a single item and constitutes representation that the submitter has investigated the proposed product, agrees to provide equivalent warranties, will coordinate installation at no additional cost to the owner, and waives claims for additional costs or time extensions. Quality control requirements mandate compliance with manufacturer instructions in sequence, verification of field measurements against shop drawings, replacement of any work not meeting specified requirements, and use of qualified personnel to perform work. Product specifications require ANSI O5.1 treated Western Red Cedar utility poles with AWPA P1/P13 creosote preservative and complete sapwood penetration; straight-grained crossarms and timbers with similar treatment; bare copper medium-voltage overhead line conductors; aluminum secondary conductors with 300-volt cross-linked polyethylene insulation; bare ACSR messenger for neutral; and porcelain insulators with minimum 80 kV wet flashover rating.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Kelly Forks Powerline Replacement 011000 - 1 Summary

SECTION 011000

SUMMARY

PART 1 GENERAL

1.01 PROJECT

A. The Project consists of the replacement of approximately 600 linear feet of overhead power lines, one (1) power poles, and the re-installation of existing pole-mounted transformers to place the overhead electrical distribution system back in complete working order.

1.02 CONTRACT DESCRIPTION

1.03 OWNER OCCUPANCY

A. Owner intends to occupy the Project upon Substantial Completion.

B. Cooperate with Owner to minimize conflict and to facilitate Owner's operations.

C. Schedule the Work to accommodate Owner occupancy.

END OF SECTION

Replacement 012000 - 1 Price And Payment Procedures

SECTION 012000

PRICE AND PAYMENT PROCEDURES

PART 1 GENERAL

1.01 SECTION INCLUDES

A. Procedures for preparation and submittal of applications for progress payments.

1.02 SCHEDULE OF VALUES

A. Electronic media printout including equivalent information will be considered in lieu of standard form specified; submit draft to Architect for approval.

B. Forms filled out by hand will not be accepted.

1.03 APPLICATIONS FOR PROGRESS PAYMENTS

A. Payment Period: Submit at intervals stipulated in the Agreement.

B. Electronic media printout including equivalent information will be considered in lieu of standard form specified; submit sample to Architect for approval.

C. Forms filled out by hand will not be accepted.

D. Execute certification by signature of authorized officer.

E. Submit one electronic and three hard-copies of each Application for Payment.

Replacement 012500 - 1 Substitution Procedures

SECTION 012500

SUBSTITUTION PROCEDURES

PART 2 PRODUCTS - NOT USED

PART 3 EXECUTION

2.01 GENERAL REQUIREMENTS

A. A Substitution Request for products, assemblies, materials, and equipment constitutes a representation that the submitter:

1. Has investigated proposed product and determined that it meets or exceeds the quality level of the specified product, equipment, assembly, or system.

2. Agrees to provide the same warranty for the substitution as for the specified product.

3. Agrees to coordinate installation and make changes to other work that may be required for the work to be complete, with no additional cost to Owner.

4. Waives claims for additional costs or time extension that may subsequently become apparent.

B. Document each request with complete data substantiating compliance of proposed substitution with Contract Documents. Burden of proof is on proposer.

C. Content: Include information necessary for tracking the status of each Substitution Request, and information necessary to provide an actionable response.

D. Limit each request to a single proposed substitution item.

2.02 RESOLUTION

2.03 ACCEPTANCE

Replacement 014000 - 1 Quality Requirements

SECTION 014000

QUALITY REQUIREMENTS

PART 3 EXECUTION

1.01 CONTROL OF INSTALLATION

A. Monitor quality control over suppliers, manufacturers, products, services, site conditions, and workmanship, to produce work of specified quality.

B. Comply with manufacturers' instructions, including each step in sequence.

C. Should manufacturers' instructions conflict with Contract Documents, request clarification from

Architect before proceeding.

D. Comply with specified standards as minimum quality for the work except where more stringent tolerances, codes, or specified requirements indicate higher standards or more precise workmanship.

E. Have work performed by persons qualified to produce required and specified quality.

F. Verify that field measurements are as indicated on shop drawings or as instructed by the manufacturer.

G. Secure products in place with positive anchorage devices designed and sized to withstand stresses, vibration, physical distortion, and disfigurement.

1.02 DEFECT ASSESSMENT

A. Replace Work or portions of the Work not complying with specified requirements.

Replacement 014216 - 1 Definitions

SECTION 014216

DEFINITIONS

PART 1 GENERAL

1.01 SUMMARY

A. Other definitions are included in individual specification sections.

1.02 DEFINITIONS

A. Furnish: To supply, deliver, unload, and inspect for damage.

B. Install: To unpack, assemble, erect, apply, place, finish, cure, protect, clean, start up, and make ready for use.

C. Product: Material, machinery, components, equipment, fixtures, and systems forming the work result. Not materials or equipment used for preparation, fabrication, conveying, or erection and not incorporated into the work result. Products may be new, never before used, or re-used materials or equipment.

D. Provide: To furnish and install.

E. Supply: Same as Furnish.

PART 2 PRODUCTS - NOT USED

PART 3 EXECUTION - NOT USED

Replacement 337116.33 - 1 Wood Electrical Utility Poles

SECTION 337116.33

WOOD ELECTRICAL UTILITY POLES

PART 2 PRODUCTS

1.01 POLES

A. Wood Poles: ANSI O5.1, treated Western Red Cedar poles.

1. Select poles for straightness and minimum sweeps and short crooks.

2. Preservative: AWPA P1/P13 creosote, applied in accordance with AWPA U1; obtain complete sapwood penetration.

B. Crossarms and Timbers: Straight-grained Western Red Cedar, free of twists to within 0.1 inch per foot (2.5 mm) (1 percent) of length, with bends and twists in only one direction.

1. Preservative: AWPA P1/P13 creosote, applied in accordance with AWPA U1.

Replacement 337149.13 - 1 Overhead Medium-Voltage

Transmission Wiring

SECTION 337149.13

OVERHEAD MEDIUM-VOLTAGE TRANSMISSION WIRING

PART 2 PRODUCTS

1.01 LINE HARDWARE

1.02 INSULATORS

A. Insulators: Radio interference free wet process porcelain insulators with minimum wet flashover rating of 80 kV.

1.03 LINE CONDUCTORS

A. Medium Voltage Overhead Line Conductors: Bare copper.

B. Secondary Conductors: Aluminum, single conductor cable.

1. Insulation for Phase Conductors: 300 volt cross-linked polyethylene.

2. Neutral: Use bare ACSR messenger.

C. Copper Conductors: ASTM B1 hard-drawn solid copper.

1.04 ARRESTERS AND CUTOUTS