This document is Forest Service Supplemental Specifications (FSSS) for the Ashley Lake North Campground Renovation project (NFSR #11296) located in the Flathead National Forest, Tally Lake Ranger District, Montana. The specifications modify FP-24 (Federal Project standards) for construction of National Forest System roads and facilities.
The project scope encompasses comprehensive campground renovation including construction of new campground loop roads, campsite spurs, picnic areas, and walking paths; development of a new water well and water system; clearing and grubbing; excavation and material placement; installation of barrier rocks and crushed aggregate surfacing; fabrication and installation of concrete/wood picnic tables, concrete wheel stops, fire rings, and steel/wood benches; and seeding, fertilizing, and mulching of disturbed sites. Key material specifications include crushed aggregate (maximum 1-inch size), screened aggregate, precast concrete vault toilets (Gunnison by CXT, Inc. or Aspen by Missoula Concrete Construction), concrete sewage holding tanks (2,000-gallon capacity), water system components (frost-free hydrants, ball valves, buried polyethylene storage tanks, submersible pumps), picnic tables with wood surfaces stained Forest Service Brown (FED-STD-595C #20059), fire rings, benches, mooring posts, and single-panel kiosks with cedar shingle roofing. Construction quality control requirements mandate NICET Level II certification or equivalent for testers, contractor-furnished weed-free materials, and adherence to AASHTO testing standards for aggregate gradation, compaction density, and plasticity indices. The specifications establish detailed construction tolerances, measurement procedures with specific decimal accuracy requirements by pay item type, and payment adjusted according to acceptance criteria under Subsection 106.05.
View the file
Other files
Show all 11
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
FOREST SERVICE SUPPLEMENTAL
SPECIFICATIONS
For
ASHLEY LAKE NORTH CAMPGROUND
RENOVATION
NFSR #11296
U.S.D.A Forest Service, Region 1 Flathead National Forest, Tally Lake Ranger District
Flathead County, Montana
Table of Contents Preface 101 - Terms¸ Format¸ and Definitions
101.01 Meaning of Terms
101.03 Abbreviations
101.04 Definitions
102 - Bid¸ Award¸ and Execution of Contract Delete Section 102
103 - Scope of Work 104 - Control of Work
104.06 Use of Roads by Contractor
105 - Control of Material
105.05 Use of Material Found in the Work
106 - Acceptance of Work
106.01 Conformity with Contract Requirements
108 - Prosecution and Progress
Delete Section 108 109 - Measurement and Payment
Delete Subsections 109.06, 109.07, 109.08, 109.09
109.01 Measurement of Work
109.02 Measurement Terms and Definitions
153 - Contractor Quality Control 201 - Clearing and Grubbing
201.06 Disposal
203 - Removal of Structures and Obstructions 204 - Excavation and Embankment 251 – RipRap 301 - Untreated Aggregate Courses 302 - Crushed Aggregate 622 - Rental Equipment
622.01 Description
625 - Turf Establishment Section 625. — TURF ESTABLISHMENT
703 - Aggregate 713 - Roadside Improvement Material
713.04 Seed
R920– Mooring Posts R930 – Single Panel Kiosks R971 – Concrete or Steel / Wood Tables R972 – Steel Fire Rings and Pedestal Grills R973 – Steel / Wood Bench with Backrest R975 – Precast Concrete Vault Toilet R980 – Precast Concrete Sewage Holding Tank
Preface
Delete all but the first paragraph and add the following:
The Forest Service, US Department of Agriculture has adopted FP-24 for construction of National Forest System Roads. The Forest Service Supplemental Specifications (FSSS) shall be incorporated in the FP-24. The applicable specifications for the project will be the FP-24 as modified by the FSSS.
101 - Terms¸ Format¸ and Definitions
Add the following paragraph to Subsection 101.01:
101.01 Meaning of Terms.
Delete all references to the TAR (Transportation Acquisition Regulations) in the specifications.
Add the following to Subsection 101.03:
101.03 Abbreviations.
(a) Acronyms.
AGAR — Agriculture Acquisition Regulations
AFPA — American Forest and Paper Association
FSSS – Forest Service Supplemental Specifications
MSHA — Mine Safety and Health Administration
NESC — National Electrical Safety Code
WCLIB — West Coast Lumber Inspection Bureau
(d) Miscellaneous unit abbreviations.
MP - milepost location ppm - parts per million volume
STA – station location
MFBM - thousand feet board measure volume
Make the following changes to Subsection 101.04:
101.04 Definitions.
Delete these definitions and replace with the following:
Bid Schedule — The Schedule of Items.
Bridge — A structure, including supports, erected over a depression or an obstruction such as water along a road, a trail, or a railway and having a deck for carrying traffic or other loads.
Contractor — The individual or legal entity contracting with the Government for performance of prescribed work. In a timber sale contract, the contractor is the “Purchaser”.
Culvert — Any structure with a bottom, regardless of fill depth, depth of invert burial, or presence of horizontal driving surface, or any bottomless (natural channel) structure with footings that will not have wheel loads in direct contact with the top of the structure.
Drawings —Design sheets or fabrication, erection, or construction details submitted to the CO by the Contractor.
Neat Line — A line defining the proposed or specified limits of an excavation or structure.
Notice to Proceed — (Public Works Contracts) Written notice to the Contractor to begin the contract work. (Timber Contracts) does not apply, replace NTP with Contract Award.
Right-of-Way — A general term denoting (1) the privilege to pass over land in some particular line (including easement, lease, permit, or license to occupy, use, or traverse public or private lands), or (2) Real property necessary for the project, including roadway, buffer areas, access, and drainage areas.
Add the following definitions:
Adjustment in Contract Price — “Equitable adjustment,” as used in the Federal Acquisition Regulations, or “construction cost adjustment,” as used in the Timber Sale Contract, as applicable.
Change — “Change” means “change order” as used in the Federal Acquisition Regulations, or “design change” as used in the Timber Sale Contract.
Forest Service — The United States of America, acting through the Forest Service, U.S.
Department of Agriculture.
Forest Service Supplemental Specifications – The Forest Service uses supplemental specifications to modify the FP-24 to meet the agency needs and intents. FSSS revise the FP-24 by adding, deleting, replacing, revising, replacing part of entire sections or subsections or adding new sections to the FP..
Pioneer Road — Temporary construction access built along the route of the project.
Purchaser — The individual, partnership, joint venture, or corporation contracting with the Government under the terms of a Timber Sale Contract and acting independently or through agents, employees, or subcontractors.
Protected Streamcourse — A drainage shown on the plans or timber sale area map that requires designated mitigation measures.
Road Order — An order affecting and controlling traffic on roads under Forest Service jurisdiction. Road Orders are issued by a designated Forest Officer under the authorities of 36 CFR, part 260.
Utilization Standards — The minimum size and percent soundness of trees described in Public Works contract specifications or Timber Sale and stewardship contract provisions to determine merchantable timber.
Add Figure 101-1—Illustration of road structure terms:
102 - Bid¸ Award¸ and Execution of Contract
Delete Section 102 in its entirety.
Delete Section 102.
103 - Scope of Work 103.00_National_11_9_2016
Delete all of Section 103 except Subsection 103.01 Intent of Contract.
103.01 Intent of Contract. Delete this subsection and replace with the following:
The project consists of renovating the Ashley Lake North Campground. The major items of work include:
constructing new campground loop road, new campsite spurs and picnic areas, new walking paths, development of new water well and water system; clearing and grubbing; excavation, hauling and placing barrier rocks and crushed aggregate surfacing; fabrication and installation of concrete/wood picnic tables and concrete wheel stops; installing fire rings, steel/wood bench seats: and seeding, fertilizing and mulching the sites.
104 - Control of Work
Add the following to Subsection 104.06:
104.06 Use of Roads by Contractor.
The Contractor is authorized to use roads under the jurisdiction of the Forest Service for all activities necessary to complete this contract, subject to the limitations and authorizations designated in the Road Order(s) or described in the contract, when such use will not damage the roads or national forest resources, and when traffic can be accommodated safely.
105 - Control of Material
Add the following to Subsection 105.02c:
105.02(c) Contractor-located sources.
All material (e.g., soil, gravel, sand, borrow, aggregate, etc.) transported onto National Forest System land or incorporated into the work shall be weed-free. The Contracting Officer may request written documentation of methods used to determine the weed-free status of any and all materials furnished by the contractor. Contractor-provided expertise and methods to establish weed-free status must be appropriate for the weeds of concern in the local area.
105.05 Use of Material Found in the Work.
Delete second paragraph and subparagraphs (a) and (b) in Subsection 105.05 Use of Material Found in the Work and replace it with the following:
The right to use and process material found in the work excludes the use and processing of material for nongovernment contract work, except for the disposal of waste material. Materials produced or processed from Government lands in excess of the quantities required for performance of this contract are the property of the Government. Place excess material at government-approved agreed to location(s), at no additional cost to government.
106 - Acceptance of Work 106.01_National_7_18_2017
Delete the 3rd and 4th paragraphs in Subsection 106.01 Conformity with Contract Requirements.
106.01 Conformity with Contract Requirements.
108 - Prosecution and Progress
Delete Section 108 in its entirety.
Delete Section 108.
109 - Measurement and Payment
Delete Subsections 109.06, 109.07, 109.08, and 109.09:
Delete Subsections 109.06, 109.07, 109.08, 109.09.
Delete the third paragraph and Table 109-1 of Subsection 109.01 and replace with the following:
109.01 Measurement of Work.
Take measurements as described in Subsection 109.02 unless otherwise modified by the Measurement Subsection of the section controlling the work being performed. Table 109-1 indicates the accuracy required for quantities of the various pay units used in the Schedule of Items. Use this guide to determine the decimal placement in the final payment.
Table 109-1
Decimal Accuracy of Quantities for Final Payment
Pay Item Level of Precision Acre 0.01 Cubic Foot 1 Cubic Yard 1 Cubic Yard Exception - Structure Excavation;
Sheathing; Materials; Bedding, Bed Course, and Backfill, Materials; Gabions;
0.1
Cubic Yard Exception – Concrete; Masonry 0.01 Day 1 Each 1 Gallon 1 Hour 0.1 Linear Foot 1 Linear Foot Exception - Timber, Steel, and Concrete Piles
0.1
M-Gallon 0.1 Mile 0.01 Month 0.1 Pound 1 Square Foot 0.1 Square Yard 0.1 Station 0.1
Thousand Board Feet Measure 0.01 Ton 0.1 Ton Exception - Calcium Chloride; Sodium Chloride;
Hydrated Lime; Bituminous Materials; Pavements; Bed Course Materials
0.01
Week 0.1
Delete Subsection 109.02(c) Measurement Terms and Definitions, Contract quantity and replace with:
109.02 Measurement Terms and Definitions.
(c) Contract quantity.
The quantity to be paid is the quantity listed in the bid schedule. The contract quantity will be adjusted for authorized changes that affect the quantity or for errors made in computing this quantity when that error exceeds 15% or more. If there is evidence that a quantity specific as a contract quantity is incorrect by 15% or more, submit calculations, drawings, or other evidence indicating why the quantity is in error and request in writing that the quantity be adjusted.
153 - Contractor Quality Control
Delete Subsection 153.02 Qualifications and replace with the following:
153.02 Qualifications. Submit the following for approval with the quality control plan:
(a) Quality control manager (QCM). Furnish a QCM who has experience in construction, inspection, quality control and material testing on construction projects of similar type and scope.
(b) Testers. Provide testers with at least 1 years' experience in the type of sampling and testing required, and with one of the following for the type of sampling and testing performed:
(1) National Institute for Certification in Engineering Technologies (NICET) Level II certification in construction materials testing for similar material types or equivalent state or industry certification;
(2) Certification by a state or regional certification program, such as Western Alliance for Quality Transportation Construction or Northeast Transportation Technician Certification Program; or
(3) At least 1 year of employment by an AASHTO accredited laboratory performing equivalent sampling and testing with competence according to AASHTO R 18.
Add the following paragraph to the end of Subsection 153.03(b) Quality Control Plan, QC procedures:
Submit written proposals for approval of alternate AASHTO or State approved test methods.
Alternate methods may be allowed based on documented equivalence to the specified method.
Add the following Subsection:
153.05 Certifications and Submittals
(a) Submittal Log At a minimum the contractor shall provide project submittals as shown on the Submittal Log below. Submittal requirements are listed in the Standard Specifications, Supplemental Specifications, and Plans.
Submittal Log
Log No.
Indirect payment to Pay
Item(s) Description of Submittal Type of
Submittal
Requirement found in
Specification No.
/Drawings
Additional Specification References
1 151 Schedule Schedule 155
2 151 List of Subcontractors Listing 153 3 151 Hazardous Spill Plan Plan 107.10 4 151 Contractor Quality Control Plan Plan 153.03
5 302 Aggregate Sieve Analysis Material Submittals 106.02 FSSS 301.08
FSSS 302.04
7 625 Seed Material Certifications 625 FSSS 625.07
8 625 Mulch Material Certifications 625 FSSS 625.10
106.03
5 13340 Fabricated Precast Concrete Well House
Material Submittal 01300, Plans 13100
6 02615-1 Well House Piping Material Submittal 01300, Plans 15400
6 16000-1 Well House Electrical Material Submittal 01300, Plans 16100
6 02615-1 Well House Piping Material Submittal 01300, Plans 15400
6 02713(1-4)
HDPE Pipe, Fittings, Hydrants, Valve Boxes, and all Appurtenances (Including Tracer Wire)
Material Submittal 01300, Plans 02510
6 02713(1-4) Pipe Bedding Material Material Submittal 01300, Plans 02510
Delete Subsection 153.08 Records and Control Charts and replace with the following:
Maintain complete testing and inspection records by pay item number and make them accessible to the CO.
201 - Clearing and Grubbing
Delete the last sentence in the second paragraph of Subsection 201.03.
201.03 General.
Delete paragraph (c) and (d) of Subsection 201.04 and replace with the following:
201.04 Clearing.
(c) In areas outside the excavation, embankment, and slope rounding limits, cut stumps to within 12 inches or one-third of the stump diameter of the ground, whichever is higher, measured on the side adjacent to the highest ground. For timber sales, stump heights will meet the requirements of the Timber Sale contract; and
(d) Trim tree branches that extend over the road surface and shoulders to attain a clear height of 16 feet. If required, remove other branches to present a balanced appearance. Trim according to accepted tree surgery practices. Treat wounds with tree wound dressing.
201.06_National_4_9_2019
Delete Subsection 201.06 Disposal and replace with the following:
201.06 Disposal.
Merchantable timber is Government property. Dispose of clearing and grubbing debris according to Subsection 203.07.
203 - Removal of Structures and Obstructions
Add the following to Subsection 203.07 Disposing of Material:
Dispose of unsuitable and excess material according to the specified method(s) as follows:
(a) Windrowing Construction Slash. Place construction slash outside the roadway in neat, compacted windrows approximately parallel to and along the toe line of embankment slopes.
Do not permit the top of the windrows to extend above subgrade. Use construction equipment to matt down all material in a windrow to form a compact and uniform pile.
Construct breaks of at least 15 feet at least every 200 feet in a windrow. Do not place windrows against trees.
(b) Scattering. Scatter construction slash in designated areas without damaging trees. Limb all logs. Place logs and stumps away from trees, positioned so they will not roll, and are not on top of one another. Limb and scatter other construction slash to reduce slash concentrations. When scattering for erosion control, place construction slash as flat as practicable on the completed slope.
(c) Chipping. Use an approved chipping machine to chip slash longer than 3 feet. Deposit chips on embankment slopes or outside the roadway to a loose depth less than 6 inches.
Minor amounts of chips or ground woody material may be permitted within the roadway if they are thoroughly mixed with soil and do not form a layer.
(d) Debris Mat. Use tree limbs, tops, cull logs, split stumps, wood chunks, and other debris to form a mat upon which construction equipment is operated. Place stumps upside down and blend stumps into the mat.
(e) Decking. Remove brush from designated log deck areas. Limb and top logs.
Logs not meeting the Utilization Standards described in Subsection 201.04(c) shall be cut to lengths less than (8) feet and decked in designated log deck location.
Merchantable timber not associated with an existing timber sale shall be cut to length meeting the Utilization Standards described in Subsection 201.04(c).
Deck logs so that logs are piled parallel to one another; can be removed by standard log loading equipment; will not damage standing trees; will not interfere with drainage, and will not roll. Keep logs in log decks free of brush and soil.
(f) Removal to designated locations. Remove construction slash to designated locations.
(g) Piling. Pile construction slash in designated areas. Place and construct piles so that if the piles are burned, the burning will not damage remaining trees. Keep piles free of dirt from stumps.
(f) Scattering. Scatter construction slash in designated areas without damaging trees. Limb all logs.
Place logs and stumps away from trees, positioned so they will not roll, and are not on top of one another. Limb and scatter other construction slash to reduce slash concentrations. When scattering for erosion control, place construction slash as flat as practicable on the completed slope.
(g) Chipping. Use an approved chipping machine to chip slash longer than 3 feet. Deposit chips on embankment slopes or outside the roadway to a loose depth less than 6 inches. Minor amounts of chips or ground woody material may be permitted within the roadway if they are thoroughly mixed with soil and do not form a layer.
(h) Debris Mat. Use tree limbs, tops, cull logs, split stumps, wood chunks, and other debris to form a mat upon which construction equipment is operated. Place stumps upside down and blend stumps into the mat.
(i) Decking. Remove brush from designated log deck areas. Limb and top logs.
Logs not meeting the Utilization Standards described in Subsection 201.04(c) shall be cut to lengths less than 8 feet and decked in designated log deck location.
Merchantable timber not associated with an existing timber sale shall be cut to length meeting the Utilization Standards described in Subsection 201.04(c).
Deck logs so that logs are piled parallel to one another; can be removed by standard log loading equipment; will not damage standing trees; will not interfere with drainage, and will not roll. Keep logs in log decks free of brush and soil.
(j) Removal to designated locations. Remove construction slash to designated locations.
(k) Piling. Pile construction slash in designated areas. Place and construct piles so that if the piles are burned, the burning will not damage remaining trees. Keep piles free of dirt from stumps.
204 - Excavation and Embankment
Delete Subsection 204.06 Roadway Excavation and replace with the following:
204.06 Roadway Excavation. Excavate as follows:
(a) Rock cuts. Verify the top portion of the rock cuts during pioneer access or initial excavation. Construct the final soil cut before starting drilling for rock blasting or other rock excavation methods unless approved. Blast rock according to Forest Service Supplemental Specification Section 205 if approved by the CO. Excavate rock cuts to 6 inches below subgrade within the roadbed limits. Backfill to subgrade with select borrow. Compact the material according to Subsection 204.11.
(b) Earth cuts. Scarify earth cuts to 6 inches below subgrade within the roadbed limits.
Compact the scarified material according to Subsection 204.11.
(c) Drainage Feature. Drainage feature includes construction of all ditches, minor channel changes, drainage dips, catch basins, surface water deflectors, and other minor drainage structures. Compact the material according to Subsection 204.11. Excavate on a uniform grade between control points.
Remove snow or ice in advance of the work and deposit beyond the roadway limits in a manner to prevent resource damage.
Conserve 6-inch minus material from the roadway excavation to use for finishing the roadbed.
Dispose of unsuitable or excess excavation material according to Subsection 204.14. Replace shortage of suitable material caused by premature disposal of roadway excavation.
At the end of each day’s operations, shape to drain and compact the work area to a uniform cross-section.
Delete and replace the first paragraph in Subsection 204.11 Compaction with the following:
When determining the quantity of material retained on a No. 4 sieve for compaction, use AASHTO T27. Compact each lift of material to a firm and stable condition and until there is no visible evidence of further consolidation or deflection. Compact using one of the following as specified:
Add the following to Subsection 204.11 Compaction:
(d) Adjust the moisture content of the material to a moisture content suitable for compaction.
Fill the interstices around rock with earth or other fine material as practical. Operate roller compaction equipment over the full width of each layer until there is no visible evidence of further consolidation or, if when a sheepsfoot roller is used, the roller “walks out” of the layer. Make at least three complete passes. Use compression-type rollers at speeds less than
6 feet per second and vibratory rollers at speeds less than 3 feet per second. Ensure rollers meet the following requirements:
(1) Steel wheeled rollers, other than vibratory, capable of exerting a force of not less than 250 pounds per inch of width of the compression roll or rolls.
(2) Vibratory steel wheeled rollers equipped with amplitude and frequency controls with a minimum dynamic force of 30,000 pounds impact per vibration, specifically designed to compact the material on which it is used.
(3) Pneumatic-tired rollers with smooth tread tires of equal size that will provide a uniform compacting pressure for the full width of the roller and capable of exerting a ground pressure of at least 80 psi.
(4) Sheepsfoot, tamping, or grid rollers capable of exerting a force of 250 pounds per inch of width of roller drum
(e) Adjust the moisture content of the material to a moisture content suitable for compaction.
Fill the interstices around rock with earth or other fine material as practical. Operate hauling and spreading equipment uniformly over the full width of each layer until there is no visible evidence of further consolidation. Make at least three complete passes.
(f). Adjust the moisture content of the material to a moisture content suitable for compaction.
Fill the interstices around rock with earth or other fine material as practical. Operate hauling and spreading equipment uniformly over the full width of each layer.
(g) Adjust the moisture content of the material to a moisture content suitable for compaction.
Compact the complete surface with a bucket of an excavator larger than 39,000 pounds Gross Vehicle Weight using a minimum of three blows. Overlap compaction by ½ width of bucket.
(h) Adjust the moisture content of the material to a moisture content suitable for compaction.
Compact using an approved mechanical tamper for a minimum of three complete passes.
When compacting with rollers or hauling and spreading equipment is not practical, use approved mechanical tampers for a minimum of three complete passes.
Replace the first paragraph of Subsection 204.13 replace with the following.
204.13 Sloping, Shaping, and Finishing. Complete slopes, ditches, culverts, riprap, and other underground minor structures before placing aggregate courses. Slope, shape, and finish to the designated tolerance class as defined in Table 204-2 as follows:
Add the following table to Section 204.
Table 204-2
Construction Tolerances
Dimension Tolerance Class
A B C D E F
Roadbed width (ft) +0.5 +1.5 +2.0 +2.0 <NA> <NA>
Subgrade elevation1 (ft) +-0.1 +-1.0 +-3.0 +-5.0 <NA> <NA>
Horizontal alignment (ft) +-0.2 +-1.5 +-5.0 +-10.0 <NA> <NA>
Vertical alignment (%) +-1 +-1 +-2 +-2 <NA> <NA>
Slopes, excavation and embankment (%)
+-3 +-3 +-3 +-3 <NA> <NA>
1 Subgrade elevation tolerance applies to the cut or fill shown in the staking information unless otherwise agreed to.
Delete 204.16(a)(1)(a) Measurement, Roadway Excavation and replace with the following:
(a) Roadway prism excavation;
Add the following to Subsection 204.16(g) Measurement:
(g) Drainage features. Measurement includes all excavation, embankment, shaping, and grading necessary for a completed drainage feature.
251 – RipRap
Add the following to Subsection 251.01:
251.01
(a) Barrier Rock. Place individual barrier rock as designated on the plans or as staked.
Individual rock sizes shall be 3’ diameter.
301 - Untreated Aggregate Courses
Delete section 301 entirely and replace with the following:
Descrip on
301.01 This work consists of construc ng aggregate courses on a prepared surface.Material
301.02 Conform to the following Subsec ons:Subbase, base, and surface course aggregate 703.05
Water for construc on 725.01(c) Screened aggregate 703.05(d)
Construc on Requirements
301.03 General. Prepare the surface according to Sec on 204 or 303 as applicable.
Written approval of the roadbed is required before placing aggregate.
For pit run material, furnish material smaller than the maximum size identified in the plans, no gradation will be required otherwise. After processing on the road, remove all oversize material from the road and dispose as directed by the CO.
Provide additives or binder, if required, at the proportions specified.
Develop and use Government furnished sources according to Section 105.
If the aggregate is produced and stockpiled before placement, handle and stockpile according to Section 314.
A er a representa ve quan ty of aggregate is produced, submit target values within the required grada on range along with a representa ve 300-pound sample at least 14 days before incorpora ng the aggregate into the work.
301.04 Mixing and Spreading. Obtain moisture content in accordance with the compac on method specified. If moisture content is not specified by the compac on method adjust the moisture content to a level suitable for compac on. Mix the aggregate and adjust the moisture content to obtain a uniform mixture. Spread and shape the mixture on the prepared surface in a uniform layer.
Do not place the mixture in a layer exceeding 6 inches (150 millimeters) in compacted thickness. When more than one layer is necessary, compact each layer according to Subsection
301.05 before placing the next layer. Route hauling equipment uniformly over the full width of the surface to minimize rutting or uneven compaction.
301.05 Compac ng. Compact each layer full width. Roll from the sides to the center, parallel to the centerline of the road. Along curbs, headers, walls, and all places not accessible to the roller, compact the material with approved tampers or compactors.
Compact the aggregate using one of the following methods as specified:
(a) Compaction A. Operating spreading and hauling equipment over the full width of the travelway.
(b) Compaction B. Operate rollers and compact as specified in Subsection 204.11(a)(4)(a).
(c) Compaction C. Moisten or dry the aggregate to a uniform moisture content between 5 and 7 percent based on total dry weight of the mixture. Operate rollers and compact as specified in Subsection 204.11(a)(4)(a).
(d) Compaction D. Compact to a density of at least 95.0 percent of the maximum density, as determined by AASHTO T 99, method C or D.
(e) Compaction E. Compact to a density of at least 95.0 percent of the maximum density, as determined by AASHTO T 180, method C or D.
For all compaction methods, blade the surface of each layer during the compaction operations to remove irregularities and produce a smooth, even surface. When a density requirement is specified, determine the in place density and moisture content according to AASHTO T 310 or other approved test procedures.
301.06 Surface Tolerance. Remove irregularities and shape to a uniform surface. Ensure that the thickness and width of the compacted aggregate conform to the dimensions SHOWN ON THE DRAWINGS, and that measurements on the compacted aggregate meet the following criteria:
(a) The maximum variation from the specified thickness is 1 inch.
(b) The compacted thickness is not consistently above or below the specified thickness, and the average thickness of measurements for any one mile of road segment is within ± ¼ inch of the specified thickness.
301.07 Maintenance. Maintain the aggregate course to the correct line, grade, and cross-section by blading, watering, rolling, or combination thereof until placement of the next course.
Correct defects according to Subsec on 301.06.
301.08 Acceptance. See Table 301-1 for sampling, tes ng, and acceptance requirements.
Screened aggregate will be evaluated Under 106.02 Aggregate grada on and surface course plas city index will be evaluated under Subsec on 106.05. Other aggregate quality proper es will be evaluated under Subsec ons 106.02 and 106.04.
(a) Aggregate gradation. The upper and lower specification limits are equal to the calculated mean of all test results plus or minus the allowable deviations shown in Tables 703-1 and 703- 2, except as follows:
(1) If the calculated mean value for a tested sieve exceeds the maximum gradation range value shown in Table 703-1, then the upper specification is equal to the maximum gradation value in Table 703-1 plus or minus the allowable deviation in Table 703-2.
(2) If the calculated mean value for a tested sieve is less than the minimum gradation range value shown in Table 703-1, then the lower specification is equal to the minimum gradation value in Table 703-1 plus or minus the allowable deviation in Table 703-2.
(b) Plasticity index. The upper and lower specification limits for surface courses are shown in Subsection 703.05(c)(3).
Construction of untreated aggregate courses will be evaluated under Subsections 106.02 and 106.04.
Measurement
301.09 Measure the Sec on 301 pay items listed in the bid schedule according to Subsec on 109.02 and the following as applicable:
When measuring aggregate by the cubic yard, measure in place.
When measuring aggregate by the square yard, measure the length horizontally along the centerline of the roadway. Measure the width horizontally to include the top of aggregate width, including designed widenings.
Payment
301.10 The accepted quan es will be paid at the contract price per unit of measurement adjusted according to Subsec on 106.05 for the Sec on 301 pay items listed in the bid schedule. Payment will be full compensa on for the work prescribed in this Sec on. See Subsec on 109.05.
Delete Table 301-1 and replace with the following table:
Table 301-1 Sampling, Testing, and Acceptance Requirements
Material or Product
(Subsection)
Type of Acceptance (Subsection)
Characteristic Category Test Methods Specifications
Sampling Frequency
Point of Sampling
Split Sample
Reporting Time Remarks
Source
Aggregate quality
(703.05(a), (b), & (c))
Measured & tested for conformance (106.04 &
105)
LA abrasion (coarse) − AASHTO
T 96
1 per type & source of material
Source of material Yes
Before using in work
Not required if using
Government -furnished sources Soundness using sodium sulfate (coarse & fine)
− AASHTO
T 104 " " " " "
Fractured faces − AASHTO
T 335 " " " " "
Liquid limit −
AASHTO
R58 & T 89, Method A
Surface course aggregate
(703.05(c))
Measured & tested for conformance (106.04 &
105)
Plasticity index −
AASHTO
R 58, T 89, & T 90
1 per type & source of material
Crusher belt or after processing
Yes Before using in work
Not required if using
Government -furnished sources Table 301-1 (continued)
Sampling, Testing, and Acceptance Requirements Material or
Product (Subsection)
Type of Acceptance (Subsection)
Characteristic Category Test Methods Specifications
Sampling Frequency
Point of Sampling
Split Sample
Reporting Time Remarks
Source (continued)
Subbase, base, or surface course aggregate
(703.05(b) & (c))
Process control
(153.03)
Gradation − AASHTO T 11 & T 27
2 per day per stockpile minimum
Crusher belt No 24 hours
Not required if using a pre-crushed commercial source
Fractured faces − AASHTO T 335 " " " " "
Surface course aggregate
(703.05(c)) " Plasticity index −
AASHTO
R 58, T 89, & T 90
2 per day per stockpile minimum
Crusher belt or after processing No 24 hours
Not required if using a pre-crushed commercial source Production
Subbase course
Grading A & B
Statistical (106.05)
Gradation
AASHTO
T 27 & T 11
1 per 1000 tons
From windrow or roadbed after processing or other approved locations
Yes 24 hours −
No. 4 II No. 200 II
Other specified sieves
II
Table 301-1 (continued)
Material or Product
(Subsection)
Type of Acceptance (Subsection)
Characteristic Category Test Methods Specifications
Sampling Frequency
Point of Sampling
Split Sample
Reporting Time Remarks
Production (continued)
Base course Grading C, D, & E
Statistical (106.05)
Gradation
AASHTO
T 27 & T 11
1 per 1000 tons
From windrow or roadbed after processing or other approved locations
Yes 24 hours −
⅜ in II No. 4 II
No. 200 II
Other specified sieves II
Subbase & base course Grading A, B, C, D, & E
Measured & tested for conformance (106.04)
Liquid limit −
AASHTO
R 58 & T 89, Method A
1 per 1000 tons
From windrow or roadbed after processing
Yes 4 hours −
Moisture-density
(maximum density)
AASHTO
T 180, Method D(1)
1 per type & source of material
Stockpile or production output
Density −
AASHTO
T 310 or other approved procedures
1 per 500 tons
In-place after compaction No End of shift −
Moisture content
(in-place)
Material or Product
(Subsection)
Type of Acceptance (Subsection)
Characteristic Category Test Methods Specifications
Sampling Frequency
Point of Sampling
Split Sample
Reporting Time Remarks
Production (continued)
Surface course aggregate
Statistical (106.05)
Gradation
AASHTO
T 27 & T 11
1 per 1000 tons
From windrow or roadbed after processing or other approved locations
Yes 24 hours −
No. 4 II No. 40 II No. 200 II
Other specified sieves II
Plasticity index II
AASHTO
R 58, T 89, & T 90
Measured & tested for conformance (106.04)
Moisture-density
(maximum density)
AASHTO
T 180, Method D(1)
1 per type & source of material
Stockpile or production output Yes " −
Density −
AASHTO
T 310 or other approved procedures
1 per 500 tons
In-place after compaction No End of shift −
Moisture content
(in-place)
Fractured faces − AASHTO
T 335 1 per
1000 tons
From windrow on roadbed after processing
Yes 4 hours −
Material or Product
(Subsection)
Type of Acceptance (Subsection)
Characteristic Category Test Methods Specifications
Sampling Frequency
Point of Sampling
Split Sample
Reporting Time Remarks
Finished Product
Subbase, base, & surface course
Measured & tested for conformance (106.04)
Surface tolerance & grade
− Subsection
301.06 As directed Surface of
final course No
Before placement of next lift or as requested
(1) At least 5 points per proctor.
302 - Crushed Aggregate
Add the following to Subsection 302.02 Material:
Soil 704
Add the following to Subsection 302.04 Mixing and Spreading:
Written approval of the surface is required before placing aggregate.
Add the following to Subsection 302.04(a) Mixing and Spreading, Roadway Aggregate:
For pit run material, furnish material smaller than the maximum size identified in the plans, no gradation will be required otherwise. After processing on the road, remove all oversize material from the road and dispose as directed by the CO.
Delete and replace 302.05(a)(1) Compacting and Finishing Crushed Aggregate, Roadway aggregate, Method 1 with the following:
(1) Method 1. Compact each lift according to Subsection 204.11.
601. - Minor Concrete
Delete from Table 601-2 Remarks column “Deliver verification cylinders to the CO or designated laboratory for scheduled testing” in Section 601 Minor Concrete.
611 – Water Systems
Add the following to the end of Section 611.02
611.02 Materials
BALL VALVES
A. Ball valves for water service shall be of bronze or brass construction with two-piece end entry body, bronze or brass ball, teflon or Viton stem seal, reinforced teflon seats and thrust washer, a removable operating lever, and threaded ends.
B. Valves shall be rated not less than 500 psi nonshock cold WOG and shall be driptight in both directions.
C. Valves shall be Conbraco Industries "Apollo 70-100 Series", Powell "Fig 4210T", Stockham "S-216” or approved equal.
FROST-FREE HYDRANT
A. Hydrant to be Certified Lead Free to NSF/ANSI 372-2016, Drinking Water System Components.
B. Hydrant shall have a brass foot valve, hose adaptor and pivot connector.
C. Hydrant to be steel, zinc-plated 1 inch diameter pipe with ¾ inch FNPT connection.
BURIED POLYETHYLENE STORAGE TANK
A. Tank shall be manufactured from high-density polyethylene with U.V. inhibitors and NSF approved. Resins must be FDA compliant for potable water use.
B. Tank shall be sectional ribbing designed to withstand up to 400 psf load pressure.
C. Tank shall be equipped with multiple fitting flats to accommodate a variety of plumbing configurations.
D. Tank shall have a minimum 20-inch diameter access cover and riser. A closed cell foam gasket shall be installed between the riser and the tank to ensure a water-tight seal.
E. Tank lid shall be lockable and watertight. Lid to overlap riser opening and extend down the riser at least two inches.
WELL CAP, VENT & SANITARY SEAL
A. The watertight cap shall be secured to the well casing with a compression gasket.
B. The cap shall include a 1-inch diameter threaded sanitary plug to allow unobstructed access to the PVC tube for water level monitoring.
C. The top of the cap must be able to be removed without affecting the sealed conduit, PVC water level monitoring tube or wiring.
D. The heavy-duty watertight cap will have a separate protected downward facing screened well vent with a pipe nipple.
1. Pipe nipple: 1.5-inch diameter, 6-inch long.
2. Screen: 24 mesh corrosion resistant.
E. Sanitary seal: holes for piping and cables, that fits into top of casing and is removable, waterproof, and vermin proof.
F. Construction of the cap and well vent will be of heavy-duty gray cast iron and painted with a green enamel finish.
CHECK VALVES
A. Check valves shall be low pressure drop, self-cleaning, swing type check valves, with elastomer seal at seat, and constructed of corrosion resistant materials.
Add the following paragraphs to the end of Section 611.03
611.03 General
Install all valves, equipment and accessories in accordance with the manufacturer’s requirements.
Reference shall be made to jointing and alignment specifications.
Pressure test all valves in a similar manner to and in conjunction with the testing prescribed for piping systems. Additionally, individually test each valve for full and unhindered operation after installation.
Disinfection required per AWWA standards for the water storage tank and for the distribution system.
PERMANENT SUBMERSIBLE PUMP
A. The permanent submersible pump shall be installed according to the manufacturer's recommendations. A qualified representative of the manufacturer shall supervise and approve installations and provide all startup services.
B. Install submersible well pumps per manufacturer’s recommendations and provide access for periodic maintenance.
1. Before lowering permanent pump into well, start pump to verify correct rotation.
2. Secure the pump at the required elevation as recommended by the pump manufacturer.
3. Securely tighten discharge piping joints.
4. Connect motor to submersible pump and locate near well bottom.
a. Connect power cable while connection points are dry and undamaged.
b. Do not damage power cable during installation; use cable clamps that do not have sharp edges.
c. Install water-sealed surface plate that will support pump and piping.
5. Electrical cable to the pump must be firmly attached to the riser pipe at 20-foot intervals or less.
C. Following completion of the pump installation and drop piping, the pumps shall be tested to determine field performance for satisfactory operation. Tests, at a minimum, shall measure:
1. Amperage draw
2. Pressure at which the amperage was measured
3. Shut off head
4. Voltage
5. Drawdown.
6. The Contractor shall provide a written report to the Engineer summarizing all operating conditions measured.
D. Disinfect water supply wells according to AWWA A100, AWWA C654 and ARM
36.21.662(1).
1. After permanent pumping equipment has been installed.
E. Government shall sample and engage a qualified testing agency, certified by the Department of Public Health and Human Services, to make bacteriological analyses of water from each finished well and report the results.
SUBMITTALS
It shall be the Contractor's responsibility to submit all items with such promptness as to cause no delay in the work. Approvals must be obtained before starting work which involves the item. The Contractor shall allow 5 business days for processing of submittals by the Government.
Manufacturer's Literature: Submit 3 copies to the Contracting Officer for approval on the items required herein. Literature shall be marked or otherwise designated to indicate the exact model, size, etc., the Contractor proposes to use. Information shall be adequate to determine compliance with the specifications without additional research by the Contracting Officer. One copy of approved submittals will be returned to the Contractor.
Submit a shop drawing and literature of the water tank (including riser, lid, vent pipe and other appurtenances) to the Contracting Officer for approval prior to fabrication of the tank and appurtenances.
Shop drawing shall show all dimensions and component details.
Submit specified literature of the water pipe, fittings, vaults, hydrants and appurtenances to the Contracting Officer for approval prior to fabrication.
Submit specified literature of the drop pipe, sanitary well cap and other appurtenances (as identified in the Drawings) to the Contracting Officer for approval prior to fabrication.
622 - Rental Equipment
Add the following to Subsection 622.01
622.01 Description
Work is to correct minor site discrepancies not noted in the contract documents that occurred between award of contract and implementation of work needed to result in a complete project. Examples of work may include:
a. Excavating and placing embankment,
b. Slide removal,
c. Drainage and roadway repair,
d. Haul and placement of material such as rocks, logs, or debris, or
e. Sign or gate installation
625 - Turf Establishment
Delete Section 625 in its entirety and replace with the following:
Section 625. — TURF ESTABLISHMENT Description
625.01 This work consists of soil preparation, watering, fertilizing, seeding, and mulching. Seeding and mulching methods are designated as dry or hydraulic.
Material
625.02 Conform to the following Subsections:
Agricultural limestone 713.02 Fertilizer 713.03 Mulch 713.05 Seed 713.04 Tackifiers 713.11 Water 725.01(b)
Construction Requirements
625.03 General. Apply turf establishment to prepared ground or any disturbed area between April 15 and October 31. Apply turf establishment to the areas shown on the plans or worklists within 30 days after completion of ground disturbing activities.
Seeded areas damaged by construction activities shall be reseeded. Do not seed during windy weather or when the ground is excessively wet, frozen, or snow covered.
Assure that all seed and mulch used in the work conforms to the weed free requirements of Section 713.
625.04 Preparing Seedbed. Ensure that the surface soil is in a roughened condition favorable for germination and growth.
625.05 Watering. Moisten seeding areas before seeding and maintain the moisture until turf is established or until final acceptance.
625.06 Fertilizing. Apply fertilizer by the following methods:
(a) Dry Method. Apply the fertilizer with approved mechanical equipment. Hand operated methods are satisfactory on areas inaccessible to mechanical equipment.
(b) Hydraulic Method. Use hydraulic-type equipment capable of providing a uniform application using water as the carrying agent. Add fertilizer to the slurry and mix before adding seed. Add the tracer material when designated by the CO.
Apply fertilizer at the rate of 100 pounds per acre. Follow manufacture’s recommendation for product and site conditions. Use an organic (bio-based), slow release fertilizer meeting the following chemical analysis:
Nutrient Percent Nitrogen, N 8% Phosphorus, P205 4% Potassium, K 4%
625.07 Seeding. Apply seed by the following methods:
(a) Dry Method. Apply the seed in a uniform application with approved power driven seeders, drills, or other mechanical equipment. Hand-operated seeding methods are satisfactory on areas inaccessible to mechanical equipment; or
(b) Hydraulic Method. Use hydraulic-type equipment capable of providing a uniform application using water as the carrying agent. Add a tracer material consisting of either wood or grass cellulose fiber mulch to the water. Apply the tracer material at a rate of 400 pounds per acre (450 kilograms per hectare) to provide visible evidence of uniform application. Add the seed to the water slurry no more than 30 minutes before application. Seed by hand areas inaccessible to seeding equipment.
Furnish and apply the following kinds and amounts of pure live seed:
Common Name Species Pure Live Seed (Lbs / Acre)
% by weight
Mountain Brome Bromus marginatus 12.03 16
Rough Bentgrass Agrostis scabra .01 10
Sandberg’s Bluegrass Poa secunda 0.5 20
Bluebunch Wheatgrass Pseudoregneria spicata 4.49 25
Idaho Fescue Festuca idahoensis 1.3 25
Sterile Wheat Triticale x Secale 5.32 4
Total 23.65 100
Seed Certification
Certified, blue-tagged seed shall be used where a name variety or cultivar is specified. Blue tags that are removed to mix or spread the seed will be saved and provided to the Forest.
All seed purchased will be certified free of seeds from weeds listed on the current "All States Noxious Weeds List."
Pounds of seed to be furnished per acre shall be obtained by dividing the pounds of pure live seed required per acre by the product of the percent purity and percent germination.
𝑥 = (5 lbs Pure Seed per Acre)(0.90 x 0.85) = 6.55 (𝑙𝑏𝑠 𝑐𝑜𝑚𝑚𝑒𝑟𝑐𝑖𝑎𝑙 𝑠𝑒𝑒𝑑 𝑝𝑒𝑟 𝑎𝑐𝑟𝑒) where: purity = 90%; germination = 85%.
625.08 Mulching. Apply Mulch within 48 hours after seeding by the following methods.
(a) Dry Method. Mulch material shall be weed free straw and shall be applied at a uniform rate to adequately cover the seed. The weed free straw shall be from a grain crop such as barley straw, wheat straw or oat straw.
Apply mulch with a hand spreader or a spreader utilizing forced air at a rate of 1 Ton per acre.
(b) Hydraulic Method. Apply mulch in a separate application from the seed using hydraulic-type equipment according to Subsection 625.07(b).
Apply wood fiber or grass straw cellulose fiber mulch at a rate of 2500 pounds per acre.
Apply bonded fiber matrix hydraulic mulch at a minimum rate of 3000 pounds per acre.
Apply so no hole in the matrix is greater than 0.04 inches. Apply so that no gaps exist between the matrix and the soil.
Apply mulch uniformly over the entire disturbed area. Mulch by hand areas inaccessible to mulching equipment.
625.09 Protecting and Caring for Seeded Areas. Protect and care for seeded areas including watering according to 625.05. Repair or apply supplemental applications of seed, mulch, fertilizer, and water according to 625.05 as many times as needed until turf is established or final acceptance.
625.10 Acceptance. Material for turf establishment will be evaluated under Subsections 106.02 and 106.03.
Placing of turf establishment will be evaluated under Subsections 106.02 and 106.04.
Measurement
625.11 Measure the Section 625 pay items listed in the bid schedule according to Subsection 109.02 and the following as applicable:
When measuring turf establishment and supplemental applications by the acre (hectare), measure on the ground surface.
When measuring water by volume or mass, measure in the hauling vehicle or by metering.
Payment
625.12 The accepted quantities will be paid at the contract price per unit of measurement for the Section 625 pay items listed in the bid schedule. Payment will be full compensation for the work prescribed in this Section. See Subsection 109.05.
703 - Aggregate
Delete Subsection 703.05(c)(3) Subbase, Base, and Surface Course aggregate, Surface course aggregate and replace with the following:
(3) Plastic Index, AASHTO T 90
If the percent passing the No. 200 sieve is less than or equal to 12% - 2 to 9
If the percent passing the No. 200 sieve is greater than 12% - Less than 2
Delete Surface Columns F, G, and H in Table 703-1 in Subsection 703.05 Subbase, Base, and Surface Course Aggregate and replace with the following F, G, H, S, T, and U columns:
Ta bl e
3-
Ta rg et V al ue
R an ge s f or S ur fa ce G ra da tio n
Pe rc en t b y M as s P as sin g D es ig na te d Si ev e
(A A
SH
TO
T an d T
G ra di ng
D es ig na tio n
Su rf ac e
U
8.
.0
If th e pl as tic ity in de x
(P I) is gr ea te r t ha n 0, th e
TV
ra ng e fo r t he N o.
si ev e siz e is 8-
(4
T
8.
S 10
8.
H
9.
G
.0
6.
F 10
-1
-8
-6
-5
-3
-2
.0
-1 6.
Si ev e S iz e
1/ in ch
3/
1/
3/
N o.
N o.
N o.
Add the following to 703.05
(d) Screened aggregate – All other requirements of Subsection 703.05 do not apply to screened aggregate. Furnish hard, durable particles or fragments of stone, slag, or gravel conforming the following:
(1) Gradation Table 703-3
(2) Plastic Index, AASHTO T 90 Less than 9
(3) Los Angeles abrasion, AASHTO T 96 55% max.
(4) Free from organic matter and lumps or balls of clay.
Do not use material that breaks up when alternately frozen and thawed or wetted and dried.
Obtain the aggregate gradation by crushing, screening, and blending processes as necessary.
Table 703-3 Gradation Requirements for Screened Aggregate
Sieve Size
Percent by Mass Passing Designated Sieve (AASHTO T 27 and T 11)
Grading Designation
L M N O P Q R
6 inch 100 100
4 inch 100 100
3 inch 100 100
2 inch 100
No. 4 15-45 15-45 15-45
Replace subsection 703.06 with the following.
703.06 Crushed Aggregate. Provide hard, durable particles or fragments of crushed stone or gravel conforming to the size and quality requirements for crushed aggregate material normally used locally in the construction and maintenance of highways by Federal or state agencies.
Provide crushed aggregate with a maximum size of 1 inch, unless otherwise specified by the pay item, as determined by AASHTO T 27 and AASHTO T 11. Provide well-graded crushed aggregate, free of organic matter, lumps or balls of clay, and other deleterious material.
713 - Roadside Improvement Material 713.04_Forest_3_19_2018
Add the following to Subsection 713.04:
713.04 Seed.
Only certified,…