This is a Statement of Work (SOW) for towing services required by the U.S. Forest Service. The project involves towing the Misty Barge, a 61-foot steel-hulled vessel weighing approximately 90 tons with an attached two-story wood-framed barracks structure and four associated floats, from its current location at Winstanley Island in Behm Canal to Shelter Cove remote dock in Carroll Inlet near Ketchikan, Alaska. The period of performance extends from the date of award through July 1, 2026, with an option to extend through November 30, 2026. Earlier performance is preferred.
The contractor must furnish all labor, materials, equipment, supervision, and transportation to complete the towing operation and related tasks. Key contractor responsibilities include coordinating the tow schedule with the Contracting Officer's Representative (COR) 48 hours prior to transportation, disconnecting and securing all lines, anchors, floats, and deck items, closing all hatches and vents, ensuring proper moorage according to an attached site development plan, and providing 100 gallons of diesel fuel for on-board generators. The contractor must also clean the deck of ocean debris upon arrival. Key personnel requirements specify that the captain must hold an active endorsed license and the towing vessel must have current USCG registration, with certified licensing documentation submitted 21 days prior to assigning any captain other than the one initially proposed. Performance standards require delivery of the barge and floats by the required delivery date in the specified orientation, with COR inspection and acceptance as the surveillance method, and reperformance or task completion as the remedial action for non-compliance.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Sol_1240BF26Q0049_Amd_0001.pdf | ||
| C04 Appendix 2 Wrangell Harbor Tow.pdf | ||
| C04 Appendix 1 Misty Shelter 2026 SITE DEV (1).pdf | ||
| Sol_1240BF26Q0049.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Project Title Misty Barge Tow Shelter Cove
1.0 Scope
The scope of this project is to tow the Misty Barge anchored at Winstanley Island in Behm Canal to Shelter Cove remote dock in Carroll Inlet near Ketchikan, Alaska. The Contractor shall furnish all labor, materials, equipment, supervision and transportation to perform all work listed on the schedule of supplies/services.
2.0 Period and Place of Performance
The barge is located in a bay on the west side of Winstanley Island in Behm Canal at Latitude 55⁰26’25.21”N, Longitude 130⁰55’2.46”W. Shelter Cove dock is located on the west side of Carroll Inlet at Latitude 55⁰32’7.19”N, Longitude 131⁰20’54.87”W.
Ketchikan, Alaska is accessible via commercial airlines, Alaska Marine Highway ferry service and by boat.
The period of performance is date of award through July 1, 2026, with earlier performance preferred. If the option is exercised the period of performance will be date of award through 30 November 2026.
3.0 Background
The U.S. Forest Service is responsible for maintaining healthy, diverse, and productive National Forests. In support of this mission, the USFS has a barge that requires towing services.
The Misty Barge is composed of a 3-compartment steel hull with a two story, wood framed barracks mounted on the deck. The bilge houses fuel tanks, an electrical generation system, a water treatment system, a MSD, and a wastewater treatment system. The barge is 61’ long, 26’ wide, 6’-6” deep with the draft of the barge being approximately 2’-4”. The overall height for the hull and barracks mounted on top is 28’-2”. The barge weighs approximately 90 tons. There are four associated floats attached to the barge (three 20’ X 20’ and one 25’ X 25’ floats).
4.0 Contractor Requirements
Technical Requirements / Task(s): All task contained here-in are applicable to CLIN 0001, 0002 and the option CLIN 1001.
4.1 Coordinate the tow schedule with COR. Contractor shall schedule the tow to coordinate with weather conditions sufficiently good to allow for controlled towing of the barge.
4.2 Disconnect all lines and anchors securing the vessel. Secure all associated floats, lines, buoys, and anchors on deck prior to departure. Care shall be taken when reloading the anchors and chain on the deck so as to prevent damage. Re-secure all associated floats, lines, buoys and anchors upon arrival.
4.3 Secure all deck items and attached floating docks prior to tow. Close all hatches and vents prior to towing.
All anchor cables shall be wound onto the vessel anchor winches. Any lost or damaged items will be replaced by the contractor.
4.4 Contractor is responsible for proper moorage of the vessel. Contractor shall adhere to the orientation and moorage of the barge and associated floats as defined in attached site development plan.
4.5 After final moorage, clean off deck of all ocean debris including, but not limited to crustaceans, kelp, and seaweed.
4.6 Provide 100 gallons of diesel for the fuel tanks that support the on-board generators.
5.0 Deliverables / Schedule
Key Deliverables
Item No. Deliverable Objective Due
4.1 Tow Schedule
Coordinate the tow schedule. COR gives final approval for commencing with tow.
48 hours prior to transportation
6.0 Submit certified licensing for
captain and vessel to perform
Compliance with U.S.C. Title 46 21 days prior to assigning a captain other than the captain the tasks outlined in this requirement initially supplied in the response to solicitation.
6.0 Contractor’s Key Personnel
The Contractor’s Key Personnel authorized to perform services under this contract:
1. Captain: shall have an active endorsed license
2. Towing Vessel: current USCG registration.
7.0 Performance Requirement Measures
Performance Objective
Required Task or Deliverable
Performance Standard Method of Surveillance
Positive/Negative Incentive % for NOT meeting the Task
Delivery of the Misty Barge and associated floats to its final location as specified in maps.
4.0 Barge and floats delivered by
required delivery date and in orientation specified.
COR inspection and acceptance
Reperformance or completion of task
Provide 100 gallons of diesel for the fuel tanks supplying the on-board generators.
4.6 Quantity of diesel supplied to fuel
tanks delivered as specified.
COR inspection and acceptance
Reperformance or completion of task
| Project Title |
| 1.0 Scope |
| 2.0 Period and Place of Performance |
| 3.0 Background |
| 4.0 Contractor Requirements |
| 5.0 Deliverables / Schedule |
| 6.0 Contractor’s Key Personnel |
| 7.0 Performance Requirement Measures |