C04_Attachment 1 Drawings.pdf

PDF 42 MB Posted

Attached to
Replace Fencing at Ames, IA Federal contract opportunity
Solicitation number
1232SA26Q1026
Issued by
Department of Agriculture Agricultural Research Service

About this file

This is a technical drawing attachment for a federal construction project at the USDA Agricultural Research Service (ARS) National Centers for Animal Health in Ames, Iowa. The drawings provide detailed specifications for the ARU Fencing and Concrete Line Feeders 2026 project, which involves the removal and replacement of fencing for animal containment and renovation of feeding areas across multiple corral and pasture locations. The scope includes: installation of wooden fence panels with 8-inch end posts and 6-inch center posts for field barns 201 and 202; replacement of fencing in corrals 203 and 204 with new concrete feeder areas and removal of select 6-foot gates; pasture perimeter fencing for areas 207 and 208 (approximately 1,476 feet each); and new concrete line feeder pads at locations 209, Z3, and H6. The concrete specifications require 4,000 psi strength at 28 days, 8-inch depth pads with 12-inch tall knee walls, Schedule 80 metal posts on 10-foot centers, #5 rebar reinforcement, and rounded bull-nosed top finish. All measurements are approximate, requiring field verification by the contractor prior to construction.

The drawings indicate that the contractor may utilize an existing USDA spoil pile containing crushed concrete and gravel as fill material and base for the project. Construction details specify round tube steel fencing and gates, with existing gates to be reused where applicable. Line feeder pad dimensions vary by location: 31 feet by 17 feet by 8 inches for location 209; 40 feet by 20 feet by 8 inches for H6; 36 feet by 7 feet by 8 inches for Z3; and 53 feet by 7 feet by 8 inches for the alternate Z3 location. The knee wall specifications include dowel embedment into existing slabs, epoxy anchoring, and quality control requirements for form alignment and concrete curing. The drawings reference the Statement of Work for complete task descriptions and are identified as prepared under Project Number ARU for designer Tommy Walker with revision tracking available.

View the file

Other files for this federal contract opportunity

Other files attached to Replace Fencing at Ames, IA, newest first.
File Type Posted
C04_Attachment 2 Specifications.pdf PDF
C04_Attachment 3 Statement of Work.docx DOCX document
C04_Sol_1232SA26Q1026.pdf PDF
C04_Attachment 4 Wage Determination.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Location Coordinator:Contracting Officer Rep.:Contracting Officer:Engineering Project Manager:

Task

Order #:

Drawing Title:PROJECT TITLE:

FEU Project #:

Drawing Number:

Agricultural Research Service U.S. Department of Agriculture

NCAH

1920 Dayton Avenue Ames, Iowa 50010

Revision:

Client:

Sheet:

Designer:

Date:

Date:

Of

Katherine Madson TBD Tommy Walker N/A

ARU Fencing and Concrete Line Feeders 2026

Title Page

FOR CONSTRUCTION

TW 1

n/a ARU 1 11

UNITED STATES DEPARTMENT OF AGRICULTURE

AGRICULTURE RESEARCH SERVICE

NATIONAL CENTERS FOR ANIMAL HEALTH

ARU Fencing and Concrete Line Feeders

1 Title Page

2 USDA Site Map

3 201 & 202 Corrals

4 203 & 204 Corrals

5 207 & 208 Pastures

6 209 Line Feeder

7 H6 Line Feeder

8 Z3 Line Feeders

9 Metal Fencing Details

10 Concrete Line Feeder Details

11 Concrete Line Feeder Details-ext

Sheet # Description

Drawing Title:

Drawing Number:

Sheet: of fu tu re

Crushed Material

USDA Site Map

2 11

1. Pasture posts and fencing for field barns 207 and 208.

2. Lot post and fencing for field barn 201-204. (201 and 202 get new push walls.) (203 and 204 get concrete feeder areas).

3. 209, Z3 (423), H6 new concrete feeder areas.

4. USDA spoil pile may be used by the contractor as needed for fill and base for the project.

N S

W

E

2 3 H6

Spoil Pile - Crushed Concrete/Gravel

Sheet: of

203 & 204 Corrals

3 11

Field Barn 201

N

S

W E

Typical Wooden Fence Panel, 8 inch end post and 6 inch center post.

G a te

G a te

Wooden fence panels

39'

Hinge post

Round steel fencing x 6' x G a te6'

Note:

Measurements are approximate.

Contractor to field verify actual values for project deliverables.

Refer to Statement of Work for tasks to be completed.

Round tube steel gate

Concrete Line Feed Pad

201 202

203 204

Field Barn 202

10'

Measurements, wooden fence, steel fence, line feeder area, Backstop, and gate locations shall be a mirror image of field barn 201.

Gates removed in field barn 201 are removed from the same locations in field barn 202.

-Refer to Metal Fencing Detail Page-9 -Refer to Concrete Line Feeder Detail Page-10

-This slab will need material from the USDA spoil pile. Reference Drawing -Slab is to match the existing corral slab elevation and slope.

-New feeder posts as per specification on Drawing Page-1010'

Board lengths and 8" end posts spacing as shown on drawing with 6" post centered between.

18"

Inside of Fence Paddock

Continuous Metal Fence Concrete Backstop

Metal Post

Ground Level

3"

3' 2'

Backstop

137 lf 137 lf

G a te

Sheet: of

203 & 204 Corrals

4 11

Field Barn 203

N

S

W E

Typical Wooden Panel Fence, 8 inch end post and 6 inch center post.

6'

8'

Gate 12'

Gate

G a te

G a te

G a te

G a te

Wooden fence panels

37'

6'

Hinge post ex is tin g lin e fe ed er a re a

Measurements, wooden fence, steel fence, line feeder area, and gate locations shall be a mirror image of field barn 203.

Gates removed in field barn 203 are removed from the same locations in field barn 204.

Round tube steel fencing x 6'

Field Barn 204 x G a te6'

Note:

Measurements are approximate.

Contractor to field verify actual values for project deliverables.

Refer to Statement of Work for tasks to be completed.

Round tube steel gate 201 202

203 204

-Remove this 6' gate. Install round tube steel fencing in its place.

-All other gates to be reused.

G a te

' a pp ro x 7' from existing pad

Board lengths and 8" end posts spacing as shown on drawing with 6" post centered between.

-Reuse existing feeder line posts -Install new concrete in front of 6' gates with the new slab -Refer to Concrete Line Feeder Detail-6 on Page-11

-Refer to Metal Fencing Detail Page-9 & 10 154 lf 154 lf

G a te

Sheet: of

207 & 208 Pasture

5 11

207 208

Pasture Perimeter= approx. 1,476 Feet Pasture Perimeter= approx. 1,476 Feet

8" Post

Typical Center Post Bracing Typical Line Post 6" Bracing

Typical Corner Post Bracing Typical Corner Post 6" Bracing

Match at existing location for end of fenceline

Reuse existing gates in existing locations.

Match existing hinge/latch locations.

Hinge post is 8"

N

S

W E

Li ne

B ra ce H er e

(h al fw ay p oi nt o f t hi s fe nc el in e)

Li ne

B ra ce H er e

(h al fw ay p oi nt o f t hi s fe nc el in e)

Line Brace H ere

(halfw ay point of this fenceline)

Line Brace H ere

(halfw ay point of this fenceline)

8" Post

8" PostRefer to Page 13 Pasture Fence Removal & Installation

Sheet: of

209 Line Feeder

6 11

N

S

W E

31'

17'

Overhead View

Side View Reference

Front View Reference

-New concrete pad and knee walls -See Detail-3 Page 10 Concrete Line Feeder Details -See Page 10 Line Feeder Post Installation -See CONCRETE SLAB SPECIFICATION_31x17x8.

Sheet: of

Barn H6 Line Feeder

7 11

N

S

W E

See Detail-2 on page 10 Concrete Line Feeder Details.

See Page 10 Line Feeder Post Installation -Concrete pad shall be 40'L X 20'W X 8" D.

40'

20'

10'

H6

Sheet: of

Z3 Line Feeders

8 11

N

S

W E

36'

7'

10'

-New concrete pad and knee walls (use existing posts) -Adjust knee wall spacing to existing posts

-Refer to Concrete Line Feeder Detail-5 on Page-11

-Refer to Concrete Line Feeder Detail Page-10 (Knee Wall Only)

-Post not evenly spaced. Must field verify measurements and adjust knee wall spacing to existing posts

30'

30'

Field Barn Z3

-New concrete pad and knee walls (use existing posts) -Adjust knee wall spacing to existing posts

-Refer to Concrete Line Feeder Detail-6 on Page-11

Sheet: of

Metal Fencing Details

9 11

XX'

Se e

C ha rt

'A'

1.90"

DETAIL 'A'

GROUND

Bottom Bar

Bar 2

Bar 3

Bar 4

Bar 5

Bar 6

Bar 7

Bar 8

Top Bar

Space on Center Between Bottom Bar and Bar 2 from Chart

Space on Center Between Bar 2 and Bar 3 from Chart

Typical Continuous Metal Fencing.

Typical Gate Latch and Hinge

Typical Custom Gate

No greater than 6' as per Statement of Work

Sheet: of

Concrete Line Feeder Details

10 11

Detail - 1

Detail - 2

Detail - 3

All posts10' On Center

New concrete knee wall

40'

New concrete knee wall

2" X xx" Wooden forms (leave in place after pour)

4" Schedule 80 Metal posts

Line Feeder 20 X 10 X 8

New concrete pad

-Dowel new slab to existing slab

New concrete knee wall

New concrete knee wall

New concrete knee wall

2" X xx" Wooden forms (leave in place after pour)

4" Schedule 80 Metal posts

20'

Field verify on center measurements

7'

Line Feeder 40 X 7X 8

New concrete pad

-Dowel new slab to existing slab

New concrete knee wall

Existing concrete pad

40'

4" Schedule 80 Metal posts

Line Feeder 40 X 20 X 8

All posts10' On Center

New concrete knee wall New concrete knee wall

31'

New concrete knee wall New concrete knee wall

2" X xx" Wooden forms (leave in place after pour)

4" Schedule 80 Metal posts

Line Feeder 31 X 17 X 8

Detail - 4

KNEE WALL / CURB SPECIFICATION

1. Dimensions & Geometry •Height: 12 in •Thickness: 6 in •Alignment: Centered in line with existing steel posts •Spacing Between Posts: 9 ft - 4.5 in (field verify and adjust for forms) •Top Profile: Rounded (bull nosed) finish along entire length

2. Reinforcement •Rebar Size: #5 (⅝ in diameter) •Quantity: (5) #5 bars continuous along the length of the curb •Configuration:

o Bars evenly distributed within the 6 in thickness o Maintain minimum 2 in concrete cover on all sides •Dowels:

o Vertical dowels from curb into existing slab o Embedment: 4 in into existing concrete slab o Spacing: 22.5 in on center (aligned with steel posts) o Bar Size: #5 o Anchorage: Epoxy set dowels using ICC approved adhesive

3. Concrete Requirements •Concrete Strength: 4,000 psi @ 28 days •Slump: 4–5 in •Air Entrainment: 5–7% (recommended for freeze–thaw climates) •Aggregate: ASTM C33 compliant •Finish:

o Smooth formed sides o Rounded top to specified radius (typically ¾ in unless otherwise noted)

4. Installation Requirements •Surface Prep:

o Clean existing slab of dust, laitance, and debris o Drill holes for dowels to manufacturer’s diameter and depth o Blow out and clean holes before epoxy installation •Form work:

o Secure forms to maintain 6 in width and 12 in height o Use rounded top form insert or hand tool after screeding •Placement:

o Concrete placed continuously to avoid cold joints o Vibrate lightly to eliminate voids •Curing:

o Apply curing compound or wet cure for minimum 3 days

5. Quality Control •Verify dowel spacing and embedment depth •Confirm rebar placement and cover before pour •Inspect form alignment and top radius profile •Perform slump and air tests as required

New concrete knee wall New concrete knee wall New concrete knee wall

New concrete knee wall New concrete knee wall New concrete knee wall

New concrete knee wall 6" 9' - 4.5"

Distance between forms-Top View

6"

12"

Side View

Line Feeder Horizontal Bars Attached with U-Bolt Crossover Clamps

KNEE WALL

Sheet: of

Concrete Line Feeder Details-ext

11 11

Adjust knee wall to exisiting post distances

New concrete knee wall New concrete knee wall

7'

36'

New concrete knee wall

Line Feeder 36 X 7 X 8

Detail - 5

Adjust knee wall to exisiting post distances

New concrete knee wall New concrete knee wall

7'

53'

New concrete knee wall

Line Feeder 53 X 7 X 8

Detail - 6

6-ft gate 6-ft gate

Concrete pad shall be extended to cover in front of the (2) 6-ft gates on both sides of the feeder.

File details come from the government source that posted it. Updated .