About this file
This is a Performance Work Statement for the replacement of metal ribbed roofing panels on Building 1A at the USDA Agricultural Research Service Northern Great Plains Agricultural Research Laboratory in Mandan, North Dakota. The contractor shall remove and replace existing galvanized steel ribbed metal roof panels with new 24-gauge (minimum) galvalume R-panels featuring trapezoidal rib configuration and 36-inch width, with all associated trim, ridge caps, pipe boots, sealants, closures, and color-matched fasteners. The project also requires removal and replacement of existing vent stacks (5 sewer stacks, 3 chimney stacks, 1 exhaust hood, and 1 TV antenna), installation of new weather-stripping, and trimming of all existing penetrations with color-matched trim metal. All roofing products must be warranted for 25 years against rupturing, structural failure, or perforation, similar to Metal Sales Galvalume AZ55 product. The work shall comply with applicable federal, state, and local code requirements, EPA, ASTM, GSA, and AASHTO standards, Unified Facilities Guide Specifications (UFGS), and ARS 242.1M standards.
The project is located at a building measuring 100 feet long by 50 feet wide with an eave height of 12 feet and apex of 14 feet. The contractor must complete the project within 120 days of Notice to Proceed, weather permitting. The contractor is responsible for obtaining all necessary permits, licenses, and inspections required by governing authorities and local regulations. Key contacts include the Engineering Project Manager Mark McWilliams and Location Monitor Mike Eberle. The solicitation (127EAX26Q0112) is set aside as a Total Small Business Set-Aside with a NAICS code of 238160 and small business size standard of $195 million. Contractor submittals shall be provided electronically in Adobe format to the Location Monitor, Engineering Project Manager, and Contracting Officer, including bi-weekly construction progress meetings during execution.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| C04 Attach 02 Wage Decision ND20260015 05-18-2026.pdf | ||
| C04 127EAX26Q0112 RFQ 1A Bridge Conf Roof.pdf | ||
| C04 Attach 00 Schedule of Items - Fillable.xlsx | XLSX spreadsheet |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
United States Department of Agriculture Agricultural Research Service
REPLACE METAL RIBBED ROOFING PANELS ON BUILDING 1A. PERFORMANCE WORK STATEMENT
USDA, ARS, PA, Northern Great Plains Agricultural Research Laboratory (NGPRL)
1701 10th Avenue SW Mandan, ND.
DATE: June 15, 2026
STATEMENT OF WORK
TABLE OF CONTENTS
1.0 Project Information
2.0 Project Contact Persons
3.0 Scope of Services
4.0 Technical Project Requirements
5.0 Background and Site Description
6.0 Technical Cost Proposal
7.0 Special Requirements
8.0 Performance Schedule
9.0 Government Furnished Equipment
10.0 General Requirements
1.0 Project Information:
A. Project Number: TBD
B. Project Title: REPLACE METAL RIBBED ROOF PANELS ON BUILDING 1A
C. Project Location:
USDA, ARS, PA, Northern Great Plains Agricultural Research Laboratory 1701 10th Ave SW.
Mandan, ND 58554
2.0 Project Contact Persons:
A. WARRANTED CONTRACTING OFFICER
TBD Phone:
USDA ARS NPA, EDWARD T. SCHAFER AGRIC. RES.
1616 Albrecht Blvb. N.
Fargo, ND 58102-2765 Email:
B. ENGINEERING PROJECT MANAGER (EPM):
Mark McWilliams USDA, ARS, W Phone: 970-492-7025 2150 Centre Avenue, Building D, Suite 300 Fort Collins, CO 80526 Email: markmcwilliams@usda.gov
C. RESEARCH PROGRAM REPRESENTATIVES (RPR):
| John Hendrickson | Phone: 701-667-3048 | |
| USDA, ARS, PA, NGPRL | Email: John.hendrickson@usda.gov |
Northern Great Plains Agricultural Research Laboratory 1701 10th Ave SW.
Mandan, ND 58554
D. LOCATION ADMINISTRATIVE OFFICER (LAO):
| Jeremy Will | Phone: 701-667-3014 | |
| USDA, ARS, PA, NGPRL | Email: Jeremy.will@usda.gov |
Northern Great Plains Agricultural Research Laboratory 1701 10th Ave SW.
Mandan, ND 58554
E. LOCATION MONITOR (LM):
| Mike Eberle | Phone: 701-667-3075 | |
| USDA, ARS, PA, NGPRL | Email: Michael.eberle@usda.gov |
Northern Great Plains Agricultural Research Laboratory 1701 10th Ave SW.
Mandan, ND 58554
F. COLLATERAL DUTY SAFETY OFFICER (CDSO):
| Holly Johnson | Phone: 701-667-3003 | |
| USDA, ARS, PA, NGPRL | Email: Holly.Johnson@usda.gov |
Northern Great Plains Agricultural Research Laboratory 1701 10th Ave SW.
Mandan, ND 58554
3.0 Scope of services:
The Contractor shall provide all professional services necessary for the accomplishment of each project and such required services shall be in accordance with requirements as described herein.
A. The Contractor shall provide services for the following tasks marked by an “X”:
| [X] | Provide a cost proposal and a technical proposal to complete the project as per project requirements. |
| [X] | The contractor shall furnish all the skilled labor, materials, equipment, tools, transportation, and supervision necessary to remove and replace the building’s ribbed metal roof panels, metal trim, and exhaust and venting covers as shown in these documents. |
4.0 Technical Project Requirements:
The Contractor will work with site personnel to ensure each task is accomplished in a timely manner.
A. The Contractor’s work shall adhere to the criteria stated within these project requirements, drawings, and specifications. All construction shall comply with applicable federal, state, and local code requirements as well as current industry standards, (i.e.: EPA, ASTM, GSA, AASHTO, etc.) and health and safety codes, in effect at the time of contract award.
B. All work to meet all pertinent Unified Facilities Guide Specifications (UFGS) and ARS 242.1M standards. UFGS available at http://www.wbdg.org/ffc/dod/unified-facilities-guide-specifications-ufgs. ARS 242.1M available at https://www.afm.ars.usda.gov/ppweb/pps-and-manuals/.
5.0 Background & Site Description:
A. Existing building dimensions are 100’L x 50’W.
B. Existing metal roof panels are galvanized steel.
C. Existing penetrations will be trimmed out with new color matched trim metal, exhaust covers, and venting boots.
6.0 Technical Cost Proposal: Base Bid for this contract.
7.0 Specific Requirements
A. Roofing Improvements
1. Remove and dispose of existing metal roof panels, flashing, trim, and venting on Building 1A and replace with new.
2. Ribbed metal roofing panels are to be replaced with new PBR panels 24-gauge (minimum) galvalume R-panels with associated trims and seals. To include ridge cap, pipe boots, sealants, closures, and fasteners.
3. Existing rake trim to be removed and salvaged for reinstallation.
a. Products must be warrantied for 25 years against rupturing, fail structurally, or perforate, similar-to Metal Sales Galvalume AZ55 product.
4. The galvalume panels will be 36 inches in width and length will be cut to the required lengths for the building, only full panels no overlapping seams will be allowed.
5. The galvalume panel rib configuration will be trapezoidal, all fasteners will be color matched and approved before installation.
6. The panels will be applied over open framing. The contractor has the responsibility to inspect all metal purlins, insulation, and surfaces for defects and/or rot and replace and repair to the approval of the COR.
7. Any ridge cap, closures, sealants, pipe boots, and fasteners must be replaced and the trim metal must match the roof panels.
8. Remove and replace existing vent stacks. 5 total sewer stacks, 3 chimney stacks, 1 exhaust hood and 1 TV antenna.
9. Contractor must install all new weather-stripping
10. All surface design and color of all roof metal panels, trim metals, and vents will be approved by COR before work proceeds.
11. All caulking required shall be an exterior, high grade elastomeric silicone based allowing maximum flexibility and adhesion. Sealant shall be applied where required as specified by manufacturer’s instructions and according to industry standards.
12. Any penetration, such as conduit, gas lines, vents, etc. shall have new boots to the COR approval.
13. Any old vents and hoods shall be replaced with new, and color matched to COR approval.
8.0 Performance Schedule: When weather is appropriate, project should be completed 120 days after Notice to Proceed or sooner.
9.0 Government Furnished Equipment\Services
A. None provided.
10.0 General Requirements:
A. Permits: Where governing regulations and imposed codes and standards require notices, permits, licenses, inspections, tests, and similar items or actions in order to lawfully proceed with the required work, the Design Contractor shall obtain items and take those actions in accordance with the regulations of the governing authority. The costs of construction permits, licenses, inspections, etc., are the obligation of the future Construction Contractor.
B. Schedules shall be updated and furnished with each submittal.
C. Submittals shall be made as scheduled in the Special Requirements section. Each submittal shall be distributed electronically in Adobe for review, to the Location Monitor at the facility, Engineering Project Manager, and Contracting Officer. Each submittal shall contain the previous submittal's Excel comment sheet with responses, notes of meetings held with ARS personnel, design notes, calculations, and construction progress bi-weekly meetings during construction.
D. Changes in the scope of work or the task order that affect the level of effort of the Contractor must be pre‑approved by the CO.
E. Disputes or questions that arise after the order of task has been negotiated will be resolved by the CO.
11.0 Approximate Building Measurements:
Eave height:12ft. Apex: 14ft.
Length x Width: 100L x 50W
East view Roof image3.jpeg image4.jpeg image5.jpeg image6.jpeg image7.jpeg image8.jpeg image1.jpeg image2.png
File details come from the government source that posted it. Updated .