C04 - 7 - Project Plans.pdf
PDF 7 MB Posted
- Attached to
- Castle Creek Bridge Repair
- Solicitation number
- 127EAW26Q0039
- Issued by
-
Department of Agriculture Forest Service
About this file
This document is a set of technical construction drawings and specifications for the Castle Creek Bridge Repair project located in Shasta County, California, on the Shasta Trinity National Forest under the Mount Shasta-McCloud Ranger District. The project is an urgent repair addressing storm damage and scour erosion at the bridge outlet on Castle Creek Road near Castella, CA (coordinates 41°10'1.48"N, 122°25'55.83"W).
The scope of work includes mobilization, clearing and grubbing with scattered disposal method, earthwork with non-woven geosynthetics (100 square yards), structure excavation and backfill for the bridge foundation (270 cubic yards), and placement of two classes of riprap to stabilize the scour area: Class 9 riprap (375 tons) and Class 7 riprap (250 tons) in accordance with FP-24 Table 705-1 specifications. Non-woven fabric will be installed under the riprap layers to reduce continued erosion. The contractor must provide temporary traffic control using W20-3 movable construction signs or Type III movable barricades, with road closure not exceeding two continuous hours without proper barricades. All equipment working in or near the stream must have stream-safe oils and comply with state and federal environmental requirements. The contractor is responsible for maintaining existing survey monuments, providing water and electricity, and submitting detailed as-built records upon project completion. The plans emphasize reducing channel slope profile and stabilizing the stream bed to prevent further damage, with reference drawings showing profile views, plan views of the damage area outline, and photographs documenting current site conditions.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
United States Department of Agriculture Forest Service
4/6 /26
:1
2 T
YS
ON
CU
RR
AN
C :\U
SE
RS
\T
YS
ON
CU
RR
AN
\O
NE
DR
IV
E
- U
SD
A\
DE
SK
TO
P\
ER
FO
\C
AS
TL
E
CR
EE
K
BR
ID
GE
(R -1
4)
-S
EL
EC
TE
D\
RE
PA
IR
S
\R
C
AS
TL
E
CR
EE
K.
DW
G;
SHASTA COUNTY, CALIFORNIA
MT. SHASTA - MCCLOUD RANGER DISTRICT
CASTLE CREEK BRIDGE
REPAIR
FOREST LOCATION MAP
INDEX OF SHEETS
SHEET SHEET TITLE DATE
G-01 COVER SHEET
G-02 VICINITY MAP
G-03 ESTIMATE OF QUANTITIES
G-04 GENERAL NOTES
D-01 PROFILE VIEW
D-02 PLAN VIEW
D-03 PLAN VIEW
F-01 PHOTOS
(R05) PACIFIC SOUTHWEST REGION
Shasta Trinity NATIONAL FOREST
SHEET 1 of 8
PROJECT LOCATION MAP
TRAVEL DIRECTIONS:
FROM/STARTING: MOUNT SHASTA RANGER STATION ON 204 W ALMA
ST, MT SHASTA, CA 96067
1. GET ON I-5 S FROM PINE ST AND W LAKE ST 3 MIN (0.8 MI),
FOLLOW I-5 S TO CASTLE CREEK RD IN SHASTA COUNTY.
2. TAKE EXIT 724 FROM I-5 S 14 MIN (13.9 MI)
3. TURN RIGHT ONTO CASTLE CREEK RD 22 MIN (8.5 MI)
4. ARRIVED AT THE BRIDGE.
CASTLE CREEK RD CASTELLA, CA 96017
LATITUDE: 41°10'1.48"N
LONGITUDE: 122°25'55.83"W
RECOMMENDED BY:
APPROVED:
DESIGN ENGINEER
FOREST SUPERVISOR
FOREST ENGINEER
DISTRICT RANGER
DATE
DATE
DATE
DATE
DWG SHEET NO.CHECKEDDESIGNERDATEDRAWING TITLE
Forest Service
NO. DATEBYREVISION DESCRIPTION(R5)
PACIFIC SOUTHWEST REGION
Castle Creek Bridge Repair
Shasta Trinity NATIONAL FOREST
Mt. Shasta - McCloud RANGER DISTRICT
G-02VICINITY MAP SHEET 2 OF 8
03/31/2026 Tyson Curran Forest Engineer
4/6 /26
:1
2 T
YS
ON
CU
RR
AN
C :\U
SE
RS
\T
YS
ON
CU
RR
AN
\O
NE
DR
IV
E
- U
SD
A\
DE
SK
TO
P\
ER
FO
\C
AS
TL
E
CR
EE
K
BR
ID
GE
(R -1
4)
-S
EL
EC
TE
D\
RE
PA
IR
S
\R
C
AS
TL
E
CR
EE
K.
DW
G;
Castle Creek Bridge Urgent Repair
Legend
39N25 Castle Creek Bridge
N
Image Landsat / Copernicus
I L d t / C i
3 mi
AutoCAD SHX Text F
AutoCAD SHX Text O
AutoCAD SHX Text R
AutoCAD SHX Text E
AutoCAD SHX Text S
AutoCAD SHX Text T
AutoCAD SHX Text S
AutoCAD SHX Text E
AutoCAD SHX Text R
AutoCAD SHX Text V
AutoCAD SHX Text I
AutoCAD SHX Text C
AutoCAD SHX Text E
AutoCAD SHX Text D
AutoCAD SHX Text E
AutoCAD SHX Text P
AutoCAD SHX Text A
AutoCAD SHX Text R
AutoCAD SHX Text T
AutoCAD SHX Text M
AutoCAD SHX Text E
AutoCAD SHX Text N
AutoCAD SHX Text T
AutoCAD SHX Text O
AutoCAD SHX Text F
AutoCAD SHX Text A
AutoCAD SHX Text G
AutoCAD SHX Text R
AutoCAD SHX Text I
AutoCAD SHX Text C
AutoCAD SHX Text U
AutoCAD SHX Text L
AutoCAD SHX Text T
AutoCAD SHX Text U
AutoCAD SHX Text R
AutoCAD SHX Text E
ESTIMATE OF QUANTITIES G-03 SHEET 3 OF 8
United States Department of Agriculture Forest Service
NO. DATEBYREVISION DESCRIPTION(R5)
PACIFIC SOUTHWEST REGION
Castle Creek Bridge Repair
Shasta Trinity NATIONAL FOREST
Mt. Shasta - McCloud RANGER DISTRICT
03/31/2026 Tyson Curran Forest Engineer
4/6 /26
:1
2 T
YS
ON
CU
RR
AN
C :\U
SE
RS
\T
YS
ON
CU
RR
AN
\O
NE
DR
IV
E
- U
SD
A\
DE
SK
TO
P\
ER
FO
\C
AS
TL
E
CR
EE
K
BR
ID
GE
(R -1
4)
-S
EL
EC
TE
D\
RE
PA
IR
S
\R
C
AS
TL
E
CR
EE
K.
DW
G;
PAY ITEM NOTES:
1) ITEM 15201 - MOBILIZATION: COVERS TO AND FROM SITE, PERMITS, INCIDENTALS, EQUIPMENT SPECIAL REQUIREMENTS, CLEANING, DISPOSAL AND OTHER RELATED COST OUTLINED IN FP-24 AND FSSS.
2) ITEM 20101 - CLEARING AND GRUBBING: ITEM IS TO BE USED TO GAIN ACCESS TO THE SAFE LOCATION AT THE OUTLET OF THE BRIDGE AND WILL REQUIRE CLEARING. THIS COVERS THE AREA OUTSIDE THE
BRIDGE AREA.
3) ITEM 20803: SEE FP-24 PAGE. 127 FOR DETAILS. ITEM IS INTENDED TO COVER REPAIRING BY REDUCING SLOPES AND CURRENT PROFILE. IN CONJUNCTION WITH PLACEMENT OF 25102 ITEMS. CONTRACTOR WILL PROVIDED A PLAN ON HOW THEY WILL REDUCE PROFILE AND PLACE RIP RAP AND BACKFILL FOR BRIDGE. CLEARING IS ALSO INCLUDED IN THIS PAY ITEM FOR THE BRIDGE AREA. CONTRACTOR WILL BE WORKING IN A STREAM COURSE AND WILL MEET STATE, LOCAL, FEDERAL, AND CA WATER BOARD REQUIREMENT WHILE PERFORMING WORK.
4) ITEM25102-9 AND -7 RIP RAP: PROVIDE COMMERCIALLY SOURCE RIP RAP MEETING OR EXCEEDING SIZE GRADATION IN FP-24 TABLE 705-1. RIP RAP WILL BE PLACED IN STREAM BED BY EQUIPMENT.
GENERAL NOTES:
ALL EQUIPMENT WORKING IN OR NEAR THE STREAM IS THE CONTRACTOR'S RESPONSIBILITY TO HAVE EQUIPMENT WITH STREAM SAFE OILS AND ALL STATE AND FEDERAL REQUIREMENTS AND MITIGATION WILL BE
THE CONTRACTORS RESPONSIBILITY.
THE PLANS ARE TO ADDRESS THE URGENT NEEDS TO REDUCE FURTHER DAMAGE AND TO STABILIZE THE SITUATION.
AutoCAD SHX Text F
AutoCAD SHX Text O
AutoCAD SHX Text R
AutoCAD SHX Text E
AutoCAD SHX Text S
AutoCAD SHX Text T
AutoCAD SHX Text S
AutoCAD SHX Text E
AutoCAD SHX Text R
AutoCAD SHX Text V
AutoCAD SHX Text I
AutoCAD SHX Text C
AutoCAD SHX Text E
AutoCAD SHX Text D
AutoCAD SHX Text E
AutoCAD SHX Text P
AutoCAD SHX Text A
AutoCAD SHX Text R
AutoCAD SHX Text T
AutoCAD SHX Text M
AutoCAD SHX Text E
AutoCAD SHX Text N
AutoCAD SHX Text T
AutoCAD SHX Text O
AutoCAD SHX Text F
AutoCAD SHX Text A
AutoCAD SHX Text G
AutoCAD SHX Text R
AutoCAD SHX Text I
AutoCAD SHX Text C
AutoCAD SHX Text U
AutoCAD SHX Text L
AutoCAD SHX Text T
AutoCAD SHX Text U
AutoCAD SHX Text R
GENERAL NOTES G-04 SHEET 4 OF 8
United States Department of Agriculture Forest Service
NO. DATEBYREVISION DESCRIPTION(R5)
PACIFIC SOUTHWEST REGION
Castle Creek Bridge Repair
Shasta Trinity NATIONAL FOREST
Mt. Shasta - McCloud RANGER DISTRICT
03/31/2026 Tyson Curran Forest Engineer
4/6 /26
:1
2 T
YS
ON
CU
RR
AN
C :\U
SE
RS
\T
YS
ON
CU
RR
AN
\O
NE
DR
IV
E
- U
SD
A\
DE
SK
TO
P\
ER
FO
\C
AS
TL
E
CR
EE
K
BR
ID
GE
(R -1
4)
-S
EL
EC
TE
D\
RE
PA
IR
S
\R
C
AS
TL
E
CR
EE
K.
DW
G;
ROAD
CONSTRUCTION
AHEAD
MINIMUM TRAFFIC CONTROL NOTES:
ONE 36"X36" W20-3 (PER MUTCD) MOVABLE CONSTRUCTION SIGN WILL BE REQUIRED AT
EACH END OF THE CONSTRUCTION ZONE DURING CONSTRUCTION ACTIVITIES. THE SIGNS
SHALL BE MOUNTED A MINIMUM OF 12" ABOVE THE GROUND AND SHALL BE PLACED WITHIN
500 FEET OF EACH CONSTRUCTION ZONE END. IF THE ROAD DEAD ENDS OR PUBLIC USE
HAS BEEN OBSTRUCTED, ONLY ONE W20-3 WILL BE REQUIRED. THE ROAD SHALL NOT BE
CLOSED FOR MORE THAN 2 CONTINUOUS HOURS WHEN USING THE W20-3. IF THE ROAD
REQUIRES CLOSURE FOR MORE THAN 2 CONTINUOUS HOURS, A TYPE III MOVABLE
BARRICADE WILL BE REQUIRED.
ONE TYPE III MOVABLE BARRICADE WILL BE REQUIRED TO CLOSE EACH 8' OF TRAVELED
WAY WIDTH. SIGNS SHALL OBSCURE NO MORE THAN 50 PERCENT OF THE TOP 2 RAILS OR
33 PERCENT OF ALL THREE RAILS. SIGNS SHALL BE MOUNTED A MINIMUM OF 12" ABOVE THE
GROUND. WHERE A BARRICADE ARRAY EXTENDS ACROSS A ROADWAY, THE STRIPES SHALL
SLOPE DOWNWARD IN THE DIRECTION TOWARD WHICH TRAFFIC MUST TURN OR PASS.
WHERE BOTH RIGHT AND LEFT VEHICULAR MOVEMENTS ARE PROVIDED, THE STRIPES
SHALL SLOPE DOWNWARD IN BOTH DIRECTIONS FROM THE CENTER OF THE BARRICADE
ARRAY. WHERE NO VEHICULAR MOVEMENTS ARE PROVIDED, THE STRIPES SHALL SLOPE
DOWNWARD TOWARD THE CENTER OF THE BARRICADE ARRAY.
IF PLANS CALL FOR TRAFFIC CONTROL PLAN CONTRACTOR MUST FOLLOW MUTCD AND
PROVIDE A PLAN BEFORE WORK BEGINS.
TYPE III MOVABLE BARRICADEW20-3 MOVABLE BARRICADE
ROAD
CLOSED
GENERAL NOTES
1. PUBLIC SAFETY, TRAFFIC CONTROL, AND DUST CONTROL SHALL BE PROVIDED BY
CONTRACTOR IN ACCORDANCE WITH STATE AND COUNTY REQUIREMENTS. CONTRACTOR
SHALL SUBMIT A TRAFFIC CONTROL PLAN.
2. THE CONTRACTOR SHALL IMMEDIATELY NOTIFY THE C.O.R. OF ANY DISCREPANCIES
ENCOUNTERED BETWEEN FIELD CONDITIONS AND THESE PLANS OR ERRORS IDENTIFIED IN
THE CONTRACT.
3. THE CONTRACTOR SHALL KEEP DETAILED RECORDS AND AS-BUILTS SHOWING ALL
MODIFICATIONS MADE TO THESE PLANS. THESE RECORDS AND AS-BUILTS SHALL BE
PROVIDED TO THE C.O. UPON PROJECT COMPLETION.
4. THE CONTRACTOR IS RESPONSIBLE FOR THE PROTECTION OF ALL EXISTING MONUMENTS
AND OTHER SURVEY MARKERS. ANY MARKERS DESTROYED DURING CONSTRUCTION SHALL
BE REPLACED AT THE CONTRACTOR'S EXPENSE.
5. THE CONTRACTOR IS RESPONSIBLE FOR THE LOCATION AND PROTECTION OF ANY AND ALL
UTILITIES. CALL 811.
6. STAGING AREAS FOR EQUIPMENT STORAGE OR MATERIAL STOCKPILES WILL BE ALLOWED
ONLY IN AREAS APPROVED BY THE C.O.
7. THE CONTRACTOR IS RESPONSIBLE FOR WATER, ELECTRICITY, AND RESTROOMS.
8. ALL EQUIPMENT WILL ARRIVE ON SITE WASHED AND FREE OF ALL VISIBLE SOIL, DEBRIS, AND
ORGANIC MATTER. ALL EQUIPMENT WILL BE APPROVED BY THE C.O. PRIOR TO UNLOADING
ON THE PROJECT SITE.
9. THE SPECIFICATIONS FOR THIS PROJECT SHALL BE FEDERAL HIGHWAY ADMINISTRATION
"STANDARD SPECIFICATIONS FOR CONSTRUCTION OF ROADS AND BRIDGES ON FEDERAL
HIGHWAY PROJECTS" (FP-14) AND THE SUPPLEMENTAL SPECIFICATIONS. THE FP-24 MAY BE
DOWNLOADED AT: HTTPS://HIGHWAYS.DOT.GOV/FEDERAL-LANDS/SPECS/FP-24
10. THE CONTRACTOR IS RESPONSIBLE FOR MATCHING EXISTING IMPROVEMENTS AND THE
SURROUNDING LANDSCAPE WITH SMOOTH TRANSITIONS. THE CONTRACTOR SHALL AVOID
CREATING ANY ABRUPT OR APPARENT CHANGES IN GRADES OR CROSS SLOPES, TO THE
SATISFACTION OF THE C.O. THE COSTS OF ANY BACKFILL OR EXCAVATION REQUIRED FOR
SUCH TRANSITIONS ARE INCIDENTAL TO OTHER ITEMS.
11. UNLESS OTHERWISE NOTED, BORROW MATERIAL IS NOT AVAILABLE ON SITE AND SHALL BE
OBTAINED FROM PRIVATE SOURCES
AutoCAD SHX Text F
AutoCAD SHX Text O
AutoCAD SHX Text R
AutoCAD SHX Text E
AutoCAD SHX Text S
AutoCAD SHX Text T
AutoCAD SHX Text S
AutoCAD SHX Text E
AutoCAD SHX Text R
AutoCAD SHX Text V
AutoCAD SHX Text I
AutoCAD SHX Text C
AutoCAD SHX Text E
AutoCAD SHX Text D
AutoCAD SHX Text E
AutoCAD SHX Text P
AutoCAD SHX Text A
AutoCAD SHX Text R
AutoCAD SHX Text T
AutoCAD SHX Text M
AutoCAD SHX Text E
AutoCAD SHX Text N
AutoCAD SHX Text T
AutoCAD SHX Text O
AutoCAD SHX Text F
AutoCAD SHX Text A
AutoCAD SHX Text G
AutoCAD SHX Text R
AutoCAD SHX Text I
AutoCAD SHX Text C
AutoCAD SHX Text U
AutoCAD SHX Text L
AutoCAD SHX Text T
AutoCAD SHX Text U
AutoCAD SHX Text R
AutoCAD SHX Text E
REFLECTIVE SHEETING
Forest Service
NO. DATEBYREVISION DESCRIPTION(R5)
PACIFIC SOUTHWEST REGION
Castle Creek Bridge Repair
Shasta Trinity NATIONAL FOREST
Mt. Shasta - McCloud RANGER DISTRICT
03/31/2026 Tyson Curran Forest Engineer
4/6 /26
:1
2 T
YS
ON
CU
RR
AN
C :\U
SE
RS
\T
YS
ON
CU
RR
AN
\O
NE
DR
IV
E
- U
SD
A\
DE
SK
TO
P\
ER
FO
\C
AS
TL
E
CR
EE
K
BR
ID
GE
(R -1
4)
-S
EL
EC
TE
D\
RE
PA
IR
S
\R
C
AS
TL
E
CR
EE
K.
DW
G;
D-01 SHEET 5 OF 8 PROFILE
NOTES:
PROFILE VIEW OF SCOUR.
PLACE RIP RAP IN SCOUR BY
INTERLOCKING THE TWO
CLASS AND GRADATIONS IN
ORDER TO REDUCE
CONTINUED EROSION.
NON-WOVEN FABRIC INSTALL
WILL GO UNDER RIP RAP
LAYERS.
SEE PHOTOS ON F-1 FOR ALL
AREAS STILL GROUTED
NOT TO SCALE
AutoCAD SHX Text F
AutoCAD SHX Text O
AutoCAD SHX Text R
AutoCAD SHX Text E
AutoCAD SHX Text S
AutoCAD SHX Text T
AutoCAD SHX Text S
AutoCAD SHX Text E
AutoCAD SHX Text R
AutoCAD SHX Text V
AutoCAD SHX Text I
AutoCAD SHX Text C
AutoCAD SHX Text E
AutoCAD SHX Text D
AutoCAD SHX Text E
AutoCAD SHX Text P
AutoCAD SHX Text A
AutoCAD SHX Text R
AutoCAD SHX Text T
AutoCAD SHX Text M
AutoCAD SHX Text E
AutoCAD SHX Text N
AutoCAD SHX Text T
AutoCAD SHX Text O
AutoCAD SHX Text F
AutoCAD SHX Text A
AutoCAD SHX Text G
AutoCAD SHX Text R
AutoCAD SHX Text I
AutoCAD SHX Text C
AutoCAD SHX Text U
AutoCAD SHX Text L
AutoCAD SHX Text T
AutoCAD SHX Text U
AutoCAD SHX Text R
AutoCAD SHX Text E
AutoCAD SHX Text
CLASS 9 -RIP RAP
AutoCAD SHX Text
CLASS 7 RIP RAP
AutoCAD SHX Text
ORIGINAL GROUTED RIP RAP
AutoCAD SHX Text
PLACE NON-WOVEN FABRIC UNDER RIP RAP LAYER
CURRENT SCOUR PROFILE AT DOWNSTREAM EDGE OF BRIDGE
Forest Service
NO. DATEBYREVISION DESCRIPTION(R5)
PACIFIC SOUTHWEST REGION
Castle Creek Bridge Repair Shasta Trinity NATIONAL FOREST
Mt. Shasta - McCloud RANGER DISTRICT
03/31/2026 Tyson Curran Forest Engineer
4/6 /26
:1
2 T
YS
ON
CU
RR
AN
C :\U
SE
RS
\T
YS
ON
CU
RR
AN
\O
NE
DR
IV
E
- U
SD
A\
DE
SK
TO
P\
ER
FO
\C
AS
TL
E
CR
EE
K
BR
ID
GE
(R -1
4)
-S
EL
EC
TE
D\
RE
PA
IR
S
\R
C
AS
TL
E
CR
EE
K.
DW
G;
D-02 SHEET 6 OF 8PLAN
NOTES: GENERAL OUTLINE OF DAMAGE AREA (SCOUR SCAR).
OUTLINED AREA IS WHERE REHAB WITH RIP RAP, SHAPING FOR STABILITY, AND EXCAVATION WILL TAKE PLACE AND
OR WILL BE REQUIRED. CONSIDERATIONS FOR REDUCING CHANNEL SLOPE PROFILE.
AutoCAD SHX Text F
AutoCAD SHX Text O
AutoCAD SHX Text R
AutoCAD SHX Text E
AutoCAD SHX Text S
AutoCAD SHX Text T
AutoCAD SHX Text S
AutoCAD SHX Text E
AutoCAD SHX Text R
AutoCAD SHX Text V
AutoCAD SHX Text I
AutoCAD SHX Text C
AutoCAD SHX Text E
AutoCAD SHX Text D
AutoCAD SHX Text E
AutoCAD SHX Text P
AutoCAD SHX Text A
AutoCAD SHX Text R
AutoCAD SHX Text T
AutoCAD SHX Text M
AutoCAD SHX Text E
AutoCAD SHX Text N
AutoCAD SHX Text T
AutoCAD SHX Text O
AutoCAD SHX Text F
AutoCAD SHX Text A
AutoCAD SHX Text G
AutoCAD SHX Text R
AutoCAD SHX Text I
AutoCAD SHX Text C
AutoCAD SHX Text U
AutoCAD SHX Text L
AutoCAD SHX Text T
AutoCAD SHX Text U
AutoCAD SHX Text R
Forest Service
NO. DATEBYREVISION DESCRIPTION(R5)
PACIFIC SOUTHWEST REGION
Castle Creek Bridge Repair
Shasta Trinity NATIONAL FOREST
Mt. Shasta - McCloud RANGER DISTRICT
03/31/2026 Tyson Curran Forest Engineer
4/6 /26
:1
2 T
YS
ON
CU
RR
AN
C :\U
SE
RS
\T
YS
ON
CU
RR
AN
\O
NE
DR
IV
E
- U
SD
A\
DE
SK
TO
P\
ER
FO
\C
AS
TL
E
CR
EE
K
BR
ID
GE
(R -1
4)
-S
EL
EC
TE
D\
RE
PA
IR
S
\R
C
AS
TL
E
CR
EE
K.
DW
G;
D-03 SHEET 7 OF 8PLAN
NOTES: GENERAL OUTLINE OF DAMAGE AREA (SCOUR SCAR).
OUTLINED AREA IS WHERE REHAB WITH RIP RAP, SHAPING FOR STABILITY, AND EXCAVATION WILL TAKE PLACE AND
OR WILL BE REQUIRED. CONSIDERATIONS FOR REDUCING CHANNEL SLOPE PROFILE.
AutoCAD SHX Text F
AutoCAD SHX Text O
AutoCAD SHX Text R
AutoCAD SHX Text E
AutoCAD SHX Text S
AutoCAD SHX Text T
AutoCAD SHX Text S
AutoCAD SHX Text E
AutoCAD SHX Text R
AutoCAD SHX Text V
AutoCAD SHX Text I
AutoCAD SHX Text C
AutoCAD SHX Text E
AutoCAD SHX Text D
AutoCAD SHX Text E
AutoCAD SHX Text P
AutoCAD SHX Text A
AutoCAD SHX Text R
AutoCAD SHX Text T
AutoCAD SHX Text M
AutoCAD SHX Text E
AutoCAD SHX Text N
AutoCAD SHX Text T
AutoCAD SHX Text O
AutoCAD SHX Text F
AutoCAD SHX Text A
AutoCAD SHX Text G
AutoCAD SHX Text R
AutoCAD SHX Text I
AutoCAD SHX Text C
AutoCAD SHX Text U
AutoCAD SHX Text L
AutoCAD SHX Text T
AutoCAD SHX Text U
AutoCAD SHX Text R
Forest Service
NO. DATEBYREVISION DESCRIPTION(R5)
PACIFIC SOUTHWEST REGION
Castle Creek Bridge Repair Shasta Trinity NATIONAL FOREST
Mt. Shasta - McCloud RANGER DISTRICT
03/31/2026 Tyson Curran Forest Engineer
4/6 /26
:1
2 T
YS
ON
CU
RR
AN
C :\U
SE
RS
\T
YS
ON
CU
RR
AN
\O
NE
DR
IV
E
- U
SD
A\
DE
SK
TO
P\
ER
FO
\C
AS
TL
E
CR
EE
K
BR
ID
GE
(R -1
4)
-S
EL
EC
TE
D\
RE
PA
IR
S
\R
C
AS
TL
E
CR
EE
K.
DW
G;
F-01 SHEET 8 OF 8PHOTOS
NOTES:
PHOTOS SHOW STORM
DAMAGE. VIEWS ARE
OUTLET FOCUSED.
VISUAL AID ONLY
CONDITIONS MAY HAVE
CHANGED SINCE PHOTOS
WERE TAKEN BUT
REFLECT DAMAGE AREAS
WELL.
AutoCAD SHX Text F
AutoCAD SHX Text O
AutoCAD SHX Text R
AutoCAD SHX Text E
AutoCAD SHX Text S
AutoCAD SHX Text T
AutoCAD SHX Text S
AutoCAD SHX Text E
AutoCAD SHX Text R
AutoCAD SHX Text V
AutoCAD SHX Text I
AutoCAD SHX Text C
AutoCAD SHX Text E
AutoCAD SHX Text D
AutoCAD SHX Text E
AutoCAD SHX Text P
AutoCAD SHX Text A
AutoCAD SHX Text R
AutoCAD SHX Text T
AutoCAD SHX Text M
AutoCAD SHX Text E
AutoCAD SHX Text N
AutoCAD SHX Text T
AutoCAD SHX Text O
AutoCAD SHX Text F
AutoCAD SHX Text A
AutoCAD SHX Text G
AutoCAD SHX Text R
AutoCAD SHX Text I
AutoCAD SHX Text C
AutoCAD SHX Text U
AutoCAD SHX Text L
AutoCAD SHX Text T
AutoCAD SHX Text U
AutoCAD SHX Text R
| Sheets and Views |
| R05 Castle Creek-TITLE |
| OLE7 |
| OLE8 |
| R05 Castle Creek-G-02 |
| OLE2 |
| OLE3 |
| OLE6 |
| OLE7 |
| OLE8 |
| R05 Castle Creek-G-03 |
| OLE2 |
| OLE3 |
| OLE4 |
| OLE5 |
| OLE6 |
| OLE7 |
| OLE8 |
| OLE9 |
| OLE10 |
| R05 Castle Creek-G-04 |
| OLE2 |
| OLE3 |
| OLE4 |
| OLE5 |
| OLE6 |
| OLE7 |
| OLE8 |
| OLE10 |
| R05 Castle Creek-D-01 |
| OLE2 |
| OLE3 |
| OLE4 |
| OLE5 |
| OLE6 |
| OLE7 |
| OLE9 |
| OLE10 |
| R05 Castle Creek-D-02 |
| OLE2 |
| OLE3 |
| OLE4 |
| OLE5 |
| OLE6 |
| OLE7 |
| OLE9 |
| OLE10 |
| R05 Castle Creek-D-03 |
| OLE2 |
| OLE3 |
| OLE4 |
| OLE5 |
| OLE6 |
| OLE7 |
| OLE9 |
| OLE10 |
| R05 Castle Creek-F-01 |
| OLE2 |
| OLE3 |
| OLE4 |
| OLE5 |
| OLE6 |
| OLE7 |
| OLE9 |
| OLE10 |
| 2026-04-06T15:26:46-0700 | |
| TYSON CURRAN |
| 2026-04-13T11:42:04-0700 | |
| ANGELICA GALAVIZ-PEREZ |
| 2026-04-08T13:27:56-0700 | |
| JOSEPH RODARME |
| 2026-04-13T16:58:11-0700 | |
| TRACI ZIMMERLEE |
File details come from the government source that posted it. Updated .