C03 - NNG15SD20B 36C10B26F0219 - Executed.pdf

PDF 1 MB Posted

Attached to
PITC End-of-Row Cable System Expansion Pt 2
Solicitation number
VA-26-00049846
Issued by

About this file

This is a Solicitation/Contract/Order for Commercial Products and Commercial Services (Standard Form 1449) issued by the Department of Veterans Affairs for the PITC End-of-Row Cable System Expansion Part 2 project.

The contract, awarded to Cynergy Professional Systems LLC on August 3, 2026, requires the provision of fiber optic and copper Category 6A structured cabling materials and installation services for a 56-cabinet data center expansion at the Philadelphia Information Technology Center (PITC) in Philadelphia, Pennsylvania. The total contract value is $1,433,740.52, with a 150-day delivery period from award. The scope includes installing fiber connections between eight end-of-row cabinets and core switches, fiber connections from end-of-row cabinets to 48 server cabinets, and Category 6A copper connections to each cabinet. Key deliverables include a Contractor Project Management Plan, weekly progress reports, kickoff meeting minutes, fiber and copper cable installation test reports, as-built cabling drawings, contractor staff roster, and Section 508 compliance test results. The contractor must conduct a site survey (scheduled for May 21, 2026), perform cable testing per ANSI/TIA standards, provide a three-year warranty on parts, and comply with VA's Infrastructure Standards for Telecommunications Spaces. The contract incorporates NASA SEWP V terms and includes standard FAR clauses, VA-specific requirements regarding security, accessibility (Section 508), energy efficiency, small business set-asides for service-disabled veteran-owned small businesses (SDVOSB), and IT security provisions. Payment will be made electronically via the VA Financial Services Center in Austin, Texas, with invoices submitted upon delivery, inspection, and acceptance at destination. The contract is set aside for certified SDVOSB concerns and includes limitations on subcontracting requiring the prime contractor to perform at least 50 percent of work in-house.

View the file

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Eatontown NJ 07724

PAGE 1 OF 1. REQUISITION NO.

2. CONTRACT NO. 3. AWARD/EFFECTIVE DATE 4. ORDER NO. 5. SOLICITATION NUMBER 6. SOLICITATION ISSUE DATE

a. NAME b. TELEPHONE NO. (No Collect Calls) 8. OFFER DUE DATE/LOCAL

TIME

9. ISSUED BY CODE 10. THIS ACQUISITION IS UNRESTRICTED OR SET ASIDE: % FOR:

SMALL BUSINESS

HUBZONE SMALL

BUSINESS

SERVICE-DISABLED

VETERAN-OWNED

SMALL BUSINESS

WOMEN-OWNED SMALL BUSINESS

(WOSB) ELIGIBLE UNDER THE WOMEN-OWNED

SMALL BUSINESS PROGRAM

EDWOSB

8(A)

NAICS:

SIZE STANDARD:

11. DELIVERY FOR FOB DESTINA-

TION UNLESS BLOCK IS

MARKED

SEE SCHEDULE

12. DISCOUNT TERMS

13a. THIS CONTRACT IS A

RATED ORDER UNDER

DPAS (15 CFR 700)

13b. RATING

14. METHOD OF SOLICITATON

RFQ IFB RFP

15. DELIVER TO CODE 16. ADMINISTERED BY CODE

17a. CONTRACTOR/OFFEROR CODE FACILITY CODE 18a. PAYMENT WILL BE MADE BY CODE

TELEPHONE NO. UEI: EFT:

PHONE: FAX:

17b. CHECK IF REMITTANCE IS DIFFERENT AND PUT SUCH ADDRESS IN OFFER

18b. SUBMIT INVOICES TO ADDRESS SHOWN IN BLOCK 18a UNLESS BLOCK BELOW IS CHECKED

SEE ADDENDUM

19. 20. 21. 22. 23. 24.

ITEM NO. SCHEDULE OF SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

(Use Reverse and/or Attach Additional Sheets as Necessary)

25. ACCOUNTING AND APPROPRIATION DATA 26. TOTAL AWARD AMOUNT (For Govt. Use Only)

27a. SOLICITATION INCORPORATES BY REFERENCE FAR 52.212-1, 52.212-4. FAR 52.212-3 AND 52.212-5 ARE ATTACHED. ADDENDA ARE ARE NOT ATTACHED.

27b. CONTRACT/PURCHASE ORDER INCORPORATES BY REFERENCE FAR 52.212-4. FAR 52.212-5 IS ATTACHED. ADDENDA ARE ARE NOT ATTACHED

28. CONTRACTOR IS REQUIRED TO SIGN THIS DOCUMENT AND RETURN _______________ 29. AWARD OF CONTRACT: REF. ___________________________________ OFFER COPIES TO ISSUING OFFICE. CONTRACTOR AGREES TO FURNISH AND DATED ________________________________. YOUR OFFER ON SOLICITATION DELIVER ALL ITEMS SET FORTH OR OTHERWISE IDENTIFIED ABOVE AND ON ANY (BLOCK 5), INCLUDING ANY ADDITIONS OR CHANGES WHICH ARE ADDITIONAL SHEETS SUBJECT TO THE TERMS AND CONDITIONS SPECIFIED SET FORTH HEREIN IS ACCEPTED AS TO ITEMS:

30a. SIGNATURE OF OFFEROR/CONTRACTOR 31a. UNITED STATES OF AMERICA (SIGNATURE OF CONTRACTING OFFICER)

30b. NAME AND TITLE OF SIGNER (TYPE OR PRINT) 30c. DATE SIGNED 31b. NAME OF CONTRACTING OFFICER (TYPE OR PRINT) 31c. DATE SIGNED

AUTHORIZED FOR LOCAL REPRODUCTION (REV. NOV 2021)

PREVIOUS EDITION IS NOT USABLE Prescribed by GSA - FAR (48 CFR) 53.212

7. FOR SOLICITATION

INFORMATION CALL:

STANDARD FORM 1449

SOLICITATION/CONTRACT/ORDER FOR COMMERCIAL PRODUCTS AND COMMERCIAL SERVICES

OFFEROR TO COMPLETE BLOCKS 12, 17, 23, 24, & 30

TAC

NNG15SD20B 36C10B26F0219

Award Date: 08/03/2026 Effective Date:08/03/26

Shakiya Harris; shakiya.harris@va.gov 512-981-4021

36C10B Department of Veterans Affairs Office of Procurement, Acquisition and Logistics Technology Acquisition Center 23 Christopher Way

X 100

X Y

541519

150 Employees

Net 30 Days

N/A

X

See Product Description

Y

Department of Veterans Affairs Office of Procurement, Acquisition and Logistics Technology Acquisition Center 23 Christopher Way Eatontown NJ 07724

5QEP7

CYNERGY PROFESSIONAL SYSTEMS LLC

23187 LA CADENA DR STE 102

LAGUNA HILLS, CA 92653-1481

949-340-0149 GK55J77VGN84

Y

Department of Veterans Affairs Financial Services Center PO Box 149971 Austin, TX 78714-8971 See website at: http://www.fsc.va.gov/einvoice.asp

(877) 353-9791

See CONTINUATION Page

PITC end-of-row Cable System Expansion Pt2

See Section B.1 for Schedule of Supplies and Services

$1,433,740.52 2026-261101-FFACTIVITIES-FRNCHFND-S1944000-2026-INFTECSERVS-VACO-S19310000-787417830-

00-4539XRDB-1; 2026-251301-FFACTIVITIES-FRNCHFND-S1944000-2026-INFTECSERVS-VACO-

S19310000-787417830-00-4539XRDB-1

Mary B. Accomando Contracting Officer

Kevin P. McGann Director, Client Experience

08/04/2026 08/04/2026

NASA SEWP: NNG15SD20B

Order Number: 36C10B26F0219

Request for Quote: 36C10B25Q0325

SECTION B - CONTINUATION OF SF 1449 BLOCKS

B.1 SCHEDULE OF SUPPLIES AND SERVICES

B.2 CONTRACT ADMINISTRATION DATA

B.3 ACCOUNTING AND APPROPRIATION DATA

B.2 PERFORMANCE WORK STATEMENT

1. BACKGROUND

2. APPLICABLE DOCUMENTS

3. SCOPE OF WORK

3.1. End of row cabinets to core switches:

3.2. End of row cabinets to server cabinets:

3.3. Acronym definitions

4. PERFORMANCE DETAILS

4.1. PERFORMANCE PERIOD

4.2. PLACE OF PERFORMANCE

4.3. TRAVEL

5. SPECIFIC TASKS AND DELIVERABLES

5.1. PROJECT MANAGEMENT

5.1.1. CONTRACTOR PROJECT MANAGEMENT PLAN

5.1.2. REPORTING REQUIREMENTS

5.1.3. KICK OFF MEETING

5.2. SITE SURVEY

5.3. MATERIALS

5.4. INSTALLATION REQUIREMENTS

5.4.1. Task 1, Core installation - Core Switch to End of Row Cabinets

5.4.2. Task 2, End of Row to Intra-row Cabinets

5.5. Tools

5.6. Testing

5.7. As-Built Drawings

5.8. WARRANTY

6. GENERAL REQUIREMENTS

6.1. ENTERPRISE AND IT FRAMEWORK

6.1.1. VA TECHNICAL REFERENCE MODEL

6.1.2. FEDERAL IDENTITY, CREDENTIAL, AND ACCESS MANAGEMENT (FICAM)

6.1.3. INTERNET PROTOCOL VERSION 6 (IPV6)

6.1.4. TRUSTED INTERNET CONNECTION (TIC)

6.1.5. STANDARD COMPUTER CONFIGURATION

6.1.6. VETERAN FOCUSED INTEGRATION PROCESS (VIP)

6.1.7. PROCESS ASSET LIBRARY (PAL)

6.1.8. AUTHORITATIVE DATA SOURCES

6.2. SECURITY AND PRIVACY REQUIREMENTS

6.2.1. POSITION/TASK RISK DESIGNATION LEVEL(S)

6.2.2. CONTRACTOR PERSONNEL SECURITY REQUIREMENTS

6.3. METHOD AND DISTRIBUTION OF DELIVERABLES

6.4. SCHEDULE FOR DELIVERABLES

6.5. PERFORMANCE METRICS

6.6. FACILITY/RESOURCE PROVISIONS

Request for Quote: 36C10B25Q0325

6.7. GOVERNMENT FURNISHED PROPERTY

6.8. SHIPMENT OF HARDWARE OR EQUIPMENT

7. ADDENDUM A – ADDITIONAL VA REQUIREMENTS, CONSOLIDATED

8. ADDENDUM B – VA INFORMATION AND INFORMATION SYSTEM

SECURITY/PRIVACY LANGUAGE

SECTION C - CONTRACT CLAUSES

C.1 NASA SEWP V RFQ INTRODUCTORY LANGUAGE

C.2 FAR 52.252-2 CLAUSES INCORPORATED BY REFERENCE (FEB 1998)

C.3 FAR 52. 52.222-53 EXEMPTION FROM APPLICATION OF THE SERVICE

CONTRACT LABOR STANDARDS TO CONTRACTS FOR CERTAIN SERVICES-

REQUIREMENTS (DEVIATION NOV 2025)

C.4 FAR 52.222-90 ADDRESSING DEI DISCRIMINATION BY FEDERAL

CONTRACTORS (APR 2026)

C.5 VAAR 852.201-70 CONTRACTING OFFICER‘S REPRESENTATIVE (DEC

2022) 47

C.6 VAAR 852.203-70 COMMERCIAL ADVERTISING (MAY 2018)

C.7 VAAR 852.212-71 GRAY MARKET AND COUNTERFEIT ITEMS (FEB 2023) . 47

C.8 VAAR 852.219-73 VA NOTICE OF TOTAL SET-ASIDE FOR CERTIFIED

SERVICE-DISABLED VETERAN OWNED SMALL BUSINESSES (JAN 2023)

(DEVIATION)

C.9 VAAR 852.219-76 VA NOTICE OF LIMITATIONS ON SUBCONTRACTING—

CERTIFICATE OF COMPLIANCE FOR SUPPLIES AND PRODUCTS (JAN 2023)

(DEVIATION)

C.10 VAAR 852.232-72 ELECTRONIC SUBMISSION OF PAYMENT REQUESTS

(NOV 2018)

C.11 VAAR 852.239-70 SECURITY REQUIREMENTS FOR INFORMATION

TECHNOLOGY RESOURCES (FEB 2023)

C.12 VAAR 852.239-76 INFORMATION AND COMMUNICATION TECHNOLOGY

ACCESSIBILITY (FEB 2023)

SECTION D - CONTRACT DOCUMENTS, EXHIBITS, OR ATTACHMENTS

Request for Quote: 36C10B25Q0325

SECTION B - CONTINUATION OF SF 1449 BLOCKS

B.1 SCHEDULE OF SUPPLIES AND SERVICES

19.

ITEM #

20. SCHEDULE OF

SUPPLIES/SERVICES

21.

QTY

22.

UNIT

23. UNIT PRICE 24. AMOUNT

Title - All supplies/services shall be in accordance with (IAW) the Product Description / Performance Work Statement (PWS), dated December 2, 2025 as set forth in Section B.4 of this solicitation.

Inspection/Acceptance: Destination

Product Service Code (PSC): 5995- For all Contract Line Item Numbers (CLIN) unless otherwise noted.

Delivery Address/Point of Contact: Helen Lynch; helen.lynch@va.gov; Please see Performance Work Statement (PWS)

Period of Performance:

Delivery Period: 150 days after award

19.

ITEM #

20. SCHEDULE OF

SUPPLIES/SERVICES

21.

QTY

22.

UNIT

23. UNIT PRICE 24. AMOUNT

0001 24-F OM4 MTP (Female) to MTP (Female) 46mtrs 2 EA $1,436.84 $2,873.68

0002 24-F OM4 MTP (Female) to MTP (Female) 52mtrs

2 EA $1,555.79 $3,111.58

0003 24-F OM4 MTP (Female) to MTP (Female) 58mtrs

2 EA $1,673.68 $3,347.36

0004 24-F OM4 MTP (Female) to MTP (Female) 64mtrs

4 EA $1,791.58 $7,166.32

0005 24-F OM4 MTP (Female) to MTP (Female) 71mtrs

2 EA $1,929.47 $3,858.94

0006 24-F OM4 MTP (Female) to MTP (Female) 73mtrs

2 EA $1,969.47 $3,938.94

0007 24-F OM4 MTP (Female) to MTP (Female) 83mtrs

2 EA $2,165.26 $4,330.52

0008 24 Cat 6A Blue Plenum Cable Bundle with RJ45 Mod Ends 150 feet

1 EA $2,287.37 $2,287.37

0009 24 Cat 6A Blue Plenum Cable Bundle with RJ45 Mod Ends 170 feet

1 EA $2,504.21 $2,504.21

0010 24 Cat 6A Blue Plenum Cable Bundle with RJ45 Mod Ends 190 feet

1 EA $2,721.05 $2,721.05

Request for Quote: 36C10B25Q0325

19.

ITEM #

20. SCHEDULE OF

SUPPLIES/SERVICES

21.

QTY

22.

UNIT

23. UNIT PRICE 24. AMOUNT

0011 24 Cat 6A Blue Plenum Cable Bundle with RJ45 Mod Ends 210 feet

2 EA $2,937.89 $5,875.78

0012 24 Cat 6A Blue Plenum Cable Bundle with RJ45 Mod Ends 230 feet

1 EA $3,154.74 $3,154.74

0013 24 Cat 6A Blue Plenum Cable Bundle with RJ45 Mod Ends 250 feet

1 EA $3,370.53 $3,370.53

0014 24 Cat 6A Blue Plenum Cable Bundle with RJ45 Mod Ends 270 feet

1 EA $3,587.37 $3,587.37

0015 72-F OM4 MTP (Female) to MTP (Female) 8mtrs

4 EA $1,904.21 $7,616.84

0016 72-F OM4 MTP (Female) to MTP (Female) 9mtrs

8 EA $1,953.68 $15,629.44

0017 72-F OM4 MTP (Female) to MTP (Female) 10mtrs

8 EA $2,003.16 $16,025.28

0018 72-F OM4 MTP (Female) to MTP (Female) 11mtrs

12 EA $2,052.63 $24,631.56

0019 72-F OM4 MTP (Female) to MTP (Female) 12mtrs

8 EA $2,102.11 $16,816.88

0020 72-F OM4 MTP (Female) to MTP (Female) 13mtrs

12 EA $2,151.58 $25,818.96

0021 72-F OM4 MTP (Female) to MTP (Female) 14mtrs

4 EA $2,201.05 $8,804.20

0022 72-F OM4 MTP (Female) to MTP (Female) 15mtrs

12 EA $2,250.53 $27,006.36

0023 72-F OM4 MTP (Female) to MTP (Female) 16mtrs

8 EA $2,300.00 $18,400.00

0024 72-F OM4 MTP (Female) to MTP (Female) 17mtrs

8 EA $2,349.47 $18,795.76

0025 72-F OM4 MTP (Female) to MTP (Female) 18mtrs

8 EA $2,397.89 $19,183.12

0026 72-F OM4 MTP (Female) to MTP (Female) 19mtrs

4 EA $2,447.37 $9,789.48

0027 -24 Cat 6A Blue Plenum Cable Bundle with RJ45 Mod Ends 25 feet

8 EA $932.63 $7,461.04

0028 -24 Cat 6A Blue Plenum Cable Bundle with RJ45 Mod Ends 28 feet

8 EA $948.42 $7,587.36

0029 -24 Cat 6A Blue Plenum Cable Bundle with RJ45 Mod Ends 29 feet

8 EA $965.26 $7,722.08

0030 -24 Cat 6A Blue Plenum Cable Bundle with RJ45 Mod Ends 30 feet

8 EA $986.32 $7,890.56

0031 -24 Cat 6A Blue Plenum Cable Bundle with RJ45 Mod Ends 32 feet

8 EA $1,008.42 $8,067.36

Request for Quote: 36C10B25Q0325

19.

ITEM #

20. SCHEDULE OF

SUPPLIES/SERVICES

21.

QTY

22.

UNIT

23. UNIT PRICE 24. AMOUNT

0032 -24 Cat 6A Blue Plenum Cable Bundle with RJ45 Mod Ends 33 feet

8 EA $1,018.95 $8,151.60

0033 -24 Cat 6A Blue Plenum Cable Bundle with RJ45 Mod Ends 34 feet

8 EA $1,029.47 $8,235.76

0034 -24 Cat 6A Blue Plenum Cable Bundle with RJ45 Mod Ends 36 feet

8 EA $1,051.58 $8,412.64

0035 -24 Cat 6A Blue Plenum Cable Bundle with RJ45 Mod Ends 37 feet

8 EA $1,062.11 $8,496.88

0036 -24 Cat 6A Blue Plenum Cable Bundle with RJ45 Mod Ends 38 feet

8 EA $1,073.68 $8,589.44

0037 -24 Cat 6A Blue Plenum Cable Bundle with RJ45 Mod Ends 40 feet

8 EA $1,094.74 $8,757.92

0038 -24 Cat 6A Blue Plenum Cable Bundle with RJ45 Mod Ends 42 feet

16 EA $1,116.84 $17,869.44

0039 -24 Cat 6A Blue Plenum Cable Bundle with RJ45 Mod Ends 44 feet

8 EA $1,137.89 $9,103.12

0040 -24 Cat 6A Blue Plenum Cable Bundle with RJ45 Mod Ends 46 feet

8 EA $1,160.00 $9,280.00

0041 -24 Cat 6A Blue Plenum Cable Bundle with RJ45 Mod Ends 48 feet

16 EA $1,181.05 $18,896.80

0042 -24 Cat 6A Blue Plenum Cable Bundle with RJ45 Mod Ends 50 feet

8 EA $1,203.16 $9,625.28

0043 -24 Cat 6A Blue Plenum Cable Bundle with RJ45 Mod Ends 52 feet

8 EA $1,225.26 $9,802.08

0044 -24 Cat 6A Blue Plenum Cable Bundle with RJ45 Mod Ends 54 feet

16 EA $1,246.32 $19,941.12

0045 -24 Cat 6A Blue Plenum Cable Bundle with RJ45 Mod Ends 56 feet

8 EA $1,268.42 $10,147.36

0046 -24 Cat 6A Blue Plenum Cable Bundle with RJ45 Mod Ends 58 feet

8 EA $1,289.47 $10,315.76

0047 -24 Cat 6A Blue Plenum Cable Bundle with RJ45 Mod Ends 60 feet

8 EA $1,307.37 $10,458.96

0048 Misc. Consumable(Velcro, Labels, Etc) 1 EA $631.58 $631.58

0049 Opt-X UHDX 1RU Angled Panel, empty;

Accepts up to (12) HDX adapter plates or (12) MTP cassettes.

88 EA $227.37 $20,008.56

0050 Fiber Cassettes - OM4, 1x24-fiber MTP (male) to LC shuttered (aqua), Universal Polarity617.3

608 EA $861.05 $523,518.40

Request for Quote: 36C10B25Q0325

19.

ITEM #

20. SCHEDULE OF

SUPPLIES/SERVICES

21.

QTY

22.

UNIT

23. UNIT PRICE 24. AMOUNT

0051 Copper Patch Panel 48 port e2XHD 1RU High-Density Universal Angled Panel, accepts shielded, UTP, and fiber cassettes

208 EA $183.16 $38,097.28

0052 Angled Blanking Panel Leviton - Angled Blanking Panel

112 EA $67.37 $7,545.44

0053 Angled Transitional Cover Leviton - Angled Transitional Cover

58 EA $72.63 $4,212.54

1001 Labor, Installation, Testing, and Project Management

NSP NSP

1001AA Contractor Project Management Plan 1 EA $36,426.79 $36,426.79

1001AB Eight end-of-row cabinets connected to core switches; work inspected and accepted with Weekly Progress Reports at Teleconference

1 EA $109,280.38 $109,280.38

1001AC Forty-eight server cabinets connected to end-of-row cabinets; work inspected and accepted with Weekly Progress Reports at Teleconference

EA $109,280.38 $109,280.38

1001AD Kickoff Meeting Minutes

EA $18,213.39 $18,213.39

1001AE Fiber Optic Cable Installation Test Report 1

EA $18,213.39 $18,213.39

1001AF Copper Cable Installation Test Report

EA $18,213.39 $18,213.39

1001AG As-Built Cabling Drawings

EA $18,213.39 $18,213.39

1001AH Contractor Staff Roster

EA $18,213.39 $18,213.39

1001AK Final Section 508 Compliance Test Results

EA $18,213.39 $18,213.39

Total Amount: $1,433,740.52

Governing Law (continuation of Schedule of Supplies and Services above) :

Federal law and regulations, including the Federal Acquisition Regulations (FAR), shall govern this Contract/Order. Commercial license agreements may be made a part of this Contract/Order but only if both parties expressly make them an addendum hereto, as permitted by FAR 12.212.

If the commercial license agreement is not made an addendum, it shall not apply, govern, be a part of or have any effect whatsoever on the Contract/Order; this includes, but is not limited to, any agreement embedded in the computer software (clickwrap), any agreement that is

Request for Quote: 36C10B25Q0325 otherwise delivered with or provided to the Government with the commercial computer software or documentation (shrinkwrap), or any other license agreement otherwise referred to in any document. If a commercial license agreement is made an addendum, only those provisions addressing data rights regarding the Government’s use, duplication and disclosure of data (e.g., restricted computer software) are included and made a part of this Contract/Order, and only to the extent that those provisions are not duplicative or inconsistent with Federal law, Federal regulation, the incorporated FAR clauses and the provisions of this Contract/Order; those provisions in the commercial license agreement that do not address data rights regarding the Government’s use, duplication and disclosure of data shall not be included or made a part of the Contract/Order. Federal law and regulation including, without limitation, the Contract Disputes Act (41 U.S.C. § 7101 et seq.), the Anti-Deficiency Act (31 U.S.C. § 1341 et seq.), the Competition in Contracting Act (41 U.S.C. § 3301 et seq.), the Prompt Payment Act (31 U.S.C.

§3901 et seq.), Contracts for Data Processing or Maintenance (38 USC § 5725), and FAR clauses 52.212-4, 52.227-14, 52.227-19 shall supersede, control, and render ineffective any inconsistent, conflicting, or duplicative provision in any commercial license agreement. In the event of conflict between this clause and any provision in the Contract/Order or the commercial license agreement or elsewhere, the terms of this clause shall prevail. The Contractor shall deliver to the Government all data first produced under this Contract/Order with unlimited rights as defined by FAR 52.227-14. Claims of patent or copyright infringement brought against the Government as a party shall be defended by the U.S. Department of Justice (DOJ in accordance with 28 U.S.C. § 516; at the discretion of DOJ, the Contractor may be allowed reasonable participation in the defense of the litigation. Any additional changes to the Contract/Order must be made by contract/order modification (Standard Form 30) and shall only be made by a warranted Contracting Officer. Nothing in this Contract/Order or any commercial license agreement shall be construed as a waiver of sovereign immunity.

SOFTWARE LICENSE, MAINTENANCE AND TECHNICAL SUPPORT:

(1) Definitions.

a) Licensee. The term “licensee” shall mean the U.S. Department of Veterans Affairs (“VA”) and is synonymous with “Government.”

b) Licensor. The term “licensor” shall mean the Contractor having the necessary license or ownership rights to deliver license, software maintenance and support of the computer software being acquired. The term “Contractor” is the party identified in Block 17a on the SF1449. If the Contractor is a reseller and not the Licensor, the Contractor remains responsible for performance under this Contract/Order.

c) Software. The term “software” shall mean the licensed computer software product(s) cited in the Schedule of Supplies/Services.

d) Maintenance. The term “maintenance” is the process of enhancing and optimizing software, as well as remedying defects. It shall include all new fixes, patches, releases, updates, versions and upgrades, as further defined below.

e) Technical Support. The term “technical support” refers to the range of services providing assistance for the software via the telephone, email, a website or otherwise.

f) Release or Update. The term “release” or “update” are terms that refer to a revision of software that contains defect corrections, minor enhancements or improvements of the software’s functionality. This is usually designated by a change in the number to the right of the decimal point (e.g., from Version 5.3 to 5.4). An example of an update is the addition of new hardware.

Request for Quote: 36C10B25Q0325

g) Version or Upgrade. The term “version” or “upgrade” are terms that refer to a revision of software that contains new or improved functionality. This is usually designated by a change in the number to the left of the decimal point (e.g., from Version 5.4 to 6).

(2) Software License.

a) Unless otherwise stated in the Schedule of Supplies/Services, the Performance Work Statement or Product Description, the software license provided to the Government is a perpetual, nonexclusive license to use the software.

b) The Government may use the software in a networked environment.

c) Any dispute regarding the license grant or usage limitations shall be resolved in accordance with the Disputes Clause incorporated in FAR 52.212-4(d).

d) All limitations of software usage are expressly stated in the Schedule of

Supplies/Services and the Performance Work Statement/Product Description.

(3) Software Maintenance and Technical Support.

a) If the Government desires to continue software maintenance and support beyond the period of performance identified in this Contract/Order, the Government will issue a separate contract or order for maintenance and support. Conversely, if a contract or order for continuing software maintenance and technical support is not received, the Contractor is neither authorized nor permitted to renew any of the previously furnished services.

b) The Contractor shall provide software support services, which includes periodic updates, enhancements and corrections to the software, and reasonable technical support, all of which are customarily provided by the Contractor to its commercial customers so as to cause the software to perform according to its specifications, documentation or demonstrated claims.

c) Any telephone support provided by Contractor shall be at no additional cost.

d) The Contractor shall provide all maintenance services in a timely manner in accordance with the Contractor’s customary practice or as defined in the Performance Work Statement or Product Description. However, prolonged delay (exceeding 2 business days) in resolving software problems will be noted in the Government’s various past performance records on the Contractor (e.g., www.cpars.gov).

e) If the Government allows the maintenance and support to lapse and subsequently wishes to reinstate it, any reinstatement fee charged shall not exceed the amounts that would have been charged if the Government had not allowed the subscription to lapse.

(4) Disabling Software Code.

The Government requires delivery of computer software that does not contain any code that will, upon the occurrence or the nonoccurrence of any event, disable the software. Such code includes but is not limited to a computer virus, restrictive key, node lock, time-out or other function, whether implemented by electronic, mechanical, or other means, which limits or hinders the use or access to any computer software based on residency on a specific hardware configuration, frequency of duration of use, or other limiting criteria. If any such disabling code is present, the Contractor agrees to indemnify the Government for all damages suffered as a result of a disabling caused by such code, and the contractor agrees to remove such code upon the Government’s request at no extra cost to the Government.

Request for Quote: 36C10B25Q0325

Inability of the Contractor to remove the disabling software code will be considered an inexcusable delay and a material breach of contract, and the Government may exercise its right to terminate for cause. In addition, the Government is permitted to remove the code as it deems appropriate and charge the Contractor for consideration for the time and effort expended in removing the code.

(5) Manuals and Publications.

Upon Government request, the Contractor shall furnish the most current version of the user manual and publications for all products/services provided under this Contract/Order at no cost.

B.2 CONTRACT ADMINISTRATION DATA

1. Contract Administration: All contract administration matters will be handled by the following individuals:

a. CONTRACTOR: Cynergy Professional Systems LLC 23187 La Cadena Drive Suite 102 Laguna Hills, CA 92653

b. GOVERNMENT: Contracting Officer 36C10B Department of Veterans Affairs Technology Acquisition Center – Procurement Service G 23 Christopher Way Eatontown NJ 07724

2. CONTRACTOR REMITTANCE ADDRESS: All payments by the Government to the contractor will be made in accordance with:

[X] 52.232-33, Payment by Electronic Funds Transfer—System For Award Management, or

[] 52.232-36, Payment by Third Party

3. INVOICES: Invoices shall be submitted in arrears:

a. Quarterly []

b. Semi-Annually []

c. Other [X] Delivery, Inspection and Acceptance

Request for Quote: 36C10B25Q0325

4. GOVERNMENT INVOICE ADDRESS: All Invoices from the contractor shall be submitted electronically in accordance with VAAR Clause 852.232-72 Electronic Submission of Payment Requests.

See website at:

http://www.fsc.va.gov/einvoice.asp

ACKNOWLEDGMENT OF AMENDMENTS: The offeror acknowledges receipt of amendments to the Solicitation numbered and dated as follows:

AMENDMENT NO DATE

B.3 ACCOUNTING AND APPROPRIATION DATA

Funds are obligated to pay for Services/Supplies based on the following breakdown.

Each invoice should reference the 36C10B26F0219 and associated CLINs

See cross walk of accounting and appropriation data for invoicing purposes at Attachment D

Request for Quote: 36C10B25Q0325

B.2 PERFORMANCE WORK STATEMENT

PERFORMANCE WORK STATEMENT (PWS)

DEPARTMENT OF VETERANS AFFAIRS

Office of Information & Technology Infrastructure Operations (IO)

PITC End of Row Expansion

Date: December 2, 2025

VA-26-00049846

PWS Version Number: 1.0

Request for Quote: 36C10B25Q0325

1. BACKGROUND

The Department of Veterans Affairs (VA), Office of Information & Technology (OIT), Infrastructure Operations (IO), Philadelphia Information Technology Center (PITC) strives to provide high quality, effective, and efficient Information Technology (IT) services to those responsible for providing care to the Veterans at the point-of-care as well as throughout all the points of the Veterans’ health care in an effective, timely and compassionate manner. VA depends on Information Management/Information Technology (IM/IT) systems to meet mission goals.

VA requires materials and installation service for a fiber optic and copper Category 6A (CAT6A) structured cabling solution for a fifty-six (56) cabinet data center expansion in the PITC Data Center. The contractor shall adhere to VA’s Infrastructure Standard for Telecommunications Spaces; a copy of which will be provided during the site survey.

2. APPLICABLE DOCUMENTS

In the performance of the tasks associated with this Performance Work Statement, the Contractor shall comply with the following:

1. 44 U.S.C. § 3541-3549, “Federal Information Security Management Act (FISMA) of 2002”

2. “Federal Information Security Modernization Act of 2014”

3. Federal Information Processing Standards (FIPS) Publication 140-2, “Security Requirements For Cryptographic Modules”

4. FIPS Pub 199. Standards for Security Categorization of Federal Information and Information Systems, February 2004

5. FIPS Pub 200, Minimum Security Requirements for Federal Information and Information Systems, March 2016

6. FIPS Pub 201-2, “Personal Identity Verification of Federal Employees and Contractors,” August 2013

7. 10 U.S.C. § 2224, "Defense Information Assurance Program"

8. Carnegie Mellon Software Engineering Institute, Capability Maturity Model® Integration for Development (CMMI-DEV), Version 1.3 November 2010; and Carnegie Mellon Software Engineering Institute, Capability Maturity Model® Integration for Acquisition (CMMI-ACQ), Version 1.3 November 2010

9. 5 U.S.C. § 552a, as amended, “The Privacy Act of 1974”

10. Public Law 109-461, Veterans Benefits, Health Care, and Information Technology Act of 2006, Title IX, Information Security Matters

11. 42 U.S.C. § 2000d “Title VI of the Civil Rights Act of 1964”

12. VA Directive 0710, “Personnel Security and Suitability Program,” June 4, 2010, https://www.va.gov/vapubs/index.cfm

13. VA Handbook 0710, Personnel Security and Suitability Program, May 2, 2016, https://www.va.gov/vapubs/index.cfm

14. VA Directive and Handbook 6102, “Internet/Intranet Services,” August 5, 2019

Request for Quote: 36C10B25Q0325

15. 36 C.F.R. Part 1194 “Information and Communication Technology Standards and Guidelines,” January 18, 2017

16. Office of Management and Budget (OMB) Circular A-130, “Managing Federal Information as a Strategic Resource,” July 28, 2016

17. 32 C.F.R. Part 199, “Civilian Health and Medical Program of the Uniformed Services

(CHAMPUS)”

18. NIST SP 800-66 Rev. 1, An Introductory Resource Guide for Implementing the Health Insurance Portability and Accountability Act (HIPAA) Security Rule, October

19. Sections 504 and 508 of the Rehabilitation Act (29 U.S.C. § 794d), as amended, January 18, 2017

20. Homeland Security Presidential Directive (12) (HSPD-12), August 27, 2004

21. VA Directive 6500, “VA Cybersecurity Program,” January 24, 2019

22. VA Handbook 6500, “Risk Management Framework for VA Information Systems – Tier 3: VA Information Security Program,” March 10, 2015

23. VA Handbook 6500.2, “Management of Breaches Involving Sensitive Personal Information (SPI)”, July 28, 2016

24. VA Handbook 6500.3, “Assessment, Authorization, And Continuous Monitoring Of VA Information Systems,” February 3, 2014

25. VA Handbook 6500.5, “Incorporating Security and Privacy into the System Development Lifecycle”, March 22, 2010

26. VA Handbook 6500.6, “Contract Security,” March 12, 2010

27. VA Handbook 6500.8, “Information System Contingency Planning”, April 6, 2011

28. VA Handbook 6500.11, “VA Firewall Configuration”, August 22, 2017

29. OI&T Process Asset Library (PAL), https://www.va.gov/process/ . Reference Process Maps at https://www.va.gov/process/maps.asp and Artifact templates at https://www.va.gov/process/artifacts.asp

30. One-VA Technical Reference Model (TRM) (reference at https://www.va.gov/trm/TRMHomePage.aspx)

31. VA Directive 6508, “Implementation of Privacy Threshold Analysis and Privacy Impact Assessment,” October 15, 2014

32. VA Handbook 6508.1, “Procedures for Privacy Threshold Analysis and Privacy Impact Assessment,” July 30, 2015

33. VA Handbook 6510, “VA Identity and Access Management”, January 15, 2016

34. VA Directive and Handbook 6513, “Secure External Connections”, October 12, 2017

35. VA Directive 6300, Records and Information Management, September 21, 2018

36. VA Handbook, 6300.1, Records Management Procedures, March 24, 2010

Request for Quote: 36C10B25Q0325

37. NIST SP 800-37 Rev 1, Risk Management Framework for Information Systems and Organizations: A System Life Cycle Approach for Security and Privacy, December

38. NIST SP 800-53 Rev. 4, Security and Privacy Controls for Federal Information Systems and Organizations, January 22, 2015

39. OMB Memorandum, “Transition to IPv6”, September 28, 2010

40. VA Directive 0735, Homeland Security Presidential Directive 12 (HSPD-12) Program, October 26, 2015

41. VA Handbook 0735, Homeland Security Presidential Directive 12 (HSPD-12) Program, March 24, 2014

42. OMB Memorandum M-06-18, Acquisition of Products and Services for Implementation of HSPD-12, June 30, 2006

43. OMB Memorandum 04-04, E-Authentication Guidance for Federal Agencies, December 16, 2003

44. OMB Memorandum 05-24, Implementation of Homeland Security Presidential Directive (HSPD) 12 – Policy for a Common Identification Standard for Federal Employees and Contractors, August 5, 2005

45. OMB memorandum M-11-11, “Continued Implementation of Homeland Security Presidential Directive (HSPD) 12 – Policy for a Common Identification Standard for Federal Employees and Contractors, February 3, 2011

46. OMB Memorandum, Guidance for Homeland Security Presidential Directive (HSPD) 12 Implementation, May 23, 2008

47. Federal Identity, Credential, and Access Management (FICAM) Roadmap and Implementation Guidance, December 2, 2011

48. NIST SP 800-116 Rev 1, Guidelines for the Use of Personal Identity Verification (PIV) Credentials in Facility Access, June 2018

49. OMB Memorandum M-07-16, Safeguarding Against and Responding to the Breach of Personally Identifiable Information, May 22, 2007

50. NIST SP 800-63-3, 800-63A, 800-63B, 800-63C, Digital Identity Guidelines, December 2017

51. NIST SP 800-157, Guidelines for Derived PIV Credentials, December 2014

52. NIST SP 800-164, Guidelines on Hardware-Rooted Security in Mobile Devices (Draft), October 2012

53. Draft National Institute of Standards and Technology Interagency Report (NISTIR) 7981 Mobile, PIV, and Authentication, March 2014

54. VA Memorandum, VAIQ #7100147, Continued Implementation of Homeland Security Presidential Directive 12 (HSPD-12), April 29, 2011 (reference https://www.voa.va.gov/documentlistpublic.aspx?NodeID=514)

55. IAM Identity Management Business Requirements Guidance document, May 2013, (reference Enterprise Architecture Section, PIV/IAM (reference https://www.voa.va.gov/documentlistpublic.aspx?NodeID=514)

Request for Quote: 36C10B25Q0325

56. VA Memorandum “Personal Identity Verification (PIV) Logical Access Policy Clarification,” July 17, 2019, https://www.voa.va.gov/DocumentView.aspx?DocumentID=4896

57. Trusted Internet Connections (TIC) Reference Architecture Document, Version 2.2, Federal Interagency Technical Reference Architectures, Department of Homeland Security, June 19, 2017, https://www.dhs.gov/sites/default/files/publications/TIC_Ref_Arch_v2.2_2017.pdf

58. OMB Memorandum M-08-05, “Implementation of Trusted Internet Connections (TIC), November 20, 2007

59. OMB Memorandum M-08-23, Securing the Federal Government’s Domain Name System Infrastructure, August 22, 2008

60. VA Memorandum, VAIQ #7497987, Compliance – Electronic Product Environmental Assessment Tool (EPEAT) – IT Electronic Equipment, August 11, 2014 (reference Document Libraries, EPEAT/Green Purchasing Section, https://www.voa.va.gov/documentlistpublic.aspx?NodeID=552)

61. Sections 524 and 525 of the Energy Independence and Security Act of 2007, (Public Law 110–140), December 19, 2007

62. Section 104 of the Energy Policy Act of 2005, (Public Law 109–58), August 8, 2005

63. Executive Order 13834, “Efficient Federal Operations”, dated May 17, 2018

64. Executive Order 13221, “Energy-Efficient Standby Power Devices,” August 2, 2001

65. VA Directive 0058, “VA Green Purchasing Program”, July 19, 2013

66. VA Handbook 0058, “VA Green Purchasing Program”, July 19, 2013

67. Office of Information Security (OIS) VAIQ #7424808 Memorandum, “Remote Access”, January 15, 2014, https://www.voa.va.gov/DocumentListPublic.aspx?NodeId=28

68. Clinger-Cohen Act of 1996, 40 U.S.C. §11101 and §11103

69. “Veteran Focused Integration Process (VIP) Guide 3.2”, December 2018, https://www.voa.va.gov/DocumentView.aspx?DocumentID=4371

70. VA Memorandum “Proper Use of Email and Other Messaging Services”, January 2, 2018, https://www.voa.va.gov/DocumentListPublic.aspx?NodeId=28

3. SCOPE OF WORK

The Contractor shall provide all materials and labor for an End of Row Structured Cabling Topology which consists of installing fiber optic and copper infrastructure, to support the End of Row Expansion. This includes fifty-six (56) cabinets standing in four (4) rows. Each row is separated by four (4) foot aisles. The structured cabling will include fiber connections to each of eight (8) end of row cabinets, fiber connections from each end of row cabinet to each of cabinets within each of the four (4) rows, as well as Category 6A (CAT6A) unshielded twisted pair copper connections to each cabinet.

Request for Quote: 36C10B25Q0325

3.1. End of row cabinets to core switches:

The Contractor shall install as follows, each of eight (8) end of row cabinets will require twenty-four (24) fiber pairs and twenty-four (24) copper cables connected to core switches in distant cabinets. The fiber trunk cables will terminate into 1U fiber panels at the end of row cabinet and into a 1U fiber panel enclosure at core switch cabinets. The Cat6A copper bundles will terminate into 1U copper KMJ style patch panels in the end of row cabinets and in the core switch cabinet.

3.2. End of row cabinets to server cabinets:

Each of forty-eight (48) server cabinets (cabinets 2 through 13 in each row) require seventy-two

(72) fiber pairs and a forty-eight (48) port CAT6A copper bundle connected to end of row cabinets. End of row cabinets 1 and 14, will provide thirty-six (36) fiber pairs and a twenty-four

(24) port CAT6A copper connecting to cabinets 2 through 13. All fiber trunk cables will terminate into 1U fiber panel. The Cat6A copper bundles will terminate into 1U copper KMJ style patch panels.

3.3. Acronym definitions

The following table has been provided for acronym and their meaning referenced throughout this PWS.

Acronym Definition

ANSI American National Standards Institute

DC Direct Current

EIA Electronic Industries Alliance

FSS Facilities Standards Service

GbE Gigabit Ethernet

Gb/s Gigabit per second

ICC Intermediate Cross Connect

IEC International Electrotechnical Commission

IEEE Institute of Electrical and Electronics Engineers

IT Information Technology

ITOPS IT Operations and Services

LAN Local Area Network

MPO Multi-Fiber Push On

NDCOL National Data Center Operations and Logistics

NEC® National Electrical Code®

NEMA National Electrical Manufacturers Association

NFPA National Fire Protection Association

NIC Network Interface Card

Request for Quote: 36C10B25Q0325

Acronym Definition

OIT Office of Information and Technology

OM Optical Multimode

PBB Primary Bonding Busbar

PDU Power Distribution Unit

PVC Polyvinyl Chloride

RBB Rack Bonding Busbar

RBC Rack Bonding Conductor

RCDD Registered Communications Distribution Designer

RDC Regional Data Center

RDC Remote Distribution Cabinet

RU Rack Unit

SBB Secondary Bonding Busbar

SM Single-mode

TBB Telecommunication Bonding Backbone

TEBC Telecommunications Equipment Bonding Conductor

TIA Telecommunications Industry Association

TIL Technical Information Library

TR Telecommunications Room

UL Underwriters Laboratories Inc

UTP Unshielded Twisted Pair

VA Department of Veterans Affairs

4. PERFORMANCE DETAILS

4.1. PERFORMANCE PERIOD

The Period of Performance (POP) for materials and installation shall be completed within 150 business days from date of Award.

Any work at the Government site shall not take place on Federal holidays, weekends or after business hours unless directed by the Contracting Officer (CO).

There are eleven (11) Federal holidays set by law (USC Title 5 Section 6103) that VA follows:

Under current definitions, five are set by date:

New Year's Day January 1

Juneteenth June 19

Request for Quote: 36C10B25Q0325

Independence Day July 4

Veterans Day November 11

Christmas Day December 25

If any of the above falls on a Saturday, then Friday shall be observed as a holiday. Similarly, if one falls on a Sunday, then Monday shall be observed as a holiday.

The other six are set by a day of the week and month:

Martin Luther King's Birthday Third Monday in January

Washington's Birthday Third Monday in February

Memorial Day Last Monday in May

Labor Day First Monday in September

Columbus Day Second Monday in October

Thanksgiving Fourth Thursday in November

4.2. PLACE OF PERFORMANCE

Tasks under this PWS shall be performed in a VA facility located at:

Philadelphia Information Technology Center (PITC)

5000 Wissahickon Ave, Philadelphia, PA 19144

4.3. TRAVEL

The Government does not anticipate travel to perform the tasks associated with this effort.

5. SPECIFIC TASKS AND DELIVERABLES

The Contractor shall perform the following:

5.1. PROJECT MANAGEMENT

5.1.1. CONTRACTOR PROJECT MANAGEMENT PLAN

The Contractor shall deliver a Contractor Project Management Plan (CPMP) that lays out the Contractor’s approach timeline, and tools to be used in execution of the contract. The CPMP should take the form of both a narrative and graphic format that displays the schedule, milestones risks, and resource support. The CPMP shall also include how the Contractor shall coordinate and execute planned, routine, and ad hoc data collection reporting requests as identified within the PWS. The initial baseline CPMP shall be concurred upon and updated in accordance with Section B of the contract. The Contractor shall update and maintain the VA PM approved CPMP throughout the POP.

Deliverable:

A. Contractor Project Management Plan

Request for Quote: 36C10B25Q0325

5.1.2. REPORTING REQUIREMENTS

The Contractor shall provide the COR with weekly Progress Reports in electronic form in Microsoft Word and Project formats. The report shall include detailed instructions/explanations for each required data element, to ensure that data is accurate and consistent. These reports shall reflect data as of the last day of the preceding week.

The Weekly Progress Reports shall cover all work completed during the reporting period and work planned for the subsequent reporting period. The report shall also identify any problems that arose and a description of how the problems were resolved. If problems have not been completely resolved, the Contractor shall provide an explanation including their plan and timeframe for resolving the issue. The report shall also include an itemized list of all Information and Communication Technology (ICT) deliverables and their current Section 508 conformance status. The Contractor shall monitor performance against the CPMP and report any deviations.

It is expected that the Contractor will keep in communication with VA accordingly so that issues that arise are transparent to both parties to prevent escalation of outstanding issues.

The Contractor shall conduct weekly status teleconference meetings to provide VA Project Manager with the status of task. In advance of each weekly status teleconference, the contractor will provide a weekly progress report.

Deliverable:

A. Weekly Progress Report

B. Weekly Status Teleconference

5.1.3. KICK OFF MEETING

A technical kickoff meeting shall be held within seven (7) calendar days after award. The Contractor shall coordinate the date, time, and location (can be virtual) with the Contracting Officer (CO), the VA PM, as the Co-Chairperson, the Contract Specialist (CS), and the COR. The Contractor shall provide a draft agenda to the CO and VA PM at least three business days prior to the meeting. Upon Government approval of a final agenda, the Contractor shall distribute to all meeting attendees. During the kickoff-meeting, the Contractor shall present, for review and approval by the Government, the details of the intended approach, work plan, and project schedule. The Contractor shall distribute the meeting minutes of the kickoff meeting to the CO, COR and all attendees within three calendar days after the meeting.

Deliverable:

A. Meeting minutes

5.2. SITE SURVEY

The Contractor shall conduct a pre-proposal site survey at the location indicated in section 4.2 of this PWS to identify any unique site considerations, potential installation issues that may affect the implementation of the solution, and to verify material list including cable lengths and any other specific requirements before submitting a proposal. The VA will provide floor plans which will identify each cabinet involved in the project and the anticipated cable pathway to be used.

Site surveys are scheduled for May 21, 2026. Contractors must contact Helen Lynch, helen.lynch@va.gov (512) 623-0925 and Jamar Davis, jamar.davis@va.gov (512)-842-2000. (5) five business days prior to the scheduled site survey dates. The Contractor must provide the

Request for Quote: 36C10B25Q0325 following details on the attendees including: First Name, Last Name, Company Name, and Prime Contractor company name represented if not the Prime.

Upon arrival at the VA facility, each Contractor representative must provide a government issued photo identification and review the guidelines for accessing a secure federal building.

Each Contractor representative must sign a Confidentiality of Sensitive Information Non-disclosure Agreement before they will be allowed onto the datacenter floor.

5.3. MATERIALS

The Contractor shall provide all cabling installation in accordance with VA’s Infrastructure Standard for Telecommunications Spaces, a copy of which will be provided during the site survey period. The following is a list of VA approved material guidelines that shall be included in the design.

Description/ Part Number Quantity

Opt-X UHDX 1RU Angled Panel, empty; Accepts up to (12) HDX adapter plates or (12) MTP cassettes.

Fiber Cassettes - OM4, 1x24-fiber MTP (male) to LC shuttered (aqua), Universal Polarity617.3

Copper Patch Panel 48 port e2XHD 1RU High-Density Universal Angled Panel, accepts shielded, UTP, and fiber cassettes

Angled Blanking Panel

Leviton - Angled Blanking Panel

Angled Transitional Cover

Leviton - Angled Transitional Cover

Angled Transitional Cover

Leviton - Angled Panel Cover

24-F OM4 MTP (Female) to MTP (Female) 50mtrs 1

24-F OM4 MTP (Female) to MTP (Female) 55mtrs 2

24-F OM4 MTP (Female) to MTP (Female) 65mtrs 2

24-F OM4 MTP (Female) to MTP (Female) 70mtrs 2

24-F OM4 MTP (Female) to MTP (Female) 75mtrs 1

(24) Cat 6A Black Plenum Cable Bundle with RJ45 Mod Ends 50mtrs

(24) Cat 6A Black Plenum Cable Bundle with RJ45 Mod Ends 55mtrs

(24) Cat 6A Black Plenum Cable Bundle with RJ45 Mod Ends 65mtrs

Request for Quote: 36C10B25Q0325

Description/ Part Number Quantity

(24) Cat 6A Black Plenum Cable Bundle with RJ45 Mod Ends 70mtrs

(24) Cat 6A Black Plenum Cable Bundle with RJ45 Mod Ends 75mtrs

72-F OM4 MTP (Female) to MTP (Female) 25ft 8

72-F OM4 MTP (Female) to MTP (Female) 30ft 8

72-F OM4 MTP (Female) to MTP (Female) 35ft 8

72-F OM4 MTP (Female) to MTP (Female) 40ft 8

72-F OM4 MTP (Female) to MTP (Female) 45ft 8

72-F OM4 MTP (Female) to MTP (Female) 50ft 8

72-F OM4 MTP (Female) to MTP (Female) 55ft 8

72-F OM4 MTP (Female) to MTP (Female) 60ft 8

72-F OM4 MTP (Female) to MTP (Female) 65ft 8

72-F OM4 MTP (Female) to MTP (Female) 70ft 8

72-F OM4 MTP (Female) to MTP (Female) 75ft 8

72-F OM4 MTP (Female) to MTP (Female) 80ft 8

72-F OM4 MTP (Female) to MTP (Female) 85ft 8

(24) Cat 6A Black Plenum Cable Bundle with RJ45 Mod Ends 25ft 32

(24) Cat 6A Black Plenum Cable Bundle with RJ45 Mod Ends 30ft 32

(24) Cat 6A Black Plenum Cable Bundle with RJ45 Mod Ends 35ft 32

(24) Cat 6A Black Plenum Cable Bundle with RJ45 Mod Ends 40ft 32

(24) Cat 6A Black Plenum Cable Bundle with RJ45 Mod Ends 45ft 32

(24) Cat 6A Black Plenum Cable Bundle with RJ45 Mod Ends 50ft 32

(24) Cat 6A Black Plenum Cable Bundle with RJ45 Mod Ends 55ft 32

(24) Cat 6A Black Plenum Cable Bundle with RJ45 Mod Ends 60ft 32

(24) Cat 6A Black Plenum Cable Bundle with RJ45 Mod Ends 65ft 32

(24) Cat 6A Black Plenum Cable Bundle with RJ45 Mod Ends 70ft 32

(24) Cat 6A Black Plenum Cable Bundle with RJ45 Mod Ends 75ft 32

(24) Cat 6A Black Plenum Cable Bundle with RJ45 Mod Ends 80ft 32

(24) Cat 6A Black Plenum Cable Bundle with RJ45 Mod Ends 85ft 32

Misc. Consumable (Velcro, Labels, Etc.) 1

Request for Quote: 36C10B25Q0325

1) CAT6A cables and components shall be unshielded twisted pair. Cat 6A cabling is specified in standard ANSI/TIA-1179.

2) All cabling system components shall be of the same performance category across each entire channel. Components typically may not be mismatched with respect to performance category.

3) Communications cabling must not be painted. Paint, plaster, cleaners, abrasives, corrosive residues, or other contaminants may result in an undetermined alteration of the cable properties.

4) Optical Multimode-4 and -5 (OM4 and OM5) rated 850 nm laser- enhanced multi-cable fiber cable assemblies pre-terminated with MPO connectors are required. One cassette shall be used to provide LC interfaces at both ends of the horizontal or backbone link and will support one or two 12-strand cable assemblies or one 24-strand cable assembly for a total capacity of 6 or 12 duplex LC interfaces. Cassettes shall also be used to breakout 24- strand MPO fiber cables into three MPO connections of eight fiber strands.

5) Unused materials shall be submitted to the on-site POC before leaving the site. The miscellaneous line shall be used to provide and install cabling and ensure compliance with all installation requirements. The Contractor’s response to solicitation shall include a list of miscellaneous items required with a description of the need/use for each item listed and the quantity. Contractor is required to detail the types and quantities of materials and supplies to be used, how they will be used as part of vendor's installation methodology and approach for each location as applicable.

5.4. INSTALLATION REQUIREMENTS

5.4.1. Task 1, Core installation - Core Switch to End of Row Cabinets

a) The Contractor shall install and label all fiber cables, fiber patch cables, CAT6A cables, cabinet enclosures and patch panels in sequential order and any other equipment required to complete cabling job. The Contractor shall label all cables in adherence to VA’s Infrastructure Standard for Telecommunications Spaces. A copy of these standards will be provided during the sites survey.

b) The Contractor shall provide and install any cable management supply needed to keep cables in a neat and orderly fashion.

5.4.2. Task 2, End of Row to Intra-row Cabinets

5.5. Tools

The Contractor is responsible for using their own tools, ladders, and supplies to perform the installation.

5.6. Testing

The Contractor shall perform cable testing as required by VA’s Telecommunications Infrastructure Standards listed below, to demonstrate that all installed equipment and cabling meets VA and industry standard specifications. The testing shall include every cable connection that is ran. The Contractor shall correct any material related installation issues and perform a retest to show the issue has been resolved.

a) The contractor shall test unshielded twisted pair cabling and components using the following standards.

Request for Quote: 36C10B25Q0325

a. ANSI/TIA-1152-A, Requirements for Field Test Instruments for Balanced Twisted- Pair Cabling

b. ANSI/TIA-568.0.D, Generic Telecommunications Cabling Standard

c. ANSI/TIA-568-1.D, Commercial Building Telecommunications Cabling Standard

d. ANSI/TIA-568-C.2, Balanced Twisted Pair Telecommunications Cabling and Components Standard

e. ANSI/TIA-606-C, Administration Standard for Commercial Telecommunications Infrastructure.

b) The contractor shall test fiber optic cabling and components using the following standards.

a. ANSI/TIA/EIA-455-1: Cable Flexing for Fiber Optic Interconnecting Devices

b. ANSI/TIA/EIA-455-2: Impact Test Measurements for Fiber Optic Devices

c. TIA/EIA-455-4: Fiber Optic Component Temperature Life Test

d. TIA/EIA-455-5: Humidity Test Procedure for Fiber Optic Components

e. TIA-455-6: Cable Retention Test Procedure for Fiber Optic Cable Interconnecting Devices

f. ANSI/TIA/EIA-455-8: Measurement of Splice or Connector Loss and Reflectance Using an OTDR

g. TIA-455-13: Visual and Mechanical Inspection of Fiber Optic Components, Devices, and Assemblies

h. TIA-455-21: Mating Durability Of Fiber Optic Interconnecting Devices

i. TIA/EIA-455-34: Interconnection Device Insertion Loss Test

j. TIA/EIA-455-36: Twist Test For Fiber Optic Connecting Devices

k. TIA-455-78: Optical Fibers Part 1-40: Measurement Methods and Test Procedures – Attenuation

l. ANSI/TIA-455-107: Determination of Component Reflectance or Link/System Return Loss Using a Loss Test Set

m. ANSI/TIA/EIA-455-171: Attenuation by Substitution Measurement for Short- Length Multimode Graded-Index and Single-Mode Optical Fiber Cable Assemblies

n. ANSI/TIA/EIA-455-185: Strength of Coupling Mechanism for Fiber Optic Interconnecting Devices

o. ANSI/TIA/EIA-455-188: Low-Temperature Testing of Fiber Optic Components

The Contractor shall capture and provide the results of the cable test information in a Cable Installation Test Reports for both fiber optic and copper cables to be delivered in pdf or excel format.

Deliverables:

A. Fiber Optic Cable Installation Test Report

Request for Quote: 36C10B25Q0325

B. Copper Cable Installation Test Report

5.7. As-Built Drawings

The Contractor shall provide as-built drawings to include the following:

All equipment installed by vendor in each cabinet

Rack elevation drawings for each rack

Cable routes and termination points for each cable run

The vendor shall provide a listing of all cables installed which shall include the rack location, rack unit (RU) number and port numbers for each cable installed.