C. SOMS- CZQZ160061.xls

XLS spreadsheet 41 KB Posted

Attached to
B190, Repair Doors, Sprinklers, Tile Briefing Rm
Solicitation number
CZQZ160061
Issued by

View the file

Other files

Show all 16

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Sheet1

SUBMITTAL REGISTERCONTRACT NO.
TITLE AND LOCATION:Renovate B190
Cannon Air Force Base, New MexicoCONTRACTOR:DATE:
ACTIVITY NOSUBMITTAL NOPARAGRAPH #CLASSIFICATION GOVT OR A/E REVWRCONTRACTOR: SCHEDULE DATESCONTRACTOR ACTIONAPPROVING AUTHORITY
SPEC SECTDESCRIPTION
ITEM SUBMITTEDSUBMITAPPROVAL NEEDED BYMATERIAL NEEDED BYACTION CODEDATE OF ACTIONDATE FWD TO APPR AUTH / DATE RCD FROM CONTRDATE FWD TO OTHER REVIEWERDATE RCD FROM OTH REVIEWERACTION CODEDATE OF ACTIONMAILED TO CONTR/ DATE RCD FRM APPR AUTHREMARKS
(a)(b)(c)(d)(e)(f)(g)(h)(i)(j)(k)(l)(m)(n)(o)(p)(q)(r)
01 01 00AF Form 1031.2G
01 01 00Construction Progress Schedule AF 30641.3G
01 01 00Submittal Register (SOMs)1..17G
01 30 00Superintendent1.5G
01 33 00Key Personnel List1.1G
01 33 00Certificates of Insurance1.1G
01 33 00List of Proposed Subcontractors1.1G
01 33 00List of proposed Products1.1G
01 33 00DD Form 1354, Transfer and Acceptance of Military Real Property1.1G
01 30 00Color boards, carpet, paint, ceiling, moldings1.3G
01 33 00Health and Safety Plan1.1G
01 33 00Work Plan1.1G
01 35 26Accident Reports1.2.1.2
01 35 26Site Safety and Health Officer1.9G
01 35 26Pre-Outage Coordination Meeting1.19G
01 45 01Quality Control Plan3.2G
01 57 19Environmental Protection Plan
01 74 19Waste Management Plan1.7G
01 45 00.0010Acceptance tests and inspections3.8G
Transparent Walls/Fish Bowl walls
Transparent Walls/Fish Bowl frame
SUBMITTAL REGISTERCONTRACT NO.
TITLE AND LOCATION:CONTRACTOR:DATE:
ACTIVITY NOSUBMITTAL NOPARAGRAPH #CLASSIFICATION GOVT OR A/E REVWRCONTRACTOR: SCHEDULE DATESCONTRACTOR ACTIONAPPROVING AUTHORITY
SPEC SECTDESCRIPTION
ITEM SUBMITTEDSUBMITAPPROVAL NEEDED BYMATERIAL NEEDED BYACTION CODEDATE OF ACTIONDATE FWD TO APPR AUTH / DATE RCD FROM CONTRDATE FWD TO OTHER REVIEWERDATE RCD FROM OTH REVIEWERACTION CODEDATE OF ACTIONMAILED TO CONTR/ DATE RCD FRM APPR AUTHREMARKS
(a)(b)(c)(d)(e)(f)(g)(h)(i)(j)(k)(l)(m)(n)(o)(p)(q)(r)

&C&"Arial,Regular"Page &P of &N

File details come from the government source that posted it. Updated .