C.04.01 Abstract of Bids W912DR24B0004 Water Treatment Plant Upgrades W912DR24B0004.pdf

PDF 223 KB Posted

Attached to
Water Treatment Plant Upgrades at Raystown Lake in Hesston, PA Abstract Of Bids
Solicitation number
Not on record
Issued by

About this file

This document is an Abstract of Bids for a water treatment plant upgrade project at Raystown Lake in Hesston, Pennsylvania. The solicitation number is W912DR24B0004, and the bid opening date was 23 September 2024. The government estimate for the base bid was $2,715,373.02.

Six offers were received, from Reagent World, Inc., Gagne Technical Services Inc., Hickes Associates Inc., Maverick Construction LLC, and Kunj Construction Corporation. The bid prices ranged from $1,747,000 to $2,765,000 for the base bid, with additional option bid items for fiber optic cable work. All offerors provided bid bonds of 20%. The contracting officer certified that all offers were opened, read, and recorded on the abstract.

View the file

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

3. DATE OPENED PAGE

23-Sep-24 1 of 2

4. ISSUING OFFICE Name and title of Certifying Official (Type) Cheryl K. Williams - Contracting Officer I CERTIFY that I have opened, read, and

USACE, BALTIMORE DISTRICT recorded on this abstract all offers Signature Date Signed 2 HOPKINS PLAZA received in response to this solicitation.

BALTIMORE, MD 21201 Contracting Officer: Cheryl K. Williams

5. PROJECT TITLE

8. GOVERNMENT ESTIMATE

(Check A, B or C and complete D, E, and F.)

A. HIRED LABOR

B. REASONABLE CONTRACT B. Bid Security (Type and Amount) B. Bid Security (Type and Amount) (Without Profit)

X C. REASONABLE CONTRACT C. Amendment Acknowledged C. Amendment Acknowledged (Including Profit)

7A. 7B. 7C. D. E. F. E. F. E. F.

ITEM DESCRIPTION OF OFFERED ITEM EST. UNIT UNIT ESTIMATED UNIT ESTIMATED UNIT ESTIMATED

No. QUANTITY PRICE AMOUNT IGE PRICE AMOUNT PRICE AMOUNT

All costs associated with the Raystown Lake Water Treatment Plant Process and Operational Improvements including upgrades to piping, clearwell, filters, electrical, instrumentation and controls, and site restoration, complete as shown on drawings and specified, but exclusive of Optional Bid Items 0002 and 0003 below.

1 Job LS 1,752,629.00$ LS 2,446,282.00$ LS 2,505,000.00$

All costs associated with Option #1 Fiber Optic Cable to Other Bldgs including site telecommunication, circuits, and wire diagrams, complete as shown on drawings and specified.

1 Job LS 75,788.00$ LS 146,776.92$ LS 190,000.00$

All costs associated with Option #2 Fiber Optic Cable Components including site telecommunications, complete as shown on drawings and specified

1 Job LS 25,864.00$ 122,314.10$ 70,000.00$

TOTAL ESTIMATED BASE BID AMOUNT 1,854,281.00$ 2,715,373.02$ 2,765,000.00$

NSN 7540-01-150-0981 501419-101 NOTE: If more than two offers are received, continue on OF 1419A. Prescribed by GSA-FAR(48 CER)53.236-1 OPTIONAL FORM 1419 (11-88)

Yes

No. 2

REAGENT WORLD, INC.

18401 Von Karman Ave Irvine, CA 92612 USA

CAGE: 6TV08

ABSTRACT OF OFFERS - CONSTRUCTION 2. DATE ISSUED1. SOLICITATION NUMBER

6. NUMBER OF AMENDMENTS ISSUED: 6 (SIX)

Yes

Bid Bond 20%

24-Jul-24W912DR24B0004

Water Treatment Plant Upgrades at Raystwon Lake Hesston, Pennsylvania

No. 1

9. OFFERS

Bid Bond 20%

GAGNE TECHNICAL SERVICES INC

1901 Mayview RD STE 10

Bridgeville, Pennsylvania 15017

CAGE:8CZ82

23Sept2024

1. SOLICITATION NUMBER PAGE

ABSTRACT OF OFFERS W912DR24B0004 2 OF 2

CONSTRUCTION INSTRUCTIONS - Attach this form to OF 1419, Abstract of Offers - Construction, when more than 2 offers are received on CONTINUATION SHEET a construction project. Each Continuation Sheet will accommodate 14 contract items to conform to the number of items which can be entered on the OF 1419. Use additional OF 1419's for contract items in excess of 14 and attach additional Continuation Sheets (OF 1419A) as needed.

2. PROJECT TITLE

B. BID SECURITY (Type and AmB. BID SECURITY (Type and Amount) B. BID SECURITY (Type and Amount)

3. CONTRACT ITEMS C. AMENDMENT ACKNOWLE C. AMENDMENT ACKNOWLEDGED C. AMENDMENT ACKNOWLEDGED 7A. B. C. D.

ITEM DESCRIPTION OF OFFERED ITEMS ESTIMATED UNIT E. UNIT F. ESTIMATED E. UNIT F. ESTIMATED E. UNIT F. ESTIMATED

NO. QUANTITY PRICE AMOUNT PRICE AMOUNT PRICE AMOUNT

All costs associated with the Raystown Lake Water Treatment Plant Process and Operational Improvements including upgrades to piping, clearwell, filters, electrical, instrumentation and controls, and site restoration, complete as shown on drawings and specified, but exclusive of Optional Bid Items 0002 and 0003 below.

1 Job LS 1,579,000.00$ Job 2,251,800.00$ LS 1,951,770.00$

All costs associated with Option #1 Fiber Optic Cable to Other Bldgs including site telecommunication, circuits, and wire diagrams, complete as shown on drawings and specified.

1 Job LS 119,000.00$ Job 377,500.00$ Job 113,250.00$

All costs associated with Option #2 Fiber Optic Cable Components including site telecommunications, complete as shown on drawings and specified

1 Job LS 49,000.00$ Job 17,500.00$ Job 11,900.00$

TOTAL ESTIMATED BASE BID AMOUNT 1,747,000.00$ 2,646,800.00$ 2,076,920.00$

NSN 7540-01-150-0981 501419-101 NOTE: If more than two offers are received, continue on OF 1419A. Prescribed by GSA-FAR(48 CER)53.236-1 OPTIONAL FORM 1419 (11-88)

OFFERS (Continued) No. 3 No. 4 No. 5 No. 6

Water Treatment Plant Upgrades at Raystwon Lake

HICKES ASSOCIATES INC

8253 Old Route 22 Alexandria, Pennsylvania 16611

CAGE: 1BUL1

MAVERICK CONSTRUCTION LLC

401 Greenwood Creek LN

Grasonville, Maryland 21638

CAGE: 8L9Q3

KUNJ CONSTRUCTION

CORPORATION

163 Paris AVE Suite B Northvale, New Jersey 07647

CAGE:65EU8

Hesston, Pennsylvania

Bid Bond 20% Bid Bond 20% Bid Bond 20%

Yes Yes Yes

Page 1
Page 2
2024-09-23T17:24:59-0400
WILLIAMS.CHERYL.K.1270669634

File details come from the government source that posted it. Updated .