C.04.01 Abstract of Bids W912DR22B0004 F-16 Training Center.pdf
PDF 196 KB Posted
- Solicitation number
- W912DR22B0004
About this file
This document is an abstract of bids received in response to solicitation number W912DR22B0004 for the construction of an F-16 flight simulator facility at Joint Base Andrews in Maryland. Eleven contractors submitted bids for the base project and optional line items. Goldbelt Operations Support Services provided the lowest bid of $14,138,470 for the base work and $14,561,022 when including all optional line items. The other bids ranged from $13,708,801 to $18,494,538 for the base work and $14,240,245 to $16,910,059 with options. The government estimate for just the base work was $16,021,087. The soliciting agency was the Department of the Army Corps of Engineers Baltimore District. The document provides bid amounts for each of the eleven contractors across twelve contract line items for the base project and options.
View the file
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
3. DATE OPENED PAGE
3/11/2022 1 of 4
4. ISSUING OFFICE Name and title of Certifying Official (Type) Gary Faykes - Contracting Officer I CERTIFY that I have opened, read, and recorded on this abstract all offers Signature Date Signed 3/11/2022 received in response to this solicitation
Contracting Officer: GARY A. FAYKES
5. PROJECT TITLE
8. GOVERNMENT ESTIMATE
(Check A, B or C and complete D, E, and F.)
A. HIRED LABOR
B. REASONABLE CONTRACT B. Bid Security (Type and Amount) B. Bid Security (Type and Amount) (Without Profit)
X C. REASONABLE CONTRACT C. Amendment Acknowledged (Including Profit)
7A. 7B. 7C. D. E. F. E. F. E. F.
ITEM DESCRIPTION OF OFFERED ITEM EST. UNIT UNIT ESTIMATED UNIT ESTIMATED UNIT ESTIMATED
No. QUANTITY PRICE AMOUNT IGE PRICE AMOUNT PRICE AMOUNT
All costs in connection with construction of the F-16 Mission Training Center at Joint Base Andrews, including utilities to points 5 feet outside the building lines, complete as shown on drawings and specified, exclusive of optional bid items below.
1 JOB LS 7,537,178.00$ LS 14,882,678.00$ LS 11,630,167.00$
All costs in connection with construction of all outside utilities beyond points 5 feet outside the building lines and all site work for the F-16 Mission Training Center at Joint Base Andrews, complete as shown on drawings and specified, exclusive of optional bid items below.
1 JOB LS 1,129,039.00$ LS 799,705.00$ LS 2,169,599.00$
0003 Payment to ASUS(Terrapin Utility Services, Inc.) for Utility work 1 JOB 338,704.00$ 338,704.00$ LS 338,704.00$ LS 338,704.00$
TOTAL ESTIMATED BASE BID AMOUNT 9,004,921.00$ 16,021,087.00$ 14,138,470.00$
All costs in connection with the construction of masonry walls with decorative gate in the Mechanical Yard, complete as shown on drawings and specified.
1 JOB LS 98,128.00$ LS 138,582.00$ LS 91,925.00$
All cost in connection with the construction of illuminated insignia sign, complete as shown on drawings and specified.
1 JOB LS 7,757.00$ LS 44,835.00$ LS 16,800.00$
All costs in connection with the construction of 2” stone at Mechanical Yard, complete as shown on drawings and specified.
1 JOB LS 22,431.00$ LS 11,518.00$ LS 5,015.00$
All cost in connection with the construction of the roof hatch and ladder, complete as shown on drawings and specified.
1 JOB LS 8,964.00$ LS 22,286.00$ LS 6,416.00$
All costs in connection with the construction of the vertical monolith building entry panel, complete as shown on drawings and specified.
1 JOB LS 67,225.00$ LS 193,304.00$ LS (26,833.00)$
All costs in connection with the construction of the additional brick veneer masonry, complete as shown on drawings and specified.
1 JOB LS 67,908.00$ LS 335,091.00$ LS 229,918.00$
All costs in connection with construction of HMA driveway pavements and associated curb cuts, complete as shown on drawings and specified.
1 JOB LS 53,870.00$ LS 114,676.00$ LS 46,825.00$
All costs in connection with construction of interior flooring finishes (identified as OLI #8), complete as shown on drawings and specified.
1 JOB LS 111,622.00$ LS 17,809.00$ LS 47,173.00$
All costs in connection with construction of building interior signage, complete as shown on drawings and specified.
1 JOB LS 5,430.00$ LS 10,871.00$ LS 5,312.00$
TOTAL ESTIMATED OPTIONAL AND BASE
BID AMOUNT 9,448,256.00$ 16,910,059.00$ 14,561,022.00$
1. Correct total should be $14,561,021.00
2. CLIN 0008 is a negative $26,833.00
NSN 7540-01-150-0981 501419-101 NOTE: If more than two offers are received, continue on OF 1419A. Prescribed by GSA-FAR(48 CER)53.236-1 OPTIONAL FORM 1419 (11-88)
C. Amendment Acknowledged
ARS Aleut Services, LLC 2609 N. River Road
Port Allen, LA 70767
No. 2
BALTIMORE, MD 21201
ABSTRACT OF OFFERS - CONSTRUCTION 2. DATE ISSUED1. SOLICITATION NUMBER
Yes
Bid Bond 20%
1/24/2022W912DR22B0004
F-16 Flight Simulator Facility Joint Base Andrews, Maryland
No. 1
BALTIMORE DISTRICT, CORPS OF ENIGNEERS
2 HOPKINS PLAZA
9. OFFERS
Bid Bond 20%
Goldbelt Operations Support Services, LLC 13900 Lincoln Park Drive, Suite 140
Herndon, VA 20171
Yes
6. NUMBER OF AMENDMENTS ISSUED: Four (4)
1. SOLICITATION NUMBER PAGE
ABSTRACT OF OFFERS W912DR22B0004 2 of 4 CONSTRUCTION INSTRUCTIONS - Attach this form to OF 1419, Abstract of Offers - Construction, when more than 2 offers are received on CONTINUATION SHEET a construction project. Each Continuation Sheet will accommodate 14 contract items to conform to the number of items which can be entered on the OF 1419. Use additional OF 1419's for contract items in excess of 14 and attach additional Continuation Sheets (OF 1419A) as needed.
2. PROJECT TITLE
B. BID SECURITY (Type and Amount) B. BID SECURITY (Type and Amount) B. BID SECURITY (Type and Amount) B. BID SECURITY (Type and Amount)
3. CONTRACT ITEMS C. AMENDMENT ACKNOWLEDGED C. AMENDMENT ACKNOWLEDGED C. AMENDMENT ACKNOWLEDGED C. AMENDMENT ACKNOWLEDGED 7A. B. C. D.
ITEM DESCRIPTION OF OFFERED ITEMS ESTIMATED UNIT E. UNIT F. ESTIMATED E. UNIT F. ESTIMATED E. UNIT F. ESTIMATED E. UNIT F. ESTIMATED
NO. QUANTITY PRICE AMOUNT PRICE AMOUNT PRICE AMOUNT PRICE AMOUNT
All costs in connection with construction of the F-16 Mission Training Center at Joint Base Andrews, including utilities to points 5 feet outside the building lines, complete as shown on drawings and specified, exclusive of optional bid items below.
1 JOB LS 14,087,670.80$ LS 11,637,891.33$ LS 13,089,000.00$ LS 12,667,803.00$
All costs in connection with construction of all outside utilities beyond points 5 feet outside the building lines and all site work for the F-16 Mission Training Center at Joint Base Andrews, complete as shown on drawings and specified, exclusive of optional bid items below.
1 JOB LS 1,892,980.51$ LS 1,732,205.58$ LS 1,650,000.00$ LS 381,675.00$
0003 Payment to ASUS(Terrapin Utility Services, Inc.) for Utility work 1 JOB 338,704.00$ 338,704.00$ LS 338,704.00$ LS 350,000.00$ LS 338,704.00$
TOTAL ESTIMATED BASE BID AMOUNT 16,319,355.31$ 13,708,800.91$ 15,089,000.00$ 13,388,182.00$
All costs in connection with the construction of masonry walls with decorative gate in the Mechanica Yard, complete as shown on drawings and specified.
1 JOB LS 88,300.80$ LS 89,164.73$ LS 120,000.00$ LS 100,320.00$
All cost in connection with the construction of illuminated insignia sign, complete as shown on drawings and specified.
1 JOB LS 11,645.76$ LS 14,571.18$ LS 45,000.00$ LS 49,500.00$
All costs in connection with the construction of 2” stone at Mechanical Yard, complete as shown on drawings and specified.
1 JOB LS 21,640.64$ LS 23,094.82$ LS 35,000.00$ LS 27,600.00$
All cost in connection with the construction of the roof hatch and ladder, complete as shown on drawings and specified.
1 JOB LS 14,000.00$ LS 8,272.87$ LS 25,000.00$ LS 21,600.00$
All costs in connection with the construction of the vertical monolith building entry panel, complete as shown on drawings and specified.
1 JOB LS 61,275.20$ LS 141,251.59$ LS 195,000.00$ LS 86,400.00$
All costs in connection with the construction of the additional brick veneer masonry, complete as shown on drawings and specified.
1 JOB LS 197,960.00$ LS 124,718.99$ LS 135,000.00$ LS 236,250.00$
All costs in connection with construction of HMA driveway pavements and associated curb cuts, complete as shown on drawings and specified.
1 JOB LS 60,742.08$ LS 76,628.13$ LS 365,000.00$ LS 117,600.00$
All costs in connection with construction of interior flooring finishes (identified as OLI #8), complete as shown on drawings and specified.
1 JOB LS 44,410.24$ LS 49,249.26$ LS 45,000.00$ LS 23,000.00$
All costs in connection with construction of building interior signage, complete as shown on drawings and specified.
1 JOB LS 4,032.00$ LS 4,492.95$ LS 35,000.00$ LS 14,400.00$
TOTAL ESTIMATED OPTIONAL AND BASE
BID AMOUNT 16,823,362.03$ 14,240,245.43$ 16,094,000.00$ 14,064,852.00$
1. Correct total should be $16,089,000.00
2. CLIN 0003 Did not use the pre-filled amount of $338,704.00
NSN 7540-01-150-0981 501419-101 NOTE: If more than two offers are received, continue on OF 1419A. Prescribed by GSA-FAR(48 CER)53.236-1 OPTIONAL FORM 1419 (11-88)
Yes Yes Yes
No.6No. 3 No. 4
Corenic Construction Group, LLC 1220 12th Street, SE Suite 280
Washington, DC 20003
Nadiad, Inc.
1026 Old Corlies Ave.
Neptune, NJ 07753
Doyon Management Services, LLC 3450 South 344th Way
Suite 100 Federal Way, WA 98001
ENCON Desbuild JV 2, LLC 8201 Corporate Drive, Ste 720
Hyattsville, MD 20785
Bid Bond 20%Bid Bond 20% Bid Bond 20%
No. 5
Yes
OFFERS (Continued)
Bid Bond 20%
Joint Base Andrews, Maryland F-16 Flight Simulator Facility
ABSTRACT OF OFFERS W912DR22B0004 3 of 4 CONSTRUCTION INSTRUCTIONS - Attach this form to OF 1419, Abstract of Offers - Construction, when more than 2 offers are received on CONTINUATION SHEET a construction project. Each Continuation Sheet will accommodate 14 contract items to conform to the number of items which can be entered on the OF 1419. Use additional OF 1419's for contract items in excess of 14 and attach additional Continuation Sheets (OF 1419A) as needed.
2. PROJECT TITLE
B. BID SECURITY (Type and Amount) B. BID SECURITY (Type and Amount) B. BID SECURITY (Type and Amount) B. BID SECURITY (Type and Amount)
3. CONTRACT ITEMS C. AMENDMENT ACKNOWLEDGED C. AMENDMENT ACKNOWLEDGED C. AMENDMENT ACKNOWLEDGED C. AMENDMENT ACKNOWLEDGED 7A. B. C. D.
ITEM DESCRIPTION OF OFFERED ITEMS ESTIMATED UNIT E. UNIT F. ESTIMATED E. UNIT F. ESTIMATED E. UNIT F. ESTIMATED E. UNIT F. ESTIMATED
NO. QUANTITY PRICE AMOUNT PRICE AMOUNT PRICE AMOUNT PRICE AMOUNT
All costs in connection with construction of the F-16 Mission Training Center at Joint Base Andrews, including utilities to points 5 feet outside the building lines, complete as shown on drawings and specified, exclusive of optional bid items below.
1 JOB LS 15,538,087.35$ LS 11,924,062.00$ LS 12,282,717.09$ LS 13,071,068.00$
All costs in connection with construction of all outside utilities beyond points 5 feet outside the building lines and all site work for the F-16 Mission Training Center at Joint Base Andrews, complete as shown on drawings and specified, exclusive of optional bid items below.
1 JOB LS 2,230,219.70$ LS 1,502,907.00$ LS 1,128,899.68$ LS 1,604,632.00$
0003 Payment to ASUS(Terrapin Utility Services, Inc.) for Utility work 1 JOB 338,704.00$ 338,704.00$ LS 338,704.00$ LS 385,829.22$ LS 338,704.00$
TOTAL ESTIMATED BASE BID AMOUNT 13,765,673.00$ 13,797,446.00$ 15,014,404.00$
All costs in connection with the construction of masonry walls with decorative gate in the Mechanica Yard, complete as shown on drawings and specified.
1 JOB LS 159,841.55$ LS 295,863.00$ LS 58,264.00$ LS 75,392.14$
All cost in connection with the construction of illuminated insignia sign, complete as shown on drawings and specified.
1 JOB LS 25,805.46$ LS 87,751.00$ LS 13,815.47$ LS 22,190.50$
All costs in connection with the construction of 2” stone at Mechanical Yard, complete as shown on drawings and specified.
1 JOB LS 24,316.30$ LS 91,123.00$ LS 12,910.50$ LS 9,467.82$
All cost in connection with the construction of the roof hatch and ladder, complete as shown on drawings and specified.
1 JOB LS 9,371.79$ LS 90,523.00$ LS 5,471.19$ LS 26,735.13$
All costs in connection with the construction of the vertical monolith building entry panel, complete as shown on drawings and specified.
1 JOB LS 60,420.03$ LS 434,387.00$ LS 98,082.29$ LS 77,457.30$
All costs in connection with the construction of the additional brick veneer masonry, complete as shown on drawings and specified.
1 JOB LS 13,269.04$ LS 169,423.00$ LS 200,486.98$ LS 81,906.87$
All costs in connection with construction of HMA driveway pavements and associated curb cuts, complete as shown on drawings and specified.
1 JOB LS 6,908.31$ LS 123,274.00$ LS 708.72$ LS 69,559.94$
All costs in connection with construction of interior flooring finishes (identified as OLI #8), complete as shown on drawings and specified.
1 JOB LS 74,377.52$ LS 100,741.00$ LS 12,544.93$ LS 25,614.24$
All costs in connection with construction of building interior signage, complete as shown on drawings and specified.
1 JOB LS 13,217.43$ LS 80,387.00$ LS 6,184.92$ LS 5,118.36$
TOTAL ESTIMATED OPTIONAL AND BASE
BID AMOUNT 18,494,538.48$ 15,239,145.00$ 14,199,915.00$ 15,407,846.30$
1. Base Bid should be $18,107,011.05
1. CLIN 0003 Did not use the pre-filled amount of $338,704.00
2. Base bid should be $13,797,445.99
3. Total amount should be $14,199,914.99
NSN 7540-01-150-0981 501419-101 NOTE: If more than two offers are received, continue on OF 1419A. Prescribed by GSA-FAR(48 CER)53.236-1 OPTIONAL FORM 1419 (11-88)
Yes Yes Yes
No.10No. 7 No. 8
TDX Quality, LLC 3601 C Street Suite 1000-21
Anchoirage, AK 99503
SDC Contracting, Inc.
2211 S. Military Hwy
Chesapeake, VA 23320
CF2 Construction, LLC (CF2) 10838 E. Marshall St., #220
Tulsa, OK 74116
SES Civil and Environmental, LLC 1006 Floyd Culler Ct., Ste 4
Oak Ridge, TN 37830
Bid Bond 20%Bid Bond 20% Bid Bond 20%
No. 9
Yes
OFFERS (Continued)
Bid Bond 20%
Joint Base Andrews, Maryland F-16 Flight Simulator Facility
ABSTRACT OF OFFERS W912DR22B0004 4 of 4 CONSTRUCTION INSTRUCTIONS - Attach this form to OF 1419, Abstract of Offers - Construction, when more than 2 offers are received on CONTINUATION SHEET a construction project. Each Continuation Sheet will accommodate 14 contract items to conform to the number of items which can be entered on the OF 1419. Use additional OF 1419's for contract items in excess of 14 and attach additional Continuation Sheets (OF 1419A) as needed.
2. PROJECT TITLE
B. BID SECURITY (Type and Amount) B. BID SECURITY (Type and Amount) B. BID SECURITY (Type and Amount) B. BID SECURITY (Type and Amount)
3. CONTRACT ITEMS C. AMENDMENT ACKNOWLEDGED C. AMENDMENT ACKNOWLEDGED C. AMENDMENT ACKNOWLEDGED C. AMENDMENT ACKNOWLEDGED 7A. B. C. D.
ITEM DESCRIPTION OF OFFERED ITEMS ESTIMATED UNIT E. UNIT F. ESTIMATED E. UNIT F. ESTIMATED E. UNIT F. ESTIMATED E. UNIT F. ESTIMATED
NO. QUANTITY PRICE AMOUNT PRICE AMOUNT PRICE AMOUNT PRICE AMOUNT
All costs in connection with construction of the F- 16 Mission Training Center at Joint Base Andrews, including utilities to points 5 feet outside the building lines, complete as shown on drawings and specified, exclusive of optional bid items below.
1 JOB LS 13,944,310.00$
All costs in connection with construction of all outside utilities beyond points 5 feet outside the building lines and all site work for the F-16 Mission Training Center at Joint Base Andrews, complete as shown on drawings and specified, exclusive of optional bid items below.
1 JOB LS 633,070.00$
0003 Payment to ASUS(Terrapin Utility Services, Inc.)
for Utility work 1 JOB 338,704.00$ 338,704.00$
TOTAL ESTIMATED BASE BID AMOUNT 14,916,084.00$
All costs in connection with the construction of masonry walls with decorative gate in the Mechanical Yard, complete as shown on drawings and specified.
1 JOB LS 94,250.00$
All cost in connection with the construction of illuminated insignia sign, complete as shown on drawings and specified.
1 JOB LS 12,210.00$
All costs in connection with the construction of 2” stone at Mechanical Yard, complete as shown on drawings and specified.
1 JOB LS 24,840.00$
All cost in connection with the construction of the roof hatch and ladder, complete as shown on drawings and specified.
1 JOB LS 10,420.00$
All costs in connection with the construction of the vertical monolith building entry panel, complete as shown on drawings and specified.
1 JOB LS 48,330.00$
All costs in connection with the construction of the additional brick veneer masonry, complete as shown on drawings and specified.
1 JOB LS 216,000.00$
All costs in connection with construction of HMA driveway pavements and associated curb cuts, complete as shown on drawings and specified.
1 JOB LS 7,060.00$
All costs in connection with construction of interior flooring finishes (identified as OLI #8), complete as shown on drawings and specified.
1 JOB LS 25,910.00$
All costs in connection with construction of building interior signage, complete as shown on drawings and specified.
1 JOB LS 19,860.00$
TOTAL ESTIMATED OPTIONAL AND BASE
BID AMOUNT 15,374,964.00$
NSN 7540-01-150-0981 501419-101 NOTE: If more than two offers are received, continue on OF 1419A. Prescribed by GSA-FAR(48 CER)53.236-OPTIONAL FORM 1419 (11-88)
OFFERS (Continued)
Bid Bond 20%
Joint Base Andrews, Maryland F-16 Flight Simulator Facility
Yes
No. 11
Copper River Infrastructure Services, LLC 1577 C Street, Suite 300 Anchorage, AK 99501
| 2022-03-11T16:02:47-0500 | |
| FAYKES.GARY.A.1086691600 |
File details come from the government source that posted it. Updated .