C.04.01 Abstract of Bids.pdf
PDF 532 KB Posted
- Solicitation number
- W91237-25-B-0002
About this file
This document is an Abstract of Bids for a concrete rehabilitation project for the Fishtrap Spillway Machinery Platform. The solicitation (W91237-25-B-0002) was issued by the U.S. Army Corps of Engineers Huntington District, with bid opening on 03/11/2025. Nine companies submitted bids, with prices ranging from $798,222.68 (Reagent World, Inc.) to $1,496,350.19 (MiDeCon, Inc.), and a government estimate of $886,683.27. All bidders provided a 60-day acceptance period, and most are small businesses. The lowest bid was submitted by Reagent World, Inc. at $798,222.68, and the bids were recorded by Contracting Officer Robert P. Rounay on 03/12/2025.
View the file
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Use this space to indicate categories, limited dissemination controls, special instructions, points of contact, etc., if needed.
All individuals handling this information are required to protect it from unauthorized disclosure.
Handling, storage, reproduction, and disposition of the attached document(s) must be in accordance with 32 CFR Part 2002 and applicable agency policy.
Access to and dissemination of Controlled Unclassified Information shall be allowed as necessary and permissible to any individual(s), organization(s), or grouping( s) of users, provided such access or dissemination is consistent with or in furtherance of a Lawful Government Purpose and in a manner consistent with applicable law, regulations, and Government-wide policies.
Component:
Controlled by:
CUI Category(ies):
Distribution Statement:
POC:
Directorate of Contracting
Abstract of Offers Solicitation Number W91237-25-B-0002
Opening Date 03/11/2025
Page Of Pages 1 1
Issuing Office
CELRH-CT
Supplies Or Services (General Description) Fishtrap Spillway Machinery Platform Concrete Rehabilitation
Num-ber
Name Of Offeror
Accep-tance Time* (Days)
Busi-ness Size Item Number Delivery
Time**
Free On Board (F.O.B.)
Point
Remarks La-rge
S-m all
Quantity Unit
1 Reagent World, Inc. 60 X
X $798,222.68 2 Boca Enterprises, Inc. 60 X X $889,605.00
3 GFM Partners, Inc. 60 X X $975,317.00
4 Gale Construction of Illinois
60 X X $1,450,543.82
5 Brannon Contracting and Maintenance Services, LLC
60 X X $1,049,678.00
6 Construction Solutions Group
Not Provided
X Not Provided
7 MiDeCon, Inc. 60 X X $1,496,350.19 8 Kovilic Construction
Company, Inc.
60 X X $905,300.00
9 American Pavement Solutions
60 X X $1,116,000.00
IGE $886,683.27
* Indicate by an X a 60 - day acceptance
** Indicate by an X if offer conforms to delivery time specified in solicitation
I certify that I have opened, read and recorded on this Abstract (and Continuation Sheets, if any) all offers received in response to the solicitation.
Name and Title Robert P. Rounay, Contracting Officer Signature Date
03/12/2025 Authorized For Local Reproduction Previous Edition Is Usable
STANDARD FORM 1409 (REV. 10/2023)
Prescribed by GSA-FAR (48 CFR) 53.214(f)
| 1 CUI Coversheet |
| C.03.07 No Bid Letter- Massillon.pdf |
| @ CUI Coversheet |
C.04.01 Abstract of Bids.pdf
| Title of Procurement, Number and Date: | |
| Office Name: CELRH-CT | |
| CUI Category: [General Procurement and Acquisition] | |
| POC: Brittani Stowers | |
| CUI Marking: [CUI//SP-PROCURE//FED ONLY] | |
| Distribution: [FED ONLY] | |
| 2025-03-12T11:32:41-0400 | |
| ROUNAY.ROBERT.P.1277676377 |
File details come from the government source that posted it. Updated .