_C_Award_Criteria_Figure.pdf

PDF 39 KB Posted

Attached to
Job Order Contract for General Construction (JOC 2601 through JOC 2605)
Solicitation number
2026-RFP-00066
Issued by
San Mateo County, California

About this file

This is an Award Criteria Figure Formula document for the County of San Mateo Department of Public Works' Job Order Contract (JOC) procurement for General Construction services. The County is seeking up to five general construction contractors to provide comprehensive labor, materials, tools, equipment, and resources for construction projects throughout the county's jurisdiction. A mandatory pre-bid conference is scheduled for November 5, 2025, at 10:00 am, with proposal submissions due on December 10, 2025, by 2:00 pm. The contract term is one year with a maximum aggregate fiscal obligation of $6,000,000 per agreement, and separate Job Order Notices to Proceed will be issued as needed. The apparent lowest, responsive, and responsible bidder will be selected for each contract but excluded from consideration for successive contracts.

The Award Criteria Figure is calculated using a formula that multiplies six adjustment factors by specified percentages and is used as the primary basis for evaluating bids. Contractors must bid adjustment factors for General Facilities (40% normal working hours and 10% other hours), Detention Facilities (15% normal working hours and 10% other hours), and OSHPD Facilities (15% normal working hours and 10% other hours), with all calculations carried to the fourth decimal place. Bidders must possess a California 'B' license, maintain a local office within 55 miles of Redwood City, and demonstrate a minimum of five years' continuous experience on municipal projects. A $25,000 bid bond is required, and performance and payment bonds may increase to 100% of contract value if job orders exceed $1,000,000. Contractors must comply with equal employment opportunity provisions, the County's Equal Benefits Ordinance, and construction and demolition debris diversion requirements of at least 50%. A 1% JOC System License Fee is payable to The Gordian Group for use of their proprietary Construction Task Catalog system with preset unit prices.

View the file

Other files

File Type Posted
Job_Order_Contract_for_General_Construction_(JOC_2601_through_JOC_2605)_(Addendum_#2_Revision).pdf PDF
_F_EEO_Contractor_Report_Form_General_Construction.pdf PDF
Job_Order_Contract_for_General_Construction_(JOC_2601_through_JOC_2605)_(Addendum_#1_Revision).pdf PDF
_R_Technical_Specifications_-_General_Construction_-_Distribution.pdf PDF
Q_Construction_Task_Catalog®_-_General_Construction_-_Distribution.pdf PDF
_P_JOC_System_License_and_Fee_Agreement_Sample.pdf PDF
_O_Payment_and_Performance_Bonds_Sample.pdf PDF
_N_Job_Order_Contact_Agreement_SAMPLE.pdf PDF
_M_Contract_Documents_General_Conditions.pdf PDF
_L_Recycling_and_Diversion_of_Debris_from_Construction_and_Demolition_Ordinance_No._4099_Chapter_4.105.pdf PDF
_K_Contractor_Employee_Jury_Service_Ordinance_No.4324_Chapter_2.85.pdf PDF
_J_Contractor's_Declaration_Form_General_Construction.pdf PDF
_I_Equal_Benefits_Compliance_Ordinance.pdf PDF
_H_Anti-Trust_Laws_Questionnaire_General_Construction.pdf PDF
_G_EEO_Certification_of_Compliance.pdf PDF
_F_EEO_Contractor_Report_Form_General_Construction.pdf PDF
_E_EEO_Questionnaire_for_General_Construction.pdf PDF
_D_EEO_Program_Supplemental_General_Conditions.pdf PDF
_C_Award_Criteria_Figure.pdf PDF
_B_Bid_Schedule_for_General_Construction.pdf PDF
_A_Bid_Bond_JOC_2601-2605.pdf PDF
Standard_Contract_Template_-_Under_$200K_DRAFT.docx DOCX document
Standard_Contract_Template_-_Over_$200K_DRAFT.docx DOCX document
Show all 23

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Award Criteria Figure Formula

Award Criteria Figure Formula percentages are for Bid purposes only. The County is not obligated to issue Job Orders in the stated percentages.

Carry out all Lines to the 4th decimal place.

Line 1. General Facilities

Normal Working Hours Adjustment Factor

1.

Line 2. Multiply Line 1 by 40% = (0.40 x Line 1) 2.

Line 3. General Facilities

Other than Normal Working Hours Adjustment Factor

3.

Line 4. Multiply Line 3 by 10% = (0.10 x Line 3) 4.

Line 5. Detention Facilities

5.

Line 6. Multiply Line 5 by 15% = (0.15 x Line 5) 6.

Line 7. Detention Facilities

7.

Line 8. Multiply Line 7 by 10% = (0.10 x Line 7) 8.

Line 9. OSHPD Facilities

9.

Line 10. Multiply Line 9 by 15% = (0.15 x Line 9) 10.

Line 11 OSHPD Facilities

11.

Line 12 Multiply Line 11 by 10% = (0.10 x Line 11) 12.

Line 13. Add Lines 2, 4, 6, 8, 10 and 12

(This is the Award Criteria Figure)

ACF =