Houston Water General Maintenance, Repair and Preventive Services
Solicitation number
BVB-2026-0001
Issued by
Harris County, Texas

About this file

This is a Best Value Bid (BVB) solicitation document issued by the City of Houston, Texas for Houston Water General Maintenance, Repair, and Preventive Maintenance Services. The City seeks a qualified contractor to furnish all supervision, labor, tools, supplies, equipment, parts, and materials required for repair, inspection, replacement, and preventive maintenance of pumps, blowers, motors, valves, mixers, and various other equipment at multiple Houston Water facilities throughout the city, including wastewater treatment plants, sludge plants, lift stations, wet weather facilities, surface water treatment plants, groundwater plants, and generators. The solicitation (BVB-2026-0001) was issued on November 20, 2026, with a pre-bid conference scheduled for December 2, 2026 at 10:00 AM via Microsoft Teams. The deadline for pre-bid questions is December 9, 2026 at 2:00 PM Central Time, and bids are due January 7, 2027 at 10:00 AM Central Time. The City reserves the right to conduct site inspections of bidders' facilities to evaluate equipment, staff capabilities, and storage. Award is anticipated in January 2027, with an estimated council agenda date in February 2027 and an estimated award start date in February 2027. The contract is a three-year award with two one-year options to extend, providing 24-hour, 365-day availability for maintenance and emergency services.

The solicitation establishes a 1 percent Women Business Enterprise (WBE) and 5 percent Small Business Enterprise (SBE) participation goal. The City's standard payment term is net 30 days after receipt of invoice or goods/services, whichever is later, in accordance with the Texas Prompt Payment Act; however, the City may pay in less than 30 days at its option in return for an early payment discount. Bidders must submit financial stability documentation, including two years of audited or unaudited accrual-basis financial statements depending on entity type, along with current quarter statements and disclosure of liabilities affecting financial capacity. Evaluation criteria include responsive and responsible determinations (pass/fail), financial stability (pass/fail), W/SBE participation (pass/fail), technical competence requirements (40 points), past performance including references (30 points), bid price (30 points), and local preference points for Hire Houston First designated City Businesses or Local Businesses (up to 5 points), for a maximum of 105 points. Bidders must demonstrate at least three prior contracts as prime vendor for similar services, provide at least five senior technicians with minimum five years' experience, maintain current environmental permits, and comply with numerous technical standards and codes including EASA, ASTM, ANSI, IEEE, NEC, and OSHA requirements. The contractor is responsible for all aspects of maintenance including corrective, preventive, and predictive maintenance programs, with warranty obligations of minimum 12 months from acceptance.

View the file

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

PART 1 – BEST VALUE BID (BVB)

SOLICITATION TITLE: Houston Water General Maintenance, Repair, and Preventive Maintenance Services

SOLICITATION NO.: BVB-2026-0001

Date Issued: November 20, 2026

Pre-Bid Conference: December 2, 2026 @ 10:00 am (CT) Microsoft Teams Meeting Join on your computer or mobile app via:

https://www.microsoft.com/en-us/microsoft-teams/join-a-meeting Meeting ID: 296 850 520 516 769 Passcode: fg9F6aS6 Or call in (audio only) Conference Number: +1 936-755-1521 Conference ID: 902 407 454# (Please mute your phone for the duration of the call)

Pre-Bid Questions Deadline:

December 9, 2026@ 2:00 pm (CT)

Solicitation Due Date: January 7, 2027@ 10:00 am (CT)

Solicitation Contact Person:

Joyce Baker Joyce.baker@houstontx.gov 832-395-3688

Project Summary: The Contractor shall furnish all supervision, labor, tools, supplies, equipment, parts, and materials required for repair, inspection, replacement, and preventive maintenance of pumps, blowers, motors, valves, mixers, and various other equipment at multiple Houston Water facilities throughout the City of Houston.

NIGP Code: 910-52, 913-91, 936-91, 968-92, 968-95

W/SBE Goal: 1% WBE, and 5% SBE

Important Notice About the City’s Early Payment Discount Program: The City’s standard payment term is to pay 30 days after the receipt of invoice or receipt of goods or services, whichever is later, according to the requirements of the Texas Prompt Payment Act (Tx. Gov’t Code, Ch. 2251). However, the City may pay in less than 30 days, at its option, in return for an early payment discount from the vendor.

Candice M. Gambrell, JD, Assistant Director

Date

Docusign Envelope ID: 4D0B1D3B-0938-8925-83EE-16192C68187D

11/13/2026 https://www.microsoft.com/en-us/microsoft-teams/join-a-meeting https://www.microsoft.com/en-us/microsoft-teams/join-a-meeting

PART 2 – GENERAL INFORMATION

1.0 General Information

The City of Houston (“City”) is currently seeking Bids from qualified Vendors (hereinafter, “Bidder,” “Contractor,” or “Vendor”) to furnish all supervision, labor, tools, supplies, equipment, parts, and materials required for repair, inspection, replacement, and preventive maintenance of equipment at various Houston Water facilities within the City of Houston.

The City intends to award one or more contracts with the qualified Bidder(s) to assist the City with the aforementioned project.

THIS IS A THREE (3) YEAR AWARD WITH TWO (2) ONE (1) YEAR OPTIONS TO EXTEND

2.0 City of Houston Background

The City is the fourth largest City in the United States and is composed of 23 departments with multiple physical locations throughout the geographical boundaries of the City. The City has approximately 23,000 employees, with approximately 500 employees involved in the procurement and/or contracting process.

Contracts/Awards where the City must pay in excess of $100,000 are routed to City Council for approval.

The annual volume of contracts and purchase orders issued by the City in the last five years has ranged from 19,000 to 23,000.

3.0 Texas Public Information Act

All information submitted to the City is subject to the provisions of the Texas Public Information Act (TPIA), located in Chapter 552 of the Texas Government Code. Bidders may mark any information submitted, including their financial information, as confidential, trade secret, proprietary, or any other designation of choice. The City will notify any Bidder should their information be requested under the TPIA, and Bidder will have an opportunity to assert their own arguments to the Texas Attorney General as to why their information should be excepted from public disclosure.

4.0 Solicitation Schedule

Listed below are the important dates for this BVB.

EVENT DATE

BVB Issuance November 20, 2026 Pre-Bid Conference December 2, 2026 Deadline for Questions December 9, 2026 Solicitation Due Date January 7, 2027 Notification of Intent to Award (estimated) January 2027 Council Agenda Date (estimated) February 2027 Award Start Date (estimated) February 2027

PART 3 – INSTRUCTIONS TO BIDDERS

1.0 PRE-BID CONFERENCE

A Pre-Bid Conference will be held on the date, time, and location indicated on the first page of the BVB document. Interested Bidder(s) are encouraged to attend. It will be assumed that potential Bidder(s) attending this meeting have reviewed the BVB in detail and are prepared to bring up any substantive questions not already addressed by the City.

2.0 ADDITIONAL INFORMATION AND SPECIFICATION CHANGES

Requests for additional information and questions shall be addressed to the Finance Department, Strategic Procurement Division, Joyce Baker, preferably by e-mail to joyce.baker@houstontx.gov or by telephone at

(832) 395-3688 no later than the date and time shown on page one of this document. The City shall provide written responses to all questions received by Bidders prior to the solicitation due date. Questions received from all Bidder(s) shall be answered by the City and made available to Bidder(s) who are listed as having obtained the BVB. Bidder(s) shall be notified in writing of any changes in the specifications contained within this BVB.

3.0 LETTER(S) OF CLARIFICATION

3.1 All Letters of Clarification and interpretations to this Solicitation shall be in writing. Any Letter of Clarification(s) or interpretation that is not in writing shall not legally bind the City. Only information supplied by the City in writing or in this BVB shall be used in preparing bid responses.

3.2 The City does not assume responsibility for the receipt of any Letters of Clarification sent to Bidder(s).

3.3 Bidders may submit no more than 25 questions relating to this solicitation. Should more than 25 questions be received from a single Bidder, the City will only respond to the first 25 questions received.

4.0 EXAMINATION OF DOCUMENTS AND REQUIREMENTS

4.1 Each Bidder shall carefully examine all BVB documents and familiarize themselves with all requirements prior to submitting a Bid to ensure that the Bid meets the intent of this BVB. Bidders are advised to carefully review all the requirements and submit all documents and information as indicated in this BVB.

4.2 Before submitting a Bid, each Bidder shall be responsible for making all investigations and examinations that are necessary to ascertain conditions and affecting the requirements of this BVB. Failure to make such investigations and examinations shall not relieve the Bidder from obligation to comply, in every detail, with all provisions and requirements of the BVB.

4.3 The City shall bear no responsibility for submitting a Bid on behalf of any Bidder. Bidder(s) may submit their Bid any time prior to the solicitation due date. The Bidder remains responsible for ensuring that its Bid is received by the solicitation due date. The City assumes no responsibility for any Bid not received, regardless of whether the delay is caused by some other act or circumstance.

4.4 This BVB does not commit the City to award a Contract, issue a Purchase Order, or to pay any costs incurred in the preparation of a bid in response to this request.

4.5 The Bid must be signed by someone legally authorized to bind the Bidder. Bidders shall hold the pricing in the Bid for a minimum of 180 days.

5.0 CANCELLATION

The City has sole discretion and reserves the right to cancel this BVB or to reject any or all Bids received prior to award.

6.0 POST-BID DISCUSSIONS WITH BIDDER(S)

The City reserves the right to conduct post-bid discussions with any Bidder(s).

7.0 BIDDING AND AWARD

It is the intent of the City to award, on the basis of overall best Bid meeting specifications for the entire award; however, the right is reserved to accept or reject in whole or in part any or all Bids received and to make an award on the basis of individual item, combination of items or overall best Bid, as it is deemed in the best interest of the City.

The City reserves the right, after the Bid due date, to increase or decrease quantities or to award by line item.

8.0 BID DISQUALIFICATION

The City may disqualify a Bid if the Bidder: 1) improperly or illegibly completes the information required by this solicitation; 2) fails to sign the Official Signature Page or improperly signs the Official Signature Page;

3) qualifies its Bid; or 4) improperly submits its Bid.

When requested, the Bidder shall present satisfactory evidence that the Bidder has regularly engaged in providing the commodities or performing the services as proposed, and has the capital, labor, equipment, and material to deliver the required commodities or perform the work.

9.0 SPECIAL BIDDERS NOTE

The specifications in this solicitation are to be bid exactly as published or amended by any letter(s) of clarification that may be issued pertaining thereto. The City reserves the right to request clarity of any bid after they have been received.

Provisions of this solicitation shall not be altered. Any alteration of figures or terms may invalidate the Bid on the item on which the alteration is made. Submission or attachment of company “Quotation Forms” containing alternative terms and/or conditions is not acceptable and may result in your Bid being determined as non-responsive.

If subcontractor involvement is required in the use of a license, patent, or proprietary process, the Prime contractor is responsible for obtaining written authorization from the subcontractor to use the process or provide another process comparable to that which is required, and which is acceptable to the City, all at no additional cost or liability to the City.

10.0 COMPETITION INTENDED

It is the City’s intent that this BVB permits competition. It shall be the Bidder’s responsibility to advise the Solicitation Contact Person in writing if any language, requirement, specifications, etc., or any combination thereof, inadvertently restricts or limits the requirements stated in the BVB to a single source. Such notification must be received by the Solicitation Contact Person no later than seven (7) days prior to the solicitation due date.

11.0 REFERENCES

In order to receive bid award consideration, the Bidder must be able to demonstrate that it is currently providing or has had at least three (3) contracts, as a prime Vendor, for delivering goods or services that are similar in size and scope to this solicitation. The reference(s) should be included with the Bid. If references are not included with the Bid, the Bidder shall be required to provide such references to the City within five (5) working days from receipt of a written request from the City to do so. Bidder’s capability and experience shall be a factor in determining the Vendor’s responsibility. Bidder must have references documenting that it has delivered goods or services that are similar in size and scope to this solicitation.

12.0 WITHDRAWAL OF BID

A bidder may withdraw its Bid before the solicitation due date, without prejudice, by submitting a written request through the City’s electronic bidding system.

13.0 REQUIRED FORMS TO BE INCLUDED WITH BID

This section details the required forms that must be completed and submitted with the Bid.

1. Official Signature Page, List of References, and List of Proposed Subcontractors (Exhibit I)

2. Signed W/SBE Forms (Exhibit II): Attachment “A” W/SBE Participation Plan/Good Faith Efforts, Attachment “B” Letter of Intent; Attachment “C” Certified W/SBE Subcontracting Agreement Terms

3. Declaration of Hire Houston First Designation (Exhibit II – Attachment “D”)

4. City of Houston Ownership Information Form (Exhibit III)

5. Anti-Collusion Statement (Exhibit IV)

6. Conflict of Interest Questionnaire (Exhibit V)

7. Financial Stability Documents as listed in Part 5 - Evaluation and Selection Process, 4.0 Evaluation Criteria, 4.3 Financial Stability

8. Response to Evaluation Criteria Listed in Part 5 - Evaluation and Selection Process, 4.0 Evaluation Criteria, 4.5 Technical Competence Requirements

14.0 REQUIRED FORMS TO BE SUBMITTED BY RECOMMENDED VENDOR ONLY

This section lists other documents and forms that should be viewed/downloaded from the City’s website but are not required to be submitted with the Bid. The City will request these forms, as applicable, to be completed and submitted to the City by the recommended/successful Bidder.

1. Insurance Requirements and Insurance Certificate

2. Requested information outlined in the scope of work and other additional relevant/supporting information.

3. Texas Ethics Commission, Certificate of Interested Parties (Form 1295). Create a certificate at https://www.ethics.state.tx.us/filinginfo/1295/

4. City Contractors’ Pay or Play Acknowledgement Form (POP-1) pop1.pdf (houstontx.gov), Certification of Compliance with Pay or Play Program (POP-2) pop2.pdf (houstontx.gov), and List of Participating Subcontractors (POP-3) pop3.pdf (houstontx.gov).

Docusign Envelope ID: 4D0B1D3B-0938-8925-83EE-16192C68187D https://www.ethics.state.tx.us/filinginfo/1295/ http://www.houstontx.gov/obo/payorplay/pop1.pdf http://www.houstontx.gov/obo/payorplay/pop2.pdf http://www.houstontx.gov/obo/payorplay/pop3.pdf

PART 4 – SCOPE OF WORK/ TECHNICAL SPECIFICATIONS

1.0 GENERAL

1.1 The Contractor shall furnish all supervision, labor, materials, tools, supplies, equipment (except existing City-owned, permanently installed equipment), transportation, insurance, subcontracts, management, engineering, reports, incidentals, quality control, and all other resources necessary to perform the maintenance, inspection, repair, and replacement services required under the Contract. The Contractor shall also perform all operations necessary to maintain, inspect, repair, and, when required under the Contract, replace equipment in accordance with all applicable laws, regulations, ordinances, permits, industry standards, and equipment manufacturers' recommendations. These services shall be performed at various Houston Water facilities throughout the City of Houston. The City will monitor the Contractor's performance of all required maintenance, inspection, repair, and replacement activities to verify compliance with the requirements of the Contract.

1.2 The meanings of specific terms and equipment types are defined in the Definitions (Exhibit A).

1.3 The Houston Water facilities include but are not limited to a range of sizes of wastewater treatment plants (WWTPs), sludge plants, lift stations, wet weather facilities, surface water treatment plants, groundwater plants, groundwater well sites, and generators.

1.4 The Contractor shall be available to provide the services hereunder as well as carry out inspections, machine shop services, replacement parts, and auxiliary equipment 24 hours per day, 365 days per year on an as-needed basis.

1.5 This contract covers the general requirements for the inspection, maintenance, and repair of all the equipment, instruments, and components located at Houston Water facilities. This includes, but is not limited to, pumps, blowers, motors, valves, mixers, clarifiers, filters, belt press, bar screens, centrifuges, and general mechanical work. In addition, the specification defines minimum acceptable requirements for the maintenance/repair or replacement of the equipment.

1.6 All test equipment required for test results shall be calibrated at a minimum of once a year and adhere to standards traceable to the National Institute of Standards and Technology (NIST) or equivalent standards laboratories (see EASA AR100-2010 and AR100-2015). The Contractor shall establish, document, and maintain calibration records for testing and measuring equipment used to demonstrate the product's conformance with specified requirements.

1.7 The Contractor shall furnish to the City, when requested by Houston Public Works’ Director or designee, copies of current environmental permits and demonstrate compliance with current environmental regulations.

1.8 The Contractor’s facility shall be subject to inspection, with or without advance notice, to verify that the equipment and personnel deemed necessary to perform the type of repair services required under this contract are in place at the time of inspection.

1.9 Subcontractors to the Prime Contractor are subject to the same standards and terms as the Prime Contractor.

1.10 The equipment at Houston Water facilities is purchased and installed under the City’s Master Specifications (latest edition) requiring compliance with the applicable sections of the following standards and codes:

• American National Standards Institute (ANSI)

• Anti-Friction Bearing Manufacturing Association (AFBMA)

• Institute of Electrical and Electronics Engineers (IEEE)

• National Electrical Code (NEC)

• National Electrical Manufacturers Association (NEMA)

• American Society of Mechanical Engineers (ASME)

• International Building Code (IBC)

• Safety and Health Regulations for Construction

• Occupational Safety and Health Standards (OSHA)

• National Fire Protection Association (NFPA)

• Life Safety Code (Edition 2015)

• American Gas Association (AGA)

• Underwriters Laboratories, Inc. (UL)

• Factory Mutual Engineering Corporation or other recognized National Laboratories;

Environmental Protection Agency (EPA)

• Sheet Metal and Air Conditioning Contractors’ National Association, Inc. (SMACNA)

• Steel Structures Painting Council (SSPC)

• American Society for Non-Destructive Testing

• City of Houston Electrical Code

• American Society for Testing and Materials (ASTM)

• American Gear Manufacturers Association (AGMA)

• International Organization for Standardization (ISO), ISO 9001–Quality Management Systems–

Requirements

1.10.1 Unless otherwise specified, fabrications, processes, parameters, and test methods for any electrical parts and/or equipment shall conform to the latest revision of the following ELECTRICAL APPARATUS SERVICE ASSOCIATION (EASA) documents and ASTM guide:

• EASA AR100-2010 - RECOMMENDED PRACTICE FOR REPAIR OF

ROTATING APPARATUS (hereafter abbreviated as EASA AR100-2010);

• EASA Technical Note No. 16 – GUIDELINES FOR MAINTAINING MOTOR EFFICIENCY

DURING REBUILDING, September 1999 (hereafter abbreviated as EASA Tech Note No. 16);

• EASA Technical Note No. 17 – STATOR CORE TESTING, updated March 1997 (hereafter abbreviated as EASA Tech Note No. 17); and

• EASA Bearing Fit Tolerance Chart, updated 1997

• ASTM E1934-99a (2005e1) – Standard Guide for Examining Electrical and Mechanical

Equipment and Infrared Thermography (herein abbreviated as ASTM E 1934).

1.10.2 Wherever this document refers to the following codes and standards, the specific sections of the code/standard shall apply to the repairs being carried out by the Contractor and/or Subcontractor:

• Steel Structures Painting Council (SSPC)

• Anti-Friction Bearing Manufacturing Association (AFBMA)

• American Society for Non-Destructive Testing (AS-NDT)

1.11 The Contractor shall maintain the Houston Water facilities' equipment in compliance with all applicable laws and regulations. As described below, the Contractor shall be responsible for all aspects of maintenance, including providing all necessary labor, materials, tools, equipment, and supervision.

1.12 The Contractor shall maintain the equipment at all Houston Water facilities, WWTPs, sludge plants, wet weather and collection system lift stations, surface water treatment plants, groundwater plants, groundwater well sites, and generators, and perform routine maintenance and necessary repairs to the equipment 1.13 The Contractor shall also establish a corrective, preventive, and predictive maintenance program within the first sixty (60) days of the contract for equipment at all Houston Water facilities for which the Contractor will be responsible. A copy of the program shall be provided to the User Department Representatives (UDR) or the Contract Technical Representatives (CTR) for both Drinking Water Operations and Wastewater Operations.

1.14 The Contractor may also perform certain emergency repairs as authorized by the City of Houston as part of additional services.

1.15 Any lubricants or bulk chemicals proposed to be utilized by the Contractor at any Houston Water facilities must comply with ANSI/NSF Standards and equipment manufacturer specifications.

1.16 The Contractor shall meet the following minimum objectives:

1.16.1 Protecting public health, safety, and welfare in a manner consistent with all local, state, and national laws, codes, and regulations.

1.16.2 Protecting the health and safety of the operations and maintenance (O&M) staff;

1.16.3 Complying with all applicable laws, rules, regulations, and ordinances, including, without limitation, City, State, and Federal water quality and supply requirements, and safety requirements.

1.16.4 Protecting the environment.

1.16.5 Protecting and preserving the plant equipment and facilities.

1.16.6 Maximizing plant operational efficiency and minimizing operating costs.

1.16.7 Maintain effective customer relations and develop and implement procedures to define and ensure the prompt handling of routine remedial work requests, including the proper communication channels, service-level response goals, and workload-tracking mechanisms; and

1.16.8 Develop and implement 24-hour emergency response procedures for unplanned facility system interruptions and/or severe weather conditions that affect life safety, physical assets, or business operations. Participate, as needed, in developing emergency response plans (ERPs) and effectively perform assigned support responsibilities. The Contractor shall develop and implement procedures to achieve these goals, including going beyond the minimum requirements outlined in the Agreement.

1.17 The Contractor’s responsibilities include, but are not necessarily limited to:

1.17.1 Providing all materials, both durable and consumable, and supplies necessary to maintain equipment at all Houston Water facilities, including but not limited to grease, oil, oil filters, air filters, and consumables.

1.17.2 Cooperating with the City of Houston and third-party Contractors who may be responsible for expanding the capacity and upgrading the Houston Water utilities and facilities during the term of the Agreement. The Contractor will cooperate with these parties to minimize production disruptions and to maintain compliance with the performance standards and all applicable laws.

1.17.3 Respond immediately to emergency or disaster situations in a manner equal to or better than existing plans, and in accordance with the current “Continuity of Operations Plan” and the approved Emergency Response and Risk Management plans.

1.17.4 As authorized by the UDR/CTR, provide emergency repair services to the Houston Water facilities and utilities in accordance with the Additional Services provisions of the Agreement. The City will pay for labor, equipment, and materials required for any repairs, damages, or cleanup, which, in the sole opinion of the UDR/CTR per Exhibit “C” Fee and Cost Schedule, are wholly caused by a third party.

1.17.5 Provide seven days per week, 24 hours per day maintenance coverage, supervision, regulatory oversight, and corrective actions for the Houston Water utilities and facilities.

1.17.6 The Contractor and its staff may use the Houston Water facilities for the sole express purpose of maintaining the equipment. If the Contractor or its staff intends to use the facilities for purposes other than those covered under the Agreement, the City and the Contractor shall execute an agreement on the cost for use of those facilities. This cost may be subtracted from the fixed monthly Service Fee owed to the Contractor, as a credit due back to the City.

1.17.7 The Contractor’s personnel shall always be available on an “on-call” basis via email or telephone.

Answering machines and/or voicemail are not acceptable. At a minimum, the Contractor shall have maintenance personnel on the premises of the City of Houston, Houston Water facilities eight (8) hours per day between 7:00 a.m. and 6:00 p.m. Monday through Friday, excluding City holidays, unless directed otherwise by the Director.

1.17.8 After normal working hours as defined above, the Contractor shall provide sufficient on-call staff to manage necessary Basic Services and Emergency Services. On-call staff should be reachable by mobile phone or other means approved by the Director outside of normal business hours, 7 days per week.

1.17.9 All Contractor employees working on the premises of the City of Houston/ Houston Water shall observe and, when necessary, promptly report and correct any maintenance problems or irregularities to the UDR/CTR, seven (7) days per week.

1.17.10 The Contractor shall program all computer or automatic telephone systems to call the dispatch number and further shall monitor the alarms and promptly respond to all alarm signals.

1.17.11 The Contractor shall provide a Project Manager who will be the single point of contact for all contract compliance and administrative issues. The Project Manager proposed by the Contractor shall be subject to approval by the UDR/CTR. The Project Manager shall be assigned and dedicated to the City of Houston/ Houston Water facilities on weekdays. They shall be available to respond to after -hours issues and problems via mobile phone.

1.17.12 Provide a transition team including, at a minimum, the Contractor’s project manager and senior technician of the Houston Water systems for a 30-day transition period before the service commencement date. Upon receiving a notice to proceed, the Contractor shall implement a detailed transition plan to begin to assume responsibility for the Houston Water facilities and utilities. These transition services are intended to ensure that the Contractor is fully able to commence maintenance and repair services at Houston Water facilities and treatment plants on the NTP date. This shall include:

1.17.12.1 Recruiting staff necessary to fill all positions required by the Contractor’s staffing plan;

1.17.12.2 Monitoring plant operations for at least 7 days on multiple shifts before assuming maintenance responsibility.

1.17.12.3 Using a reliable system/method to incorporate the preventive maintenance standards and schedules for all major operational equipment in accordance with the manufacturer’s O&M manuals. The software will be set up to provide the reports and information for the monthly operations reports. The UDR/CTR will provide the Contractor with access to all Houston Water operation facilities, and the Contractor will be responsible for logging all equipment information and all preventive and corrective maintenance work items. In addition, the Contractor will be responsible for updating and maintaining the accuracy of the information contained in the system as equipment is repaired, added, or replaced. This data entry shall be completed within 60 days of the commencement of operations by the Contractor;

1.17.12.4 Preparing within sixty (60) days of the effective start date given in the Notice to Proceed and obtaining UDR/CTR approval within ninety (90) days of the onset of the effective start date given in the Notice to Proceed, an Emergency Response Plan and a Risk Management Plan. The Emergency Response Plan should include the Contractor’s plan to provide backup power to the facilities that do not have backup generators. The Contractor may bring in company-owned portable generators. Failure to have the plans approved by this date could result in the Director retaining a portion of the Contractor’s fee until the plans are approved

1.17.12.5 Conducting an inventory and certifying to the UDR/CTR the quantities of materials, supplies, and other consumables on site at the time service commences.

1.17.13 Provide administrative and technical support services as required to ensure efficient maintenance and repair of the City of Houston Water Operation facilities and utilities. Support services subcontractor(s), proposed by the Contractor, shall be subject to approval by the UDR/CTR.

1.17.14 Conduct an inspection of facilities’ equipment (electrical, mechanical, instrumentation, etc.) with the UDR/CTR within thirty (30) calendar days following the Notice to Proceed date, unless instructed otherwise by the UDR/CTR, and annually thereafter.

1.17.15 Submit an initial inventory that documents the condition and operational status of major and minor pieces of equipment and the number of expendable supplies and spare parts within forty-five (45) calendar days following the Notice to Proceed date, unless instructed otherwise by the UDR/CTR.

1.17.15.1 Each party shall maintain a copy of the initial inventory, signed by the Contractor and the UDR/CTR.

1.17.15.2 The Contractor shall maintain and update the equipment inventory monthly throughout the term and shall provide the monthly equipment inventory to the UDR/CTR.

1.17.16 Prepare, submit, and justify a detailed annual report on recommended capital expenditures to restore, replace, or upgrade equipment or facilities for efficiency, safety, function, and/or compliance with current and/or anticipated regulatory requirements. Submit the report to the UDR/CTR by November 1st of each year, unless instructed otherwise by the UDR/CTR.

1.17.17 Performance Standards: The Contractor shall be responsible for meeting the following performance standards:

1.17.17.1 Performing all the Contractor’s obligations as outlined in the Agreement;

1.17.17.2 Performing the preventive maintenance, installing and removing equipment, and repairs as outlined in the Agreement;

1.17.17.3 Correcting within 60 days any deficiencies identified through the required preventive and predictive maintenance program or the City of Houston’s facility and equipment audits. If it is not possible to rectify a deficiency within 60 days, then the Contractor shall provide the UDR/CTR with a written plan for completing the work;

1.17.17.4 Contractor and the UDR/CTR shall conduct an inventory of the spare parts and supplies and shall jointly sign a schedule listing all items in such inventories at the start-up of the Agreement ("Inventory"). Thereafter, Contractor shall assume custody of all items in such Inventories and shall be responsible for replenishing such Inventories to at least their initial stock levels. Any suggested modifications to the inventoried items shall be submitted to the UDR/CTR for approval. Upon completion of the Term, such Inventories shall have the same composition as the initial Inventory unless otherwise approved in writing by the UDR/CTR;

1.17.17.5 Contractor shall ensure that all employees comply with applicable Federal, State, and local health and safety regulations and that all employees are oriented to the safety, health, and environmental regulations specific to the site. Contractor shall comply with the safety manual specific to practices and procedures of the City of Houston/ Houston Water facilities contained in the Safety Program, approved by the UDR/CTR, which may be amended from time to time with the approval of the UDR/CTR. Failure to take corrective action identified through site visits by UDR/CTR or OSHA personnel will be grounds for termination; and

1.17.17.6 Housekeeping: Contractor shall maintain the equipment of the City of Houston/ Houston Water facilities attractively and neatly to provide a facility that may be used for open house and plant tours.

1.17.18 Facilities Maintenance:

1.17.18.1 The Contractor shall be responsible for all aspects of maintenance on City of Houston/ Houston Water equipment, including corrective, preventive, predictive maintenance and repairs.

The Contractor will be required to develop and implement maintenance procedures to ensure attainment of the objectives. This includes, at a minimum, responding to corrective maintenance needs in a timely and appropriate manner.

1.17.18.2 The Contractor will use an acceptable system approved by the City of Houston. The system will incorporate the preventive maintenance standards and schedules for all major operational equipment in accordance with the manufacturer’s O&M manuals. The system will be set up to provide the reports and information for the monthly operations reports. The Contractor will be responsible for the entry of all equipment information and all preventive and corrective maintenance work items. In addition, the Contractor will be responsible for updating and maintaining the accuracy of the information contained in the system for the City of Houston/ Houston Water facilities as equipment is repaired, added, or replaced. This data entry shall be completed within 60 days of the commencement of operations by the Contractor. Following the completion of the equipment data entry, the Contractor shall be required to provide monthly summary reports on preventive and corrective maintenance performed, in accordance with the reporting capabilities in the system.

1.17.18.3 The Contractor shall provide necessary corrective, preventive, and predictive maintenance and repairs for all equipment at the plants. The Contractor shall be responsible for providing all required maintenance for the plant equipment, including but not limited to pumps, blowers, motors, valves, mixers, clarifiers, filters, belt press, bar screens, centrifugal, and general mechanical components; maintenance as required by the manufacturer of the equipment; and all generally accepted engineering, operational, and maintenance practices for a facility of this size and type. If a piece of equipment fails, the UDR/CTR will determine whether the Contractor has followed the required maintenance procedures. If the Contractor has been deficient, then the Contractor is responsible for the entire cost of the repair or replacement. In addition, the Contractor shall:

1.17.18.4 Perform maintenance on all chlorine feed systems, including relief valves, evaporators, and vacuum regulators, on a biannual basis, per manufacturer’s specifications. This shall include complete disassembly of the units and repair or replacement as necessary;

1.17.18.4.1 Perform maintenance on flexible metal tubing used to connect chlorine supply cylinders to piping systems, according to manufacturer’s and the Chlorine Institute’s specifications, and replace on an annual basis or sooner if needed;

1.17.18.4.2 Perform annual vibration analysis testing of major rotating equipment. Major rotating equipment includes all dry pit lift pump machine trains (machine trains are defined as the motor and its coupled machinery), all aeration blower machine trains, all aeration mixer machine trains, generators, etc. Vibration analysis testing and reporting protocols include the acquisition of seismic (mils), velocity (in/s), and acceleration (g’s) data provided in overall tabular format, as well as full-spectrum Fast Fourier Transform (FFT) waveforms. Data must be repeatable and historically trended. Reporting includes overall data values for each reference point taken (Horizontal, Vertical, Axial, Inboard, Outboard, Motor, Machine), with exception reporting and recommendations of anomalies found based on industry standards or equipment changes. The Contractor shall perform interpretation and analysis of test results and submit an evaluative written report in an approved format to the UDR/CTR, including necessary action plans. The Contractor shall promptly address any deficiencies identified in the testing report;

1.17.18.4.3 Perform annual oil sampling of major pumps, motors, mixers, and blowers. The Contractor shall perform interpretation and analysis of test results and submit an evaluative written report in an approved format to the UDR/CTR. Test/Analysis should include ferrography, viscosity, particle, water, and total acid number (TAN) for reference oils and on a historical basis. Equipment that qualifies for oil analysis is all equipment with an oil reservoir and a mechanically circulated lube oil system, or any equipment containing an oil capacity of sufficient quantity such that a 6X sample size (24 oz) from normal operating level does not affect safe operation. Types of equipment considered for oil analysis include gearboxes, blowers, mixers, clarifiers (secondary drive, final drive), and oil-filled transformers (excludes polychlorinated biphenyls (PCB’s)). The Contractor shall promptly address any deficiencies identified in the testing report;

1.17.18.4.4 Touch up paint on any equipment or piping as needed to minimize corrosion and maximize service life;

1.17.18.4.5 Conduct annual infrared inspections of all motor control centers, transformers, and motor connections greater than 60 hp. This includes dry pit pumps & motors, aeration blowers & motors, any process motors over 60 hp, and substation main switchgear & buss bars. Thermal imaging testing and reporting should include standard digital images (by positional asset), associated infrared thermal image with min/max temperature identification, thermal histograms of heat distribution, and exception reporting of anomalies;

1.17.18.4.6 Conduct an initial instrument calibration of all existing installed monitoring and measuring devices for flow, pH, temperature, pressure, turbidity, chlorine residual, etc. The Contractor shall provide a report demonstrating that the instruments have been calibrated successfully according to the manufacturer’s specifications within sixty (60) days of the onset of the effective start date given in the Notice to Proceed;

1.17.18.4.6.1 Perform periodic calibration of instruments in accordance with manufacturer’s recommended procedures;

1.17.18.4.6.2 In the event of a sanitary sewer overflow, Contractor shall follow the City’s Sanitary Sewer Overflow Response Plan.

1.17.18.5 The Contractor must notify the UDR/CTR in writing that equipment is planned to be removed from service, why this activity is needed, when the equipment will be returned to service, and what scheduled maintenance will be completed while in storage. Any equipment that the Contractor would like to remove from service must have the following services performed:

1.17.18.5.1 All equipment must be cleaned and parts lubricated to prevent corrosion.

1.17.18.5.2 All rotating equipment such as pumps and motors must be rotated on a weekly schedule.

This can be performed by hand or by energizing the system;

1.17.18.5.3 Electrical motor heaters must remain energized to prevent condensation;

1.17.18.5.4 Chlorine systems removed from service will be purged with nitrogen gas and the lines plugged; and

1.17.18.5.5 Treatment process units shall not be taken out of service for periods longer than ninety (90) days, unless otherwise approved by the UDR/CTR.

1.17.18.6 If the Contractor removes equipment from service, then the preventative maintenance specified by the manufacturer must continue to be performed to maintain the equipment in a state of operational readiness.

1.17.18.7 The Contractor is required to notify the UDR/CTR in writing one week before performing preventive maintenance tasks on major equipment, as the UDR/CTR may have a representative witness the Contractor perform the preventive maintenance task(s).

1.18 Equipment maintenance and/or recalibration recommended by the manufacturer, required by law, regulation, permit or order, or otherwise determined by the Contractor, in consultation with the UDR/CTR, to be advisable, including detailed service procedures and oil or grease specifications.

1.19 Agreement Close-out:

1.19.1 At the end of the agreement, all equipment will be fully operational in accordance with the manufacturer’s equipment specifications, normal wear and tear excepted. The Contractor will substantiate that the City of Houston/ Houston Water utilities and facilities equipment meets those specifications. Inventory levels will be replenished to the levels certified at service commencement.

The UDR/CTR will undertake a complete facility inspection and audit to establish the City of Houston/ Houston Water utilities and facilities condition before the completion of the agreement. The minimum agreement close-out requirements of the Contractor are provided below. The list is not all-inclusive, but representative of Houston Public Works’ standards.

1.19.2 If the Contractor fails to comply with these provisions, the UDR/CTR may reduce the cost of repairs and/or grounds cleanup from amounts due to the Contractor or from the Contractor’s performance bond.

1.19.3 Before the release of final payment to the Contractor at the conclusion of the term of the agreement, certain items must be completed by the Contractor and accepted by the UDR/CTR. These items include the following:

1.19.3.1 Repairing any electrical maintenance deficiencies, including those items identified because of the annual third-party testing program;

1.19.3.2 Completing all preventive maintenance work orders generated by the system, and bringing preventive maintenance activities current and up to date;

1.19.3.4 Ensuring all operations and management (O&M) and vendor equipment manuals are appropriately filed and updated.

1.20 All discounts/markups shall be based on Supplier’s or Sub-contractor’s actual original invoiced amount. The Contractor shall submit the actual original invoices, as attachments, with the final invoice for payment by the City for the work performed by the Contractor.

1.20.1 FREIGHT FOR REPAIR PARTS AND/OR REPLACEMENT PARTS/UNITS ORDERED FROM

ANOTHER STATE OR COUNTRY IS THE RESPONSIBILITY OF THE CITY. THE VENDOR MUST

PROVIDE INVOICE(S) DETAILING FREIGHT COSTS WITH NO MARKUP. FREIGHT FOR ALL

OTHER REPAIR/REPLACEMENT PARTS/UNITS IS THE RESPONSIBILITY OF THE CONTRACTOR.

1.21 All equipment removed from any City facility must be documented on a City Equipment Release Authorization Form (Exhibit B-5).

1.22 If the Contractor plans to use any part other than an original equipment manufacturer (OEM) part, the Contractor shall obtain written confirmation from UDR/CTR. Based on independent testing as set out below, the non-OEM part(s) are equal to or of better material, craftsmanship, and performance standards and will not require modification to other parts. The Contractor shall submit specifications and documentation on the proposed substitution.

1.22.1 Upon request by the City, at the expense of the contractor, testing may be required by an independent third party approved by the CTR. The onus shall be upon the contractor to prove that Non- OEM parts meet the required specifications in fit, form, and function as OEM parts.

1.22.2 Testing data provided to the CTR must show whether parts exceed or are equivalent to OEM requirements.

1.22.3 All Repair or replacement parts shall equal or exceed specifications for OEM repair or replacement parts.

1.22.4 In the event the City rejects any item, the Contractor shall have ten (10) days after Receipt of Notice of such rejection to replace the items with replacements which conform to the contract at no additional cost to the City. If the unit is unable to be placed back in service within ten (10) business days, then a written explanation for the delay shall be provided to the UDR or CTR.

1.22.5 If the Contractor uses Non-OEM parts to repair equipment without prior written approval from the UDR and CTR, payment for such repair will be denied.

1.23 The City reserves the right to pick up all equipment parts that are quoted by the Contractor to be replaced. This includes (but is not limited to) seals, bearings, impellers, end plates, gears, silencers, shafts, volutes and other items of equipment.

1.23.1 A City representative shall pick up all non-repairable equipment and components from the Contractor’s or City facility. Non-repairable units do not need to be reassembled but shall be labeled and grouped by job number and placed on a skid or container.

1.24 When requested by the UDR/CTR, the Contractor shall furnish parts needed for maintenance activities of equipment by City Personnel. The Contractor shall charge the same price and mark-up or discount for these parts as scheduled in Fees and Costs (Exhibit F).

1.25 The Contractor shall ensure the Equipment Inventory Number (EI) tag remains attached to the equipment. The Contractor shall notify the UDR if the EI tag is damaged or missing.

1.26 The Contractor shall install a stainless-steel identification tag stamped with the Contractor’s name, job number, and repair date on each equipment housing. The tag shall be secured with stainless drive pins. The cost of the identification tag shall be included as a part of the base cost of any overhaul or replacement.

1.27 Before the dismantling and inspection (D&I), nameplate data shall be verified, all missing or damaged parts shall be identified in writing, recorded, and special items shall be noted on the inspection form.

1.27.1 D&I shall be performed within seven (7) business days of the equipment being received into Contractor’s shop. In the event the equipment cannot and/or will not be D&I within the specified seven

(7) business days, then the Contractor shall provide the UDR/CTR with the cause of delay in writing.

1.28 Upon receipt of the equipment, the Contractor shall verify and document all information about the condition of the unit(s), including nameplate data. The Contractor shall inspect the unit and document the damaged and missing parts on the Teardown and Recommended Repair Report (Exhibit B-1). Digital photographs of each unit, as received, and damaged components will be taken and included in Exhibit B- 1.

1.29 The Contractor shall replace all defective nameplates upon completion of repair. All original nameplate information shall be stamped on the new nameplate after the final coat of paint. New nameplates shall be permanently attached using mechanical fasteners. The cost of a new nameplate shall be included as a part of the base cost of any repair, overhaul and/or replacement of the unit.

1.30 Delivery tickets and packing slips shall contain quantity, part number, description of commodity delivered, name of department or section and facility name to which the merchandise was delivered, the City of Houston Ordinance Number, contract number, signature of UDR, printed name, employee number, and authorization release number.

1.31 Where hourly work is performed on behalf of the City, the Contractor and approved Sub-contractor shall fully document the start of the work, the time spent on the job, and completion of each job. The documentation shall be a punch card/timeclock, shop record, or any other mutually agreed method.

Original documents shall be furnished in the invoice package. See Timesheet Report Form (Exhibit B- 10).

1.32 The Contractor shall establish and maintain records of the repair , maintenance and services performed for at least four (4) years after the contract expires. These records shall be provided if requested by the Houston Public Works Director or designee.

1.33 The Contractor shall perform repairs specifically at the Contractor’s facilities. The Contractor shall provide the UDR/CTR with a list of the name(s) and location(s) of ALL shop(s) and Sub-contractors that will be used for specified repair work before the commencement of any work.

1.34 The Contractor shall obtain written approval for each shop and Sub-contractor before the start of the contract. If the Contractor plans to use any Sub-contractor not on the list, the Contractor shall obtain written approval from the Houston Public Works Director or designee before subcontracting the work.

1.35 The repair shop must be able to verify all hours charged for machine work. This will apply to work done by Sub-contractors or the Contractor. In-house work will be supported with copies of timecards.

This verification shall be submitted with the invoice.

1.36 The field TIME SHEETS should be signed DAILY by the UDR and/or CTR at the Houston Water Operations facilities where work was performed. However, if the UDR and/or CTR are not present, then the timesheet can be signed by a City employee designated by the UDR/CTR, including the employee’s ID, at the designated Houston Water facility. ALL TIME SHEETS shall be approved by the UDR and/or CTR on the last working day of each week.

1.37 The City shall be billed only for the hours the contractor works on City equipment whether at City facility or at Contractor’s facility. The labor rate for work at a City facility shall include the travel expenses incurred by the contractor. No itemized travel time is allowed.

1.38 The price of parts, materials, and cost of a replacement unit supplied for this contract shall be the total original invoiced cost to the Contractor plus Contractor’s quoted percentage (%) markup or percent (%) discount for the item. The Contractor shall submit all ORIGINALs of the supporting documentation with the FINAL invoice.

1.39 All rates for any service, parts, and/or material, and work performed by Contractor and/or Sub-contractor(s) shall be clearly defined within the Fees and Costs (Exhibit F). All services rendered, parts and materials shall be documented, and original documents will be submitted in the final invoice package.

1.40 Wherever OEM documentation such as operation and maintenance manual, etc., specifies torque values, the Contractor shall use a torque wrench and adhere to the OEM torque values and record the information on shop acceptance tests form (Exhibit B-3).

1.41 The Contractor shall be responsible for storage of the equipment and all parts in secured locations maintained by adequate, clean, indoor, and dry space for storage. Any parts lost or damaged while in the possession of the Contractor shall be repaired or replaced at the Contractor’s expense.

1.42 All metal parts shall be checked for structural integrity and cracks using a Non-Destructive Test and recorded on Teardown and Recommended (Exhibit B-1), and structurally unsound or cracked parts shall be repaired or replaced.

1.43 All maintenance and repairs shall be made to bring the unit to OEM’s specifications.

1.44 The Teardown and Recommended Repair Report (Exhibit B-1) included in this document shall be used for each repair or replacement.

1.45 Pricing for parts and/or materials, and replacement units supplied under this contract will be based on the Latest Manufacturer’s Price List provided by the Contractor bi-annually during each contract year.

1.46…