This statement of work outlines requirements for spray foam insulation installation at the Butler Building of the Horicon National Wildlife Refuge. The contractor shall apply a two-inch R-14 spray foam insulation to insulate the walls of the 60 by 96 by 16-foot steel pole shed building, excluding the roof, two service doors, and two overhead doors. The contractor must follow all OSHA safety regulations and protect surrounding structures from overspray. The period of performance is 45 calendar days from notice to proceed. Acceptance will occur once all work is complete and inspected. The related federal contract opportunity is solicitation number 140FC223Q0025 for spray foam insulation at the Horicon National Wildlife Refuge in Wisconsin. The customer agency is the Department of the Interior Fish and Wildlife Service.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Wage_Determination_WI20220011.pdf | ||
| Sol_140FC223Q0025.pdf | ||
| Clauses_Attachment.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
STATEMENT OF WORK
INSTALLATION OF SPRAY FOAM INSULATION TO THE BUTLER BUILDING WALLS
Horicon National Wildlife Refuge May 17, 2023
1. GENERAL:
The Horicon National Wildlife Refuge Butler Building needs spray in insulation to provide for a heated building that recently had a heater system installed. The roof is currently insulated so it would be insulating the walls. The Butler Building dimensions are 60ft by 96ft by 16ft tall with 35ft gable peaks on two ends steel pole shed.
2. BACKGROUND:
The Horicon National Wildlife Refuge installed a heater to the Butler Building in 2020 to create a heated storage building to house fire equipment with water tanks that won’t freeze in weather below 32 degrees. The building has a concrete floor, lights and outlets. A mezzanine is located in the southeast corner of the building. Pallet racks run along the west side of the building.
3. SCOPE:
Contractor:
· Contractor shall follow OSHA regulations for safety.
· Contractor shall clean any debris caused by new spray-on insulation installation.
· Contractor shall protect overspray from all building structures during work: lights, walls, doors, floor and any other building equipment or structure.
· Contractor shall apply a spray insulation 2” R-14 warrantied by the manufacturer to last the life of the building.
· Exclude roof, 2 service doors and 2 overhead doors 16ft by 20ft.
· Spray behind steel columns.
· Expose conduit covers but spray over conduit.
Standard practice for spraying around overhead doors.
· All deliveries are the sole responsibility of the contractor.
Refuge:
· Refuge will remove equipment stored in the building from the work area before contracting work begins. A mezzanine and pallet racks will remain on site.
· Refuge will not be providing any material or labor.
4. DELIVERY SCHEDULE:
· The period of performance is 45 calendar days after issuance of Notice to Proceed.
5. INSPECTION AND ACCEPTANCE:
· The work shall be accepted when all the work is completed as described here within and in accordance with any contract specifications. Work shall be inspected to assure compliance with the contract documents. Quality control and adherence to all contract requirements is still the responsibility of the contractor.
· The station point of contact must complete written confirmation of the cleaning and observable quality control acceptance prior to payment authorization.
6. GOVERNMENT FURNISHED EQUIPMENT OR MATERIALS:
· Contractor responsible for all supplies and equipment needed to finish the agreed upon work.
· Public restroom is available.
7. SPECIAL NOTICE:
· N/A.
8. AVAILABILITY:
Refuge hours are Monday through Friday between the hours of 7am and 3:30pm, work outside these hours or on Federal holidays must be coordinated with the station point of contact.
Location Address:
U.S. Fish and Wildlife Service Horicon National Wildlife Refuge W4279 Headquarters Rd.
Mayville, WI 53059
9. POINTS OF CONTACTS:
Technical Coordinator:
Primary Station Point of Contact:
1) Sean Sallmann 920-948-2863 sean_sallmann@fws.gov
2) Mike Madel 920-210-0979 mike_madel@fws.gov
3) Bill Peterson 920-387-6502 bill_peterson@fws.gov
File details come from the government source that posted it. Updated .