This Request for Qualifications (RFQ #RFQ 011227) is issued by Beaufort County, South Carolina, Procurement Services Department, soliciting qualifications from professional design firms to provide multi-disciplinary design services for the Burton Wells Baseball/Softball Complex Expansion project. The project encompasses modernization of Old Burton Wells Baseball Park, located at 65 Burton Wells Road within Burton Wells Regional Park, incorporating three natural-grass baseball/softball fields (two existing fields to be renovated in their current locations and one new third field), a shared concession/restroom/press box building, parking and circulation improvements, stormwater management, utilities, lighting, landscaping, and associated site improvements. The scope of work is limited to Phase 1, which includes existing-condition review, conceptual design development, preliminary permitting feasibility analysis, and detailed construction cost estimation to support capital budgeting and funding decisions. A non-mandatory pre-proposal meeting is scheduled for 2:00 pm EST on Wednesday, December 16, 2026, as a virtual meeting. Qualification statements must be submitted electronically through the Procurement Portal by 3:00 pm EST on Tuesday, January 12, 2027. Questions must be submitted by 5:00 pm EST on Wednesday, December 30, 2026. The County reserves the right to conduct oral presentations with the top-ranked firms if needed to make a final selection decision. The final Phase 1 scope and fee will be negotiated with the selected firm, with potential authorization of subsequent phases (final design, permitting, bidding, and construction-phase services) contingent upon County funding confirmation and separate written authorization.

The qualification-based selection process evaluates respondents on five criteria: experience with public athletic facilities (25 points), qualifications and experience of project manager and multidisciplinary team (25 points), understanding of project objectives and proposed conceptual design approach (20 points), cost estimating and permitting approach (15 points), and project schedule, staff availability, and client references (15 points). Firms must submit qualification statements not exceeding 15 double-sided pages, excluding cover pages, organized by executive summary, approach to planning process, work plan and scheduling, experience and qualifications, and any exceptions or exclusions. The consultant team must include professional disciplines in project management, land surveying, civil engineering, architecture, structural/mechanical/electrical/plumbing engineering, landscape architecture, and baseball/softball sports-field design expertise, with all professionals holding required South Carolina licenses. The County does not commit to awarding a contract, paying proposal preparation costs, or proceeding with any phase beyond Phase 1 without separate authorization. All submitted materials become County property. Professional liability insurance with minimum limits of $1,000,000 per occurrence is required, along with standard commercial general liability ($1,000,000 each occurrence/$2,000,000 aggregate), workers' compensation, and comprehensive automobile liability coverage naming Beaufort County as additional insured. The contract will be subject to South Carolina law, Title VI civil rights requirements, and standard County contracting provisions including termination for convenience, debarment certifications, and non-discrimination assurances.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

REQUEST FOR QUALIFICATION

BURTON WELLS BASEBALL/SOFTBALL

COMPLEX EXPANSION

RFQ # RFQ 011227

Prepared By: Capital Projects/Facilities

Dated: Monday, November 23, 2026

Proposal Due Date: Tuesday, January 12, 2027, 3:00 pm (EST)

RFQ #RFQ 011227 DOCUMENTS Page 2

NOTICE

COUNTY COUNCIL OF BEAUFORT COUNTY

PROCUREMENT SERVICES DEPARTMENT

106 Industrial Village Road, Bldg. 2 Post Office Drawer 1228 Beaufort, South Carolina 29901-1228

PROPOSAL NOTICE NO. RFQ 011227

CLOSING DATE AND TIME: Tuesday, January 12, 2027, 3:00 pm PROPOSAL TITLE: Burton Wells Baseball/Softball Complex Expansion

You are invited to submit a qualification statement, in accordance with the requirements of this solicitation which are contained herein.

There will be a Non-Mandatory Pre-Proposal meeting at 2:00 pm (EST) on Wednesday, December 16, 2026 at This is a virtual meeting. Please contact nicole.sproesser@bcgov.net for the link. Please contact Nicole Sproesser at nicole.sproesser@bcgov.net for the meeting link.

All vendors are encouraged to attend.

In order for your qualification statement to be considered, it must be submitted through the

Procurement Portal no later than 3:00 pm (EST) on Tuesday, January 12, 2027, at which time respondents to this request will be recorded in the presence of one or more witnesses. RFQs received after the time specified will not be considered. Due to the possibility of negotiation with all respondents, the identity of any respondents or the contents of any proposal shall not be public information until after the contract award is made; therefore, the public is not invited to the proposal closing.

Proposals must be submitted through the Procurement Portal at https://procurement.opengov.com/portal/bcgov. If you are not already registered, please register as a Vendor. There is no cost to register your company. This will allow you to submit your RFQ electronically.

All submittals (see Submission Requirements) received in response to this Request for

Qualifications will be rated by a Selection Committee, based upon the Evaluation

Criteria contained within this RFQ. If the best proposal respondent is clearly identified from the point summary, there will not be a need for oral presentations. If not, then an oral presentation from a minimum of the top two rated firms shall be required.

This solicitation does not commit Beaufort County to award a contract, to pay any costs incurred in the preparation of a proposal, or to procure or contract for the articles of goods or services. The

County reserves the right to accept or reject any or all qualifications received as a result of this request, to negotiate with all qualified firms, or to cancel in part or in its entirety this solicitation, if it is in the best interests of the County to do so.

Victoria Moyer, Deputy Director Procurement Services mailto:gmurray@bcgov.net https://procurement.opengov.com/portal/bcgov

RFQ #RFQ 011227 DOCUMENTS Page 3

(843) 255-2295

RFQ #RFQ 011227 DOCUMENTS Page 4

IMPORTANT ELECTRONIC SUBMITTAL REQUIREMENTS

Response submittals for this Request for Qualifications will ONLY be received electronically and must be submitted ONLINE, through the Procurement Portal, no later than 3:00 pm on Tuesday, January 12, 2027.

All responses must adhere to the following guidelines:

• Suppliers are encouraged to submit responses as soon as possible. Responses are received through our secure Procurement Portal and cannot be opened prior to the due date and time. The time and date of receipt as recorded by the server will serve as the official time of receipt. The County is not responsible for late submissions, regardless of the reason.

• All requested information and forms MUST be uploaded as indicated in the

PROPOSAL SUBMITTAL Section. If you have a problem with your submittal, you may contact Support through the Procurement Portal.

https://procurement.opengov.com/portal/bcgov/projects/328220/document?section=3104405 mailto:cservice@vendorregistry.com

RFQ #RFQ 011227 DOCUMENTS Page 5

TITLE VI STATEMENT

COUNTY COUNCIL OF BEAUFORT COUNTY

Title VI Statement to Prime Contractors, Subcontractors, Architects, Engineers, and

Consultants

It is the policy of the County Council of Beaufort County, South Carolina, hereafter referred to as

“Beaufort County” or “the County”, to comply with Title VI of the 1964 Civil Rights Act (Title

VI) and its related statutes. To this end, Beaufort County assures that no person shall be excluded from participation in, denied the benefit of, or subjected to discrimination under any of its programs or activities on the basis of race, color, national origin, age, sex, disability, religion, or language regardless of whether those programs and activities are Federally funded or not. The

County is also committed to assuring every effort will be made to prevent the discrimination of low-income and minority populations as a result of any impact of its programs or activities. Beaufort County also assures that every effort will be made to prevent discrimination through the impacts of its programs, policies, and activities on minority and low-income populations. Additionally, the County will take reasonable steps to provide meaningful access to services for persons with limited English proficiency. In addition, Beaufort County will not retaliate against any person who complains of discrimination or who participates in an investigation of discrimination. Beaufort County will, where necessary and appropriate, revise, update, and incorporate nondiscrimination requirements into appropriate documents, directives, and regulations.

Pursuant to Title VI requirements, any entity that enters into a contract with Beaufort County including, but not limited to Prime Contractors, Subcontractors, Architects, Engineers, and

Consultants, may not discriminate on the basis of race, color, national origin, age, sex, disability, religion, or language in their selection and retention of first-tier subcontractors, and first-tier subcontractors may not discriminate in their election and retention of second-tier subcontractors, including those who supply materials and/or lease equipment. Further, Contractors may not discriminate in their employment practices in connection with highway construction projects or other projects assisted by the U.S. Department of Transportation (USDOT) and/or the Federal

Highway Administration (FHWA).

In all solicitations either by competitive bidding or negotiation made by the Contractor for work to Beaufort County to be performed under a subcontract, including procurements of materials or leases of equipment, each potential subcontractor or supplier shall be notified by the Contractor of the Contractor's obligations under the contract and the Title VI regulations relative to nondiscrimination on the basis of race, color, national origin, age, sex, disability, religion, or language by providing such a statement in its bidding and contract documents.

RFQ #RFQ 011227 DOCUMENTS Page 6

Upon request, the Contractor shall provide all information and reports required by Title VI requirements issued pursuant thereto, and shall permit access to its books, records, accounts and other sources of information, and its facilities as may be determined by Beaufort County, USDOT, and/or FHWA to be pertinent to ascertain compliance with such regulations, orders, and instructions. Where any information required of a Contractor is in the exclusive possession of another who fails or refuses to furnish this information, the Contractor shall so certify to USDOT or FHWA, as appropriate and via Beaufort County, and shall set forth what efforts it has made to obtain the information. In the event of the Contractor's non-compliance with nondiscrimination provisions of this contract, USDOT may impose such contract sanctions as it or FHWA may determine to be appropriate, including, but not limited to:

• Withholding of payments to the Contractor under the contract until the Contractor complies, and/or

• Cancellation, termination, or suspension of the contract, in whole or in part.

In the event a Contractor becomes involved in, or is threatened with, litigation with a subcontractor or supplier as a result of this direction to comply with Title VI, the Contractor may request USDOT to enter into such litigation to protect the interests of USDOT and FHWA. Additionally, the

Contractor may request the United States to enter into such litigation to protect the interests of the

United States. Any person or Subcontractor who believes that they have been subjected to an unlawful discriminatory practice under Title VI has a right to file a formal complaint within one hundred eighty (180) days following the alleged discriminatory action. Any such complaint must be filed in writing or in person:

Beaufort County Government Post Office Drawer 1228 | Beaufort, SC 29901-1228

843-255-2304 Telephone | E-mail: dthomas@bcgov.net mailto:dthomas@bcgov.net

RFQ #RFQ 011227 DOCUMENTS Page 7

SCOPE OF WORK

4.1. Project Purpose

Beaufort County, South Carolina (the “County”), is requesting statements of qualifications from experienced professional design firms to provide multi-disciplinary professional design services for modernization of Old Burton Wells Baseball Park, located within Burton Wells Regional

Park, at 65 Burton Wells Rd. The County intends to use the Beaufort County Parks and

Recreation Master Plan prepared by Wood+Partners, Inc. in 2024 as the planning basis for this project.

The purpose of the initial assignment is not to prepare a new park master plan or full construction documents. The County seeks a coordinated conceptual design package and detailed opinion of probable construction cost sufficiently developed to support capital budgeting, funding decisions, preliminary permitting and agency discussions, and a decision on whether to advance the project to final design. The consultant shall clearly document assumptions, exclusions, cost-estimate basis, escalation methodology, and items requiring verification or updating before final design.

The County’s goal is to transform the existing, aging baseball facilities into a modern, functional baseball and softball sports complex that better supports local recreation, organized league play, tournaments, spectators, and park operations.

Phased delivery approach: Phase 1 is the only phase included in the initial procurement authorization and is intended to produce a decision-ready concept and budget. Phase 2 (final design and permitting) and Phase 3 (bidding and construction-phase services) may be pursued only after the County confirms funding and issues separate written authorization, subject to

County procurement requirements.

4.2. Planning Basis and Project Objectives

The consultant shall review and use the 2024 Beaufort County Parks and Recreation Master Plan as the basis for the design. In the Capital Improvements Recommendations chapter, the plan identifies Burton Wells Park as heavily used and recommends renovation of the two existing ballfields and addition of one ballfield with a new press box/restroom facility. The plan also identifies other park-wide recommendations; this RFQ is focused on the baseball/softball complex and related site improvements.

The selected consultant shall verify the relevant master-plan recommendations against current site conditions and County priorities, then develop a coordinated design concept that considers the following objectives:

• Modernize the existing two baseball fields and add a third field, resulting in a coordinated three-field baseball/softball complex.

RFQ #RFQ 011227 DOCUMENTS Page 8

• Plan a shared, centrally located support building with concessions, public restrooms, and a press box serving the three fields.

• Evaluate and design associated parking, internal circulation, pedestrian routes, accessible routes and parking, spectator areas, and emergency/service access.

• Address field layout and orientation, playing-surface options, grading, field drainage, irrigation, fencing, backstops, dugouts, bullpens/warm-up areas, scoreboards, and sports lighting, as appropriate to the agreed concept.

• Coordinate site grading, stormwater management, utilities, lighting, landscaping, signage, trash/recycling, and other supporting amenities.

• Prepare a detailed, itemized construction cost estimate with documented quantities, assumptions, contingencies, escalation to a potential future construction year, and clear separation of construction costs from design and other owner costs; identify major cost drivers and practical implementation options.

• Develop a conceptual design package coordinated sufficiently to support capital budgeting and preliminary permitting/agency discussions. Formal permit applications, final design, construction documents, bidding, and construction-phase services are future services and are not part of the initial authorization unless expressly included in the negotiated scope.

4.3. Scope of Services

The initial authorization is intended to cover Phase 1 only: existing-condition review and survey as needed, conceptual design, preliminary permitting feasibility, and a detailed construction cost estimate. Respondents shall identify their approach, required disciplines, assumptions, and recommended supplemental investigations. The County may consider later phases after funding and authorization; no future phase is guaranteed. The final Phase 1 scope and fee will be negotiated with the selected firm.

Task 1 – Project Initiation and Master Plan Review

• Conduct a kickoff meeting with County project representatives and Parks and Recreation staff to confirm project goals, intended users, operational needs, schedule, budget parameters, decision points, and communications.

• Review the 2024 Beaufort County Parks and Recreation Master Plan, available park plans and record drawings, prior studies, utility information, field maintenance information, and other relevant documents provided by the County.

RFQ #RFQ 011227 DOCUMENTS Page 9

• Review the master-plan recommendation for Burton Wells Park and identify design decisions requiring County confirmation, including the intended level of baseball/softball play, field dimensions, field surface, lighting, and building program.

• Conduct a site visit to document visible existing conditions, constraints, access, field and building conditions, and relationships to adjacent park facilities.

Task 2 – Existing Conditions Survey and Investigations

• Provide or coordinate a current topographic and boundary survey adequate for conceptual design and cost estimating and to identify likely permitting constraints. The consultant shall state the survey scope and any limitations. If a survey or other investigation is not necessary for the initial concept, identify the information needed and when it should be obtained before final design.

• Coordinate utility records review and utility locating/designation as needed to understand existing services and potential connections.

• Review existing field grading, drainage, irrigation, lighting, fencing, backstops, dugouts, bleachers, batting cages, and other improvements to identify items to retain, coordinate with the scheduled renovations, supplement, relocate, or replace. Distinguish planned work to be completed before this project from additional work included in the conceptual design and cost estimate.

• Identify the need for geotechnical exploration, environmental or wetland review, tree survey, traffic review, infiltration testing, or other specialty investigations. Distinguish work needed to complete the Phase 1 concept and estimate from work that can reasonably be deferred until final design; identify optional services, purpose, and likely timing.

Task 3 – Baseball/Softball Complex Conceptual Design

• Prepare a coordinated site layout that retains the two existing fields in their current locations and adds a third field, based on the 2024 Master Plan and verified site conditions. The two existing fields are scheduled to be renovated before this project;

evaluate them as part of the overall complex to confirm field dimensions, layout compatibility, drainage performance and needs, spectator facilities, and coordination with batting cages and the new field.

• Evaluate and confirm the field dimensions and layout for all three fields, including the two existing fields in their current locations and the proposed third field. Assess orientation, safety zones, foul territory, dugouts, backstops, bullpens or warm-up spaces, team and official areas, spectator viewing, scoreboards, fencing, and maintenance access, subject to County confirmation of the desired levels of play. Identify any field-size or layout adjustments needed to create a consistent, functional complex.

RFQ #RFQ 011227 DOCUMENTS Page 10

• Design all three playing fields with natural-grass playing surfaces. Evaluate the natural-grass field construction, soil profile, grading, drainage, irrigation, turfgrass establishment, and maintenance requirements needed to support the intended levels of play and expected use. For the two existing fields, evaluate dimensions, drainage, and coordination with the renovations planned before this project; identify any additional work required to integrate them with the completed complex.

• Develop concepts for natural-grass playing surfaces, field grading, subsurface and surface drainage, irrigation, lighting, electrical service, and other systems needed for reliable use and maintenance.

• Show relationships among the fields, central support building, parking, pedestrian routes, other park uses, and emergency/service access.

• Identify any conflicts between the master-plan concept and current conditions, and present recommended resolutions to the County.

Task 4 – Concession, Restroom, and Press Box Facility

• Develop a conceptual program and building layout for a shared facility centrally located to serve all three fields, incorporating concessions, public restrooms, and a press box.

• Evaluate building location, spectator and staff access, press-box views, concession queuing and service, accessible circulation, storage, janitorial functions, mechanical/electrical/plumbing needs, waste handling, and service/delivery access.

• Prepare conceptual floor plan(s), building elevations or massing studies, approximate building area, outline of anticipated materials and systems, and basic code/accessibility considerations.

• Coordinate architectural concepts with structural, mechanical, electrical, plumbing, fire/life-safety, communications, and site utility requirements at a level appropriate to the design phase.

Task 5 – Parking, Site Civil, Utilities, and Stormwater

• Develop parking and circulation concepts based on anticipated everyday and tournament use, including accessible parking, pedestrian connections, drop-off/queuing where needed, emergency access, service access, and safe separation of vehicles and pedestrians. Include new or improved bleachers and batting cages in the overall site layout and assess their locations, access, safety clearances, and relationships to all three fields.

• Prepare conceptual grading and drainage plans and evaluate stormwater management requirements for the proposed development.

RFQ #RFQ 011227 DOCUMENTS Page 11

• Identify anticipated water, sewer, electrical, communications, and other utility connections or upgrades, including preliminary service capacity considerations where information is available.

• Coordinate erosion and sediment control, stormwater, and other site development requirements and identify the anticipated permits, agency approvals, and additional information required for applications.

• Identify the likely permitting pathway and prepare conceptual materials suitable to support preliminary agency discussions. Formal permit applications and final permit-ready construction documents shall be included only if expressly agreed in the final scope.

Task 6 – Landscape Architecture and Site Amenities

• Prepare a conceptual landscape plan that considers shade, tree preservation, planting, screening, buffers, site identity, and long-term maintenance.

• Coordinate accessible pedestrian routes, spectator gathering areas, signage and wayfinding, trash receptacles, and other supporting amenities.

• Coordinate landscaping with field safety areas, utilities, lighting, stormwater facilities, parking, and maintenance access.

Task 7 – Detailed Cost Estimate, Escalation, Phasing, and Budget Support

• Prepare a detailed, quantity-based opinion of probable construction cost aligned with the conceptual design and organized by major work category, including natural-grass field construction and renovation integration, building, parking and paving, grading, drainage/stormwater, utilities, lighting, landscaping, demolition, equipment, and other site improvements.

• Document the estimate date, design maturity, basis of estimate, quantities, unit-cost sources or methodology, allowances, contingencies, exclusions, and key risks. State the assumed construction start or midpoint year and show the escalation methodology and allowance used to translate the estimate to that future period. Identify costs that are uncertain or dependent on further investigation.

• Show construction costs separately from design fees, survey and testing, permitting, furnishings/equipment, owner costs, and other non-construction costs, to the extent information is available. Clearly identify which items are included, excluded, or carried as allowances.

RFQ #RFQ 011227 DOCUMENTS Page 12

• Provide cost comparisons for major alternatives where they materially affect the project budget, and identify the cost and operational implications of practical construction phasing. Do not include artificial turf or other synthetic playing surfaces as an alternative.

• Recommend practical implementation or construction phasing options if the County elects to construct the project in stages. Identify dependencies between the existing-field renovations planned before this project, the third field, shared support building, parking, and infrastructure.

• Review the estimate with the County, revise it to reflect agreed design decisions and comments, and provide a concise list of major cost drivers, risks, assumptions, exclusions, and information that should be refreshed before final design or construction procurement.

Task 8 – Phase 1 Conceptual Design Package and Presentation

• Prepare a coordinated conceptual design package that includes an existing-conditions/base plan; proposed overall site and three-field layout; parking/circulation and accessibility concepts; conceptual grading and stormwater approach; utility concept;

lighting and landscape concepts; and conceptual plans/massing for the shared concession/restroom/press-box building.

• Include a written design narrative describing the proposed improvements, key design criteria, operational considerations, assumptions, unresolved items, and recommended next steps.

• Provide the detailed opinion of probable construction cost, estimate basis and escalation assumptions, cost-risk items, and a preliminary implementation/phasing schedule that recognizes that construction funding may not be available for several years.

• Present the concept and estimate to County staff and, if requested, Parks and Recreation leadership or other designated stakeholders. Incorporate one consolidated round of

County comments and issue a final Phase 1 package.

• Provide electronic deliverables in PDF and editable/native formats appropriate to the disciplines and agreed scope.

Task 9 – Future Phases (Separately Authorized)

After the County reviews the Phase 1 deliverables and approves a project budget, it may elect to authorize subsequent services. Potential future services may include design development, final architectural and engineering design, permit applications and responses to permitting agencies, construction documents and specifications, bidding assistance, and construction-phase services.

Respondents should describe their capability to provide these services and may identify a separate, non-binding planning-level approach or fee information if requested by the County.

RFQ #RFQ 011227 DOCUMENTS Page 13

Any later phase shall be subject to available funding, applicable County procurement requirements, negotiation, and written authorization. The initial Phase 1 agreement shall not obligate the County to proceed with any subsequent phase, and future services shall not be represented as guaranteed.

4.4. Deliverables

• Phase 1 kickoff notes, work plan, and schedule.

• Review of the 2024 Master Plan recommendations relevant to the baseball/softball complex.

• Existing-conditions survey/base mapping appropriate to the agreed Phase 1 scope, including stated limitations and any additional information needed before final design.

• Conceptual three-field baseball/softball complex layout retaining the two existing fields in their current locations, incorporating their planned prior renovations, and adding the proposed third field.

• Conceptual plan for the shared concession/restroom/press-box building, with associated bleachers and batting-cage locations and circulation shown.

• Conceptual parking, circulation, accessible routes, utilities, grading, stormwater, lighting, and landscape plans.

• Design narrative, assumptions and constraints log, preliminary permitting/agency coordination matrix, deferred-investigation list, and recommended next steps.

• Detailed opinion of probable construction cost with estimate date, quantity/basis documentation, allowances, contingencies, exclusions, escalation assumptions to a stated future construction period, and separate identification of non-construction/owner costs.

• Preliminary implementation/phasing strategy and schedule, including dependencies on prior renovations to the two existing fields and a list of information that should be verified or updated before final design.

• Final Phase 1 presentation and electronic files in PDF and appropriate editable/native formats.

4.5. Consultant Team and Qualifications

The prime consultant shall demonstrate the ability to lead and coordinate a multi-disciplinary team. The team should include the disciplines necessary for the proposed scope, either in-house or through qualified subconsultants:

• Project management and athletic/recreation facility planning.

RFQ #RFQ 011227 DOCUMENTS Page 14

• Professional land surveying.

• Civil engineering, including grading, drainage, stormwater, parking, and utilities.

• Architecture for the concession/restroom/press-box facility.

• Structural, mechanical, electrical, plumbing, and fire/life-safety engineering as required.

• Landscape architecture.

• Baseball/softball sports-field design, including field grading, drainage, irrigation, surface systems, lighting, and related facilities.

• Geotechnical, environmental, permitting, traffic, or other specialty services as warranted.

The prime consultant and applicable subconsultants shall hold professional licenses required to perform their services in South Carolina. Identify the project manager, key technical leads, proposed subconsultants, roles and responsibilities, and anticipated level of involvement.

QUALIFICATION SUBMISSION INSTRUCTIONS

1. Award shall be posted on the County's Procurement Portal.

2. Prohibition of Gratuities: It shall be unethical for any person to offer, or give, or agree to give any County employee or former County employee, or for any County employee or former County employee to solicit, demand, accept, or agree to accept from another person, a gratuity or an offer of employment in connection with any decision, approval, disapproval, recommendation, or preparation of any part of a purchase request, influencing the content of any specification or procurement standard, rendering of advice, investigation, auditing, or in any other advisory capacity in any proceeding or application, request for ruling, determination, claim or controversy, or other particular matter, pertaining to any program requirement or a contract or subcontract, or to any solicitation or proposal therefore.

3. Questions

A. Submit questions you have through the Procurement Portal no later than 5:00 pm on

Wednesday, December 30, 2026.

B. Answers to questions received that would change and/or clarify this solicitation will be posted on the Procurement Portal as addendum.

C. Selection Committee members SHALL NOT be contacted during the RFQ process.

4. In order to do business with the Beaufort County, vendors must register through the

Procurement Portal at https://procurement.opengov.com/portal/bcgov. Registering allows https://procurement.opengov.com/portal/bcgov

RFQ #RFQ 011227 DOCUMENTS Page 15 businesses to identify the type of goods and services they provide so that they may receive email notifications regarding relevant solicitations out for bid.

EVALUATION CRITERIA

No. Evaluation Criteria Scoring Method Weight (Points)

1. Experience with Public Athletic

Facilities

Relevant experience delivering comparable baseball/softball complexes and public athletic facilities, including natural-grass fields, support buildings, and associated site improvements.

0-100 Points 25 (25% of Total)

2. Qualifications and Experience of the Project Manager and

Multidisciplinary Team

Qualifications and relevant experience of the project manager and key personnel, including the team’s ability to coordinate the architectural, engineering, surveying, and sports-field design disciplines required for the project.

0-100 Points 25 (25% of Total)

3. Understanding of the Project and

Proposed Conceptual Design

Approach

Understanding of the County’s project objectives, existing conditions, and Master Plan recommendations, and the proposed approach to developing an integrated conceptual design that supports future budgeting and implementation.

0-100 Points 20 (20% of Total)

RFQ #RFQ 011227 DOCUMENTS Page 16

4. Cost Estimating, Quality

Assurance, and Permitting

Approach

Approach to developing a detailed, reliable construction cost estimate, maintaining design quality and coordination, identifying project risks, and evaluating permitting requirements and feasibility.

0-100 Points 15 (15% of Total)

5. Project Schedule, Staff

Availability, and Client

References

Ability to meet the anticipated project schedule, availability of key personnel, reasonableness of the proposed work plan, and demonstrated performance on comparable projects.

0-100 Points 15 (15% of Total)

QUALIFICATION SUBMITTAL

1. Firm confirms the proposal is firm for a period of at least 90 days from the closing date for submission of proposal.*

☐ Please confirm

*Response required

2. Certification regarding Debarment, Suspension, Ineligibility, and Voluntary exclusion*

The contractor certifies, by submission of this qualification statement or acceptance of a contract, that neither it nor its principals is presently debarred, suspended, proposed for debarment, declared ineligible, or voluntarily excluded from participation in this transaction by any State, Federal department, or agency.

It further agrees by submitting this qualification statement that it will include this clause without modification in all lower tier transactions, solicitations, proposals, contracts, and subcontracts.

Where the bidder/contractor or any lower tier participant is unable to certify to this statement, it shall attach an explanation to this solicitation/bid.

☐ Please confirm

*Response required

3. Has your company been involved in any litigation within the past five (5) years, arising out of your performance. *

RFQ #RFQ 011227 DOCUMENTS Page 17

☐ Yes

☐ No

*Response required

When equals "Yes"

3.1. Explain fully any litigation involving performance.*

*Response required

4. Non-Segregated Facilities*

CERTIFICATION BY CONTRACTOR

Regarding

NON-SEGREGATED FACILITIES

The Bidder certifies that he does not, and will not, provide and maintain segregated facilities for his employees at his establishments and, further that he does not, and will not, permit his employees to perform their services at those locations, under his control, where segregated facilities are provided and maintained. Segregated fountains, transportation, parking, entertainment, recreation, ad housing facilities; waiting, rest, wash, dressing, and locker room, and time clock, work, storage, restaurant, and other eating areas which are set apart in fact, or by explicit directive, habit, local custom, or otherwise, based on color, creed, national origin, and race. The Bidder agrees that, except where he has obtained identical certifications from proposed subcontractors for specific time periods, he will obtain identical certifications from proposed subcontractors prior to the award of subcontractors exceeding $10,000.00 which are not exempt from the provisions of the Equal Opportunity clause, and that he will retain such certifications in his files.

The Bidder agrees that a breach of this certification is a violation of the Equal Opportunity clause in this Contract. The penalty for making false statements is prescribed in 18 U.S.C. 1001.

☐ Please confirm

*Response required

5. Please upload any relevant certifications and/or licenses

6. Qualification Statement*

To achieve a uniform review process and allow for adequate comparability, the information is to be organized in the manner specified below and the entire package must not exceed 15 double-sided printed pages excluding cover pages. Please include a cover page at the start of each section.

1. Executive Summary: Summary of your company's mission, management, services provided, and competitive advantage

2. Approach to the Planning Process: Explanation of the process to the Firm's Planning

Process for project kickoff

RFQ #RFQ 011227 DOCUMENTS Page 18

3. Work Plan and Scheduling: A summary of tasks to be performed from evaluation of data through County approval of the final plan. Include a timeline of key milestone to include overall durations for each major task.

4. Experience and Qualifications: Experience and qualifications of the team members, with an emphasis on similar type project completed within the last five (5) years. Provide an organization chart including sub-consultants and contractors.

5. List any exceptions, qualifications, or exclusions to this RFP

*Response required

RESERVED RIGHTS

The County shall not be responsible for any of the costs associated with responding to this request and all submitted materials shall become the property of the County. Furthermore, the County expressly reserves the right and options to:

• Reject any or all consultants and re-advertise if deemed necessary

• Waive any or all formalities and technicalities

• Approve, disapprove, or cancel all services associated with the project

The County has yet to decide whether to select one or more other firms to provide some or all of the professional services described in this document. All selected firms will perform such services under the direct supervision of Beaufort County.

SELECTION AND NOTIFICATION

The selected firms will be given written notification of being selected by the County. This work may be awarded in whole or in part at the sole discretion of the County. The County will negotiate and execute a contract with the selected firm(s) prior to the beginning of the actual services. Should contract negotiations fail, the County will negotiate with one or the other highly ranked firms. In general, the contract will comply with applicable laws and standard provisions and shall contain the following terms:

• Detailed scope of services

• Schedule for providing services

BEAUFORT COUNTY STANDARDS FOR CONTRACTING

CHAPTER 1. TYPES OF CONSULTANT SERVICES REQUIRED:

Please see Scope of Work Section.

CHAPTER 2. PROCEDURES FOR SELECTION OF CONSULTANTS

RFQ #RFQ 011227 DOCUMENTS Page 19

2-1. GENERAL

Qualifications-based procedures require that a contract for consulting services be awarded pursuant to a fair and open selection process based on the qualifications of the firms. The fees for such services are established following selection of a firm through a negotiation process to determine a fair and reasonable price.

2-2. OBJECTIVE

Consultants employed for work on projects shall be responsible and possess the ability to perform successfully under the terms and conditions of the proposed procurement. Consideration shall be given to such matters as integrity, record of past performance, extent of experience with the type of services required by the sponsor, technical resources, and accessibility to other necessary resources.

2-3. QUALIFICATIONS-BASED SELECTION PROCEDURES.

Consultants shall be selected based on their qualifications and experience, with fees determined through negotiations following selection. The highest ranked offeror shall be selected, and price proposals shall be negotiated with one or more of the firms identified through the qualifications-based selection procedure.

2-4. SELECTION CRITERIA.

Criteria include, but are not limited to, the following:

1. Please see the Evaluation Criteria Section.

CHAPTER 3. CONTRACT FORMAT

3-1. MANDATORY CONTRACT PROVISIONS.

All contracts involving State or Federal funds must contain the applicable procurement standards in 49 CFR 18.36. Listed below are those provisions which pertain to consultant contracts:

1. Contracts shall contain provisions or conditions which will allow for administrative, contractual, or legal remedies in instances where contractors violate or breach contract terms and provide for sanctions and penalties as may be appropriate.

2. Contracts over $10,000 shall contain suitable provisions for termination by the sponsor, including how it will be affected and the basis for settlement. In addition, contracts shall describe conditions under which the contract may be terminated for default as well as conditions where the contract may be terminated because of circumstances beyond the control of the consultant.

3. All negotiated contracts shall include provisions to the effect that sponsors, the Federal

Department of Transportation, the Comptroller General of the United States, or any of the duly authorized representatives shall have access to any books, documents, papers, and

RFQ #RFQ 011227 DOCUMENTS Page 20 records of consultants which are directly pertinent to a specific grant program, for the purpose of making audits, examinations, excerpts, and transcriptions. Sponsors shall require consultants to maintain all required records for 3 years after the sponsor makes final payment and all other pending matters are closed.

4. In addition to the requirements contained in 49 CFR Section 23, Participation by

Minority Business Enterprises in Department of Transportation Programs, and AC

150/5100-15, Civil Rights Requirements for the Airport Improvement Program, current edition, the Title VI, and Disadvantaged Business Enterprise Assurances in Appendix 1 shall be included in each contract.

3-2. TIME OVERRUNS BEYOND CONTROL OF THE CONSULTANT.

Frequently, the consultant is called upon to continue technical inspection services on construction contracts--overrunning the program schedule contemplated at the time of negotiation. In most instances, the time element is beyond the control of the consultant. To provide for the contingency of overrun of time, the agreement between the County and the consultant will state the period for which the compensation shall apply and that the consultant shall be reimbursed for services in excess of the specified period of time at a mutually acceptable fee negotiated at the time all the pertinent circumstances are known.

CHAPTER 4. METHODS OF CONTRACTING AND ALLOWABLE COSTS

4-1. ALLOWABLE COSTS.

1. Direct Salary Costs.

A. Direct salary cost is defined as the cost of salaries of engineers, draftsmen, surveyors, stenographers, clerks, etc., for time directly chargeable to the project.

B. Salaries or imputed salaries of partners or principals, to the extent that they perform technical or advisory services directly applicable to the project, are to be added to salary cost.

2. Overhead Costs. Overhead costs include overhead on direct salary costs and general and administrative overhead.

A. Labor Overhead. Overhead on direct salary costs includes sick leave, vacation, and holiday pay; unemployment, excise, and payroll taxes; contributions for social security, employment compensation insurance, retirement benefits, and medical insurance benefits; and any other benefits customarily paid to or enjoyed by all employees. The allowable percentage for labor overhead allocable to a project is the ratio of (a) a firm's total direct labor overhead costs to (b) a firm's total direct salary costs (excluding overtime) for a given period, usually the average for the past 3 years.

RFQ #RFQ 011227 DOCUMENTS Page 21

B. General and Administrative Overhead. General and administrative overhead includes the following indirect costs which are not directly attributable to specific projects.

a. Provisions for office, light, heat, and similar terms for working space, depreciation allowances or rental for furniture, drafting equipment and engineering instruments, and office and drafting supplies not identifiable to specific projects.

b. Taxes and insurance other than those included as salary cost but excluding state and Federal income taxes.

c. Library and periodical expenses, and other means of keeping abreast of advances in engineering such as attendance at technical and professional meetings and subscriptions to trade, business, professional, or technical periodicals.

d. Executive, administrative, accounting, legal, stenographic, and clerical salaries, and expenses (other than identifiable salaries included in salary costs and expenses included in reimbursable non-salary expenses, plus salaries or imputed salaries of partners and principals) to the extent that they perform general executive and administrative services as distinguished from technical or advisory services directly applicable to projects.

e. Costs of memberships in trade, business, technical, and professional organizations.

f. Incentive compensation for management employees, cash bonuses, suggestion awards, safety awards, and incentive compensation based on production, cost reduction, or efficient performance are allowable to the extent that the overall compensation is determined to be reasonable, and such costs are paid or accrued pursuant to an agreement entered into in good faith between the consultant and the employees before the services are rendered or pursuant to an established plan followed by the consultant so consistently as to imply, in effect, an agreement to make such payment. The allowable percentage for general and administrative overhead allocable to a project is the ratio of (a) all general and administrative costs to (b) total direct salary costs (excluding overtime) for a given period, usually the average for the past 3 years.

3. Direct Non-salary Expenses. Direct non-salary expenses usually incurred may include the following (detailed records must be kept supporting charges and allow auditing):

A. Living and traveling expenses of employees, partners, and principals when away from the home office on business connected with the project. (Records must include employee name, dates, points of travel, mileage rate, lodging, and meals.)

RFQ #RFQ 011227 DOCUMENTS Page 22

B. Identifiable communication expenses such as long-distance telephone, telegraph, cable, express charges, and postage, other than for general correspondence.

C. Services directly applicable to the work such as special legal and accounting expenses, computer rental and programming costs, special consultants, borings, laboratory charges, commercial printing and bindings, and similar costs that is not applicable to general overhead.

D. Identifiable drafting supplies and stenographic supplies and expenses charged to the sponsor's work as distinguished from such supplies and expenses that are applicable to two or more projects.

E. Identifiable reproduction costs applicable to the work such as blueprinting, photosetting, mimeographing, printing, etc.

F. Advertising costs which are solely for the recruitment of personnel required for the performance by the consultant of obligations arising under the contract.

4-2. NON-ALLOWABLE COSTS.

The expenses listed below are not allowable for reimbursement:

1. Costs of amusement and social activities and incidental costs relating thereto such as meals, lodging, rentals, transportation, and gratuities.

2. Contributions and donations.

3. Bad debts, including losses due to uncollectible customer's accounts and other claims, related collection costs, and related legal costs, arising from other businesses of the consultant.

4. Dividend provisions or payments and, in the case of sole proprietors and partners, distributions of profit.

5. Interest on borrowed capital.

6. Bonus payment for early completion of work.

4-3. FIXED PAYMENT.

To all the estimated costs, including overhead, a percentage rate is applied to determine payment for profit, willingness to serve, and assumption of responsibility.

CHAPTER 5. BEAUFORT COUNTY STANDARD CLAUSES

CONTRACTUAL REQUIREMENTS

1.0 EXCUSABLE DELAY: The Contractor shall not be liable for any excess costs, if the failure to perform the contract arises out of causes beyond the control and without the fault or

RFQ #RFQ 011227 DOCUMENTS Page 23 negligence of the Contractor. Such causes may include, but are not restricted to, acts of God or of the public enemy, acts of the Government in either its sovereign or contractual capacity, fires, floods, epidemics, quarantine restrictions, strikes, freight embargoes, and unusually severe weather; but in every case the failure to perform must be beyond the control and without the fault or negligence of the Contractor. If the failure to perform is caused by the default of a subcontractor, and if such default arises out of causes beyond the control of both the Contractor and the subcontractor, and without the fault or negligence of either of them, the Contractor shall not be liable for any excess costs for failure to perform, unless the supplies or services to be furnished by the subcontractor were obtainable from other sources in sufficient time to permit the

Contractor to meet the required delivery schedule.

2.0 S.C. LAW CLAUSE: Upon award of a contract under this Request for PROPOSALS, the person, partnership, association, or corporation to whom the award is made must comply with local and State laws which require such person or entity to be authorized and/or licensed to do business in Beaufort County. Notwithstanding the fact that applicable statutes may exempt or exclude the successful offeror from requirements that it be authorized and/or licensed to do business in

Beaufort County, by submission of this signed Request for PROPOSALS the offeror agrees to subject itself to the jurisdiction and process of the Fourteenth Judicial Circuit Court of Beaufort

County, as to all matters and disputes arising or to arise under the contract and the performance thereof including any questions as to the liability for taxes, licenses, or fees levied by State or local government.

3.0 OFFEROR’S PROPOSALS: Offeror must, upon request of the County, furnish satisfactory evidence of their ability to furnish products or services in accordance with the terms and conditions of this Request for PROPOSALS. The Procurement Services Department reserves the right to make the final determination as to the offeror’s ability to provide the services requested herein, before entering into any contract.

4.0 OFFEROR RESPONSIBILITY: Each offeror shall fully acquaint himself with conditions relating to the scope and restrictions attending the execution of the work under the conditions of this Request for PROPOSALS. It is expected that this will sometimes require on-site observation. The failure or omission of an offeror to acquaint themselves with existing conditions shall in no way relieve him of any obligation with respect to this Request for PROPOSALS or to the contract.

5.0 AFFIRMATIVE ACTION: The Contractor will take affirmative action in complying with all Federal and State requirements concerning fair employment and employment of the handicapped and concerning the treatment of all employees, without regard or discrimination by reason of race, religion, sex, national origin, or physical handicap.

6.0 PRIME CONTRACTOR RESPONSIBILITIES: The Contractor will be required to assume sole responsibility for the complete effort, as required by this RFP. The County will consider the

Contractor to be the sole point of contact with regard to contractual matters.

7.0 SUBCONTRACTING: If any part of the work covered by this RFP is to be subcontracted, the Contractor shall identify the subcontracting organization and the contractual arrangements

RFQ #RFQ 011227 DOCUMENTS Page 24 made with same. All subcontractors must be approved, in writing by the County, or when applicable a political subdivision within the County with the County’s concurrence. The successful offeror will also furnish the corporate or company name and the names of the officers of any subcontractors engaged by the vendor. The County reserves the right to reject any or all subcontractors and require substitution of a firm qualified to participate in the work as specified herein.

8.0 OWNERSHIP OF MATERIAL: Ownership of all data, material, and documentation originated and prepared for the County pursuant to this contract shall belong exclusively to the

County.

9.0 PERFORMANCE AND PAYMENT BONDS: (NOT Required for Professional Services)

The successful Contractor shall furnish, within ten (10) days after written notice of acceptance of

Request for PROPOSALS, Performance and Payment Bonds. Contractor shall provide and pay the cost of a both bonds. The Bonds shall be in the amount of one hundred percent (100%) the contract, issued by a Surety Company licensed in South Carolina with an “A” minimum rating of performance as stated in the most current publication of “Best’s Key Rating Guide, Property

Liability” which shall show a financial strength rating of at least five (5) times the Contract

Price. The Bond shall…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .