Burke County FTTP Bidder Pricing Sheet.xlsx

XLSX spreadsheet 19 KB Posted

Attached to
Fiber Optic Materials Procurement
Solicitation number
PE-61700-NONST-2026-000000071
Issued by
Calhoun County, Georgia

About this file

This is a Fiber to the Premises (FTTP) material bid response form for Burke County, Georgia, requesting pricing on fiber cable and handhole equipment for a broadband infrastructure project. The bid form specifies quantities for eleven fiber cable line items across various configurations, including 24-count through 432-count single-mode loose tube and ribbon armored cables in G.652.D specification, with quantities ranging from 15,000 to 1,570,000 feet. Additionally, the form requests pricing for nine handhole line items in multiple sizes and tiers, with quantities ranging from 24 to 2,942 units each. Bidders are required to complete all yellow-highlighted cells with unit pricing, manufacturer information, manufacturing location, lead time in days, and separate shipping costs for each line item. All materials must comply with Build America, Buy America (BABA) requirements per NTIA guidelines, with bidders selecting "Yes" or "No" from a dropdown menu for each item.

The pricing form calculates extended prices and total line costs automatically through embedded formulas in gray cells that bidders may not modify. Bidders must submit the completed form to the Burke County Manager's Office, with the form tracking subtotals for extended pricing and shipping costs separately for Section A (Fiber Cable) and Section B (Handholes), culminating in a combined grand total bid amount. The spreadsheet includes fields for bidder company name, date of submission, and contact information, ensuring all necessary procurement details are captured for evaluation by Burke County.

View the file

Other files

File Type Posted
Fiber Optic Materials Procurement Packet Fibe.docx DOCX document

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Bid Response

Burke County, GA — FTTP Material Bid Response Form
Fiber & Handhole Pricing Schedule
INSTRUCTIONS FOR BIDDERS:
1. Complete all yellow-highlighted cells for each line item you are bidding on.
2. Enter your company's unit price, manufacturer name, manufacturing location, and lead time for each item.
3. For BABA Compliance, select "Yes" or "No" from the dropdown. All materials must comply with Build America, Buy America (BABA) requirements per NTIA guidelines.
4. Shipping costs must be entered separately per line item in the Shipping Cost column.
5. Do not modify gray cells — these contain formulas.
6. Submit completed form to Burke County Manager's Office.
Bidder Company Name:Date:
Contact Name:Contact Email:
SECTION A: FIBER CABLE
Line ItemItem DescriptionPart NumberQuantityUnit of MeasureUnit PriceExtended PriceManufacturerManufacturing LocationBABA CompliantLead Time (Days)Shipping CostTotal Line Cost
124-Count Single-Mode Loose Tube Armored Fiber Cable G.652.D1,570,000Feet
248-Count Single-Mode Loose Tube Armored Fiber Cable G.652.D897,000Feet
372-Count Single-Mode Loose Tube Armored Fiber Cable G.652.D15,000Feet
496-Count Single-Mode Loose Tube Armored Fiber Cable G.652.D525,000Feet
5144-Count Single-Mode Loose Tube Armored Fiber Cable G.652.D495,000Feet
6288-Count Single-Mode Loose Tube Armored Fiber Cable G.652.D145,000Feet
7432-Count Single-Mode Loose Tube Armored Fiber Cable G.652.D25,000Feet
896-Count Single-Mode Ribbon Armored Fiber Cable G.652.D525,000Feet
9144-Count Single-Mode Ribbon Armored Fber Cable G.652.D495,000Feet
10288-Count Single-Mode Ribbon Armored Fiber Cable G.652.D145,000Feet
11432-Count Single-Mode Ribbon Armored Fiber Cable G.652.D25,000Feet
12
13
14
15
Subtotal Extended Price:$0.00
Subtotal Shipping:$0.00
Grand Total Section A:$0.00
SECTION B: HANDHOLES
Line ItemItem DescriptionPart NumberQuantityUnit of MeasureUnit PriceExtended PriceManufacturerManufacturing LocationBABA CompliantLead Time (Days)Shipping CostTotal Line Cost
117"x30"x24" Handhole w/ Cover (Tier 15)2,942Each
224"x36"x24" Handhole w/ Cover (Tier 15)1,159Each
330"x48"x30" Handhole w/ Split Lid Cover (Tier 15)165Each
436"x60"x36" Handhole w/ Split Lid Cover (Tier 15)24Each
517"x30"x24" Handhole w/ Cover (Tier 22)2,942Each
624"x36"x24" Handhole w/ Cover (Tier 22)1,159Each
730"x48"x30" Handhole w/ Split Lid Cover (Tier 22)165Each
836"x60"x36" Handhole w/ Split Lid Cover (Tier 22)24Each
936"x60"x36" Handhole Lid Conversion Cabinet (LCC) – includes hole for lid conversion cabinet42Each
10
Subtotal Extended Price:$0.00
Subtotal Shipping:$0.00
Grand Total Section B:$0.00
COMBINED BID TOTAL
Total Materials (Extended):$0.00
Total Shipping:$0.00
GRAND TOTAL BID AMOUNT:$0.00