C D E F G H I J K

Great Lakes St. Lawrence

Seaway Dev. Corporation Buoy Barge BPL-6704

Statement of Work List

Work Scope Designations

A Items that need Naval Architect and/or Marine Engineering assistance. SNAME/ Mechanical Engineering/

Electrical Engineering.

B Critical Dry Dock Work needed to be completed in a shipyard.

C Option - Work needed but can be completed dockside either at GLS (Massena) or Shipyard.

D Option Work that could help streamline maintenance or operations of the vessel.

Item No. Priority Category Item Description A B C D

1 High Modifications Push Kness & associated structure / reinforcement

SNAME (Structure/Load) - (Robert Allan) Engineer and design fabrication drawings and fabricate pushing pads and structure upgrades for possible additions of transvers or longitudinal stringers and possibly spider webbing of trusses between to strengthen stern of barge to accept the Tug Seaway Guardians pushing knees to mate for pushing configuration and still allow for the use of the Robinson Bay and new HT-60 tug in the notch. Possible upgrades would include vertical doubler pads welded on stern to allow for wear of pushing knees, C-channel welded to sides of pushing pads to reduce side deflection and keep tug pushing knee pads centered on doubler pads, vertical deck structure to continue contact to tug pushing knees during all trim configuration of both vessels and to transfer force through all structure below deck. Below deck there may need to be additional gussets and deflection beams installed to transfer load to longitudinal deck and overhead stringers, any other structural additions that is engineered in to transfer load throughout structure. (See supporting pictures of below deck notch structure) (Adjust fixed stone ballast as needed for trim after steel structure added for knees and gangway) (Design and layout and selection of all associated deck fittings to moor Seaway Guardian, Robinson Bay and HT-60 vessels)(Update and modifications of drawings to show new structure and upgrades)

X X

2 High Modifications Gangway SNAME (Structure/Load) - (Robert Allan) Design, fabricate, install aluminum gangway located on platform atop pushing knee structure to allow for safe embarkation point to and from Buoy Barge (See supporting pictures)

X X

3 High Modifications

Deck Fittings (Bitts, Fairleads, roller chocks, cleats) for compatibility for Tug "SEAWAY

GUARDIAN"

SNAME (Structure/Load) - (NDT existing double bits and survey) Replace all existing double bits on deck with owner specified Schoellhorn-Albrecht or equal and weld on safe working load rating. In addition to replacing existing shop made pipe bits with cast/certified bits, add additional single bits on each side of buoy port, new

42” kevel C/L aft just forward of pushing knees or cruciform bit to allow tugs other than Seaway Guardian to make up to stern of barge, on the stern of the barge add a) single bit, P & S aft corner, for anchoring of synthetic barge lines to. b) inside of the single bit add a 16” composite single roller, P & S, to allow for barge winch synthetic line from Seaway Guardian to turn around and head back to the vessel to be anchored to the amidships bits to make tight. Closed Panama style chocks may need to be added back aft to provide proper line routing on deck. We will need to provide a mooring drawing for both dock and vessel to stern.

X X

4 High Modifications

Barge Bow Thruster -provision of umbilical for remote operations

SNAME (Electrical/Electronic Review with PMC) - Upgrade bow thruster umbilical connection on barge to mate to new Seaway Guardian quick attachment ILME plug. This will require the replacement of the existing umbilical connection box on the aft deck with a new NEMA 4X stainless steel junction box. New depth-sounder transducer cable umbilical will need to be incorporated either into this new box or the addition of separate insulated box and new umbilical manufactured and installed. The current umbilical connection location is on the port side of the stern notch and may need to be moved to the stern more and away from the notch to allow room for new embarkation stairs and stern navigational lighting mast. This will also require the engineering and building of two new umbilical cables with the matching ILME quick connect plugs installed. Cables should be a minimum of

25 feet long and meet propper ratings for unprotected use in exterior environments. Requirements should meet specifications set forth by PMC - Prime Mover Controls, the manufacturer of the bow thruster.

X X

5 High Life Extension External Deck Coatings Paint Specification - Blast exterior of deck house and provide new exterior coatings as well as new non-skid on top deck for safety boat access. (Zinc Deck Paint) X X

6 High Life Extension Coatings

Paint Specification - Blast and coat with specified paint coatings (International Paint Supply) any bulkhead/stiffener/gusset/shell plate/decking/tank wall or other structure that has had coating disturbed, hot work performed on, rust blistering or newly installed. This will include any tank, void space, interior space, engine room decking or bulkhead, exterior accommodations, exterior working decks, shell plating and under side coatings as per paint specifications.

X X

7 High Life Extension On-Deck Coatings -

Preparations

Paint Specification - Remove and smooth any deck protrusions from deck or deck anchor tabs verified by owner before high zinc solids deck coating is applied.

X X

C D E F G H I J K

8 High Repair

Skin Coolers - coolers, piping, valves, steel replacement: Inspection, repair, replacement

SNAME (Structure/Load) - Inspect thickness of port side skin cooler decking at base of stairs/entrance to engine room, as the deck plate has become spongy. Replace skin cooler plating if needed, clean cooler internals and install new skin plate with double plate that covers base of stairs to past engine room door to protect skin cooler and attach tabs for mounting new stair case to. Replace all vents and fill valves on both P & S skin coolers.

Replace and or repair any coolant piping that need repair outside of engine room.

X X

9 High Repair Buoy Ports (Repair) Engineering to produce build drawings - Repair D-rubber transition ramps at buoy ports. Fabricate and weld to ramp a new steel structure to protect D-rubber fendering located on port and starboard sides of barge.

X X

10 High Safety Electrical Panel

Replacement

Electrical - Update to 480V service panels. Replacement of panels to latest electrical code and serviceable breakers. Existing 480V breaker panels are now non-serviceable as those breakers are not manufactured anymore.

X X

11 High Safety Fire Detection System Design/Install Fire Detection System for monitoring of engine room and all working spaces, including Dog House.

Install of detection monitoring station in dog house by entrance door on left side.

x x

12 High Safety Safety Placards IMO labeling of all safety devices to match safety plan. X

13 High Safety Stanchions & Railings

(Renewal)

Engineering to produce build drawings - Fabricate and install 3” heavy wall deck safety cable railing pipe stanchions to match what has been installed on port side of deck. Starboard side of main deck will need the deck coaming cut off to match port side and new stanchions welded to the deck, this includes the aft side of main deck as well. Stanchion should be arranged to allow for a dedicated embarkation zones, choosen by owner, (P &

S) with stainless safety chains, pad eyes mounted to the deck for Jacobs ladder attachment point, chamfer pipe welded to deck edge (prevent chaffing to Jacobs ladder) and handles welded to sides of deck stanchions to allow for safe transition to/from ladder. Replace all stanchion safety cabling with new 3/8” 7x19 vinyl coated galvanized cable with new stainless steel turnbuckles and stainless steel swaged anchor points. (See supporting pictures) (Inspect and renew as needed)

X X

14 High Safety Internal - Ladder /

Stairway to below deck Engineering design - Replace existing stair well with new C-channel and stair treads provided by owner. Reuse existing handrails and modify as needed to install. Modify and or replace mounting tabs to suit new stair unit.

X X

15 High Safety Fire Station(s) Additions

SNAME (Structure/Regulatory) - Install two additional fire stations: one at aft main deck near notch on starboard side and one located below deck outside the engine room outboard of engine room door. Both stations should be fitted with hose storage rack. A) Main deck station should be fitted with 100’ double wall 1-1/2” NH hose, wye valve on main supply line to support the use of two hoses. This aft fire station should have the capability to be back feed via a hose from the pushing tug, valve and female 1-1/2” hose connection should be fitted at station to supply fire main. All exterior fire stations should be fitted with a covered hose storage rack box. All exterior piping should be fitted with 110V switchable heat tracing on piping back to a normally heated space below deck. Fire main piping should be sloped to allow for natural line drainage back to fire main in engine room. B) Fire station located outside engine room should be fitted with 50’ double wall 1-1/2” NH firehose. C)

Akron ProVenger pistol grip style 1-1/2” NH Heavy Duty 30-150 GPM fire nozzle or equal located at each station.

Both exterior fire stations fitted with 1-1/2” NH wye valve on main supply hydrant and hose rack cover to fit specified hose length. D) Existing fire station on starboard side of forward doghouse needs to have heat tracing installed on above deck piping to prevent freezing and covered fire hose storage box/rack installed. For both of the new fire stations, new hot dip galvanized supply piping would need to be installed from the engine room fire pump supply manifold at the sea chest. E) Additionally, the current sea chest vent piping is located in the overhead of the engine room and is now required to be vented to atmosphere external to the engine room through the main deck and next to the deck house exterior bulkhead. F) Rehab existing fire station outside of deck house to match new fire station fittings and label each fire station accordingly to safety plan.

X X

16 Safety

New Fire Pump &

Associate piping and valving

SNAME (Structure/Regulatory) - Upgrade existing fire pump to a new self-priming pump sized meet supply/demand for additional fire stations located farthest from fire pump (aft fire station located next to notch). The new pump sizing would need to be calculated to provide a water stream that reaches a minimum of

60’ with hose nozzle set on straight stream with one other station in use at the same time. The pipe friction loss, fluid dynamic equation for pump sizing would need to be calculated to place an order for a new self-priming fire pump to be placed. This system should also have a cross-over pipe to the new bilge dewatering piping/pump system mentioned in the next section (10).

C D E F G H I J K

17 High Safety New Bilge System

SNAME (Structure/Regulatory) - Upgrade of a non-existent bilge dewatering system for the entire vessel. Right now, there is a dewatering line heading aft that is part of the piping of the fire pump and sea chest. (see attached picture) But, it is cut off at the aft crane void and there are no bilge suction stations located anywhere in the lower voids of the vessel. Design new bilge suction system with new bilge suction piping located in aft voids and working spaces connected to new self-priming bilge pump in engine room. Discharge can be routed into bow thruster tunnel or through exterior void space to starboard side of engine room and fitted to side shell penetration. New bilge suction system will need be constructed of hot dipped galvanized pipe, have HDG rose box strainers at each suction point, bilge level alarms located at each bilge suction routed to an alarm panel located in doghouse, designed with either a bilge suction manifold or reach rod deck fittings located on the main deck to allow for suction from selected spaces and local and remote pump controls.

X X

18 High Navigation New Depth Sounder /

Transducer installation

SNAME (Structure) - Replace old bow transducer with new Furuno FE 8020 transceivers, transducer (CA200B-

8B/50), install gate valve and tank (GV200B-8B) for transducer, matching box (00-015-548) and umbilical NEMA

4X junction box at barge stern to connect to tugs. This will allow for integration with new Furuno display on

Seaway Guardian as well as an upgraded display on Robinson Bay (if needed). Remove mid-ships transducer from hull and weld in patch to bottom plating and remove electrical cable. This will require hot work and replacement of coatings.

X X

19 High Classification /

Statutory

Barge Tank(s) Vents &

Check Valves

SNAME (Regulatory) - Replace all main deck space/void tank vents with appropriate hot dip galvanized ball check vent heads. Also, provide sounding access for all exterior void tanks. This will require new pipe and flange deck fittings being welded/installed for bolting new flange mounted deck vent check valves to.

X X

20 Hign Classification /

Statutory

Hull Gauging / Steel

Renewal

SNAME (Structure) – Performed by Certified Marine Surveyor - Provide an internal NDT hull thickness check and inspection. Replace any bulkheads/stiffeners/gussets/shell plate/decking/tank wall with rot greater than 25% of designed thickness (as per ABS rules). Complete hull inspection and create report.

X X

21 High Classification /

Statutory

Deck Penetration Removal

(Deck)

SNAME (Structure) - Remove penetration at crane pedestal that was for pumping bilge water from void spaces.

Remove and plug fill deck.

X X

22 High Classification /

Statutory

Penetration Removal

(Internal)

SNAME (Structure) - Plug fill and weld open penetration in port side transverse watertight bulkhead at crane pedestal.

X X

23 High Classification /

Statutory

Electrical Main 480V Bus

Board Replacement

Electrical - Main 480V bus board needs to be updated with working gauges and displays to suit existing generator controls and feedback and shore power feed.

X X

24 High Classification /

Statutory External Hull Markings

Design template drawings - Weld to stern, cutout steel plate letters (1/4” thick/8” tall letters for name and 5” tall for home port) to spell out name and home port welded to stern both sides. Refurbish draft marks as needed. Paint letters to contrasting paint scheme from hull color.

X X

25 High Classification /

Statutory

Barge Calculations for

Weight & Stability Need to perform and Certify the following calculations:

X

a) Tonnage Review

b) Tonnage Calculation

c) Deck Load Review

d) Deck Load Calculation

e) Tank Soundings Review

f) Tank Soundings Calculation

g) Trim and Stability Review

h) Trim and Stability Calculation

i) Question do we need a load line certificate and Plimsol marks added to the barge?

Certification Renewal

j) Compile all Certificates for the vessel (safety equipment, deck and crane rigging, ground tackle rigging, navigational lights, fire-fighting equipment, life-saving equipment, deck equipment, machinery and load test certificates (wire ropes, crane winches and gear, lifting points and towing gear) for filing.

Emmisions Certification k) Compile EPA certificates for all engines onboard.

Asbestos/Lead

Certification l) Asbestos-Free Survey/Certificate. Lead-Free Survey/Certificate.

26 High Classification /

Statutory

Barge Drawings

(Generation) Generate the following drawings:

X

a) General Arrangement

b) Structural arrangement

c) Foundation detail

d) Fendering arrangement

e) Electrical one-line Diagram (AC & DC)

f) 480V buss diagram

g) Tank Plan

h) 208V distribution

i) Up-river 240V distribution

j) Shore power connection drawing

k) Lighting arrangement

C D E F G H I J K

l) Docking Plan

m) Ladders, stairs, walkways and handrail arrangement

n) Manholes, hatches and access plate arrangement

o) Muster plan

p) Safety equipment plan

q) Fire and bilge drawing

r) Anchor and Mooring arrangement

s) Towing and pushing arrangement

t) Detailed lighting layout plan

u) Electrical distribution plan

v) Fire and smoke detection

w) Navigational lighting plan

x) Machinery cooling diagram

y) Fuel oil system diagram

z) Fills, vents and soundings diagram

aa) Fixed firefighting system diagram

bb) Bow thruster cable diagram update for new umbilical

27 High Environmental Bunkering Stations

SNAME (Design/Regulatory) – Design and manufacture new fueling station pipe and valve connections for installation inside both P & S spill containment boxes. Also, provide a 3” diameter x 6” tall stub pipe welded to deck plate over fuel oil sounding tubes/plugs with a threaded cap to protect sounding tube and plug from foul weather and deck equipment from being set on top of. Paint yellow as this could be a tripping hazard.

X X

28 High Maintenance Skin Coolers - Coolant

Replacement

Drain, flush and refill both P & S skin coolers with new 50/50 coolant (coolant spec. to follow John Deere

Requirements). This would include flushing of both engines (generator & bow thruster) and head tanks.

X X

29 High Navigation Navigation Lights Renewal

SNAME (Regulatory and electrical) - Upgrade of navigational running lights. Replace current running lights with

Perko commercial marine navigational LED lights. Replacement should include both port and starboard running lights on bow, flashing yellow light on bow, and a switchable stern light for towing located on stern at appropriate height. Provide navigational light control panel located in deck house. If LED can’t be provided for any of the lights please provide 2 spare bulbs per light and 1 spare O-ring cap seal per light and spare flasher for flashing yellow light. 12 or 24 volt DC tied into existing or upgraded DC electrical distribution system.

X X

30 High Navigation Anchoring System (Hold back and safety railing)

Engineering to produce build drawings - Fabricate and install new 2” heavy wall safety stanchions (designed and built to match 3” stanchion specifications in section 4) around anchor pocket fitted with three (3) levels of 3/8” stainless steel safety chain attached to shackle eyes on stanchion posts to protect from falls into anchor pocket.

(See supporting pictures)

X X

31 Medium Safety Main Deck Hatch SNAME (Structure/Load) - Replace main deck bolted hatch with a flush/hinged hydraulically powered doggable

(with T-handle key) from exterior cargo hatch as well as add a second non-powered hatch to port side of main deck to allow the stowage of AtoN gear and oil boom below deck and move weight aft to even out draft.

X X

32 Medium Safety Hull Internal grating and walkways

Engineering to produce drawings for build – Provide handrails, access steps and cross over cat walks in aft voids to existing raised catwalk walkway.

X X

33 Medium Classification /

Statutory

Void Hatches on deck -

Remove and provide deck plating

SNAME (Structure/Load) - Replace flush deck bolted access hatches to voids inboard of wing tanks along centerline of vessel (marked with a white X) with ¾” plate steel and backing stiffeners for integrity of deck structure. These bolted hatches are not required now after the addition of the quick acting escape hatches where added back in 2014 to these centerline spaces. These have become a maintenance issue over the years with their structural design of hand cups holding water and rotting out causing pinhole leaks into the space below. They just need to be eliminated from the deck and patched flush to equal or greater deck plate thickness filler plate. (See supporting pictures)

X X

34 Medium Classification /

Statutory

On-deck hatch replacements

SNAME (Structure/Load) - Replace two, bolted man-hole hatches (marked with a yellow X) with 24”x24” steel flush hinged 4-dog quick-acting water-tight hatch with a hand wheel on the inside and a T-handle slot on the topside equal/or better (Nabrico model no. DF-595-2424, Part # 93011 w/ exterior handle modification to T-handle slot). These hatches need to be fitted with a drain line ran to an overboard side shell scupper from the hinge pocket. These drains would prevent water/ice buildup preventing the hatch from being opened during freezing conditions. These lines may need an electric heat tracing circuit along the entirety to prevent them from freezing when ran through unheated spaces. These two hatches are located in: 1) forepeak (P & S) side access

(transducer location).

X X

35 Medium Classification /

Statutory

On-deck hatch replacements

SNAME (Structure/Load) - Replace all other 18”x24” flush bolted deck/void hatches (12 total) with equal or better (http://products.mcsllcusa.com/CT_DWG_303.html with ½” thick upgraded thick cover and hot dip galvanized finished cover and mounting ring. Additional backer bracing may need to be fitted to hatch cover to suit deck strength.

X X

36 Medium Classification /

Statutory Electrical Penetrations

Inspect all electrical penetrations that intersect watertight bulkhead or shell plate and repair or replace as needed.

X X http://products.mcsllcusa.com/CT_DWG_303.html http://products.mcsllcusa.com/CT_DWG_303.html http://products.mcsllcusa.com/CT_DWG_303.html http://products.mcsllcusa.com/CT_DWG_303.html

C D E F G H I J K

37 Medium Classification /

Statutory

Electrical Provision to fwd.

deck mooring winches

SNAME (Electrical) - Install 208V supply power to two (2) forward deck mooring winches. New wiring can be run through existing bulkhead penetrations up to winches. New penetration seals both internally and externally will need to be provided for bulkheads and deck fittings. 208V supply power can come off 208V power panel located in starboard hold.

X X

38 Medium Classification /

Statutory

Internal Structure

Markings SNAME (Documentation) - All major frames and bulkheads need to be labeled.

X X

39 Medium Navigation Wire Anchor winch -

Replacement

SNAME (Structure/Electrical/NA/Regulatory) - Replace wire rope anchor winch with new Schoellhorn-Albrecht

480V (or equal to), local controlled, 1-1/4” cable size 900’ capacity anchor windlass or equal. Old winch is non-repairable as the company no longer makes or provides replacement parts for repair or maintenance of that unit. Current winch does not allow for free-fall of anchor and is becoming impossible to provide maintenance on.

Steel foundation may need to be modified. (hotwork) (coatings)

X X

40 Medium Repair Buoy Ports

SNAME (Engineer load distribution) - Buoy port rehab – a) rebuild and rehab aft chain stoppers (replace angled transition plate with 1” solid plate welded to deck and vertical stiffeners). b) rehab or replace pipe cap at buoy port deck edge (Either fill in chain groove wear in cap with hardened weld or replace cap with hardened unit and machine or grind smooth)

X X

41 Medium Repair Internal Insulation Repair All internal bulkhead insulation needs to have seams taped to finish vapor barrier. X X

42 Medium Modifications On-deck Air System SNAME (Regulation) - Replace compressed air pipe and connection at base of crane pedestal with new manifold, quick connect fittings and exterior rated hose reel.

X X

43 Medium Modifications Deck House

Refurbishment

Paint Specification - Deck house floor deck needs to be mechanically abraded and primed and have a new poured epoxy floor installed. Deck house insulation around watertight door needs to be replaced and taped.

Then all bulkheads and overhead need to be painted. Three windows in forward part of deck house need to be replaced with solid pane, ½” thick, non-opening glass pane marine grade windows. Remove the aft window and replace with steel plate and insulate after coatings have been applied. Replace window wiper motor with new unit for starboard side forward window with new pantographic-arm wiper unit and controls on inside by thruster console.

X X

44 Medium Modifications Existing Deck Locker

Replacement

SNAME (Structure/Load) - Design and build larger deck locker with lockable water tight door under overhang at deck house. Remove and weld in filler plate for existing deck locker as this locker is directly in-line with cargo hatch and possess a safety hazard to personnel. Layout new locker utilizing old locker and new shelves for storage with new lighting and deck drains for wash-down of interior. Provide shelves, hooks and cabinets for deck rigging storage as well as damage control storage item cabinet.

X X

45 Medium Modifications

Internal Hull - Access

Grating, associated workshop upgrade

SNAME (Structure) - Replace all plywood decking in workshop/crew holds with solid fiberglass decking panels raised to the same height as transverse bilge beams. Remove existing work bench from under cargo hatch and install line hanging rods on bulkhead to provide a place to hang mooring lines to dry and be easily accessed through deck hatch by crane. Remove hose rack from overhead on port side of workshop and install new work bench in center where lockers are currently located. Storage lockers will be moved to the outboard side of the workshop with additional new storage shelving. New workbench will be built to a height to allow for storage cabinets to be installed below with air line connections, hose reel and electrical outlets located on vertical support beams to each side of work bench.

X X

46 Medium Modifications Fueling System

SNAME (Structure/Regulation) - Replace hand operated diesel fuel transfer pump in engine room with a rated

24V DC powered fuel pump supplying fuel deck fitting. At the new deck fitting located at the base of the crane pedestal, provide a lockable fuel pump switch, fuel shut-off valve, properly sized fuel oil containment at crane pedestal base and hose reel with 30 feet of fuel hose with auto shutoff fueling nozzle.

X X

47 Low Weight Control Removal of existing Air

Receivers

Will need to be documented for weight calculations - Remove two (2) old (original USACE) air receivers located in the port side center void below deck. These are for the old air ratchet spud system and are just extra weight we are pushing around.

X X

48 Low Modifications Internal Insulation

Removal Remove insulation from overhead of engine room on stbd side that is directly exterior of doghouse watertight door. This will allow for the heat from engine room to melt snow at the entry/exit point of doghouse.

X X

49 Low Modifications Deck Lighting Upgrade

Electrical - Install new LED deck lighting panels on exterior of barge. This would include new wiring from engine room panel supply to switching in deck house. New lighting on forward deck house exterior, crane pedestal, inside crane pedestal, and on two hinged poles at both aft corners of barge deck. Lighting specifications provided by owner.

X X

50 Low Modifications Internal Hull - Safe Access

SNAME (Structure/Load) Modify C/L bulkhead manway at frame ##, and bulkhead manways at frame ## both port and starboard to allow for 36” opening through those frame bulkheads. This will require cutting out old opening frame work and installing required structure to support bulkhead and vertical stiffeners to provide for a clear/safe access opening.

X X

51 Low Modifications Internal - landing platform in way of hatchways

SNAME (Structure/Load) - Below both new deck hatches build a suitable decking platform to handle weight of

AtoN chain, bridles, small buoy markers, rigging and oil boom. Provide a new support structure below and deck with solid panel FRP (non-skid) with side lips to prevent liquids from open hatch and gear from spilling into bilge.

C D E F G H I J K

52 Low Environmental Deck Scuppers - Renewal SNAME (Structure) - Replace 4 deck drain scuppers at buoy ports with new hot dip galvanized pipe and drain cups to match existing drain line size and having recessed cast bronze drain grates at deck level.

X X

53 Low HVAC HVAC - Exhaust Fan

Installation

SNAME (Structure/Regulatory) - Design and install new exhaust fan unit with exterior deck gooseneck vent for exhausting aft void spaces. Also, replace/rebuild exhaust vent fan for engine room located on main deck starboard side of doghouse.